This document provides work load factor tables and standards for custodial services at Ascension Island Mission Services (AIMS). The tables list various tasks involved in AIMS and estimate workloads in units per year or month. Tasks include cost estimates, exercises, inspections, facility studies and projects, work orders, antennas, medical services, shipments, aircraft, vehicles and utility systems. Meeting frequencies and participants are outlined. Custodial standards for restrooms, floors, trash and grounds maintenance at Ascension Auxiliary Airfield are also defined. The related federal contract opportunity notice is for solicitation FA252119RA017 for AIMS services. The Government has provided all questions received from industry and the corresponding answers in response to the solicitation.
View the file
Other files for this federal contract opportunity
Show all 50
Ascension Island Mission Services (AIMS) Solicitation FA252119RA017 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIMS Work Load Factor Tables For Planning Purposes Only
14 June 2019
1.0 Work Load Factors
1.1 By Task
Table 1-1: List of Work Load Factors
TASK # WORK LOAD FACTOR
UNIT OF
MEASURE/FREQUENCY UNITS
UNIT
VARIANCE
1.7 Cost Estimate Changes Short notice budget drills / Per
year
10 +/- 10%
1.6 and 4.2
Ad Hoc Cost Data Requests
Ad hoc request/ Per year 200 +/- 10%
1.8 Range Tours Tours / Per Month 2 + / - 1
Hours / Per Tour 4 + / - 1
1.8 Wing Exercises Exercise Days / month 2 + / - 1
1.8 Wing Inspections
(ORI/UCI)
Inspections / Yr 10 + / - 1
Days / Per Inspection 2 + / - 5
4.1 Downrange Facility
Studies
Studies / Yr 4 + / - 1
4.2.4 Construction Procured
Contracts
Projects/ Yr 3-5 N/A
4.2.7 GIS Surveys Surveys / Yr 2 N/A
4.3 Downrange Facility
Projects Programming and Project Support
Facility Projects / Yr 8 + / - 3
4.3 and 4.4
Downrange Planned Work Orders
$ Planned work orders / Yr (labor only)
$500K + / - $50K
4.3 and 4.4
Downrange Direct Scheduled Work
Direct Scheduled Work / Occurrence
Less than 50 hrs NA
4.4 Work Plans Recurring Work Plans / Yr 3.5 N/A
2.6 TDY / Personnel TDY / Personnel AAAF / Yr 1040 +/- 10%
2.6 Permanent Party
Quarters
Quarters (Rooms) AAAF – 300 Quarters
N/A
2.5 Emergency Medical
Service Calls
Emergency Calls / Month 3 +/- 2
4.4 Antennas Number of Antennas Maintained
/ Yr
64 +/- 5
TASK # WORK LOAD FACTOR
UNIT OF
MEASURE/FREQUENCY UNITS
UNIT
VARIANCE
2.3 Distinguished Visitors Visitors / Yr 1-2 AAAF +/-1
Visitors / Group 1-2 AAAF
2.6 TDY lodging Lodging (Rooms) AAAF – 30
TDY lodging
N/A
2.6 TDY Trips Ascension: Estimated 1040 / Yr AAAF: 1040
TDY Trips / year
+/- 10%
2.3 and 4.3
Escort Services Visitors / Yr 800 +/- 10
2.5 Cash Reimbursable
Medical Services
$ / Yr Estimate:
AAAF -
$13,500 / Yr
+/- 10%
3.2 Combined Downrange
Shipments (Air)
Pallets of Cargo Per Every Other Week
8-10 pallets / every other wk of cargo
+/-15%
3.2 Downrange shipments
(Sea)
Sea Vans / Vessel Shipment, 5 Vessels / Year
50 +/- 10%
2.8 Total Aircraft Aircraft / Per Year AAAF 700 +/- 50
2.8 Transient Aircraft Aircraft / Per Year AAAF 12 +/- 10%
3.5.2.28 Vehicle Recovery Vehicle Callouts / Yr 10-15 +/- 10%
5.4.3.3 and 6.2.21.4.1
Circuit Line Record Cards Total CLRC 72 +/- 20% Maintained CLRC 72 +/- 20% Updated / Month 10 +/- 20% # Changes / Month 10 +/- 20%
6.2.21 Telephone Lines Telephone Records 676 +/- 20%
1.6.21 Hydroponics Growing Area to be Utilized
(square feet)
5500 sq ft +/- 500 sq ft
2.9 Tenant Support Labor Hours 3600/year +/- 20%
2.7.4 Lifeguard Services (Pool) Hours / Week Pool Will Have a Manned Lifeguard (Unmanned Remainder of the Year)
NTE 16 hrs / wk
N/A
6.2.17 Launch/Test Mission
Operations
Missions/ Per Year 2 +/- 2
6.2.21 Cable Records Total Fiber Lines: 624 Strands +/- 10%
Total Copper Lines: 7896 Pair
Total In Use Fiber Lines: 153 Strands
Total In Use Copper Lines: 1123 Pair
1.2 Meetings
Table 1-2: List of Meetings
Meeting Title Frequency Government Participants Objective
Ascension Systems, Projects, & Flt Schedules Status
Weekly 45 MSG/CC, Det
2/CC
Review status of projects, issues, actions, upcoming events impacting Ascension AAF
Range Schedule As Requested
RANS Detailed review of Range Schedule
CE Projects Status Weekly CES Review status of upcoming CE projects to understand impacts on communications infrastructure
CE Facility Review Weekly CES CEPT and/or 332 Review & Prioritization
Communications Corrective Action TIM
Bi-Weekly SCS/SCX, SCS/SCO SCS/SCX Status Meeting of open WOMS/Remedy (and other) projects
Downrange Construction Status
Bi-Weekly CES, Det 1 & 2 CCs Downrange Construction Status
Contractor Performance Feedback
Monthly OG/CC, CONS/CC, CONS/LGCZR, SCS/CC
Review status of program.
Government provides Ktr performance feedback.
Program Management
TIM
Monthly RANS Chief Engineer and RANS CORs
Monthly dialogue between regarding PWS Chapter 4 issues, concerns, and performance
Program Management Review
Weekly OG/CC, CONS/CC, CONS/LGCZR
Review status of AIMS program.
Government provides contractor performance feedback.
Communications TIM Monthly SCS/SCX, others by invitation
Review status of Communications projects, issues, actions, upcoming events
Downrange Customer Brief
Quarterly CES Downrange Customer Brief
Review of Airfield Status Quarterly Det 2/CC & Det 2 Air Field Manager
Review of Airfield Status
AIMS Tag-Up Bi-Monthly PMO, SCS, CES, FSS, OSS, MDG, Review of real-time activities being performed by AIMS contractor
1.3 Custodial Standards
Note: Ascension Auxiliary Airfield does not have any facilities that qualify for Prestige, Academic, etc.
AF COLS 3
METRIC DESCRIPTION
AND KEY
PERFORMANCE
INDICATORS
Clean restrooms twice per week
Level of service performed for restroom cleaning
Key Performance Indicators:
Yes No
Sweep and mop floors, vacuum carpet, and clean walk-off mats once every two weeks
Level of service performed for sweeping and mopping floors, vacuuming carpet, and cleaning walk-off mats
Conduct trash removal (centralized location only) once per week
Level of service performed for trash removal
Buff floors, maintain/strip floors, and shampoo carpets for emergency spot cleaning only as required
Level of service performed for buffing floors, maintaining/stripping floors, and shampooing carpets
Ascension (AAAF)
Maintain as Improved Grounds (Estimated at ~3 Acres total):
Strip of land between Facilities (Dorms) 12175 and 12176 Strip of land between Facilities (Dorms) 12142 and 12143 Strip of land between Facilities (Dorms) 12126 and 12127 Strip of land between Facilities (Dorms) 12177 and 12188 Strip of land in front of (North of) Facility (Dorm) 12141 Grassy areas around all the Modular Dorms Grassy areas around the Volcano Club (Facility 12103)
All other areas at Ascension are Unimproved.
NOTE: There will be requirements to remove Acacia plant if/when it encroaches on equipment and facilities.
AF COLS 3 DESCRIPTION OF REQUIREMENTS
IMPROVED
GROUNDS
Maintain irrigated grass at 2”-4” and non-irrigated grass at 2-5”; provide limited non-mowing maintenance solely for appearance purposes. Limit trimming and edging to DV, high visitor, memorial/flag parks, parade and fitness areas Limit irrigation system maintenance and fertilization to only DV, high visitor, memorial/parade/fitness areas, and limit lawn renovation to vehicle rut correction and erosion control as needed Limit leaf removal, debris removal, grounds policing to operational, safety, AT/FP, drainage problem and lawn disease prevention Limit pest/weed control to noxious or invasive species control Limit pruning of shrubs, hedges, and other vegetation to prevention of infrastructure damage, pest infestation and to comply with AT/FP standards
SEMI-IMPROVED
GROUNDS
Grass height maintained at 7-14” to match BASH standard; Limit trimming and edging to prevent infiltration of grates, equipment, other infrastructure and safety issues. Limit weed control to noxious or invasive species control appropriate to local region guidance
UNIMPROVED
GROUNDS
Control vegetation as necessary for safety, security, wildlife control and to minimize fire fuel (generally keep grass height at 10”-14”). Limit weed control to noxious or invasive species control appropriate to local region guidance
AIRFIELD GROUNDS
Maintain airfield grounds height between 7 and 14 inches in BASH areas. Follow AFI 91- 202, The US Air Force Mishap Prevention Program guidance. Maintain weed and pest control IAW BASH guidance.
SURFACE DRAINAGE
DITCHES
Maintain surface drainage ditches to be free of shrubs, trees, silt and trash to prevent erosion and ensure continuous flow of water
OTHER
REQUIREMENTS
Limit pruning or trimming trees, removal of trees and/or stumps for safety or AT/FP emergencies only, and discontinue planting of trees
No DV cuts provided; provide special cuts for emergency special events only
Provide maintenance of vegetative beds, inert beds, and related areas per 2008 LOS baseline limited to DV, high visitor and memorial areas only Discontinue planting of vegetative beds, inert beds, and related areas
| AIMS Work Load Factor Tables |
| 14 June 2019 |
| 1.0 Work Load Factors |
| 1.1 By Task |
| 1.3 Custodial Standards |
| Note: Ascension Auxiliary Airfield does not have any facilities that qualify for Prestige, Academic, etc. |
File details come from the government source that posted it. Updated .