VanceCostModel-8-28-07.xls
XLS spreadsheet 4 MB Posted
- Attached to
- Vance AFB Aircraft Maintenance and Base Operating Support (BOS) Services Federal contract opportunity
- Solicitation number
- FA3002-06-R-0003
About this file
Updated Cost Model
View the file
Other files for this federal contract opportunity
Show all 50
Vance AFB Aircraft Maintenance and Base Operating Support (BOS) Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions, SchB
| These instructions apply to each SchB worksheet, basic and all option periods. | ||||
| DO NOT CHANGE ANY FORMULA ON ANY SHEET. | ||||
| DO NOT CHANGE THE POSITION OF ANY SHEET | ||||
| DO NOT DELETE ANY SHEET, OR ADD AN ADDITIONAL SHEEET. | ||||
| PLEASE ENSURE EACH YEAR'S SHEETS HAVE MATCHING TOTAL AMOUNTS. | ||||
| ALL ENTRIES YOU MAKE ARE TO BE MADE ONLY WITHIN THE BOXED AREAS. | ||||
| All amounts entered on this Excel Sch B (including Mobilization costs details) are to be fully supported | ||||
| and detailed by supporting schedules in the cost volume . | ||||
| THE FOLLOWING CLIN IS FIRM FIXED PRICE (NON-TARGET) | ||||
| UNIT | TOTAL | |||
| Mobilization/changeover | ||||
| Instructions: | ||||
| FOR FPIF CLIN OR SUBCLIN | Enter the Total Target Costs for the specific period. | |||
| Total Target Costs | Enter the total of the CLIN and SubCLIN Target Costs | |||
| Target Profit Rate | Enter the proposed profit percent to be applied to Total Target Costs, e.g., 20%. | |||
| Target Profit | Enter the Profit Amount (Target Profit Rate x Total Target Costs). | |||
| Target Price | Enter the sum of Total Target Costs and Target Profit. | |||
| Ceiling Price Rate | Enter percent applied to Total Target Costs; must be greater than 100% + Profit Rate. | |||
| Ceiling Price | Enter the Ceiling Price (Ceiling Price Rate x Total Target Costs). | |||
| Share Percentages | Government | Contractor | ||
| Overrun | Enter Govt/Contractor percent shares (summing 100%) for cost overruns. The contractor's share must be a minimum of 50% | |||
| Underrun | Enter Govt/Contractor percent shares (summing 100%) for cost underruns. The contractor's share must be a minimum of 50% | |||
| Award Fee Pool | $ 2,000,000.00 | The award fee pool is fixed. | ||
| (See Award Fee Plan (Atch X) for potential award fee for each contract period. | ||||
| To be paid semi-annually by ACO modification as determined by the FDO) | ||||
| EVALUATION MATRIX: | ||||
| TOTAL TARGET COSTS | $ - 0 | |||
| TOTAL TARGET PROFIT | $ - 0 | |||
| MOBILIZATION | ||||
| TOTAL EVALUATED PRICE | $ - 0 | |||
| AVERAGE POSSESSED (AP) ANNUAL ADJUSTMENT RATE (IAW Section B, para B-8). | ||||
| TAI adjustments are not subject to wage pass through adjustments. | ||||
| T-38C Adj Rate | Enter monthly total cost per aircraft for the contract period. | |||
| T-1A Adj Rate | Enter monthly total cost per aircraft for the contract period. | |||
| T-6 Adj Rate | Enter monthly total cost per aircraft for the contract period. | |||
| T-38C Adj Rate (IFF) | Enter monthly total cost per aircraft for the contract period. | |||
| FLYING HOUR ADJUSTMENT RATES | ||||
| The hourly adjustment rates shall include the functional areas for aircraft maintenance, supply and fuels-see Section B, para 9 and are not subject to wage pass through adjustments. | ||||
| T-38C Adj Rate | Enter direct labor cost per sortie, not an annual figure. | |||
| T-1A Adj Rate | Enter direct labor cost per sortie, not an annual figure. | |||
| T-6 Adj Rate | Enter direct labor cost per sortie, not an annual figure. | |||
| T-38C Adj Rate (IFF) | Enter direct labor cost per sortie, not an annual figure. | |||
| THE FOLLOWING CLIN's ARE UNFUNDED-COST REIMBURSABLE CLINS | Basic Period Amount Example. | |||
| Purchasing | Estimated | $ 15,000,000.00 | The amount is Estimated. | |
| Weekend/Holiday Flying | Estimated | $ 500,000.00 | The amount is Estimated. | |
| Wing Funded Services | Estimated | $ 50,000.00 | The amount is Estimated. | |
| These items will be funded by the ACO as required. | ||||
| ACRN: To be assigned on ACO modification | ||||
| THE FOLLOWING CLIN's ARE FUNDED-COST REIMBURSABLE CLINS | ||||
| Travel/Per Diem | Not To Exceed | |||
| THE FOLLOWING CLIN's ARE COST REIMBURSABLE ONLY | ||||
| No Overhead, G&A, or Profit will be paid in support of these CLINs. | ||||
| Travel/Per Diem rates shall not exceed those established in the Federal | ||||
| Joint Travel Regulation (in effect at the time of travel) for both travel | ||||
| and per-diem expenses. | ||||
| Basic Period Amount Example. | ||||
| Local Aircraft Recovery | NTE | $ 65,000.00 | The amount is not to exceed. | |
| Western Region Aircraft Recovery | NTE | $ 170,000.00 | The amount is not to exceed. | |
| A/C Maintenance Conferences, Seminars, Classes, Training, etc. | NTE | $ 35,000.00 | The amount is not to exceed. | |
| Supply/Fuels, Airfield Management (DO), Aviation Operation Support | NTE | $ 7,000.00 | The amount is not to exceed. | |
| Operations & Maintenance, Energy Management, Fire Protection, Custodial, Engineering Services, Site Management, Space Management. | NTE | $ 26,000.00 | The amount is not to exceed. | |
| Environmental Pollution Prevention, Environmental Compliance | NTE | $ 9,000.00 | The amount is not to exceed. | |
| Housing Management Operations | NTE | $ 2,000.00 | The amount is not to exceed. | |
| Information Technology, Pubs & Forms Management, Audio Visual | NTE | $ 10,000.00 | The amount is not to exceed. | |
| Supply, Transportation, Community Services, Local Purchase, Airfield Management (LG), Lodging | NTE | $ 28,000.00 | The amount is not to exceed. | |
| Civil Engineering Maintenance & Repair | NTE | $ 5,000.00 | The amount is not to exceed. | |
| Child Development Center/Youth Center | NTE | $ 8,000.00 | The amount is not to exceed. |
&CSCHEDULE B WORKSHEET
&CFOR OFFICIAL USE ONLY - SOURCE SELECTION INFORMATION&RFA3002-06-R-0003
Attachment 6 &D
Instructions, Wksht
| SCHEDULE B WORKSHEET | ||
| Mobilization, Basic and Options | Instructions: (All information provided will be by CLIN.) | |
| Total Labor Hours | Enter by CLIN. Subcontractors submitting a Cost Volume willl enter their hours. Prime enters all other hours. | |
| Manyears Priced | Subcontractors submitting a Cost Volume will enter their manyears. Prime enters all other manyears. | |
| Direct Labor Costs | Subcontractors submitting a Cost Volume will enter their labor cost. Prime enters all other labor costs. | |
| Other Direct Costs | ||
| Aircraft Maintenance: | ||
| Shop Supplies | Subcontractors submitting a Cost Volume will enter their shop supplies costs. Prime enters all other shop supplies costs. | |
| Tools | Subcontractors submitting a Cost Volume will enter their tools costs. Prime enters all other tools costs. | |
| Consumables | Subcontractors submitting a Cost Volume will enter their consumables costs. Prime enters all other consumables costs. | |
| Safety Equipment/Protective Clothing | Subcontractors submitting a Cost Volume will enter their safety equipment/protective clothing costs. Prime enters all other safety equipment costs. | |
| Licensing & Certification | Subcontractors submitting a Cost Volume will enter their licensing & certification costs. Prime enters all other licensing & certification costs. | |
| Uniforms | Subcontractors submitting a Cost Volume will enter their uniform costs. Prime enters all other uniform costs. | |
| OSHA Physicals & Drug Testing | Subcontractors submitting a Cost Volume will enter their OSHA physicals & drug testing costs. Prime enters all other OSHA physicals & drug testing costs. | |
| ODC Detail - Other Target Costs: | ||
| Insurance/Service Center | Subcontractors submitting a Cost Volume will enter their insurance/service center costs. Prime enters all other insurance/service center costs. | |
| Miscellaneous Expenses | Subcontractors submitting a Cost Volume will enter their miscellaneous expenses costs. Prime enters all other miscellaneous expenses costs. | |
| Management Incentive Plan/Awards | Subcontractors submitting a Cost Volume will enter their management incentive plan/awards costs. Prime enters all other management incentive plan/awards costs. | |
| Travel | Subcontractors submitting a Cost Volume will enter their travel costs. Prime enters all other travel costs. | |
| Equipment | Subcontractors submitting a Cost Volume will enter their equipment costs. Prime enters all other equipment costs. | |
| Communications | Subcontractors submitting a Cost Volume will enter their communications costs. Prime enters all other communications costs. | |
| Vehicles | Subcontractors submitting a Cost Volume will enter their vehicle costs. Prime enters all other vehicle costs. | |
| Misc Vendors | Subcontractors submitting a Cost Volume will enter their miscellaneous vendors costs. Prime enters all other miscellaneous vendors costs. | |
| All Other Dir Costs | Subcontractors submitting a Cost Volume will enter their O.D.C.'s. Prime enters all other O.D.C.'s. | |
| Subcontract Costs | Subcontractors submitting a Cost Volume will enter their subcontract costs. Prime enters all other subcontract costs. | |
| G&A | Subcontractors submitting a Cost Volume will enter their G&A costs. Prime enters all other G&A costs. | |
| Subtotal Cost = Target Costs | This is this CLIN's total of direct labor costs, vehicle costs, uniforms cost, O.D.C.'s and G&A costs. | |
| Profit = Target Profit | Subcontractors submitting a Cost Volume willl enter their profit amount. Prime enters all other profit amounts. | |
| Price = Target Price | This is this CLIN's total of target costs and profit. | |
| (1) | The Target Costs should match the amounts entered in the Sch B for these amounts for each respective period | |
| (2) | The Target Profit should match the amounts entered in the Sch B for these amounts for each respective period | |
| (3) | The Target Price should match the amounts entered in the Sch B for these amounts for each respective period | |
| If there is more than one subcontractor for a CLIN, combine their costs in column C of the worksheets. | ||
| Provide the worksheets on which you combined the costs for each subcontractor. | ||
| Be sure to include all subcontractors in all contract periods. |
&CSCHEDULE B WORKSHEET
&CFOR OFFICIAL USE ONLY - SOURCE SELECTION INFORMATION&RFA3002-06-R-0003
Attachment 6 &D
TOTAL Schedules
| PART I - THE SCHEDULE | TOTALS | |||
| SECTION B | ||||
| SUPPLIES/SERVICES AND PRICES/COSTS | ||||
| OFFEROR NAME: | ||||
| B-1. SUPPLIES AND SERVICES TO BE FURNISHED | ||||
| The contractor shall furnish all management, equipment, personnel and services necessary to perform aircraft | ||||
| maintenance and related services in supportof the 71st Flying Training Wing mission at Vance AFB OK, as | ||||
| set forth in the Performance Work Statement (PWS), identified as Attch 1. | ||||
| ITEM | DESCRIPTION | UNIT | TOTAL | SUBCLIN |
| THE FOLLOWING CLIN's ARE F.P.I.F. WITH PERFORMANCE INCENTIVES: | ||||
| TOTAL CONTRACT - 15 Feb 08 through 30 Sep 14 | MONTHLY | |||
| X001 | T-38C A/C Maintenance | $ - 0 | $ - 0 | |
| X002 | T-38C A/C Maintenance (Includes JEIM) (Introduction to Fighter Fundamentals) | $ - 0 | $ - 0 | |
| X003 | T-1A A/C Maintenance | $ - 0 | $ - 0 | |
| X004 | T-6 A/C Maintenance | $ - 0 | $ - 0 | |
| X005 | Other Target Cost-Aircraft Maintenance | $ - 0 | $ - 0 | |
| X006 | Life Support | $ - 0 | $ - 0 | |
| Target Costs (Aircraft Maintenance) | $ - 0 | $ - 0 | ||
| Target Profit Rate (A PERCENT of Target Costs, e.g. 20%) | 0.00% | |||
| Target Profit Amt. Aircraft Maintenance | $ - 0 | $ - 0 | ||
| Target Price Aircraft Maintenance | $ - 0 | $ - 0 | ||
| Ceiling Price Rate (Must be greater than 100% plus Target Profit Rate %, e.g. 125%) | The ceiling price is the maximum dollar amount for which the Government is liable. This factor should be expressed as a percentage of the target cost and must be higher than the target price. | |||
| Ceiling Price Amt(MUST BE GREATER THAN TARGET PRICE) | $ - 0 | |||
| Share Percentages for Cost Overruns and Underruns: | Government | Contractor | ||
| Overrun | ||||
| Underrun | ||||
| EVALUATED PRICE: | ||||
| Target Costs | $ - 0 | |||
| Target Profit | $ - 0 | |||
| Target Price | $ - 0 | |||
| EVALUATED PRICE (AIRCRAFT MAINTENANCE) | $ - 0 | |||
| Other Target Cost (OTC)-Base Operating Support (BOS) | UNIT | TOTAL | SUBCLIN | |
| X007 | OTC-Operations & Maintenance | $ - 0 | $ - 0 | |
| X008 | OTC-Fire Protection | $ - 0 | $ - 0 | |
| X008AA | Fire Protection Mgmt & Admin Support | $ - 0 | $ - 0 | |
| X008AB | Fire Protection Operations | $ - 0 | $ - 0 | |
| X008AC | Fire Prevention | $ - 0 | $ - 0 | |
| X009 | OTC-Custodial | $ - 0 | $ - 0 | |
| X010 | OTC-Real Property Mgmt & Engineering Services | $ - 0 | $ - 0 | |
| X010AA | Resources & Real Property | $ - 0 | $ - 0 | |
| X010AB | Engineering Management | $ - 0 | $ - 0 | |
| X010AC | Operations Flight Management | $ - 0 | $ - 0 | |
| X010AD | Utility & Energy Management | $ - 0 | $ - 0 | |
| X010AE | Furnishing Management Office | $ - 0 | $ - 0 | |
| X011 | OTC-Environmental Compliance | $ - 0 | $ - 0 | |
| X012 | OTC-Pest Control | $ - 0 | $ - 0 | |
| X013 | OTC-Pavement Clearance | $ - 0 | $ - 0 | |
| X014 | OTC-Refuse Collection & Disposal | $ - 0 | $ - 0 | |
| X015 | OTC-Grounds Maintenance & Landscaping | $ - 0 | $ - 0 | |
| X016 | OTC-Housing | $ - 0 | $ - 0 | |
| X016AA | Management | $ - 0 | $ - 0 | |
| X016AB | Services | $ - 0 | $ - 0 | |
| X017 | OTC-Supply | $ - 0 | $ - 0 | |
| X018 | OTC-Fuels | $ - 0 | $ - 0 | |
| X019 | OTC-Information Technology | $ - 0 | $ - 0 | |
| X019AA | Information Systems | $ - 0 | $ - 0 | |
| X019AB | Telephone Switchboard | $ - 0 | $ - 0 | |
| X019AC | Help Desk | $ - 0 | $ - 0 | |
| X019AD | Smart Net/NAF-T Maintenance | $ - 0 | $ - 0 | |
| X019AE | On Call Network Support | $ - 0 | $ - 0 | |
| X020 | OTC-Audio Visual | $ - 0 | $ - 0 | |
| X021 | OTC-Pubs & Forms Management | $ - 0 | $ - 0 | |
| X022 | OTC-Transportation | $ - 0 | $ - 0 | |
| X023 | OTC-Community Services | $ - 0 | $ - 0 | |
| X023AA | Bowling Center | $ - 0 | $ - 0 | |
| X023AB | Arts & Crafts | $ - 0 | $ - 0 | |
| X023AC | Auto Skills | $ - 0 | $ - 0 | |
| X023AD | Library | $ - 0 | $ - 0 | |
| X023AE | Fitness Center/HAWC | $ - 0 | $ - 0 | |
| X023AF | Outdoor Recreation | $ - 0 | $ - 0 | |
| X024 | OTC-Youth Programs (CDC/Youth Center) | $ - 0 | $ - 0 | |
| X024AA | Child Development Center | $ - 0 | $ - 0 | |
| X024AB | School Age Programs | $ - 0 | $ - 0 | |
| X024AC | Teen Center | $ - 0 | $ - 0 | |
| X025 | OTC-Purchasing | $ - 0 | $ - 0 | |
| X026 | OTC-Airfield Management (DO) | $ - 0 | $ - 0 | |
| X027 | OTC-Airfield Management (LG) | $ - 0 | $ - 0 | |
| X028 | OTC-Lodging | $ - 0 | $ - 0 | |
| X029 | OTC Dormitory Management | $ - 0 | $ - 0 | |
| X030 | OTC-GEOBASE Management | $ - 0 | $ - 0 | |
| X031 | Engineering (Sustainment) | $ - 0 | $ - 0 | |
| X032 | Electrical Distribution System | $ - 0 | $ - 0 | |
| X033 | Sewer/Waste Water System | $ - 0 | $ - 0 | |
| X034 | Water Distribution System | $ - 0 | $ - 0 | |
| X035 | Gas Distribution System | $ - 0 | $ - 0 | |
| TOTAL OTHER TARGET COST | $ - 0 | $ - 0 | ||
| TOTAL OTHER TARGET PROFIT (X%) of Target Costs) | 0.00% | |||
| Target Profit Amount | $ - 0 | $ - 0 | ||
| TOTAL OTHER TARGET PRICE | $ - 0 | $ - 0 | ||
| CEILING PRICE (XX% of Target Costs) | ||||
| Ceiling Price Amount | $ - 0 | |||
| SHARE FORMULA: Government/Contractor | Government | Contractor | ||
| Over Target (%) XX/XX | ||||
| Under Target (%) XX/XX | ||||
| EVALUATED PRICE: | ||||
| Target Costs | $ - 0 | |||
| Target Profit | $ - 0 | |||
| Target Price | $ - 0 | |||
| EVALUATED PRICE (OTHER TARGET COST) | $ - 0 | |||
| X036 | AWARD FEE POOL - NOT TO EXCEED | 1 LOT | $ 13,000,000.00 | |
| AVERAGE POSSESSED (AP) ADJUSTMENT RATE (IAW Section B, para B-8). Note: AP adjustments are not subject to wage pass through adjustments. | Monthly Rate | |||
| T-38C AP ADJUSTMENT RATE | ||||
| T-1 AP ADJUSTMENT RATE | ||||
| T-6 AP ADJUSTMENT RATE | ||||
| T-38C AP ADJUSTMENT RATE (IFF) | ||||
| FLYING HOUR ADJUSTMENT RATES | ||||
| The hourly adjustment rates shall include the functional areas for aircraft maintenance, supply and fuels-see Section B, para XX and are not subject to wage pass through adjustments. | Hourly Rate | |||
| T-38C FLYING HOUR ADJUSTMENT RATE | ||||
| T-1 FLYING HOUR ADJUSTMENT RATE | ||||
| T-6 FLYING HOUR ADJUSTMENT RATE | ||||
| T-38C FLYING HOUR ADJUSTMENT RATE (IFF) | ||||
| UNFUNDED - COST REIMBURSABLE CLINS | ||||
| X037 | LOCAL PURCHASE | Estimated | $ 97,500,000.00 | |
| X038 | WEEKEND/HOLIDAY FLYING | Estimated | $ 3,250,000.00 | |
| X039 | WING FUNDED SERVICES | Estimated | $ 325,000.00 | |
| FUNDED-COST REIMBURSABLE CLINS | ||||
| The following CLINs are cost reimbursable only. No overhead, G&A or Profit will be paid in support of these CLINs. Travel/Per-Diem rates shall not exceed those established in the Federal Joint Travel Regulation (in effect at the time of travel) for both | ||||
| X040 | TRAVEL/PER-DIEM | Not to Exceed | ||
| X040AA | LOCAL AIRCRAFT RECOVERY (IAW PWS SECTION X, PARA XXX) | 1 Lot | $ 422,500.00 | |
| X040AB | WESTERN REGION AIRCRAFT RECOVERY (PWS Section X, para XXXXX) | 1 Lot | $ 1,105,000.00 | |
| X040AC | AIRCRAFT MAINTENANCE CONFERENCES, SEMINARS, CLASSES, TRAINING ETC. | 1 Lot | $ 227,500.00 | |
| (IAW PWS Section X, para XXXXX) | ||||
| (Conferences, Seminars, Classes, Training, Etc...., for the | ||||
| following SubCLINs (0040AD - 0040AL), are IAW PWS | ||||
| Sections X-XX, and as specified under each functional area.) | Not to Exceed | |||
| X040AD | Supply/Fuels, Airfield Management (DO), Aviation Operation Support | 1 Lot | $ 45,500.00 | |
| X040AE | Operations & Maintenance, Energy Management, Fire Protection, Custodial, Engineering Services, Site Management, Space Management. | 1 Lot | $ 169,000.00 | |
| X040AF | Environmental Pollution Prevention, Environmental Compliance | 1 Lot | $ 58,500.00 | |
| X040AG | Housing Management Operations | 1 Lot | $ 1,000.00 | |
| X040AH | Information Technology, Pubs & Forms Management, Audio Visual | 1 Lot | $ 65,000.00 | |
| X040AJ | Supply, Transportation, Community Services, Local Purchase, Airfield Management (LG), Lodging | 1 Lot | $ 182,000.00 | |
| X040AK | Civil Engineering Maintenance & Repair | 1 Lot | $ 32,500.00 | |
| X040AL | Child Development Center/Youth Center | 1 Lot | $ 52,000.00 | |
| X041 | MOBILIZATION | $ - 0 | ||
| TOTAL AMOUNT TO BE FUNDED FOR PERFORMANCE PERIOD: | $ 116,435,500.00 | |||
| TOTAL BASIC CONTRACT VALUE WITHOUT AWARD FEE: | $ 103,435,500.00 | |||
| EVALUATED PRICE: | ||||
| TARGET COSTS | $ - 0 | |||
| TARGET PROFIT | $ - 0 | |||
| TARGET PRICE | $ - 0 | |||
| MOBILIZATION | $ - 0 | |||
| EVALUATED PRICE (AIRCRAFT MAINTENANCE and BOS) | $ - 0 |
&CSOURCE SELECTION INFORMATION
&A
&RFA3002-06-R-0003
&CFOR OFFICIAL USE ONLY
&R Attachment 6
Page &P of &N Pages &D
TOTAL Wksht
| SCHEDULE B WORKSHEET | ||||
| TOTAL CONTRACT | ||||
| OFFEROR NAME: | ||||
| TOTAL CONTRACT | PRIME | SUBCONTRACT** | Prime and Sub | **See Instructions |
| X001 | ||||
| ACRN | T-38C A/C Maint. | T-38C A/C Maint. | T-38C A/C Maint. | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Aircraft Maintenance: | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X002 | ||||
| ACRN | T-38C INTRO FGTR FND | T-38C INTRO FGTR FND | T-38C INTRO FGTR FND | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Aircraft Maintenance: | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X003 | ||||
| ACRN | T-1A A/C Maint. | T-1A A/C Maint. | T-1A A/C Maint. | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Aircraft Maintenance: | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X004 | ||||
| ACRN | T-6 A/C Maintenance | T-6 A/C Maintenance | T-6 A/C Maintenance | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Aircraft Maintenance: | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X005 | ||||
| Other Target Cost | Other Target Cost | Other Target Cost | ||
| ACRN | Aircraft Maintenance | Aircraft Maintenance | Aircraft Maintenance | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Aircraft Maintenance: | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X006 | ||||
| ACRN | Life Support | Life Support | Life Support | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Aircraft Maintenance: | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| Total | Total | Total | ||
| Aircraft Maint | Aircraft Maint | Aircraft Maint | ||
| CLINS | CLINS | CLINS | ||
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Aircraft Maintenance: | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| Base Operating Support | ||||
| X007 | ||||
| ACRN | Operations & Maint | Operations & Maint | Operations & Maint | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X008 | ||||
| ACRN | Fire Protection | Fire Protection | Fire Protection | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X008AA | ||||
| ACRN | Fire Protection Mgmt &Adm | Fire Protection Mgmt &Adm | Fire Protection Mgmt &Adm | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X008AB | ||||
| ACRN | Fire Protection Operations | Fire Protection Operations | Fire Protection Operations | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X008AC | ||||
| ACRN | Fire Prevention | Fire Prevention | Fire Prevention | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X009 | ||||
| ACRN | Custodial | Custodial | Custodial | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X010 | ||||
| ACRN | Real Property Mgmt & Engr | Real Property Mgmt & Engr | Real Property Mgmt & Engr | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X010AA | ||||
| ACRN | Resources & Real Property | Resources & Real Property | Resources & Real Property | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X010AB | ||||
| ACRN | Engineering Management | Engineering Management | Engineering Management | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X010AC | ||||
| ACRN | Operations Flight Mgmt | Operations Flight Mgmt | Operations Flight Mgmt | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X010AD | ||||
| ACRN | Utility & Energy Mgmt | Utility & Energy Mgmt | Utility & Energy Mgmt | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X010AE | ||||
| ACRN | Furnishing Mgmt Office | Furnishing Mgmt Office | Furnishing Mgmt Office | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X011 | ||||
| ACRN | Environmental Compliance | Environmental Compliance | Environmental Compliance | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X012 | ||||
| ACRN | Pest Control | Pest Control | Pest Control | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X013 | ||||
| ACRN | Pavement Clearance | Pavement Clearance | Pavement Clearance | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X014 | ||||
| ACRN | Refuse Collection & Disposal | Refuse Collection & Disposal | Refuse Collection & Disposal | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X015 | ||||
| ACRN | Grounds Maint & Landscape | Grounds Maint & Landscape | Grounds Maint & Landscape | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X016 | ||||
| ACRN | Housing | Housing | Housing | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X016AA | ||||
| ACRN | Management | Management | Management | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X016AB | ||||
| ACRN | Services | Services | Services | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X017 | ||||
| ACRN | Supply | Supply | Supply | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X018 | ||||
| ACRN | Fuels | Fuels | Fuels | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X019 | ||||
| ACRN | Information Technology | Information Technology | Information Technology | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - | $ - | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - | $ - | $ - 0 | |
| Tools | $ - | $ - | $ - 0 | |
| Consumables | $ - | $ - | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - | $ - | $ - 0 | |
| Licensing & Certification | $ - | $ - | $ - 0 | |
| Uniforms | $ - | $ - | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - | $ - | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - | $ - | $ - 0 | |
| Miscellaneous Expenses | $ - | $ - | $ - 0 | |
| Management Incentive Plan/Awards | $ - | $ - | $ - 0 | |
| Travel | $ - | $ - | $ - 0 | |
| Equipment | $ - | $ - | $ - 0 | |
| Communications | $ - | $ - | $ - 0 | |
| Vehicles | $ - | $ - | $ - 0 | |
| Misc Vendors | $ - | $ - | $ - 0 | |
| All Other Dir Costs | $ - | $ - | $ - 0 | |
| Subcontract Costs | $ - | $ - | $ - 0 | |
| G&A | $ - | $ - | $ - 0 | |
| Subtotal Cost | $ - | $ - | $ - 0 | |
| Profit | $ - | $ - | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X019AA | ||||
| ACRN | Information Systems | Information Systems | Information Systems | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X019AB | ||||
| ACRN | Telephone Switchboard | Telephone Switchboard | Telephone Switchboard | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X019AC | ||||
| ACRN | Help Desk | Help Desk | Help Desk | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X019AD | ||||
| ACRN | Smart Net/NAF-T Maint | Smart Net/NAF-T Maint | Smart Net/NAF-T Maint | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X019AE | ||||
| ACRN | On Call Network Support | On Call Network Support | On Call Network Support | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 | |
| ODC Detail - Other Target Costs: | ||||
| Insurance/Service Center | $ - 0 | $ - 0 | $ - 0 | |
| Miscellaneous Expenses | $ - 0 | $ - 0 | $ - 0 | |
| Management Incentive Plan/Awards | $ - 0 | $ - 0 | $ - 0 | |
| Travel | $ - 0 | $ - 0 | $ - 0 | |
| Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Communications | $ - 0 | $ - 0 | $ - 0 | |
| Vehicles | $ - 0 | $ - 0 | $ - 0 | |
| Misc Vendors | $ - 0 | $ - 0 | $ - 0 | |
| All Other Dir Costs | $ - 0 | $ - 0 | $ - 0 | |
| Subcontract Costs | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | $ - 0 | |
| Price | $ - 0 | $ - 0 | $ - 0 | |
| X020 | ||||
| ACRN | Audio Visual | Audio Visual | Audio Visual | |
| Total Labor Hours | 0.0 | 0.0 | 0.0 | |
| Manyears Priced | 0.0 | 0.0 | 0.0 | |
| Direct Labor Costs | $ - 0 | $ - 0 | $ - 0 | |
| Other Direct Costs | ||||
| Shop Supplies | $ - 0 | $ - 0 | $ - 0 | |
| Tools | $ - 0 | $ - 0 | $ - 0 | |
| Consumables | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment/Protective Clothing | $ - 0 | $ - 0 | $ - 0 | |
| Licensing & Certification | $ - 0 | $ - 0 | $ - 0 | |
| Uniforms | $ - 0 | $ - 0 | $ - 0 | |
| OSHA Physicals & Drug Testing | $ - 0 | $ - 0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .