| Pre‐Proposal | Conference | for | ||
| Repair | Apron | and | Trench | Drain |
| and | Install | Mooring | Points |
Solicitation
FA4621‐17‐R‐0003
Early Exchanges of Information
• This conference facilitates the prudent exchange of information between the Government and prospective Offerors.
• Any questions or concerns that may be discussed at this time are specifically non‐binding as only the CO can enter into obligations on behalf of the Government.
• If you have any questions concerning this notice, please feel free to ask the contract administrator.
Overview
• Identify key personnel and their responsibilities
• Solicitation & requirements overview
• Unique Government considerations
• Proposal requirements
• Conduct site visit
• Invite questions and answers
| Key | Gov’t | Personnel | & |
| Their | Responsibilities |
• Contracting Officer (CO) – The only person who can bind the Government – Ms. Valerie Brown
• Contract Administrator (CA) – CO’s assistant – Ms. Christina Muth/SrA Keith Marasigan
• Gov’t project engineer – Technical expert – Mr.
Jay McFarland
• Gov’t Inspector – Quality Assurance – will be assigned after award
Solicitation/Requirements
• Repair Apron and Trench Drain and Install Mooring Points
• Contract award contingent on funding
• Davis‐Bacon Act
• Wage Determination KS170020 01/06/2017 KS20 and
KS170035 01/06/2017 KS35
• Weekly Payroll
• Period of Performance (PoP) – 210 days (25 Apr 2017‐ 6 Dec 2017)
• Firm Fixed Price (FFP)
• 100% Total Small Business Set‐aside
• NAICS Code: 237310, Size Standard: $36.5M
Solicitation/Requirements
• Solicitation Package
• SF1442, Attachments, Provisions, and Clauses
• Attachment 1 – Price Schedule
• Attachment 2 – Statement of Work
• Attachment 3 – Specifications
• Attachment 4 – Drawings
• Attachment 5 – Schedule of Material Submittals
• Attachment 6 – Past Performance Questionnaire (PPQ)
• Attachment 7 – Wage Determination – KS170020
• Attachment 8 – Wage Determination – KS170035 6
Unique Considerations
• System for Award Management (SAM)
• FAR Clause 52.204‐7 – System for Award Management
• Wide Area Workflow (WAWF/iRAPT)
• 252.232‐7006 WIDE AREA WORKFLOW
PAYMENT INSTRUCTIONS
• Base Access Requests
• Attach 2: SOW, General Requirements Section, Para 1.04 CONTRACTOR/VENDOR ENTRY
REQUIREMENTS
Unique Considerations
• 52.222‐6 Construction – Wage
Requirements
• 52.211‐12 Liquidated Damages
• 52.236‐5 Material and Workmanship
• 52.246‐21 Warranty of Construction
Proposal Requirements
• Proposal Preparation/Instructions/Evaluation ‐ Section L & M (Subjective Tradeoff)
• Factor 1: Price
• Factor 2: Past Performance
• (Significantly more important than Price)
• Bonding Capability (20% / $3M)
• Proposals are due to this office
• NLT 2:00 PM local CST, 4 Apr 2017
• Late proposals not accepted 9
Proposal Requirements (cont’d)
• Amendments
• Only an amendment from the CO changes the solicitation
• Acknowledgement procedures‐(contractor must acknowledge to be binding)
• Requirement
• SOW (Attachment 2)
• Price Schedule (Attachment 1)
• Specifications (Attachments 3)
• Drawings (Attachments 4)
Conclusion
• Proposals are due to this office
• NLT 2:00 PM local CST, 4 April 2017
• Pre‐Proposal conference meeting minutes along with questions/answers will be provided via FBO.gov
• Questions?
• Final questions are due to this office: NLT 24 March 2017, 2:00 PM (NLT 10 Days prior to solicitation due date)
Next Up
• Review Solicitation
• Review Attachments
• Site Visit