Attch_1_-_Price_Schedule_(Revised).xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- FA4621-17-R-0003
About this file
Attachment 1 - Price Schedule
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FA4621-17-R-0003 |
| Repair Apron & Trench Drain & Install Mooring Points |
| Attachment 1 - Price Schedule |
| CLIN | Description | Quantity | Unit | Unit Price | Amount |
| 0001 | Reseal PCC pavement joints with non-sag silicone sealant in accordance with contract specifications & drawings. | 155,000 | LF | $ - 0 | |
| Route & seal PCC pavement cracks with non-sag silicone sealant in accordance with contract specifications & drawings. | 16,000 | LF | $ - 0 | ||
| Partial Depth Patch PCC pavement in accordance with contract specifications & drawings. | 1,500 | SY | $ - 0 | ||
| Full Depth Patch 12 inch thick PCC pavement in accordance with contract specifications & drawings. | 500 | SY | $ - 0 | ||
| Full Depth Patch 18 inch thick PCC pavement in accordance with contract specifications & drawings. | 70 | SY | $ - 0 | ||
| Replace 12” thick PCC 20 foot by 20 foot pavement panel/slab with 12” thick reinforced PCC slab in accordance with contract specifications & drawings. | 46 | EA | $ - 0 | ||
| Replace 18” thick PCC 20 foot by 20 foot pavement panel/slab with 18” thick PCC slab in accordance with contract specifications & drawings. | 2 | EA | $ - 0 | ||
| Repair Apron & Trench Drain Subtotal | $ - 0 |
| 0002 | Install Mooring Points | 1 | LO | $ - 0 |
| Install Mooring Points Subtotal | $ - 0 |
Repair Apron & Trench Drain and Install Mooring Points Grand Total $ - 0