Report 2177 PH B110 BFP PM 3-9-22.pdf

PDF 378 KB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This notice provides information regarding a future solicitation for base operations support services at Prospect Harbor Space Force Station in Maine. The Department of the Air Force will release a solicitation in January 2024 seeking a contractor to provide management, maintenance, logistics, security, and other base support services on a government owned, contractor operated basis. The requirement is set aside exclusively for small businesses and will utilize a best value source selection process. Offerors must register in the Procurement Integrated Enterprise Environment system, including the solicitation module, to submit proposals electronically in response to the solicitation when released.

View the file

Other files

File Type Posted
Report 1426 PH B104 Right OVHD PM 7-7-2020.pdf PDF
Report 657 PH B103 OVHD SC water getting in 7-10-18.pdf PDF
Report 655 PH B105 OVHD PM 7-10-18.pdf PDF
Report 1018 PH B106 OVHD PM 7-24-19.pdf PDF
Report 653 PH B104 OVHD Nr 1 PM 7-10-18.pdf PDF
Report 1016 PH B104 OVHD 1 PM 7-24-19.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1056 PH B102 roof Inspection PM 8-12-19.pdf PDF
Report 1824 PH B102 Inside Generator PM 5-19-21.pdf PDF
Report 2379 PH B102 Outside Generator PM 8-1-22.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B102 CO2 Fire Systm PM 2-15-19.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
Report 2066 PH B110 No Heat ESC 10-15-21.pdf PDF
PH B102 Inside Generator PM 11-28-18.pdf PDF
Report 1173 PH B103 Heat PM 9-27-19.pdf PDF
Report 2450 PH B110 Annual Heating Boiler Nr 1 PM 9-28-22.pdf PDF
Report 2452 PH B112 Annual Heating PM 9-30-22.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 2449 PH B105 Annual Heating PM 9-29-22.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 2447 PH B103 HVAC PM 9-28-22.pdf PDF
Report 1612 PH B101 Boiler Heat PM 9-30-20.pdf PDF
Report 1614 PH B104 Furnace Heat PM 9-30-20.pdf PDF
Report 1081 PH B102 outside Generator PM 8-22-18.pdf PDF
Report 1227 PH B102 Inside Generator PM 12-12-19.pdf PDF
Report 2201 PH B101 HVAC Condensor Side A 4-8-22.pdf PDF
Report 2199 PH B101 HVAC Air Handler Side A 4-13-24.pdf PDF
Report 2050 PH B101 HVAC Condensor Side B 9-30-21.pdf PDF
Report 2181 PH B110 Fire Alarm PM 3-9-22.pdf PDF
PH B105 Heat PM 9-18.pdf PDF
Report 2186 PH B112 BFP PM 3-9-22.pdf PDF
PH B104 Heat PM 9-18.pdf PDF
Report 1996 PH B112 Annual Heating PM 9-30-21.pdf PDF
Report 2368 PH Storage Tank Inspections 5-22.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1459 PH B112 BFP PM 6-30-20.pdf PDF
Report 2173 PH B102 CO2Fire System Panel SC 3-21-22.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 1610 PH B101 HVAC Compressor Nr 1 PM 10-8-20.pdf PDF
Report 1627 PH B103 HVAC PM 10-8-20.pdf PDF
Report 1608 PH B101 HVAC Air Handler Nr 1 PM 10-8-20.pdf PDF
Report 1609 PH B101 HVAC Air Handler Nr 2 PM 10-8-20.pdf PDF
Report 1682 PH B112 No heat ESC 1-22-21.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH B112 Hot Water Boiler 2-26-2021.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
PH B101 HVAC Air Handler Nr 2 PM 10-18.pdf PDF
20231215_Prospect_Harbor_One_on_One_Meeting_Questions.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

YES NO

YES NO

YES NO

MATERIALS USED

MAINTENACE & INSPECTION REPORT

(ONE FOR EACH PIECE OF EQUIPMENT)

WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?

EXPLAIN BELOW

HAVE NOT BEEN MET

(BELOW) FOR ADMINISTRATION USE ONLY

DATE IT WILL BE RECEIVED :

PROPER PPE BEING WORN

YES

CONTRACTOR: TECHNICIANS NAME:

LOCATION WEATHERBUILDING NAME or #

CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE

CONTRACT # ELIN # REPORT NO.

HAVE BEEN MET

DATE:

General Direct Condition Rating

TYPE OF EQUIPMENT MAKE MODEL

WORK DESCRIPTION & PROBLEMS FOUNDS

TIME TO COMPLETE TASK

IS INSPECTION CHECK LIST ATTACHED?

SAFETY REQUIREMENTS

WAS WORK COMPLETED?

IF NO EXPLAIN BELOW

General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)

N40085-17-D-7201

NO

HOUSE KEEPING COMPLETE

YES

NO

MAXIMO # Work Order #

Backflow Prevention Assembly

Test and Maintenance Report

Property Owner/Agent Prospect Harbor

Lighthouse Point Road

Prospect Harbor, ME

CCI Group, LLC

Property Access Derek McCaslin

(207)620-7172 x111

Owner/Agent Contact

March 09, 2022

526 Western Ave.

Augusta, ME 04430 Water Company

DomesticBldg #110 Date of InstallDevice Manufacturer Model Serial No.Size Type

Gauge Manufacturer Purchase DateModel Serial No.

909M1QTWatts 4335451 1/4"

New Install ?

Type

Location of Assembly Service Type-Class-Use

Next Date DueDate Calibrated

Meter/Acct #

Alarm Company Phone Reference Date/Time OnDate/Time Off

RPZ

CV Assembly

______psi ______psi

CHECK VALVE #1 CHECK VALVE #2

PRESSURE VACUUM

Leaked

R E

P A

IR

S

IN

IT

IA

L

T E

S T

F

IN

A L

T E

S T

Closed tight

Pressure drop across check valve

Closed tight

Leaked

Cleaned

Rubber Kit Disc

Opened at:

Did not open Did not open

Air inlet opened:

REPLACED

O-Ring Seat

Spring

Stem/Guide

Retainer

Locknuts

Other

Cleaned

Rubber Kit Disc

REPLACED

O-Ring Seat

Spring

Stem/Guide

Retainer

Locknuts

Other

Cleaned

Rubber Kit Disc

REPLACED

Diaphragm Seat

Spring Guide

O-Ring

Other

Cleaned

Air Inlet Disc

Inlet Spring

REPLACED

Diaphragm

CV Disc

Spring

Guide

Retainer

O-Ring

Other

Closed Tight Closed Tight

Opened at:

Satisfactory

Check held at:

OR OR OR

CV Assembly RV Assembly

Pressure drop across check valve

Pressure drop across check valve

Pressure drop across check valve

X X

LINE PRESSURE:CONTROL VALVE #2:RESULTS OF TEST: LeakedTight

DIFFERENTIAL PRESSURE

Leaked

FailPass

RELIEF VALVE BREAKER

_______psi

______psi ______psi ______psi

______psi ______psi

______psi

XX

9.0 1.6 4.3

I ACKNOWLEDGE THE CONTROL

VALVES HAVE BEEN LEFT IN THE

OPEN POSITION

Witness to Assembly Test (Print) Witness to Assembly Test Signature Date

APPROVALS

INITIAL

TEST

Certified Tester (Print) Certified Tester # Exp. DateCertified Tester Signature

Exp. DateCertified Tester #

FINAL

TEST

Barry Prescott #135

Barry Prescott #135

Date

DateCertified Tester (Print) Certified Tester Signature

I CERTIFY THAT THIS DATA IS ACCURATE AND RELECTS THE PROPER OPERATION AND MAINTENANCE OF THE ASSEMBLY

1990NEWWA 8/26/2024

8/26/20241990NEWWA

3/9/2022

3/9/2022

Print Date: 3/30/2022 Copyright 2002-2020 Life Safety Inspector, OnSite Software

Barry Prescott #135

200000047508Inspection Ref:

Conducted by:

Report of Inspection/Test

Property Owner/Agent

526 Western Ave.

Augusta, ME 04430

CCI Group, LLCProspect Harbor

Lighthouse Point Road

Prospect Harbor, ME

Annual Backflow Prevention Assemblies

Derek McCaslin

(207)620-7172 x111 Print Date: 3/30/2022

03/09/2022

Equipment Summary

Site

Description

Inspected Unable to

Inspect Serviced

Repaired Failed

%Qty%Qty%Qty%QtyQty

Backflow Prevention Assemblies Valve

RPZ (Reduced Pressure) 2 2 0 0100.0% 0.0% 0.0% 0 0.0%

Print Date: 3/30/2022 Copyright 2002-2020 Life Safety Inspector, OnSite Software

DATE: 3/9/2022
TYPE OF EQUIPMENTRow1: Backflow preventer
MAKERow1: Watts
MODELRow1: 909M1QT
TIME TO COMPLETE TASKRow1: .5
CONTRACTOR: Dean & Allyn, Inc.
TECHNICIANS NAME: Barry Prescott
LOCATIONRow1: Prospect Harbor
BUILDING NAME or Row1: #110
WEATHERRow1: Cool/overcast
General Direct Condition RatingRow1: Green +
General Direct Condition Rating Notes Explain Conditions found for the Rating given aboveRow1:
WILL MATERIALS NEED TO BE ORDERED HOW LONG IS THE LEED TIME EXPLAIN BELOW:
MATERIALS USEDRow1:
DATE IT WILL BE RECEIVED:
CCI SIGNATURERow1:
ELIN N4008517D7201: F002AQ
REPORT NON4008517D7201: 2177
REPORT NOWork Order:
MAXIMO Row1:
Work Order Row1:
REPORT NORow3:
Text1: Annual backflow preventer test. Replaced leaking first check valve assembly
Text2:
Check Box3: Yes
Check Box4: Off
Check Box5: Off
Check Box6: Yes
Check Box7: Yes
Check Box8: Off
Check Box9: Yes
Check Box10: Off
Check Box11: Yes
Check Box12: Off
Check Box13: Yes
Check Box14: Off

File details come from the government source that posted it. Updated .