3ISRFP_Amend_Synopsis.docx

DOCX document 13 KB Posted

Attached to
Innovation, Integration, and Information (3IS) Support Contract Federal contract opportunity
Solicitation number
FA2550-08-R-8009(RFP)
Issued by
Department of the Air Force Space Command

About this file

3IS RFP Amendment Synopsis

View the file

Other files for this federal contract opportunity

Other files attached to Innovation, Integration, and Information (3IS) Support Contract, newest first.
File Type Posted
AttachL-5_Sample_Cover_Letter_for_Questonnaires.doc DOC document
3ISQuestionsAnswers_24Mar09.xls XLS spreadsheet
AttachL-4_PPQ.docm DOCM document
AttachL-1_StaffTable.xls XLS spreadsheet
AttachL-2_Position_Description_Format.doc DOC document
AttachL-7_Sample_Client_Authorization_Letter.doc DOC document
Final_RFP_Cover_Ltr_Signed.pdf PDF
AttachL-3_Present_Past_Perf_Info_ Rel_Matrix.xls XLS spreadsheet
CDRLS-DIDS_16Mar09.pdf PDF
AttachL-6_Sample_Consent_Letter.doc DOC document
FinalRFP-30Mar09.pdf PDF
Atch2 - DD 254.doc DOC document
MASTER RSVP LIST_1.xls XLS spreadsheet
3IS_Sect_C_PWS 24Mar09-1.pdf PDF
3ISQuestionsAnswers_20Apr09.xls XLS spreadsheet
PPQ_Subs.docx DOCX document
3ISQuestionsAnswers_15Apr09.xls XLS spreadsheet
3ISQuestionsAnswers_14Apr09.xls XLS spreadsheet
3IS Amendment01.pdf PDF
3IS_Sect_C_PWS7Apr09v1.docx DOCX document
3ISQuestionsAnswers_7Apr09.xls XLS spreadsheet
AttachL-4_PPQ.docm DOCM document
3IS Pre-Proposal Conf Attendees 3 Apr 09.pdf PDF
AttachL-2_Position_Description_Format.doc DOC document
3ISQuestionsAnswers_3Apr09.xls XLS spreadsheet
FinalRFP-3Apr09.pdf PDF
3IS_Sect_C_PWS3Apr09v1.docx DOCX document
FinalRFP-3Apr09.rtf RTF text file
Pre-proposalConfBrief 2 Apr 09.pdf PDF
FinalRFP-30Mar09.rtf RTF text file
AttachL-7_Sample_Client_Authorization_Letter_31Mar09.doc DOC document
AttachL-5_Sample_Cover_Letter_for_Questonnaires31Mar09.doc DOC document
Atch2 - DD 254 30 Mar 09.doc DOC document
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following 3IS Solicitation items have been amended:

· ODC amounts in both Section B and Table L-2 have been updated to reflect $0 ODCs for phase-in, and the correct amounts for the base period based on the current schedule (4.5 months).

· Section L, Para 2.3 has been updated to reflect Mountain Time vs. MST.

· Section L, Para 2.3 c & d have been updated to reflect that both paper and electronic copies should be sent to the cognizant DCAA/DCMA offices.

· Attachment L-2, Position Description, has been updated to eliminate secondary and tertiary duties.

· Attachment L-4, PPQ, numbering in Section 5, Elements V & VI has been updated.

· PWS Para 1.4.5.2.1.1 – “Support approximately fifteen (15) annual tests for the 17 TS” has been deleted. These tests are included in the 35 tests in PWS Para 1.4.5.2.1.3.

· PWS Table of Contents updated to reflect Para 1.5.14, Security.

· PWS Para 1.4.4.5.2.5 (pg 11) updated to reflect correct Para number 1.4.4.2.5.

· PWS Para 1.4.6.1.7.4 (pg 22) updated to reflect correct Para number 1.4.6.1.7.2.4.

· PWS Section B, Para numbers for items 3, 4, 5, and 7 have been updated.

File details come from the government source that posted it. Updated .