About this file

Answers to RFP Past Performance Questions

Text of this file

FA3002-06-R-0003

Vance RFP Questions and Responses 6 Mar 07
IDRequest ForPerformancePage ReferenceParagraphAdditional
ProposalWork StatementReferenceCross Reference

122 Past Performance Section L 1.12 Discussion Question Section L., paragraph 1.12 instructs that pages should be one and one half spaced. Does that requirement extend to responses on Government Attachments that we complete, such as Attachment 8?

Response Spacing on Government-provided attachments need not comply with the one and one half spacing requirement.

80Past PerformanceSection L, page4.1.4
114

Discussion This section says that offerors may discuss efforts to resolve problems on prior contracts, but Section 4.1, Contents, does not provide direction for where in the Past Performance Volume offerors are to include this discussion.

Question Please clarify whether responses to Resolution of Problems should be addressed in the individual Past Performance Information Sheets or as a separate section within the Past Performance Volume.

Response Offerors should address Resolution of Problems (if applicable) within the Past Performance Volume. Create a separate tab within the volume, if required.

Tuesday, March 06, 2007 Page 1 of2

IDRequest ForPerformancePage ReferenceParagraphAdditional
ProposalWork StatementReferenceCross Reference
79Past PerformanceAttachment 8,H.
page 3

Discussion This Item requires discussion of the cited contract’s relevance to Mission Capability Subfactor 4, Small Business Subcontracting Plan and SDB Participation Targets. This would appear to duplicate the information requested in Items J and K.

Question Please clarify the distinction among each of the requirements:Item H., response to Subfactor 4Item J., Compliance with Utilization of Small Business ConcernsItem K., Subcontracting Plan requirements Response Item H deals with the contractor's assessment of past performance relevancy to the Mission Capability subfactors. Item J deals with the utilization of small business concerns on the described contract. Item K pertains to whether or not the offeror met subcontracting goals on the described contract.

78Past PerformanceAttachment 8,F.
page 5

Discussion Requirement: “For Government contracts, provide current information on all three individuals.” However, the format of the Past Performance Information Sheet only appears to require two points of contact (although three may be provided if one were to exercise the option to include the QA person and the Site Manager):1 Quality Assurance Person and/or Site Manager2 Administrative Contracting Officer.

Question Please clarify the number and titles of the customer points of contact required.

Response Two points of contact are sufficient. The RFP will be amended to reflect this change.

Tuesday, March 06, 2007 Page 2 of 2

Other files for this federal contract opportunity

Other files attached to Vance AFB Aircraft Maintenance and Base Operating Support (BOS) Services, newest first.
File Type Posted
FA3002-06-R-0003-0008.doc DOC document
0315VNCAircraftMaintenanceGFPVehiclesAppendix3FF12Sep07A0008.pdf PDF
1315VNCGroundsandSiteGFPVehiclesAppendix13FF23Aug07A0007.pdf PDF
0315VNCAircraftMaintenanceGFPVehiclesAppendix3FF23Aug07A0007.pdf PDF
0301PWSVNCAircraftMaintenancePWS23Aug07A0007.pdf PDF
summaryofchanges.doc DOC document
PlansAnnouncement.doc DOC document
0300VNCChangestoSection327Jan07A0003.pdf PDF
2100VNCChangestoAirfieldMgt27Mar07A0003.pdf PDF
1714VNCEnergyandUtilMgmtGFPADPEAppendix17FEA0004.pdf PDF
0300VNCChangestoSection328Jan07A0004.pdf PDF
1101VNCOMDescriptionsofServices11-1A0004.pdf PDF
0705AVNCCommunicationInformationWorkloadAppendix7BA29Mar07A0004. —
FA3002-06-R-0003-0004.doc DOC document
2500VNCChangestoTransportationA0004.pdf PDF
1700SummaryofChangesA0004.pdf PDF
0700VNCCommunications InformationServicesA0004.pdf PDF
VanceRFPQuestionsandResponses28Mar07FBO.doc DOC document
Attachment1 PWSSection2ApplicabletoAllServices.zip ZIP file
Attachment1 PWSSection24Fuels.zip ZIP file
Questioncutoffdate.doc DOC document
CBAinfo2.doc DOC document
VanceRFPQuestionsandResponses9Mar07.rtf RTF text file
05Pre-ProposalConference-PastPerformance.ppt PPT presentation
ServicesSiteVisit.ppt PPT presentation
sitevisitinfo.doc DOC document
0101VNCExpectationsSection1.pdf PDF
FA3002-06-R-0003 Atch8 Amend1.doc DOC document
1_24Fuels.zip ZIP file
1_21AirfieldManagement.zip ZIP file
1_03AircraftMaintance.zip ZIP file
FA3002-06-R-0003 Atch3.xls XLS spreadsheet
FA3002-06-R-0003 Atch4.doc DOC document
1_13GroundsandSite.zip ZIP file
FA3002-06-R-0003 Atch9.doc DOC document
FA3002-06-R-0003 Atch10.doc DOC document
CBA.pdf PDF
25Transportation.zip ZIP file
30Aug06VanceOfferorQuestions.doc DOC document
21AirfieldManagement.zip ZIP file
17EnergyandUtilityManagement.zip ZIP file
12SpaceManagement.zip ZIP file
15EngineeringServices.zip ZIP file
VanceIndustryDaySourceSelection29Mar06.zip ZIP file
SignIn.pdf PDF
VanceIndustryDayAllServices23Mar06.zip ZIP file
Energy Utility.zip ZIP file
CorrectiontoCommITSections.doc DOC document
AirfieldManagement.zip ZIP file
IndustryForum RegistrationForm.doc DOC document
Show all 50

Vance AFB Aircraft Maintenance and Base Operating Support (BOS) Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .