summaryofchanges.doc
DOC document 31 KB Posted
- Solicitation number
- FA3002-06-R-0003
About this file
Summary of Changes
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS Section/Appendices
| Paragraph |
| Description of Changes |
| 3-1 |
| Table 3.1.28.1 |
| Revised table (deleted and added inspection requirements) and added note 10. |
| 3, 11, 13, 23 and 24-FF |
| XFF.1 |
| Revised paragraph to read: “The contractor(s) will assume sole responsibility for all associated utilization costs of GFE vehicles, including: operations, maintenance and repair, and replacement. Please note: Per discussion above, the service provider is responsible for all cost (for example, but not limited to, tires, batteries, oil changes, repairs (engines and transmissions), etc) associated with the use of GFE vehicles. Also, all GFE vehicles shall be maintained IAW TO 36-1-191. See Appendix 25-FF for GFE vehicle removal schedule. |
3-A
Revised dated for AETC Supplements 21-101 and 21-303
3-BA
Revised FY08-FY14 Flying Hours
3-BE
Added Appendix (FY08 monthly flying hours)
| 6-B |
| 6B.6.3 |
| Added paragraph: Support HQ message, email and phone taskings: 60 - 70 taskings annually (180 – 200 annual labor hours (estimate)). |
| 7-1 |
| 7.1.3a.4, 7.1.3a.4.1 and 7.1.3a.4.3 |
| Revised. |
| 7-1 |
| 7.1.3a.4.4 |
| Reserved. |
| 7-2 |
| Service Delivery Summary |
| Revised. |
7-B
Revised.
25-FF
Added vehicle removal schedule.
File details come from the government source that posted it. Updated .