This document provides details regarding a forthcoming solicitation for base operations support services at Prospect Harbor Space Force Station in Maine. The solicitation is expected to be released in January 2024 for a competitively awarded firm-fixed-price contract with a period of performance from October 2024 through September 2029. The contractor will be responsible for operating and maintaining the government-owned facility, including physical security, civil engineering, communications systems, logistics, and environmental compliance. Submission of proposals must be done through the Procurement Integrated Enterprise Environment Solicitation Module. This will be a 100% small business set-aside conducted using a subjective tradeoff best value evaluation.

View the file

Other files

File Type Posted
Report 1426 PH B104 Right OVHD PM 7-7-2020.pdf PDF
Report 657 PH B103 OVHD SC water getting in 7-10-18.pdf PDF
Report 655 PH B105 OVHD PM 7-10-18.pdf PDF
Report 1018 PH B106 OVHD PM 7-24-19.pdf PDF
Report 653 PH B104 OVHD Nr 1 PM 7-10-18.pdf PDF
Report 1016 PH B104 OVHD 1 PM 7-24-19.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1056 PH B102 roof Inspection PM 8-12-19.pdf PDF
Report 1824 PH B102 Inside Generator PM 5-19-21.pdf PDF
Report 2379 PH B102 Outside Generator PM 8-1-22.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B102 CO2 Fire Systm PM 2-15-19.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
Report 2066 PH B110 No Heat ESC 10-15-21.pdf PDF
PH B102 Inside Generator PM 11-28-18.pdf PDF
Report 1173 PH B103 Heat PM 9-27-19.pdf PDF
Report 2450 PH B110 Annual Heating Boiler Nr 1 PM 9-28-22.pdf PDF
Report 2452 PH B112 Annual Heating PM 9-30-22.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 2449 PH B105 Annual Heating PM 9-29-22.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 2447 PH B103 HVAC PM 9-28-22.pdf PDF
Report 1612 PH B101 Boiler Heat PM 9-30-20.pdf PDF
Report 1614 PH B104 Furnace Heat PM 9-30-20.pdf PDF
Report 1081 PH B102 outside Generator PM 8-22-18.pdf PDF
Report 1227 PH B102 Inside Generator PM 12-12-19.pdf PDF
Report 2201 PH B101 HVAC Condensor Side A 4-8-22.pdf PDF
Report 2199 PH B101 HVAC Air Handler Side A 4-13-24.pdf PDF
Report 2050 PH B101 HVAC Condensor Side B 9-30-21.pdf PDF
Report 2181 PH B110 Fire Alarm PM 3-9-22.pdf PDF
PH B105 Heat PM 9-18.pdf PDF
Report 2186 PH B112 BFP PM 3-9-22.pdf PDF
PH B104 Heat PM 9-18.pdf PDF
Report 1996 PH B112 Annual Heating PM 9-30-21.pdf PDF
Report 2368 PH Storage Tank Inspections 5-22.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1459 PH B112 BFP PM 6-30-20.pdf PDF
Report 2173 PH B102 CO2Fire System Panel SC 3-21-22.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 1610 PH B101 HVAC Compressor Nr 1 PM 10-8-20.pdf PDF
Report 1627 PH B103 HVAC PM 10-8-20.pdf PDF
Report 1608 PH B101 HVAC Air Handler Nr 1 PM 10-8-20.pdf PDF
Report 1609 PH B101 HVAC Air Handler Nr 2 PM 10-8-20.pdf PDF
Report 1682 PH B112 No heat ESC 1-22-21.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH B112 Hot Water Boiler 2-26-2021.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
PH B101 HVAC Air Handler Nr 2 PM 10-18.pdf PDF
20231215_Prospect_Harbor_One_on_One_Meeting_Questions.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

YES NO

YES NO

YES NO

MATERIALS USED

MAINTENACE & INSPECTION REPORT

(ONE FOR EACH PIECE OF EQUIPMENT)

WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?

EXPLAIN BELOW

HAVE NOT BEEN MET

(BELOW) FOR ADMINISTRATION USE ONLY

DATE IT WILL BE RECEIVED :

PROPER PPE BEING WORN

YES

CONTRACTOR: TECHNICIANS NAME:

LOCATION WEATHERBUILDING NAME or #

CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE

CONTRACT # ELIN # REPORT NO.

HAVE BEEN MET

DATE:

General Direct Condition Rating

TYPE OF EQUIPMENT MAKE MODEL

WORK DESCRIPTION & PROBLEMS FOUNDS

TIME TO COMPLETE TASK

IS INSPECTION CHECK LIST ATTACHED?

SAFETY REQUIREMENTS

WAS WORK COMPLETED?

IF NO EXPLAIN BELOW

General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)

N40085-17-D-7201

NO

HOUSE KEEPING COMPLETE

YES

NO

MAXIMO # Work Order #

4/5/2021

Backflow preventer Watts 909M1QT .5 Dean & Allyn, Inc. Barry Prescott

Prospect Harbor #110 Cool/drizzle Green +

Annual backflow preventer test

E002AQ 1849

x

Backflow Prevention Assembly

Test and Maintenance Report

Property Owner/Agent US Navy - Prospect Harbor - Bldg 110

Light House Point Road

Prospect Harbor, ME

CCI Group, LLC

Property Access Derek McCaslin

(207)620-7172 x111

Owner/Agent Contact

April 05, 2021

526 Western Ave.

Augusta, ME 04430 Water Company

Bldg #110 Date of InstallDevice Manufacturer Model Serial No.Size Type

Gauge Manufacturer Purchase DateModel Serial No.

909M1Watts 4335451-1/4"

New Install ?

Type

Location of Assembly Service Type-Class-Use

Next Date DueDate Calibrated

Meter/Acct #

Alarm Company Phone Reference Date/Time OnDate/Time Off

RPZ

CV Assembly

______psi ______psi

CHECK VALVE #1 CHECK VALVE #2

PRESSURE VACUUM

Leaked

R E

P A

IR

S

IN

IT

IA

L

T E

S T

F

IN

A L

T E

S T

Closed tight

Pressure drop across check valve

Closed tight

Leaked

Cleaned

Rubber Kit Disc

Opened at:

Did not open Did not open

Air inlet opened:

REPLACED

O-Ring Seat

Spring

Stem/Guide

Retainer

Locknuts

Other

Cleaned

Rubber Kit Disc

REPLACED

O-Ring Seat

Spring

Stem/Guide

Retainer

Locknuts

Other

Cleaned

Rubber Kit Disc

REPLACED

Diaphragm Seat

Spring Guide

O-Ring

Other

Cleaned

Air Inlet Disc

Inlet Spring

REPLACED

Diaphragm

CV Disc

Spring

Guide

Retainer

O-Ring

Other

Closed Tight Closed Tight

Opened at:

Satisfactory

Check held at:

OR OR OR

CV Assembly RV Assembly

Pressure drop across check valve

Pressure drop across check valve

Pressure drop across check valve

X X

LINE PRESSURE:CONTROL VALVE #2:RESULTS OF TEST: LeakedTight

DIFFERENTIAL PRESSURE

Leaked

FailPass

RELIEF VALVE BREAKER

_______psi

______psi ______psi ______psi

______psi ______psi

______psi

XX

9.2 1.6 4.5

I ACKNOWLEDGE THE CONTROL

VALVES HAVE BEEN LEFT IN

THE OPEN POSITION

Witness to Assembly Test (Print) Witness to Assembly Test Signature Date

APPROVALS

INITIAL

TEST

Certified Tester (Print) Certified Tester # Exp. DateCertified Tester Signature

Exp. DateCertified Tester #

FINAL

TEST

Barry Prescott #135

Barry Prescott #135

Date

DateCertified Tester (Print) Certified Tester Signature

I CERTIFY THAT THIS DATA IS ACCURATE AND RELECTS THE PROPER OPERATION AND MAINTENANCE OF THE ASSEMBLY

1990NEWWA 12/31/21

12/31/211990NEWWA

4/5/2021

4/5/2021