Atch_6_Demo_IDIQ_Pricing_Sheet_Rev2.xlsx

XLSX spreadsheet 64 KB Posted

Attached to
Indefinite Quantity Indefinite Delivery (IDIQ) for Demolition Requirements, CCAFS, FL
Solicitation number
FA252118B0004
Issued by

About this file

Attachment 06 Demo IDIQ Pricing Sheet, Revision 2 2 pages, 5 Sep 18

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

First Year

IDIQ DEMOLITION PRICING SHEET (FIRST YEAR)SOLICITATION NUMBERDATE
TBD
PROJECT: DEMOLITION DIVISION 2
PROJECT NO.WORK ORDER NO.
N/A
ITEM DESCRIPTIONESTIMATED QUANTITYCOST
NO.UNITOLD
UNITSMEASPER UNITTOTALPER UNITPER UNITTOTAL
02 41 1300 0000SELECTIVE SITE DEMOLITION
02 41 1317 5000DEMOLISH, REMOVE PAVEMENT and CURBS
02 41 1317 5111Asphalt to 3" Thick300SY$ - 0$ 4.10$ 4.27$ (4.27)1286.8654729464$ (1,286.87)
02 41 1317 5121Asphalt 4" to 6" Thick200SY$ - 0$ 6.60$ 7.00$ (7.00)1382.1888413128$ (1,382.19)
02 41 1317 5131Asphalt 7" to 10" Thick200SY$ - 0$ 7.60$ 8.97$ (8.97)1591.4858022912$ (1,591.49)
02 41 1317 5141Asphalt 11" to 14" Thick200SY$ - 0$ 9.46$ 10.91$ (10.91)1978.996017172$ (1,979.00)
02 41 1317 5151Asphalt 15" to 18" Thick200SY$ - 0$ 11.32$ 12.86$ (12.86)2368.5784791912$ (2,368.58)
02 41 1317 5201Concrete to 6" Thick - Mesh Reinf5000SY$ - 0$ 10.86$ 11.55$ (11.55)56831.37777062$ (56,831.38)
02 41 1317 5301Concrete to 6" Thick - Rod Reinf500SY$ - 0$ 13.85$ 14.65$ (14.65)7247.684366554$ (7,247.68)
02 41 1317 5401Concrete 7" to 24" Plain200CY$ - 0$ 84.00$ 89.50$ (89.50)17580.9447221856$ (17,580.94)
02 41 1317 5501Concrete 7" to 24" Rein200CY$ - 0$ 115.50$ 122.00$ (122.00)24174.8351165744$ (24,174.84)
02 41 1317 6001Curbing, plain1000LF$ - 0$ 3.42$ 3.66$ (3.66)3574.62631374$ (3,574.63)
02 41 1317 6101Curb and Gutter, Concrete1000LF$ - 0$ 4.49$ 4.79$ (4.79)4693.639768476$ (4,693.64)
02 41 1317 6301Curb and Gutter, Bituminous200LF$ - 0$ 2.34$ 2.50$ (2.50)489.0503246624$ (489.05)
02 41 1317 6401Demo gravel driveway1875CY$ - 0$ 4.10$ 4.60$ (4.60)8042.909205915$ (8,042.91)
02 41 1323 2300DEMOLITION OF DRAINAGE STRUCTURE$ - 0$ - 0
02 41 1323 2301Concrete Pipe up to 12" Diameter200LF$ - 0$ 7.04$ 7.53$ (7.53)1473.3677154024$ (1,473.37)
02 41 1323 240112"< Concrete Pipe < 15" Diameter200LF$ - 0$ 16.45$ 17.15$ (17.15)3442.0024968824$ (3,442.00)
02 41 1323 250115"< Concrete Pipe < 24" Diameter200LF$ - 0$ 20.65$ 21.40$ (21.40)4322.7075307024$ (4,322.71)
02 41 1323 260124" < concrete Pipe <36" Diameter200LF$ - 0$ 27.55$ 28.55$ (28.55)5767.0637861672$ (5,767.06)
02 41 1323 2801Concrete Pad500SY$ - 0$ 8.24$ 8.23$ (8.23)4310.274047872$ (4,310.27)
02 41 1323 2901Catch Basin/Manhole5EA$ - 0$ 177.00$ 188.50$ (188.50)926.1390523294$ (926.14)
02 41 1330 3000SELECTIVE DEMOLITION$ - 0$ - 0
02 41 1330 3001Wood Decking, including Framing600SF$ - 0$ 1.90$ 2.02$ (2.02)1193.6143517184$ (1,193.61)
02 41 1330 3011Wood Friction Piles700VLF$ - 0$ 9.50$ 8.17$ (8.17)6962.750385024$ (6,962.75)
02 41 1330 3021Above Ground Piping, 1/2” to 6” Diameter, Including Supports400LF$ - 0$ 2.00$ 2.12$ (2.12)837.1878439136$ (837.19)
02 41 1330 3031Above Ground Piping, 7” to 12” Diameter, Including Supports200LF$ - 0$ 2.85$ 3.02$ (3.02)596.8071758592$ (596.81)
02 41 1330 3041UG Piping, Beyond 5’ From Building Perimeter, 1/2” to 6” Diameter, no excavation200LF$ - 0$ 4.75$ 5.04$ (5.04)994.678626432$ (994.68)
02 41 1330 3051UG Piping, Beyond 5’ From Building Perimeter, Greater Than 6” Diameter, no excavation200LF$ - 0$ 9.30$ 9.86$ (9.86)1945.8400629576$ (1,945.84)
02 41 1330 3061Fire Hydrant & Valve5EA$ - 0$ 1,063.00$ 1,122.00$ (1,122.00)5562.066738001$ (5,562.07)
02 41 1330 3071Duct Bank, Reinforced Concrete100CY$ - 0$ 19.66$ 20.84$ (20.84)2057.7414084312$ (2,057.74)
02 41 1330 3081Fencing, Wood200LF$ - 0$ 1.44$ 1.54$ (1.54)300.475835068$ (300.48)
02 41 1330 3091Pits with Metal Covers5EA$ - 0$ 156.35$ 165.00$ (165.00)818.0713640619$ (818.07)
02 41 1330 4001Masonry Wall3600CF$ - 0$ 1.92$ 2.08$ (2.08)7236.2870072928$ (7,236.29)
02 41 1330 5001Steel Tower (Comm./camera towers, angle or tubular steel, galvanized/inorganic zinc/alum) Max height of 200' and average weight of 5 Tons.900TON$ - 0$ 61.00$ 0.83$ (0.83)57452.0157885708$ (57,452.02)
02 41 1330 6001Electrical Switch/Panel Hookups/Equipment20EA$ - 0$ 114.00$ 101.00$ (101.00)2385.9853551538$ (2,385.99)
02 41 1330 6011Floodlight, Low Pressure Sodium5EA$ - 0$ 198.00$ 21.00$ (21.00)1036.0199568431$ (1,036.02)
02 41 1330 6021Floodlight, Mercury Vapor5EA$ - 0$ 198.00$ 22.50$ (22.50)1036.0199568431$ (1,036.02)
02 41 1330 7001Remove large capacity surge pumps3EA$ - 0$ 9,300.00$ 31.50$ (31.50)29196.9260564868$ (29,196.93)
02 41 1360 2000REMOVE WIRE FENCING$ - 0$ - 0
02 41 1360 2001Barbed Wire to 5 Strand500LF$ - 0$ 1.90$ 2.03$ (2.03)994.678626432$ (994.68)
02 41 1360 2011Chain Link to 10' High, post & fabric without foundation500LF$ - 0$ 2.78$ 2.95$ (2.95)1455.753614726$ (1,455.75)
02 41 1360 2031Chain Link to 8’ Height Including Posts & Foundation500LF$ - 0$ 3.09$ 3.31$ (3.31)1616.352767952$ (1,616.35)
02 41 1360 2041Demo Gates,10-12' wide8EA$ - 0$ 77.50$ 82.50$ (82.50)648.8620239758$ (648.86)
02 41 1613 1300BUILDING DEMOLITION -EXCL SALVAGE, FOUNDATION DEMO OR DUMP FEES$ - 0$ - 0
02 41 1613 1321Wood Frame, CF volume of inside structure50000CF$ - 0$ 0.29$ 0.31$ (0.31)27794.01474379$ (27,794.01)
02 41 1613 1351Reinforced Masonry, CF volume of inside structure92500CF$ - 0$ 0.30$ 0.31$ (0.31)15541.853538$ (15,541.85)
02 41 1613 1361Reinforced Concrete, CF volume of inside structure50000CF$ - 0$ 0.38$ 0.39$ (0.39)19686.3478148$ (19,686.35)
02 41 1613 1371Metal (Steel), CF volume of inside structure50000CF$ - 0$ 0.27$ 0.29$ (0.29)13987.6681842$ (13,987.67)
02 41 1617 1031Concrete, 25” to 48” Thick, Reinforced100CY$ - 0$ 85.00$ 90.11$ (90.11)8895.120841582$ (8,895.12)
02 41 1617 1041Concrete, 49” to 72” Thick, Reinforced100CY$ - 0$ 95.00$ 100.71$ (100.71)9941.605646474$ (9,941.61)
02 41 1617 17112' Wide X 1' Thick Footing600LF$ - 0$ 11.50$ 9.64$ (9.64)7223.8535244624$ (7,223.85)
02 41 1617 17213' Wide X 2' Thick Footing600LF$ - 0$ 19.70$ 16.57$ (16.57)12371.315416248$ (12,371.32)
02 41 1617 1731Walls, Masonry or Concrete, Solid Including Foundation6000SF$ - 0$ 0.95$ 1.17$ (1.17)5968.071758592$ (5,968.07)
02 41 1617 1741Walls, Masonry, Cavity including Foundation6000SF$ - 0$ 0.79$ 0.97$ (0.97)4973.39313216$ (4,973.39)
02 41 1617 1751Concrete, 7” to 24” Thick, Plain200CY$ - 0$ 57.00$ 60.43$ (60.43)11929.9267757688$ (11,929.93)
02 41 1617 1000DEMO SOG$ - 0$ - 0
02 41 1617 1001Slab on Grade - Plain200CY$ - 0$ 77.00$ 89.50$ (89.50)16115.8659953368$ (16,115.87)
02 41 1617 1011Slab on Grade - Mesh Reinf.200CY$ - 0$ 104.50$ 110.78$ (110.78)21872.568545812$ (21,872.57)
02 41 1617 1021Slab on Grade - Rod Reinf.200CY$ - 0$ 138.50$ 122.00$ (122.00)28988.6652190776$ (28,988.67)
02 41 1617 1700BUILDING DEMO FOOTINGS AND FOUNDATION WALLS$ - 0$ - 0
02 41 1920 2000SELECTIVE DEMOLITION, DUMP CHARGES$ - 0$ - 0
02 41 1920 2001Disposal and Dump Fees10TON$ - 0$ 95.00$ 79.00$ (79.00)994.1605646474$ (994.16)
02 41 1925 1000SELECTIVE DEMOLITION, SAW CUTTING$ - 0$ - 0
02 41 1925 1001Saw Cut Asphalt 1"-6"200LF$ - 0$ 1.18$ 1.22$ (1.22)246.5974094696$ (246.60)
02 41 1925 1011Saw Cut Asphalt 7"-10"200LF$ - 0$ 5.20$ 5.98$ (5.98)1087.92974766$ (1,087.93)
02 41 1925 1021Saw Cut Asphalt 11"-14"200LF$ - 0$ 9.22$ 9.38$ (9.38)1929.2620858504$ (1,929.26)
02 41 1925 1031Saw Cut Asphalt 15"-18"200LF$ - 0$ 11.23$ 11.42$ (11.42)2349.9282549456$ (2,349.93)
02 65 1030 10190UNDERGROUND STORAGE TANK REMOVAL (FIBERGLASS/STEEL)$ - 0$ - 0
02 65 1030 101913000 gal to 5000 gal tank1EA$ - 0$ 449.50$ 460.50$ (460.50)470.4001004168$ (470.40)
02 65 1030 101916000 gal tank to 8000 gal tank1EA$ - 0$ 750.00$ 740.00$ (740.00)784.863603669$ (784.86)
02 65 1030 101919000 gal to 12000 gal tank1EA$ - 0$ 1,120.00$ 1,115.00$ (1,115.00)1172.062981479$ (1,172.06)
02 65 1030 10191Remove Residual Fuel, Diesel Or Gas200GAL$ - 0$ 0.22$ 0.22$ (0.22)45.5894370448$ (45.59)
02 65 1030 10191Remove & Dispose Contaminated Soil10CY$ - 0$ 245.50$ 241.50$ (241.50)2569.1720021883$ (2,569.17)
02 82 1343 2200BULK ASBESTOS REMOVAL$ - 0$ - 0
02 82 1343 2201Boiler Asbestos Insulation200SF$ - 0$ 5.81$ 5.80$ (5.80)1216.4090702408$ (1,216.41)
02 82 1343 2211Exterior of Duct Insulation, Pre-clean Remove, Bag and Dispose of at Landfill200SF$ - 0$ 1.50$ 1.15$ (1.15)314.9815650368$ (314.98)
02 82 1343 2221Remove Entire Duct With insulation, Pre-clean, Remove, Bag and Dispose of at Landfill200SF$ - 0$ 2.75$ 3.12$ (3.12)576.0847044752$ (576.08)
02 82 1343 22311/2” Thru 4” Size of Pipe Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose of at Landfill200LF$ - 0$ 5.75$ 3.04$ (3.04)1203.9755874104$ (1,203.98)
02 82 1343 2241Pipe 4" to 8" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 5.84$ 3.43$ (3.43)1222.625811656$ (1,222.63)
02 82 1343 2251Pipe 10" to 12" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 6.33$ 3.92$ (3.92)1324.1659214376$ (1,324.17)
02 82 1343 2261Pipe 14" to 16" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 8.13$ 4.97$ (4.97)1701.3149006264$ (1,701.31)
02 82 1345 4500OSHA TESTING$ - 0$ - 0
02 82 1345 4501Air Monitoring & Testing10DAY$ - 0$ 750.00$ 355.00$ (355.00)7848.63603669$ (7,848.64)
02 82 1345 4502RCRA8 Heavy Metals Report2EACH$ - 0$ 224.00$ 260.78$ (260.78)514.8705240069$ (514.87)
02 82 1345 4503TCLP Testing2EACH$ - 0$ 600.00$ 636.05$ (636.05)1255.7817658704$ (1,255.78)
02 82 1345 4504Final Field Tech Report1DAY$ - 0$ 1,100.00$ 1,166.10$ (1,166.10)1151.1332853812$ (1,151.13)
02 83 19 2600LEAD BASED PAINT REMEDIATION$ - 0$ - 0
02 83 19 2601Scraping500SF$ - 0$ 7.91$ 7.72$ (7.72)4139.313658954$ (4,139.31)
02 83 19 2611Chemical Removal500SF$ - 0$ 4.84$ 4.57$ (4.57)2533.322126694$ (2,533.32)
02 83 19 2621Lead Base Paint Encap.500SF$ - 0$ 0.98$ 1.04$ (1.04)512.881166754$ (512.88)
02 83 19 2631Doors5000SF$ - 0$ 0.75$ 4.62$ (4.62)3937.26956296$ (3,937.27)
02 83 19 2641Walls, Ceilings, Etc.15000SF$ - 0$ 0.20$ 0.85$ (0.85)3108.3707076$ (3,108.37)
02 83 19 2651Windows5000LF$ - 0$ 0.75$ 0.63$ (0.63)3937.26956296$ (3,937.27)
09 91 03 9000RESTORATION & TOUCH UP$ - 0$ - 0
09 91 03 9001Prep & Paint Gypsum wall1000SF$ - 0$ 0.74$ 0.79$ (0.79)777.0926769$ (777.09)
09 91 03 9011Prep & Paint Masonry, Concrete, Stucco Wall1000SF$ - 0$ 1.27$ 1.32$ (1.32)1326.238168576$ (1,326.24)
09 91 03 9021Prep & Paint Metals1000SF$ - 0$ 1.49$ 1.59$ (1.59)1554.1853538$ (1,554.19)
10 91 03 9031Restoration of CMU1000SF$ - 0$ 5.50$ 5.79$ (5.79)5720$ (5,720.00)
11 91 03 9041Restoration of Concrete1000SF$ - 0$ 5.25$ 5.53$ (5.53)5460$ (5,460.00)
12 91 03 9051Restoration of Wood Construction1000SF$ - 0$ 4.40$ 4.64$ (4.64)4576$ (4,576.00)
13 91 03 9061Restoration of Steel Construction1000SF$ - 0$ 4.80$ 5.06$ (5.06)4992$ (4,992.00)
22 05 0510 1000REMOVE PVC SERVICE LINES (NOTE: THESE UTILITY LINES MAY BE FOR POTABLE WATER, SEWER, OR STORM WATER DRAINAGE. PRICE TO INCLUDE TERMINATING AND CAPPING AT SERVICE MAIN)$ - 0$ - 0
22 05 0510 1001Up To 1-1/2" Pipe Diameter200LF$ - 0$ 2.22$ 1.53$ (1.53)464.1833590016$ (464.18)
22 05 0510 10212"< Pipe Diam. < 3"200LF$ - 0$ 2.59$ 1.91$ (1.91)542.9287502608$ (542.93)
22 05 0510 10314" < Pipe Diam < 6"200LF$ - 0$ 4.31$ 3.44$ (3.44)901.427505204$ (901.43)
22 05 0510 10418" < Pipe Diam < 14"200LF$ - 0$ 5.62$ 4.59$ (4.59)1177.0363746112$ (1,177.04)
22 05 0510 1051Pipe Diam 16"200LF$ - 0$ 8.05$ 6.85$ (6.85)1684.7369235192$ (1,684.74)
22 05 0510 1100REMOVE CONCRETE, TRANSITE, RCP, TERRA COTTA CLAY SERVICE LINES (NOTE: THESE UTILITY LINES MAY BE FOR POTABLE WATER, SEWER, CHILL WATER, OR STORM WATER DRAINAGE. PRICE TO INCLUDE TERMINATING AND CAPPING AT SERVICE MAIN)$ - 0$ - 0
22 05 0510 110112" Pipe Diameter200LF$ - 0$ 8.04$ 7.53$ (7.53)1682.6646763808$ (1,682.66)
22 05 0510 111115"< Pipe Diam. < 18"200LF$ - 0$ 17.95$ 17.15$ (17.15)3756.9840619192$ (3,756.98)
22 05 0510 112121" < Pipe Diam < 24"200LF$ - 0$ 22.15$ 21.40$ (21.40)4635.6168486008$ (4,635.62)
22 05 0510 113127" < Pipe Diam < 36"200LF$ - 0$ 29.30$ 28.55$ (28.55)6131.7792825256$ (6,131.78)
22 05 0510 1141Steel Welded Connection, 4" Diameter200LF$ - 0$ 8.99$ 8.23$ (8.23)1881.6004016672$ (1,881.60)
22 05 0510 1151Steel Welded Connection, 10" Diameter200LF$ - 0$ 16.67$ 16.52$ (16.52)3489.6641810656$ (3,489.66)
22 07 1910 1000RE-INSULATION OF ABATED PIPES$ - 0$ - 0
22 07 1910 1001< 4" PIPES200LF$ - 0$ 5.92$ 6.75$ (6.75)1239.2037887632$ (1,239.20)
22 07 1910 1061> 4" - < 8" PIPES200LF$ - 0$ 9.75$ 11.30$ (11.30)2041.163431324$ (2,041.16)
22 07 1910 1101> 8" - < 12" PIPES200LF$ - 0$ 11.85$ 13.65$ (13.65)2480.4798246648$ (2,480.48)
23 05 0210 1000SELECTIVE DEMOLITION FOR HVAC$ - 0$ - 0
23 05 0210 1011HVAC - Remove A/C-to 3 Ton5EA$ - 0$ 350.00$ 360.00$ (360.00)1831.348408561$ (1,831.35)
23 05 0210 1021HVAC - Remove A/C-3 to 10 Ton5EA$ - 0$ 995.00$ 1,054.79$ (1,054.79)5206.2619043377$ (5,206.26)
23 05 0210 1031HVAC - Remove Boiler5EA$ - 0$ 645.00$ 665.00$ (665.00)3374.9134957767$ (3,374.91)
23 05 0210 1041HVAC - Remove Water Heater5EA$ - 0$ 61.50$ 63.50$ (63.50)321.8199805935$ (321.82)
31 23 1642 4200EXCAVATING, BULK BANK MEASURE$ - 0$ - 0
31 23 1642 4201Fill and Compact 6" Lifts1000SY$ - 0$ 4.50$ 4.58$ (4.58)4714.36223986$ (4,714.36)
31 23 1642 4401Fill Dirt1000CY$ - 0$ 3.50$ 4.19$ (4.19)3667.877434968$ (3,667.88)
31 23 1642 4601Bulk Excavation1000CY$ - 0$ 3.40$ 4.30$ (4.30)3553.903842356$ (3,553.90)
32 91 1323 1321Sift Sand Through 1/2" Screen500CY$ - 0$ 8.50$ 9.20$ (9.20)4450.150729714$ (4,450.15)
32 91 1323 1331Protection Of Earth Surfaces5000SF$ - 0$ 0.93$ 0.99$ (0.99)4869.78077524$ (4,869.78)
32 91 1323 2300SOIL PREP$ - 0$ - 0
32 91 1323 2311Root Rake Sites1000SY$ - 0$ 2.12$ 2.25$ (2.25)2217.304438088$ (2,217.30)
32 91 1323 2321Demo/Remove Storm Debris2000CF$ - 0$ 2.91$ 3.09$ (3.09)6092.406586896$ (6,092.41)
32 92 0000 0000TURF and GRASSES$ - 0$ - 0
32 92 1913 1301SEEDING$ - 0$ - 0
32 92 1913 1301Topsoil Fill, Including Fine Grade20CY$ - 0$ 33.80$ 34.01$ (34.01)707.4651730498$ (707.47)
32 92 1913 1311Seeding, 1 - 500 Sy, Including Topsoil And Maintenance250SY$ - 0$ 2.46$ 2.60$ (2.60)642.396612904$ (642.40)
32 92 1913 1321Seeding, 501 - 4,840 Sy, (1 Acre)2420SY$ - 0$ 0.19$ 0.20$ (0.20)476.4096171182$ (476.41)
32 92 1913 1331Seeding, 4,841 - 24,200 Sy, (1 - 5 Acres)10000SY$ - 0$ 0.19$ 0.20$ (0.20)1968.63478148$ (1,968.63)
32 92 1913 1341Seeding, > 24,201 Sy, (5 Acres Or More)25000SY$ - 0$ 0.19$ 0.20$ (0.20)4921.5869537$ (4,921.59)
32 92 2310 1000SODDING$ - 0$ - 0
32 92 2310 1001Sodding, 1 - 1000 Sf, (2 Pallets), Including Topsoil And Maintenance500SF$ - 0$ 0.46$ 0.66$ (0.66)238.308420916$ (238.31)
32 92 2310 1011Sodding, 1,000 - 4,000 Sf, (2 - 8 Pallets)1500SF$ - 0$ 0.39$ 0.54$ (0.54)606.132287982$ (606.13)
32 92 2310 1021Sodding, > 4,000 Sf, (8 Pallets Or More)5000SF$ - 0$ 0.34$ 0.49$ (0.49)1761.41006764$ (1,761.41)
32 96 4320 1000REMOVE TREES INCLUDING STUMPS$ - 0$ - 0
32 96 4320 10014"< Diameter5EA$ - 0$ 218.10$ 238.60$ (238.60)1141.1864991169$ (1,141.19)
32 96 4320 20015" - 12" Diameter5EA$ - 0$ 377.50$ 408.50$ (408.50)1975.2659723229$ (1,975.27)
32 96 4320 300113"- 24"5EA$ - 0$ 466.00$ 502.50$ (502.50)2438.3095953984$ (2,438.31)
32 96 4320 400124"> Diameter5EA$ - 0$ 624.00$ 670.50$ (670.50)3265.032591263$ (3,265.03)
$ - 0$ - 0
Building demolition, large urban projects, steel, includes 20 mile haul, excludes foundation demolition, dump fees. ('Building demolition, large urban projects' is a term used in RSMeans for facility demolition. The purpose of this line item is to capture the cost to haul a steel facility to recycle/reuse/dispose.)1CF$ - 0$ - 0$ 408.50$ (408.50)1975.2659723229$ (1,975.27)
Steel disposal savings, unit cost credit, excludes handling, packaging, or disposal costs (Applies after 50 Tons; Per task order; Total amount of credit to be deducted from the task order price.)1LB$ - 0$ - 0$ 502.50$ (502.50)2438.3095953984$ (2,438.31)
FDOT No 57 Stone (3/4")1CY$ - 0$ - 0$ 670.50$ (670.50)3265.032591263$ (3,265.03)
SELECTIVE SITE DEMOLITION$ - 0$ 519,468.49
SUBTOTAL ASBESTOS REMOVAL$ - 0$ 76,739.03
SUBTOTAL LEAD REMOVAL$ - 0$ 18,238.75
SUBTOTAL NEW CONSTRUCTION$ - 0$ 23,450.00
SUBTOTAL BUILDING DEMOLITION$ - 0$ 40,939.50
SUBTOTAL$ - 0$ 678,835.77
$ 6,788.36
1ST YEAR ESTIMATED TOTAL PRICE$ - 0$ 685,624.13$ (685,624.13)
AGGREGATE TOTALS
1ST YEAR ESTIMATED TOTAL PRICE$ - 0
2ND YEAR ESTIMATED TOTAL PRICE$ - 0
3RD YEAR ESTIMATED TOTAL PRICE$ - 0
TOTAL ESTIMATED AGGREGATE PRICE$ - 0
Rev 2 9/5/18

Yr Two

IDIQ DEMOLITION PRICING SHEET (Second Year)SOLICITATION NUMBERDATE
TBD
PROJECT: DEMOLITION DIVISION 2
PROJECT NO.WORK ORDER NO.
N/A
ITEM DESCRIPTIONESTIMATED QUANTITYCOSTOLD COST
NO.UNITNEW YR 1
UNITSMEASPER UNITTOTALPER UNITTOTAL
02 41 1300 0000SELECTIVE SITE DEMOLITION
02 41 1317 5000DEMOLISH, REMOVE PAVEMENT and CURBS
02 41 1317 5111.1Asphalt to 3" Thick300SY$ - 0$ 4.14$ 1,293.50$ 1,293.50
02 41 1317 5121.1Asphalt 4" to 6" Thick200SY$ - 0$ 6.67$ 1,414.85$ 1,414.85
02 41 1317 5131.1Asphalt 7" to 10" Thick200SY$ - 0$ 7.68$ 1,812.98$ 1,812.98
02 41 1317 5141.1Asphalt 11" to 14" Thick200SY$ - 0$ 9.55$ 2,202.36$ 2,202.36
02 41 1317 5151.1Asphalt 15" to 18" Thick200SY$ - 0$ 11.43$ 2,596.17$ 2,596.17
02 41 1317 5201.1Concrete to 6" Thick - Mesh Reinf5000SY$ - 0$ 10.97$ 58,334.94$ 58,334.94
02 41 1317 5301.1Concrete to 6" Thick - Rod Reinf500SY$ - 0$ 13.99$ 7,399.04$ 7,399.04
02 41 1317 5401.1Concrete 7" to 24" Plain200Cy$ - 0$ 84.84$ 18,079.00$ 18,079.00
02 41 1317 5501.1Concrete 7" to 24" Rein200Cy$ - 0$ 116.66$ 24,645.06$ 24,645.06
02 41 1317 6001.1Curbing, plain1000LF$ - 0$ 3.45$ 3,692.11$ 3,692.11
02 41 1317 6101.1Curb and Gutter, Concrete1000LF$ - 0$ 4.53$ 4,832.67$ 4,832.67
02 41 1317 6301.1Curb and Gutter, Bituminous200LF$ - 0$ 2.36$ 504.27$ 504.27
02 41 1317 6401.1Demo gravel driveway1875CY$ - 0$ 4.14$ 8,709.15$ 8,709.15
02 41 1323 2300DEMOLITION OF DRAINAGE STRUCTURE$ - 0
02 41 1323 2301.1Concrete Pipe up to 12" Diameter200LF$ - 0$ 7.11$ 1,520.97$ 1,520.97
02 41 1323 2401.112"< Concrete Pipe < 15" Diameter200LF$ - 0$ 16.61$ 3,463.36$ 3,463.36
02 41 1323 2501.115"< Concrete Pipe < 24" Diameter200LF$ - 0$ 20.86$ 4,323.53$ 4,323.53
02 41 1323 2601.124" < concrete Pipe <36" Diameter200LF$ - 0$ 27.83$ 5,768.03$ 5,768.03
02 41 1323 2801.1Concrete Pad500SY$ - 0$ 8.32$ 4,154.95$ 4,154.95
02 41 1323 2901.1Catch Basin/Manhole5EA$ - 0$ 178.77$ 951.93$ 951.93
02 41 1330 3000SELECTIVE DEMOLITION$ - 0
02 41 1330 3001.1Wood Decking, including Framing600SF$ - 0$ 1.92$ 1,221.86$ 1,221.86
02 41 1330 3011.1Wood Friction Piles700VLF$ - 0$ 9.60$ 5,779.20$ 5,779.20
02 41 1330 3021.1Above Ground Piping, 1/2” to 6” Diameter, Including Supports400LF$ - 0$ 2.02$ 856.55$ 856.55
02 41 1330 3031.1Above Ground Piping, 7” to 12” Diameter, Including Supports200LF$ - 0$ 2.88$ 610.93$ 610.93
02 41 1330 3041.1UG Piping, Beyond 5’ From Building Perimeter, 1/2” to 6” Diameter, no excavation200LF$ - 0$ 4.80$ 1,018.22$ 1,018.22
02 41 1330 3051.1UG Piping, Beyond 5’ From Building Perimeter, Greater Than 6” Diameter, no excavation200LF$ - 0$ 9.39$ 1,990.21$ 1,990.21
02 41 1330 3061.1Fire Hydrant & Valve5EA$ - 0$ 1,073.63$ 5,666.10$ 5,666.10
02 41 1330 3071.1Duct Bank, Reinforced Concrete100CY$ - 0$ 19.86$ 2,105.70$ 2,105.70
02 41 1330 3081.1Fencing, Wood200LF$ - 0$ 1.45$ 310.14$ 310.14
02 41 1330 3091.1Pits with Metal Covers5EA$ - 0$ 157.91$ 833.23$ 833.23
02 41 1330 4001.1Masonry Wall3600CF$ - 0$ 1.94$ 7,566.00$ 7,566.00
02 41 1330 5001Steel Tower (Comm./camera towers, angle or tubular steel, galvanized/inorganic zinc/alum) Max height of 200' and average weight of 5 Tons.900TON$ - 0$ 61.00$ 0.83$ (0.83)57452.0157885708
02 41 1330 6001.1Electrical Switch/Panel Hookups/Equipment20EA$ - 0$ 115.14$ 2,040.20$ 2,040.20
02 41 1330 6011.1Floodlight, Low Pressure Sodium5EA$ - 0$ 199.98$ 106.05$ 106.05
02 41 1330 6021.1Floodlight, Mercury Vapor5EA$ - 0$ 199.98$ 113.63$ 113.63
02 41 1330 7001.1Remove large capacity surge pumps3EA$ - 0$ 9,393.00$ 95.45$ 95.45
02 41 1360 2000REMOVE WIRE FENCING$ - 0
02 41 1360 2001.1Barbed Wire to 5 Strand500LF$ - 0$ 1.92$ 1,025.68$ 1,025.68
02 41 1360 2011.1Chain Link to 10' High, post & fabric without foundation500LF$ - 0$ 2.81$ 1,490.92$ 1,490.92
02 41 1360 2031.1Chain Link to 8’ Height Including Posts & Foundation500LF$ - 0$ 3.12$ 1,669.99$ 1,669.99
02 41 1360 2041.1Demo Gates,10-12' wide8EA$ - 0$ 78.28$ 666.64$ 666.64
02 41 1613 1300BUILDING DEMOLITION -EXCL SALVAGE, FOUNDATION DEMO OR DUMP FEES$ - 0
02 41 1613 1321.1Wood Frame, CF volume of inside structure92500CF$ - 0$ 0.29$ 28,675.00$ 28,675.00
02 41 1613 1351.1Reinforced Masonry, CF volume of inside structure50000CF$ - 0$ 0.30$ 15,500.00$ 15,500.00
02 41 1613 1361.1Reinforced Concrete, CF volume of inside structure50000CF$ - 0$ 0.38$ 19,500.00$ 19,500.00
02 41 1613 1371.1Metal (Steel), CF volume of inside structure50000CF$ - 0$ 0.27$ 14,500.00$ 14,500.00
02 41 1617 1031.1Concrete, 25” to 48” Thick, Reinforced100CY$ - 0$ 85.85$ 9,100.86$ 9,100.86
02 41 1617 1041.1Concrete, 49” to 72” Thick, Reinforced100CY$ - 0$ 95.95$ 10,171.55$ 10,171.55
02 41 1617 1711.12' Wide X 1' Thick Footing600LF$ - 0$ 11.62$ 5,844.35$ 5,844.35
02 41 1617 1721.13' Wide X 2' Thick Footing600LF$ - 0$ 19.90$ 10,042.93$ 10,042.93
02 41 1617 1731.1Walls, Masonry or Concrete, Solid Including Foundation6000SF$ - 0$ 0.96$ 7,093.89$ 7,093.89
02 41 1617 1741.1Walls, Masonry, Cavity including Foundation6000SF$ - 0$ 0.80$ 5,893.67$ 5,893.67
02 41 1617 1751.1Concrete, 7” to 24” Thick, Plain200CY$ - 0$ 57.57$ 12,205.87$ 12,205.87
02 41 1617 1000DEMO SOG$ - 0
02 41 1617 1001.1Slab on Grade - Plain200CY$ - 0$ 77.77$ 18,079.00$ 18,079.00
02 41 1617 1011.1Slab on Grade - Mesh Reinf.200CY$ - 0$ 105.55$ 22,379.54$ 22,379.54
02 41 1617 1021.1Slab on Grade - Rod Reinf.200CY$ - 0$ 139.89$ 24,644.88$ 24,644.88
02 41 1617 1700BUILDING DEMO FOOTINGS AND FOUNDATION WALLS$ - 0
02 41 1920 2000SELECTIVE DEMOLITION, DUMP CHARGES$ - 0
02 41 1920 2001.1Disposal and Dump Fees10TON$ - 0$ 95.95$ 797.90$ 797.90
02 41 1925 1000SELECTIVE DEMOLITION, SAW CUTTING$ - 0
02 41 1925 1001.1Saw Cut Asphalt 1"-6"200LF$ - 0$ 1.19$ 246.07$ 246.07
02 41 1925 1011.1Saw Cut Asphalt 7"-10"200LF$ - 0$ 5.25$ 1,207.50$ 1,207.50
02 41 1925 1021.1Saw Cut Asphalt 11"-14"200LF$ - 0$ 9.31$ 1,894.31$ 1,894.31
02 41 1925 1031.1Saw Cut Asphalt 15"-18"200LF$ - 0$ 11.34$ 2,306.37$ 2,306.37
02 65 1030 10190UNDERGROUND STORAGE TANK REMOVAL (FIBERGLASS/STEEL)$ - 0
02 65 1030 10191.13000 gal to 5000 gal tank1EACH$ - 0$ 454.00$ 465.11$ 465.11
02 65 1030 10191.16000 gal tank to 8000 gal tank1EACH$ - 0$ 757.50$ 747.40$ 747.40
02 65 1030 10191.19000 gal to 12000 gal tank1EACH$ - 0$ 1,131.20$ 1,126.15$ 1,126.15
02 65 1030 10191.1Remove Residual Fuel, Diesel Or Gas200GAL$ - 0$ 0.22$ 44.00$ 44.00
02 65 1030 10191.1Remove & Dispose Contaminated Soil10CY$ - 0$ 247.96$ 2,439.20$ 2,439.20
02 82 1343 2200BULK ASBESTOS REMOVAL$ - 0
02 82 1343 2201.1Boiler Asbestos Insulation200SF$ - 0$ 5.87$ 1,171.98$ 1,171.98
02 82 1343 2211.1Exterior of Duct Insulation, Pre-clean Remove, Bag and Dispose of at Landfill200SF$ - 0$ 1.52$ 233.07$ 233.07
02 82 1343 2221.1Remove Entire Duct With insulation, Pre-clean, Remove, Bag and Dispose of at Landfill200SF$ - 0$ 2.78$ 630.81$ 630.81
02 82 1343 2231.11/2” Thru 4” Size of Pipe Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose of at Landfill200LF$ - 0$ 5.81$ 614.34$ 614.34
02 82 1343 2241.1Pipe 4" to 8" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 5.90$ 693.40$ 693.40
02 82 1343 2251.1Pipe 10" to 12" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 6.39$ 791.68$ 791.68
02 82 1343 2261.1Pipe 14" to 16" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 8.21$ 1,003.66$ 1,003.66
02 82 1345 4500OSHA TESTING$ - 0
02 82 1345 4501.1Air Monitoring & Testing10DAY$ - 0$ 757.50$ 3,585.50$ 3,585.50
02 82 1345 4502.1RCRA8 Heavy Metals Report2EACH$ - 0$ 248.46$ 578.52$ 578.52
02 82 1345 4503.1TCLP Testing2EACH$ - 0$ 606.00$ 1,284.83$ 1,284.83
02 82 1345 4504.1Final Field Tech Report1DAY$ - 0$ 1,111.00$ 1,177.76$ 1,177.76
02 83 19 2600LEAD BASED PAINT REMEDIATION$ - 0
02 83 19 2601.1Scraping500SF$ - 0$ 7.99$ 3,897.75$ 3,897.75
02 83 19 2611.1Chemical Removal500SF$ - 0$ 4.89$ 2,308.61$ 2,308.61
02 83 19 2621.1Lead Base Paint Encap.500SF$ - 0$ 0.99$ 525.31$ 525.31
02 83 19 2631.1Doors5000SF$ - 0$ 0.76$ 23,408.00$ 23,408.00
02 83 19 2641.1Walls, Ceilings, Etc.15000SF$ - 0$ 0.20$ 12,750.00$ 12,750.00
02 83 19 2651.1Windows5000LF$ - 0$ 0.76$ 3,180.74$ 3,180.74
09 91 03 9000RESTORATION & TOUCH UP$ - 0
09 91 03 9001.1Prep & Paint Gypsum wall1000SF$ - 0$ 0.75$ 800.68$ 800.68
09 91 03 9011.1Prep & Paint Masonry, Concrete, Stucco Wall1000SF$ - 0$ 1.28$ 1,330.39$ 1,330.39
09 91 03 9021.1Prep & Paint Metals1000SF$ - 0$ 1.50$ 1,598.66$ 1,598.66
10 91 03 9031.1Restoration of CMU1000SF$ - 0$ 5.56$ 5,857.57$ 5,857.57
11 91 03 9041.1Restoration of Concrete1000SF$ - 0$ 5.30$ 5,583.66$ 5,583.66
12 91 03 9051.1Restoration of Wood Construction1000SF$ - 0$ 4.44$ 4,677.63$ 4,677.63
13 91 03 9061.1Restoration of Steel Construction1000SF$ - 0$ 4.85$ 5,109.57$ 5,109.57
22 05 0510 1000REMOVE PVC SERVICE LINES (NOTE: THESE UTILITY LINES MAY BE FOR POTABLE WATER, SEWER, OR STORM WATER DRAINAGE. PRICE TO INCLUDE TERMINATING AND CAPPING AT SERVICE MAIN)$ - 0
22 05 0510 1001.1Up To 1-1/2" Pipe Diameter200LF$ - 0$ 2.24$ 308.76$ 308.76
22 05 0510 1021.12"< Pipe Diam. < 3"200LF$ - 0$ 2.62$ 386.42$ 386.42
22 05 0510 1031.14" < Pipe Diam < 6"200LF$ - 0$ 4.35$ 694.39$ 694.39
22 05 0510 1041.18" < Pipe Diam < 14"200LF$ - 0$ 5.68$ 927.80$ 927.80
22 05 0510 1051.1Pipe Diam 16"200LF$ - 0$ 8.13$ 1,383.61$ 1,383.61
22 05 0510 1100REMOVE CONCRETE, TRANSITE, RCP, TERRA COTTA CLAY SERVICE LINES (NOTE: THESE UTILITY LINES MAY BE FOR POTABLE WATER, SEWER, CHILL WATER, OR STORM WATER DRAINAGE. PRICE TO INCLUDE TERMINATING AND CAPPING AT SERVICE MAIN)$ - 0
22 05 0510 1101.112" Pipe Diameter200LF$ - 0$ 8.12$ 1,520.99$ 1,520.99
22 05 0510 1111.115"< Pipe Diam. < 18"200LF$ - 0$ 18.13$ 3,464.40$ 3,464.40
22 05 0510 1121.121" < Pipe Diam < 24"200LF$ - 0$ 22.37$ 4,322.51$ 4,322.51
22 05 0510 1131.127" < Pipe Diam < 36"200LF$ - 0$ 29.59$ 5,766.52$ 5,766.52
22 05 0510 1141.1Steel Welded Connection, 4" Diameter200LF$ - 0$ 9.08$ 1,662.48$ 1,662.48
22 05 0510 1151.1Steel Welded Connection, 10" Diameter200LF$ - 0$ 16.84$ 3,337.69$ 3,337.69
22 07 1910 1000RE-INSULATION OF ABATED PIPES$ - 0
22 07 1910 1001.1< 4" PIPES200LF$ - 0$ 5.98$ 1,363.68$ 1,363.68
22 07 1910 1061.1> 4" - < 8" PIPES200LF$ - 0$ 9.85$ 2,283.18$ 2,283.18
22 07 1910 1101.1> 8" - < 12" PIPES200LF$ - 0$ 11.97$ 2,757.65$ 2,757.65
23 05 0210 1000SELECTIVE DEMOLITION FOR HVAC$ - 0
23 05 0210 1011.1HVAC - Remove A/C-to 3 Ton5EA$ - 0$ 353.50$ 1,818.00$ 1,818.00
23 05 0210 1021.1HVAC - Remove A/C-3 to 10 Ton5EA$ - 0$ 1,004.95$ 5,326.68$ 5,326.68
23 05 0210 1031.1HVAC - Remove Boiler5EA$ - 0$ 651.45$ 3,358.25$ 3,358.25
23 05 0210 1041.1HVAC - Remove Water Heater5EA$ - 0$ 62.12$ 320.70$ 320.70
31 23 1642 4200EXCAVATING, BULK BANK MEASURE$ - 0
31 23 1642 4201.1Fill and Compact 6" Lifts1000SY$ - 0$ 4.55$ 4,634.26$ 4,634.26
31 23 1642 4401.1Fill Dirt1000CY$ - 0$ 3.54$ 4,237.89$ 4,237.89
31 23 1642 4601.1Bulk Excavation1000CY$ - 0$ 3.43$ 4,337.94$ 4,337.94
32 91 1323 1321.1Sift Sand Through 1/2" Screen500CY$ - 0$ 8.59$ 4,648.71$ 4,648.71
32 91 1323 1331.1Protection Of Earth Surfaces5000SF$ - 0$ 0.94$ 4,986.13$ 4,986.13
32 91 1323 2300SOIL PREP$ - 0
32 91 1323 2311.1Root Rake Sites1000SY$ - 0$ 2.14$ 2,267.32$ 2,267.32
32 91 1323 2321.1Demo/Remove Storm Debris2000CF$ - 0$ 2.94$ 6,240.79$ 6,240.79
32 92 0000 0000TURF and GRASSES$ - 0
32 92 1913 1301SEEDING$ - 0
32 92 1913 1301.1Topsoil Fill, Including Fine Grade20CY$ - 0$ 34.14$ 687.04$ 687.04
32 92 1913 1311.1Seeding, 1 - 500 Sy, Including Topsoil And Maintenance250SY$ - 0$ 2.48$ 656.04$ 656.04
32 92 1913 1321.1Seeding, 501 - 4,840 Sy, (1 Acre)2420SY$ - 0$ 0.19$ 490.39$ 490.39
32 92 1913 1331.1Seeding, 4,841 - 24,200 Sy, (1 - 5 Acres)10000SY$ - 0$ 0.19$ 2,026.40$ 2,026.40
32 92 1913 1341.1Seeding, > 24,201 Sy, (5 Acres Or More)25000SY$ - 0$ 0.19$ 5,066.00$ 5,066.00
32 92 2310 1000SODDING$ - 0
32 92 2310 1001.1Sodding, 1 - 1000 Sf, (2 Pallets), Including Topsoil And Maintenance500SF$ - 0$ 0.46$ 332.00$ 332.00
32 92 2310 1011.1Sodding, 1,000 - 4,000 Sf, (2 - 8 Pallets)1500SF$ - 0$ 0.39$ 804.75$ 804.75
32 92 2310 1021.1Sodding, > 4,000 Sf, (8 Pallets Or More)5000SF$ - 0$ 0.34$ 2,437.50$ 2,437.50
32 96 4320 1000REMOVE TREES INCLUDING STUMPS$ - 0
32 96 4320 1001.14"< Diameter5EA$ - 0$ 220.28$ 1,204.92$ 1,204.92
32 96 4320 2001.15" - 12" Diameter5EA$ - 0$ 381.28$ 2,062.95$ 2,062.95
32 96 4320 3001.113"- 24"5EA$ - 0$ 470.66$ 2,537.63$ 2,537.63
32 96 4320 4001.124"> Diameter5EA$ - 0$ 630.24$ 3,386.03$ 3,386.03
$ - 0
Building demolition, large urban projects, steel, includes 20 mile haul, excludes foundation demolition, dump fees. ('Building demolition, large urban projects' is a term used in RSMeans for facility demolition. The purpose of this line item is to capture the cost to haul a steel facility to recycle/reuse/dispose.)1CF$ - 0$ - 0$ 408.50$ (408.50)1975.2659723229
Steel disposal savings, unit cost credit, excludes handling, packaging, or disposal costs (Applies after 50 Tons; Per task order; Total amount of credit to be deducted from the task order price.)1LB$ - 0$ - 0$ 502.50$ (502.50)2438.3095953984
FDOT No 57 Stone (3/4")1CY$ - 0$ - 0$ 3,386.03$ 3,386.03
SELECTIVE SITE DEMOLITION$ - 0$ 523,548.59
SUBTOTAL ASBESTOS REMOVAL$ - 0$ 75,213.96
SUBTOTAL LEAD REMOVAL$ - 0$ 18,420.00
SUBTOTAL NEW CONSTRUCTION$ - 0$ 23,680.00
SUBTOTAL BUILDING DEMOLITION$ - 0$ 41,350.10
SUBTOTAL$ - 0$ 682,212.65
$ 6,822.13
2ND YEAR ESTIMATED TOTAL PRICE$ - 0$ 689,034.78$ (689,034.78)
Rev 2 9/5/18

Yr Three

IDIQ DEMOLITION PRICING SHEET (Third Year)SOLICITATION NUMBERDATE
TBD
PROJECT: DEMOLITION DIVISION 2
PROJECT NO.WORK ORDER NO.
N/A
ITEM DESCRIPTIONESTIMATED QUANTITYCOSTOLD COST
NO.UNIT
UNITSMEASPER UNITTOTALPER UNIT
02 41 1300 0000SELECTIVE SITE DEMOLITION
02 41 1317 5000DEMOLISH, REMOVE PAVEMENT and CURBS
02 41 1317 5111.2Asphalt to 3" Thick300SY$ - 0$ 4.18
02 41 1317 5121.2Asphalt 4" to 6" Thick200SY$ - 0$ 6.74
02 41 1317 5131.2Asphalt 7" to 10" Thick200SY$ - 0$ 7.76
02 41 1317 5141.2Asphalt 11" to 14" Thick200SY$ - 0$ 9.65
02 41 1317 5151.2Asphalt 15" to 18" Thick200SY$ - 0$ 11.54
02 41 1317 5201.2Concrete to 6" Thick - Mesh Reinf5000SY$ - 0$ 11.08
02 41 1317 5301.2Concrete to 6" Thick - Rod Reinf500SY$ - 0$ 14.13
02 41 1317 5401.2Concrete 7" to 24" Plain200Cy$ - 0$ 85.69
02 41 1317 5501.2Concrete 7" to 24" Rein200Cy$ - 0$ 117.83
02 41 1317 6001.2Curbing, plain1000LF$ - 0$ 3.48
02 41 1317 6101.2Curb and Gutter, Concrete1000LF$ - 0$ 4.58
02 41 1317 6301.2Curb and Gutter, Bituminous200LF$ - 0$ 2.38
02 41 1317 6401.2Demo gravel driveway1875CY$ - 0$ 4.18
02 41 1323 2300DEMOLITION OF DRAINAGE STRUCTURE
02 41 1323 2301.2Concrete Pipe up to 12" Diameter200LF$ - 0$ 7.18
02 41 1323 2401.212"< Concrete Pipe < 15" Diameter200LF$ - 0$ 16.78
02 41 1323 2501.215"< Concrete Pipe < 24" Diameter200LF$ - 0$ 21.07
02 41 1323 2601.224" < concrete Pipe <36" Diameter200LF$ - 0$ 28.11
02 41 1323 2801.2Concrete Pad500SY$ - 0$ 8.40
02 41 1323 2901.2Catch Basin/Manhole5EA$ - 0$ 180.56
02 41 1330 3000SELECTIVE DEMOLITION
02 41 1330 3001.2Wood Decking, including Framing600SF$ - 0$ 1.94
02 41 1330 3011.2Wood Friction Piles700VLF$ - 0$ 9.70
02 41 1330 3021.2Above Ground Piping, 1/2” to 6” Diameter, Including Supports400LF$ - 0$ 2.04
02 41 1330 3031.2Above Ground Piping, 7” to 12” Diameter, Including Supports200LF$ - 0$ 2.91
02 41 1330 3041.2UG Piping, Beyond 5’ From Building Perimeter, 1/2” to 6” Diameter, no excavation200LF$ - 0$ 4.85
02 41 1330 3051.2UG Piping, Beyond 5’ From Building Perimeter, Greater Than 6” Diameter, no excavation200LF$ - 0$ 9.48
02 41 1330 3061.2Fire Hydrant & Valve5EA$ - 0$ 1,084.37
02 41 1330 3071.2Duct Bank, Reinforced Concrete100CY$ - 0$ 20.06
02 41 1330 3081.2Fencing, Wood200LF$ - 0$ 1.46
02 41 1330 3091.2Pits with Metal Covers5EA$ - 0$ 159.49
02 41 1330 4001.2Masonry Wall3600CF$ - 0$ 1.96
02 41 1330 5001Steel Tower (Comm./camera towers, angle or tubular steel, galvanized/inorganic zinc/alum) Max height of 200' and average weight of 5 Tons.900TON$ - 0$ 61.00$ 0.83$ (0.83)57452.0157885708
02 41 1330 6001.2Electrical Switch/Panel Hookups/Equipment20EA$ - 0$ 116.29
02 41 1330 6011.2Floodlight, Low Pressure Sodium5EA$ - 0$ 201.98
02 41 1330 6021.2Floodlight, Mercury Vapor5EA$ - 0$ 201.98
02 41 1330 7001.2Remove large capacity surge pumps3EA$ - 0$ 9,486.93
02 41 1360 2000REMOVE WIRE FENCING
02 41 1360 2001.2Barbed Wire to 5 Strand500LF$ - 0$ 1.94
02 41 1360 2011.2Chain Link to 10' High, post & fabric without foundation500LF$ - 0$ 2.84
02 41 1360 2031.2Chain Link to 8’ Height Including Posts & Foundation500LF$ - 0$ 3.15
02 41 1360 2041.2Demo Gates,10-12' wide8EA$ - 0$ 79.06
02 41 1613 1300BUILDING DEMOLITION -EXCL SALVAGE, FOUNDATION DEMO OR DUMP FEES
02 41 1613 1321.2Wood Frame, CF volume of inside structure92500CF$ - 0$ 0.29
02 41 1613 1351.2Reinforced Masonry, CF volume of inside structure50000CF$ - 0$ 0.30
02 41 1613 1361.2Reinforced Concrete, CF volume of inside structure50000CF$ - 0$ 0.38
02 41 1613 1371.2Metal (Steel), CF volume of inside structure50000CF$ - 0$ 0.27
02 41 1617 1031.2Concrete, 25” to 48” Thick, Reinforced100CY$ - 0$ 86.71
02 41 1617 1041.2Concrete, 49” to 72” Thick, Reinforced100CY$ - 0$ 96.91
02 41 1617 1711.22' Wide X 1' Thick Footing600LF$ - 0$ 11.74
02 41 1617 1721.23' Wide X 2' Thick Footing600LF$ - 0$ 20.10
02 41 1617 1731.2Walls, Masonry or Concrete, Solid Including Foundation6000SF$ - 0$ 0.97
02 41 1617 1741.2Walls, Masonry, Cavity including Foundation6000SF$ - 0$ 0.81
02 41 1617 1751.2Concrete, 7” to 24” Thick, Plain200CY$ - 0$ 58.15
02 41 1617 1000DEMO SOG
02 41 1617 1001.2Slab on Grade - Plain200CY$ - 0$ 78.55
02 41 1617 1011.2Slab on Grade - Mesh Reinf.200CY$ - 0$ 106.61
02 41 1617 1021.2Slab on Grade - Rod Reinf.200CY$ - 0$ 141.29
02 41 1617 1700BUILDING DEMO FOOTINGS AND FOUNDATION WALLS
02 41 1920 2000SELECTIVE DEMOLITION, DUMP CHARGES
02 41 1920 2001.2Disposal and Dump Fees10TON$ - 0$ 96.91
02 41 1925 1000SELECTIVE DEMOLITION, SAW CUTTING
02 41 1925 1001.2Saw Cut Asphalt 1"-6"200LF$ - 0$ 1.20
02 41 1925 1011.2Saw Cut Asphalt 7"-10"200LF$ - 0$ 5.30
02 41 1925 1021.2Saw Cut Asphalt 11"-14"200LF$ - 0$ 9.40
02 41 1925 1031.2Saw Cut Asphalt 15"-18"200LF$ - 0$ 11.45
02 65 1030 10190UNDERGROUND STORAGE TANK REMOVAL (FIBERGLASS/STEEL)
02 65 1030 10191.23000 gal to 5000 gal tank1GAL$ - 0$ 458.54
02 65 1030 10191.26000 gal tank to 8000 gal tank1GAL$ - 0$ 765.08
02 65 1030 10191.29000 gal to 12000 gal tank1GAL$ - 0$ 1,142.51
02 65 1030 10191.2Remove Residual Fuel, Diesel Or Gas200GAL$ - 0$ 0.22
02 65 1030 10191.2Remove & Dispose Contaminated Soil10CY$ - 0$ 250.44
02 82 1343 2200BULK ASBESTOS REMOVAL
02 82 1343 2201.2Boiler Asbestos Insulation200SF$ - 0$ 5.93
02 82 1343 2211.2Exterior of Duct Insulation, Pre-clean Remove, Bag and Dispose of at Landfill200SF$ - 0$ 1.54
02 82 1343 2221.2Remove Entire Duct With insulation, Pre-clean, Remove, Bag and Dispose of at Landfill200SF$ - 0$ 2.81
02 82 1343 2231.21/2” Thru 4” Size of Pipe Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose of at Landfill200LF$ - 0$ 5.87
02 82 1343 2241.2Pipe 4" to 8" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 5.96
02 82 1343 2251.2Pipe 10" to 12" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 6.45
02 82 1343 2261.2Pipe 14" to 16" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 8.29
02 82 1345 4500OSHA TESTING
02 82 1345 4501.2Air Monitoring & Testing10DAY$ - 0$ 765.08
02 82 1345 4502.2RCRA8 Heavy Metals Report2EACH$ - 0$ 250.94
02 82 1345 4503.2TCLP Testing2EACH$ - 0$ 612.06
02 82 1345 4504.2Final Field Tech Report1DAY$ - 0$ 1,122.11
02 83 19 2600LEAD BASED PAINT REMEDIATION
02 83 19 2601.2Scraping500SF$ - 0$ 8.07
02 83 19 2611.2Chemical Removal500SF$ - 0$ 4.94
02 83 19 2621.2Lead Base Paint Encap.500SF$ - 0$ 1.00
02 83 19 2631.2Doors5000SF$ - 0$ 0.77
02 83 19 2641.2Walls, Ceilings, Etc.15000SF$ - 0$ 0.20
02 83 19 2651.2Windows5000LF$ - 0$ 0.77
09 91 03 9000RESTORATION & TOUCH UP
09 91 03 9001.2Prep & Paint Gypsum wall1000SF$ - 0$ 0.76
09 91 03 9011.2Prep & Paint Masonry, Concrete, Stucco Wall1000SF$ - 0$ 1.29
09 91 03 9021.2Prep & Paint Metals1000SF$ - 0$ 1.52
10 91 03 9031.2Restoration of CMU1000SF$ - 0$ 5.61
11 91 03 9041.2Restoration of Concrete1000SF$ - 0$ 5.36
12 91 03 9051.2Restoration of Wood Construction1000SF$ - 0$ 4.49
13 91 03 9061.2Restoration of Steel Construction1000SF$ - 0$ 4.90
22 05 0510 1000REMOVE PVC SERVICE LINES (NOTE: THESE UTILITY LINES MAY BE FOR POTABLE WATER, SEWER, OR STORM WATER DRAINAGE. PRICE TO INCLUDE TERMINATING AND CAPPING AT SERVICE MAIN)
22 05 0510 1001.2Up To 1-1/2" Pipe Diameter200LF$ - 0$ 2.26
22 05 0510 1021.22"< Pipe Diam. < 3"200LF$ - 0$ 2.65
22 05 0510 1031.24" < Pipe Diam < 6"200LF$ - 0$ 4.39
22 05 0510 1041.28" < Pipe Diam < 14"200LF$ - 0$ 5.74
22 05 0510 1051.2Pipe Diam 16"200LF$ - 0$ 8.21
22 05 0510 1100REMOVE CONCRETE, TRANSITE, RCP, TERRA COTTA CLAY SERVICE LINES (NOTE: THESE UTILITY LINES MAY BE FOR POTABLE WATER, SEWER, CHILL WATER, OR STORM WATER DRAINAGE. PRICE TO INCLUDE TERMINATING AND CAPPING AT SERVICE MAIN)
22 05 0510 1101.212" Pipe Diameter200LF$ - 0$ 8.20
22 05 0510 1111.215"< Pipe Diam. < 18"200LF$ - 0$ 18.31
22 05 0510 1121.221" < Pipe Diam < 24"200LF$ - 0$ 22.59
22 05 0510 1131.227" < Pipe Diam < 36"200LF$ - 0$ 29.89
22 05 0510 1141.2Steel Welded Connection, 4" Diameter200LF$ - 0$ 9.17
22 05 0510 1151.2Steel Welded Connection, 10" Diameter200LF$ - 0$ 17.01
22 07 1910 1000RE-INSULATION OF ABATED PIPES
22 07 1910 1001.2< 4" PIPES200LF$ - 0$ 6.04
22 07 1910 1061.2> 4" - < 8" PIPES200LF$ - 0$ 9.95
22 07 1910 1101.2> 8" - < 12" PIPES200LF$ - 0$ 12.09
23 05 0210 1000SELECTIVE DEMOLITION FOR HVAC
23 05 0210 1011.2HVAC - Remove A/C-to 3 Ton5EA$ - 0$ 357.04
23 05 0210 1021.2HVAC - Remove A/C-3 to 10 Ton5EA$ - 0$ 1,015.00
23 05 0210 1031.2HVAC - Remove Boiler5EA$ - 0$ 657.96
23 05 0210 1041.2HVAC - Remove Water Heater5EA$ - 0$ 62.74
31 23 1642 4200EXCAVATING, BULK BANK MEASURE
31 23 1642 4201.2Fill and Compact 6" Lifts1000SY$ - 0$ 4.60
31 23 1642 4401.2Fill Dirt1000CY$ - 0$ 3.58
31 23 1642 4601.2Bulk Excavation1000CY$ - 0$ 3.46
32 91 1323 1321.2Sift Sand Through 1/2" Screen500CY$ - 0$ 8.68
32 91 1323 1331.2Protection Of Earth Surfaces5000SF$ - 0$ 0.95
32 91 1323 2300SOIL PREP
32 91 1323 2311.2Root Rake Sites1000SY$ - 0$ 2.16
32 91 1323 2321.2Demo/Remove Storm Debris2000CF$ - 0$ 2.97
32 92 0000 0000TURF and GRASSES
32 92 1913 1301SEEDING
32 92 1913 1301.2Topsoil Fill, Including Fine Grade20CY$ - 0$ 34.48
32 92 1913 1311.2Seeding, 1 - 500 Sy, Including Topsoil And Maintenance250SY$ - 0$ 2.50
32 92 1913 1321.2Seeding, 501 - 4,840 Sy, (1 Acre)2420SY$ - 0$ 0.19
32 92 1913 1331.2Seeding, 4,841 - 24,200 Sy, (1 - 5 Acres)10000SY$ - 0$ 0.19
32 92 1913 1341.2Seeding, > 24,201 Sy, (5 Acres Or More)25000SY$ - 0$ 0.19
32 92 2310 1000SODDING
32 92 2310 1001.2Sodding, 1 - 1000 Sf, (2 Pallets), Including Topsoil And Maintenance500SF$ - 0$ 0.46
32 92 2310 1011.2Sodding, 1,000 - 4,000 Sf, (2 - 8 Pallets)1500SF$ - 0$ 0.39
32 92 2310 1021.2Sodding, > 4,000 Sf, (8 Pallets Or More)5000SF$ - 0$ 0.34
32 96 4320 1000REMOVE TREES INCLUDING STUMPS
32 96 4320 1001.24"< Diameter5EA$ - 0$ 222.48
32 96 4320 2001.25" - 12" Diameter5EA$ - 0$ 385.09
32 96 4320 3001.213"- 24"5EA$ - 0$ 475.37
32 96 4320 4001.224"> Diameter5EA$ - 0$ 636.54
Building demolition, large urban projects, steel, includes 20 mile haul, excludes foundation demolition, dump fees. ('Building demolition, large urban projects' is a term used in RSMeans for facility demolition. The purpose of this line item is to capture the cost to haul a steel facility to recycle/reuse/dispose.)1CF$ - 0$ - 0$ 408.50$ (408.50)1975.2659723229
Steel disposal savings, unit cost credit, excludes handling, packaging, or disposal costs (Applies after 50 Tons; Per task order; Total amount of credit to be deducted from the task order price.)1LB$ - 0$ - 0$ 502.50$ (502.50)2438.3095953984
FDOT No 57 Stone (3/4")1CY$ - 0$ - 0
SELECTIVE SITE DEMOLITION$ - 0$ 528,784.08
SUBTOTAL ASBESTOS REMOVAL$ - 0$ 78,309.30
SUBTOTAL LEAD REMOVAL$ - 0$ 18,604.20
SUBTOTAL NEW CONSTRUCTION$ - 0$ 23,914.30
SUBTOTAL BUILDING DEMOLITION$ - 0$ 41,763.60
SUBTOTAL$ - 0$ 691,375.48
$ 6,913.75
3RD YEAR ESTIMATED TOTAL PRICE$ - 0$ 698,289.23$ (698,289.23)
Rev 2 9/5/18