Atch_6_Demo_IDIQ_Pricing_Sheet.xlsx

XLSX spreadsheet 73 KB Posted

Attached to
Indefinite Quantity Indefinite Delivery (IDIQ) for Demolition Requirements, CCAFS, FL
Solicitation number
FA252118B0004
Issued by

About this file

Attachment 6 Pricing Sheet for Demo IDIQ, CCAFS, FL 1 pg., no date

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

First Year

IDIQ DEMOLITION PRICING SHEET (FIRST YEAR)SOLICITATION NUMBERDATE
TBD
PROJECT: DEMOLITION DIVISION 2
PROJECT NO.WORK ORDER NO.
N/A
ITEM DESCRIPTIONESTIMATED QUANTITYCOST
NO.UNITOLD
UNITSMEASPER UNITTOTALPER UNITPER UNITTOTAL
02 41 1300 0000SELECTIVE SITE DEMOLITION
02 41 1317 5000DEMOLISH, REMOVE PAVEMENT and CURBS
02 41 1317 5111Asphalt to 3" Thick300SY$ - 0$ 4.10$ 4.27$ (4.27)1286.8654729464$ (1,286.87)
02 41 1317 5121Asphalt 4" to 6" Thick200SY$ - 0$ 6.60$ 7.00$ (7.00)1382.1888413128$ (1,382.19)
02 41 1317 5131Asphalt 7" to 10" Thick200SY$ - 0$ 7.60$ 8.97$ (8.97)1591.4858022912$ (1,591.49)
02 41 1317 5141Asphalt 11" to 14" Thick200SY$ - 0$ 9.46$ 10.91$ (10.91)1978.996017172$ (1,979.00)
02 41 1317 5151Asphalt 15" to 18" Thick200SY$ - 0$ 11.32$ 12.86$ (12.86)2368.5784791912$ (2,368.58)
02 41 1317 5201Concrete to 6" Thick - Mesh Reinf5000SY$ - 0$ 10.86$ 11.55$ (11.55)56831.37777062$ (56,831.38)
02 41 1317 5301Concrete to 6" Thick - Rod Reinf500SY$ - 0$ 13.85$ 14.65$ (14.65)7247.684366554$ (7,247.68)
02 41 1317 5401Concrete 7" to 24" Plain200CY$ - 0$ 84.00$ 89.50$ (89.50)17580.9447221856$ (17,580.94)
02 41 1317 5501Concrete 7" to 24" Rein200CY$ - 0$ 115.50$ 122.00$ (122.00)24174.8351165744$ (24,174.84)
02 41 1317 6001Curbing, plain1000LF$ - 0$ 3.42$ 3.66$ (3.66)3574.62631374$ (3,574.63)
02 41 1317 6101Curb and Gutter, Concrete1000LF$ - 0$ 4.49$ 4.79$ (4.79)4693.639768476$ (4,693.64)
02 41 1317 6301Curb and Gutter, Bituminous200LF$ - 0$ 2.34$ 2.50$ (2.50)489.0503246624$ (489.05)
02 41 1317 6401Demo gravel driveway1875CY$ - 0$ 4.10$ 4.60$ (4.60)8042.909205915$ (8,042.91)
02 41 1323 2300DEMOLITION OF DRAINAGE STRUCTURE$ - 0$ - 0
02 41 1323 2301Concrete Pipe up to 12" Diameter200LF$ - 0$ 7.04$ 7.53$ (7.53)1473.3677154024$ (1,473.37)
02 41 1323 240112"< Concrete Pipe < 15" Diameter200LF$ - 0$ 16.45$ 17.15$ (17.15)3442.0024968824$ (3,442.00)
02 41 1323 250115"< Concrete Pipe < 24" Diameter200LF$ - 0$ 20.65$ 21.40$ (21.40)4322.7075307024$ (4,322.71)
02 41 1323 260124" < concrete Pipe <36" Diameter200LF$ - 0$ 27.55$ 28.55$ (28.55)5767.0637861672$ (5,767.06)
02 41 1323 2801Concrete Pad500SY$ - 0$ 8.24$ 8.23$ (8.23)4310.274047872$ (4,310.27)
02 41 1323 2901Catch Basin/Manhole5EA$ - 0$ 177.00$ 188.50$ (188.50)926.1390523294$ (926.14)
02 41 1330 3000SELECTIVE DEMOLITION$ - 0$ - 0
02 41 1330 3001Wood Decking, including Framing600SF$ - 0$ 1.90$ 2.02$ (2.02)1193.6143517184$ (1,193.61)
02 41 1330 3011Wood Friction Piles700VLF$ - 0$ 9.50$ 8.17$ (8.17)6962.750385024$ (6,962.75)
02 41 1330 3021Above Ground Piping, 1/2” to 6” Diameter, Including Supports400LF$ - 0$ 2.00$ 2.12$ (2.12)837.1878439136$ (837.19)
02 41 1330 3031Above Ground Piping, 7” to 12” Diameter, Including Supports200LF$ - 0$ 2.85$ 3.02$ (3.02)596.8071758592$ (596.81)
02 41 1330 3041UG Piping, Beyond 5’ From Building Perimeter, 1/2” to 6” Diameter, no excavation200LF$ - 0$ 4.75$ 5.04$ (5.04)994.678626432$ (994.68)
02 41 1330 3051UG Piping, Beyond 5’ From Building Perimeter, Greater Than 6” Diameter, no excavation200LF$ - 0$ 9.30$ 9.86$ (9.86)1945.8400629576$ (1,945.84)
02 41 1330 3061Fire Hydrant & Valve5EA$ - 0$ 1,063.00$ 1,122.00$ (1,122.00)5562.066738001$ (5,562.07)
02 41 1330 3071Duct Bank, Reinforced Concrete100CY$ - 0$ 19.66$ 20.84$ (20.84)2057.7414084312$ (2,057.74)
02 41 1330 3081Fencing, Wood200LF$ - 0$ 1.44$ 1.54$ (1.54)300.475835068$ (300.48)
02 41 1330 3091Pits with Metal Covers5EA$ - 0$ 156.35$ 165.00$ (165.00)818.0713640619$ (818.07)
02 41 1330 4001Masonry Wall3600CF$ - 0$ 1.92$ 2.08$ (2.08)7236.2870072928$ (7,236.29)
02 41 1330 5001Steel Tower900TON$ - 0$ 61.00$ 0.83$ (0.83)57452.0157885708$ (57,452.02)
02 41 1330 6001Electrical Switch/Panel Hookups/Equipment20EA$ - 0$ 114.00$ 101.00$ (101.00)2385.9853551538$ (2,385.99)
02 41 1330 6011Floodlight, Low Pressure Sodium5EA$ - 0$ 198.00$ 21.00$ (21.00)1036.0199568431$ (1,036.02)
02 41 1330 6021Floodlight, Mercury Vapor5EA$ - 0$ 198.00$ 22.50$ (22.50)1036.0199568431$ (1,036.02)
02 41 1330 7001Remove large capacity surge pumps3EA$ - 0$ 9,300.00$ 31.50$ (31.50)29196.9260564868$ (29,196.93)
02 41 1360 2000REMOVE WIRE FENCING$ - 0$ - 0
02 41 1360 2001Barbed Wire to 5 Strand500LF$ - 0$ 1.90$ 2.03$ (2.03)994.678626432$ (994.68)
02 41 1360 2011Chain Link to 10' High, post & fabric without foundation500LF$ - 0$ 2.78$ 2.95$ (2.95)1455.753614726$ (1,455.75)
02 41 1360 2031Chain Link to 8’ Height Including Posts & Foundation500LF$ - 0$ 3.09$ 3.31$ (3.31)1616.352767952$ (1,616.35)
02 41 1360 2041Demo Gates,10-12' wide8EA$ - 0$ 77.50$ 82.50$ (82.50)648.8620239758$ (648.86)
02 41 1613 1300BUILDING DEMOLITION -EXCL SALVAGE, FOUNDATION DEMO OR DUMP FEES$ - 0$ - 0
02 41 1613 1321Wood Frame, CF volume of inside structure50000CF$ - 0$ 0.29$ 0.31$ (0.31)27794.01474379$ (27,794.01)
02 41 1613 1351Reinforced Masonry, CF volume of inside structure92500CF$ - 0$ 0.30$ 0.31$ (0.31)15541.853538$ (15,541.85)
02 41 1613 1361Reinforced Concrete, CF volume of inside structure50000CF$ - 0$ 0.38$ 0.39$ (0.39)19686.3478148$ (19,686.35)
02 41 1613 1371Metal (Steel), CF volume of inside structure50000CF$ - 0$ 0.27$ 0.29$ (0.29)13987.6681842$ (13,987.67)
02 41 1617 1031Concrete, 25” to 48” Thick, Reinforced100CY$ - 0$ 85.00$ 90.11$ (90.11)8895.120841582$ (8,895.12)
02 41 1617 1041Concrete, 49” to 72” Thick, Reinforced100CY$ - 0$ 95.00$ 100.71$ (100.71)9941.605646474$ (9,941.61)
02 41 1617 17112' Wide X 1' Thick Footing600LF$ - 0$ 11.50$ 9.64$ (9.64)7223.8535244624$ (7,223.85)
02 41 1617 17213' Wide X 2' Thick Footing600LF$ - 0$ 19.70$ 16.57$ (16.57)12371.315416248$ (12,371.32)
02 41 1617 1731Walls, Masonry or Concrete, Solid Including Foundation6000SF$ - 0$ 0.95$ 1.17$ (1.17)5968.071758592$ (5,968.07)
02 41 1617 1741Walls, Masonry, Cavity including Foundation6000SF$ - 0$ 0.79$ 0.97$ (0.97)4973.39313216$ (4,973.39)
02 41 1617 1751Concrete, 7” to 24” Thick, Plain200CY$ - 0$ 57.00$ 60.43$ (60.43)11929.9267757688$ (11,929.93)
02 41 1617 1000DEMO SOG$ - 0$ - 0
02 41 1617 1001Slab on Grade - Plain200CY$ - 0$ 77.00$ 89.50$ (89.50)16115.8659953368$ (16,115.87)
02 41 1617 1011Slab on Grade - Mesh Reinf.200CY$ - 0$ 104.50$ 110.78$ (110.78)21872.568545812$ (21,872.57)
02 41 1617 1021Slab on Grade - Rod Reinf.200CY$ - 0$ 138.50$ 122.00$ (122.00)28988.6652190776$ (28,988.67)
02 41 1617 1700BUILDING DEMO FOOTINGS AND FOUNDATION WALLS$ - 0$ - 0
02 41 1920 2000SELECTIVE DEMOLITION, DUMP CHARGES$ - 0$ - 0
02 41 1920 2001Disposal and Dump Fees10TON$ - 0$ 95.00$ 79.00$ (79.00)994.1605646474$ (994.16)
02 41 1925 1000SELECTIVE DEMOLITION, SAW CUTTING$ - 0$ - 0
02 41 1925 1001Saw Cut Asphalt 1"-6"200LF$ - 0$ 1.18$ 1.22$ (1.22)246.5974094696$ (246.60)
02 41 1925 1011Saw Cut Asphalt 7"-10"200LF$ - 0$ 5.20$ 5.98$ (5.98)1087.92974766$ (1,087.93)
02 41 1925 1021Saw Cut Asphalt 11"-14"200LF$ - 0$ 9.22$ 9.38$ (9.38)1929.2620858504$ (1,929.26)
02 41 1925 1031Saw Cut Asphalt 15"-18"200LF$ - 0$ 11.23$ 11.42$ (11.42)2349.9282549456$ (2,349.93)
02 65 1030 10190UNDERGROUND STORAGE TANK REMOVAL (FIBERGLASS/STEEL)$ - 0$ - 0
02 65 1030 101913000 gal to 5000 gal tank1EA$ - 0$ 449.50$ 460.50$ (460.50)470.4001004168$ (470.40)
02 65 1030 101916000 gal tank to 8000 gal tank1EA$ - 0$ 750.00$ 740.00$ (740.00)784.863603669$ (784.86)
02 65 1030 101919000 gal to 12000 gal tank1EA$ - 0$ 1,120.00$ 1,115.00$ (1,115.00)1172.062981479$ (1,172.06)
02 65 1030 10191Remove Residual Fuel, Diesel Or Gas200GAL$ - 0$ 0.22$ 0.22$ (0.22)45.5894370448$ (45.59)
02 65 1030 10191Remove & Dispose Contaminated Soil10CY$ - 0$ 245.50$ 241.50$ (241.50)2569.1720021883$ (2,569.17)
02 82 1339 1300ASBESTOS ABATEMENT$ - 0$ - 0
02 82 1339 1301Ceiling, Gypsum Board400SF$ - 0$ 1.09$ 1.09$ (1.09)455.894370448$ (455.89)
02 82 1339 1311Partitions (Transite Panels)400SF$ - 0$ 1.97$ 0.80$ (0.80)824.7543610832$ (824.75)
02 82 1339 1321Floor Tile & Tile Mastic and Carpet, Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.30$ 0.58$ (0.58)124.334828304$ (124.33)
02 82 1339 1331Ceiling Tile & Grid System, Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.19$ 1.31$ (1.31)78.7453912592$ (78.75)
02 82 1339 1341Built-Up Roofing Material, Roofing Felt, Flashing, Expansion Joint Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.75$ 0.90$ (0.90)310.83707076$ (310.84)
02 82 1339 1351Spray Applied Asbestos, Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 1.90$ 2.02$ (2.02)795.7429011456$ (795.74)
02 82 1339 1361Wire with Asbestos Covering, Pre-clean Remove, Bag and Dispose of at Landfill400LF$ - 0$ 0.20$ 0.21$ (0.21)82.889885536$ (82.89)
02 82 1339 1371Wall Tile & Mastic, Pre-clean Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.20$ 0.21$ (0.21)82.889885536$ (82.89)
02 82 1339 1381Mudded Joints, Remove, Bag and Dispose of at Landfill10EA$ - 0$ 38.00$ 40.28$ (40.28)397.664225859$ (397.66)
02 82 1339 1391Mudded Fittings, Remove, Bag and Dispose of at Landfill500SF$ - 0$ 3.80$ 4.03$ (4.03)1989.357252864$ (1,989.36)
02 82 1339 1401Refrigeration Putty3SF$ - 0$ 8.00$ 8.48$ (8.48)25.1156353174$ (25.12)
02 82 1339 1411Transite Panels and Wallboard, Interior, Pre-clean, Remove, Bag and Dispose of at Landfill3500SF$ - 0$ 1.92$ 2.04$ (2.04)7035.279034868$ (7,035.28)
02 82 1339 1421Transite Panels, Exterior, Pre-clean, Remove, Bag and Dispose of at Landfill800SF$ - 0$ 2.80$ 0.90$ (0.90)2345.7837606688$ (2,345.78)
02 82 1339 1431Transite Piping. Pre-clean Remove, Bag and Dispose of at Landfill200LF$ - 0$ 5.75$ 6.10$ (6.10)1203.9755874104$ (1,203.98)
02 82 1339 1441Debris, Remove, Bag and Dispose of at Landfill200SF$ - 0$ 1.80$ 1.91$ (1.91)377.1489791888$ (377.15)
02 82 1339 1451Soil Removed, Pre-clean, Remove, Bag and Dispose of at Landfill50CF$ - 0$ 11.00$ 11.66$ (11.66)575.5666426906$ (575.57)
02 82 1339 1461Containment: Initial 500 SF of Containment; to Include All Set Up, Decontamination, Tear Down, Disposal, Etc.6EA$ - 0$ 3,100.00$ 3,286.28$ (3,286.28)19464.6173709912$ (19,464.62)
02 82 1339 1471Containment: Add to Bid Item Above Amount For Each Additional 500 SF of Floor Space Subject to Containment6EA$ - 0$ 2,100.00$ 2,226.19$ (2,226.19)13185.7085416392$ (13,185.71)
02 82 1339 1481Containment: Free Standing Exterior Containment; all Inclusive for Exterior Facility Components (HVAC, Etc.)200SF$ - 0$ 9.00$ 9.54$ (9.54)1883.6726488056$ (1,883.67)
02 82 1339 1491Thermal System Insulation, Blown-In. 15,000 Remove, Bag, and Dispose of at Landfill15000SF$ - 0$ 0.12$ 0.13$ (0.13)1865.02242456$ (1,865.02)
02 82 1339 1501Concrete with Asbestos100CF$ - 0$ 13.33$ 14.14$ (14.14)1395.6584477124$ (1,395.66)
02 82 1343 2200BULK ASBESTOS REMOVAL$ - 0$ - 0
02 82 1343 2201Boiler Asbestos Insulation200SF$ - 0$ 5.81$ 5.80$ (5.80)1216.4090702408$ (1,216.41)
02 82 1343 2211Exterior of Duct Insulation, Pre-clean Remove, Bag and Dispose of at Landfill200SF$ - 0$ 1.50$ 1.15$ (1.15)314.9815650368$ (314.98)
02 82 1343 2221Remove Entire Duct With insulation, Pre-clean, Remove, Bag and Dispose of at Landfill200SF$ - 0$ 2.75$ 3.12$ (3.12)576.0847044752$ (576.08)
02 82 1343 22311/2” Thru 4” Size of Pipe Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose of at Landfill200LF$ - 0$ 5.75$ 3.04$ (3.04)1203.9755874104$ (1,203.98)
02 82 1343 2241Pipe 4" to 8" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 5.84$ 3.43$ (3.43)1222.625811656$ (1,222.63)
02 82 1343 2251Pipe 10" to 12" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 6.33$ 3.92$ (3.92)1324.1659214376$ (1,324.17)
02 82 1343 2261Pipe 14" to 16" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 8.13$ 4.97$ (4.97)1701.3149006264$ (1,701.31)
02 82 1345 4500OSHA TESTING$ - 0$ - 0
02 82 1345 4501Air Monitoring & Testing10DAY$ - 0$ 750.00$ 355.00$ (355.00)7848.63603669$ (7,848.64)
02 82 1345 4502RCRA8 Heavy Metals Report2EACH$ - 0$ 224.00$ 260.78$ (260.78)514.8705240069$ (514.87)
02 82 1345 4503TCLP Testing2EACH$ - 0$ 600.00$ 636.05$ (636.05)1255.7817658704$ (1,255.78)
02 82 1345 4504Final Field Tech Report1DAY$ - 0$ 1,100.00$ 1,166.10$ (1,166.10)1151.1332853812$ (1,151.13)
02 82 1346 10260ABATEMENT RESILIENT FLOOR TILE REMOVAL$ - 0$ - 0
02 82 1346 10261Abatement Resilient Floor Tile Removal (< 500 Sf)250SF$ - 0$ 0.43$ 0.58$ (0.58)111.383283689$ (111.38)
02 82 1346 10271Abatement Resilient Floor Tile Removal (> 500 Sf - < 1000 Sf)750SF$ - 0$ 0.43$ 0.58$ (0.58)334.149851067$ (334.15)
02 82 1346 10281Abatement Resilient Floor Tile Removal (> 1000 Sf)1500SF$ - 0$ 0.31$ 0.46$ (0.46)481.797459678$ (481.80)
02 82 1347 10200ABATEMENT MASTIC FLOOR REMOVAL$ - 0$ - 0
02 82 1347 10271Abatement Mastic Floor Removal1000SF$ - 0$ 2.30$ 1.15$ (1.15)2403.806680544$ (2,403.81)
02 82 1348 10200ABATEMENT CERAMIC FLOOR TILE REMOVAL$ - 0$ - 0
02 82 1348 10271Abatement Ceramic Floor Tile Removal (< 500 Sf)250SF$ - 0$ 0.69$ 0.73$ (0.73)181.32162461$ (181.32)
02 82 1348 10281Abatement Ceramic Floor Tile Removal (> 500 Sf - < 1000 Sf)750SF$ - 0$ 0.69$ 0.73$ (0.73)543.96487383$ (543.96)
02 82 1348 10291Abatement Ceramic Floor Tile Removal (> 1000 Sf)1500SF$ - 0$ 0.64$ 0.68$ (0.68)1010.22047997$ (1,010.22)
02 82 1349 10200ABATEMENT BASE BOARD REMOVAL$ - 0$ - 0
02 82 1349 10271Abatement Base Board Removal (< 500 Sf)250SF$ - 0$ 0.35$ 0.37$ (0.37)90.660812305$ (90.66)
02 82 1349 10281Abatement Base Board Removal (> 500 Sf - < 1000 Sf)750SF$ - 0$ 0.28$ 0.29$ (0.29)217.585949532$ (217.59)
02 82 1349 10291Abatement Base Board Removal (> 1000 Sf)1500SF$ - 0$ 0.22$ 0.23$ (0.23)341.920777836$ (341.92)
02 82 1350 10300ABATEMENT SUBFLOOR REMOVAL$ - 0$ - 0
02 82 1350 10371Abatement Subfloor Removal (< 500 Sf)250SF$ - 0$ 0.68$ 0.72$ (0.72)178.731315687$ (178.73)
02 82 1350 10381Abatement Subfloor Removal (> 500 Sf - < 1000 Sf)750SF$ - 0$ 0.68$ 0.72$ (0.72)536.193947061$ (536.19)
02 82 1350 10391Abatement Subfloor Removal (> 1000 Sf)1500SF$ - 0$ 0.68$ 0.72$ (0.72)1072.387894122$ (1,072.39)
02 83 19 2600LEAD BASED PAINT REMEDIATION$ - 0$ - 0
02 83 19 2601Scraping500SF$ - 0$ 7.91$ 7.72$ (7.72)4139.313658954$ (4,139.31)
02 83 19 2611Chemical Removal500SF$ - 0$ 4.84$ 4.57$ (4.57)2533.322126694$ (2,533.32)
02 83 19 2621Lead Base Paint Encap.500SF$ - 0$ 0.98$ 1.04$ (1.04)512.881166754$ (512.88)
02 83 19 2631Doors5000SF$ - 0$ 0.75$ 4.62$ (4.62)3937.26956296$ (3,937.27)
02 83 19 2641Walls, Ceilings, Etc.15000SF$ - 0$ 0.20$ 0.85$ (0.85)3108.3707076$ (3,108.37)
02 83 19 2651Windows5000LF$ - 0$ 0.75$ 0.63$ (0.63)3937.26956296$ (3,937.27)
02 83 19 2751Concrete PCB Abatement500SF$ - 0$ 1.75$ 1.86$ (1.86)916.969358742$ (916.97)
09 91 03 9000RESTORATION & TOUCH UP$ - 0$ - 0
09 91 03 9001Prep & Paint Gypsum wall1000SF$ - 0$ 0.74$ 0.79$ (0.79)777.0926769$ (777.09)
09 91 03 9011Prep & Paint Masonry, Concrete, Stucco Wall1000SF$ - 0$ 1.27$ 1.32$ (1.32)1326.238168576$ (1,326.24)
09 91 03 9021Prep & Paint Metals1000SF$ - 0$ 1.49$ 1.59$ (1.59)1554.1853538$ (1,554.19)
10 91 03 9031Restoration of CMU1000SF$ - 0$ 5.50$ 5.79$ (5.79)5720$ (5,720.00)
11 91 03 9041Restoration of Concrete1000SF$ - 0$ 5.25$ 5.53$ (5.53)5460$ (5,460.00)
12 91 03 9051Restoration of Wood Construction1000SF$ - 0$ 4.40$ 4.64$ (4.64)4576$ (4,576.00)
13 91 03 9061Restoration of Steel Construction1000SF$ - 0$ 4.80$ 5.06$ (5.06)4992$ (4,992.00)
22 05 0510 1000REMOVE PVC SERVICE LINES (NOTE: THESE UTILITY LINES MAY BE FOR POTABLE WATER, SEWER, OR STORM WATER DRAINAGE. PRICE TO INCLUDE TERMINATING AND CAPPING AT SERVICE MAIN)$ - 0$ - 0
22 05 0510 1001Up To 1-1/2" Pipe Diameter200LF$ - 0$ 2.22$ 1.53$ (1.53)464.1833590016$ (464.18)
22 05 0510 10212"< Pipe Diam. < 3"200LF$ - 0$ 2.59$ 1.91$ (1.91)542.9287502608$ (542.93)
22 05 0510 10314" < Pipe Diam < 6"200LF$ - 0$ 4.31$ 3.44$ (3.44)901.427505204$ (901.43)
22 05 0510 10418" < Pipe Diam < 14"200LF$ - 0$ 5.62$ 4.59$ (4.59)1177.0363746112$ (1,177.04)
22 05 0510 1051Pipe Diam 16"200LF$ - 0$ 8.05$ 6.85$ (6.85)1684.7369235192$ (1,684.74)
22 05 0510 1100REMOVE CONCRETE, TRANSITE, RCP, TERRA COTTA CLAY SERVICE LINES (NOTE: THESE UTILITY LINES MAY BE FOR POTABLE WATER, SEWER, CHILL WATER, OR STORM WATER DRAINAGE. PRICE TO INCLUDE TERMINATING AND CAPPING AT SERVICE MAIN)$ - 0$ - 0
22 05 0510 110112" Pipe Diameter200LF$ - 0$ 8.04$ 7.53$ (7.53)1682.6646763808$ (1,682.66)
22 05 0510 111115"< Pipe Diam. < 18"200LF$ - 0$ 17.95$ 17.15$ (17.15)3756.9840619192$ (3,756.98)
22 05 0510 112121" < Pipe Diam < 24"200LF$ - 0$ 22.15$ 21.40$ (21.40)4635.6168486008$ (4,635.62)
22 05 0510 113127" < Pipe Diam < 36"200LF$ - 0$ 29.30$ 28.55$ (28.55)6131.7792825256$ (6,131.78)
22 05 0510 1141Steel Welded Connection, 4" Diameter200LF$ - 0$ 8.99$ 8.23$ (8.23)1881.6004016672$ (1,881.60)
22 05 0510 1151Steel Welded Connection, 10" Diameter200LF$ - 0$ 16.67$ 16.52$ (16.52)3489.6641810656$ (3,489.66)
22 07 1910 1000RE-INSULATION OF ABATED PIPES$ - 0$ - 0
22 07 1910 1001< 4" PIPES200LF$ - 0$ 5.92$ 6.75$ (6.75)1239.2037887632$ (1,239.20)
22 07 1910 1061> 4" - < 8" PIPES200LF$ - 0$ 9.75$ 11.30$ (11.30)2041.163431324$ (2,041.16)
22 07 1910 1101> 8" - < 12" PIPES200LF$ - 0$ 11.85$ 13.65$ (13.65)2480.4798246648$ (2,480.48)
23 05 0210 1000SELECTIVE DEMOLITION FOR HVAC$ - 0$ - 0
23 05 0210 1011HVAC - Remove A/C-to 3 Ton5EA$ - 0$ 350.00$ 360.00$ (360.00)1831.348408561$ (1,831.35)
23 05 0210 1021HVAC - Remove A/C-3 to 10 Ton5EA$ - 0$ 995.00$ 1,054.79$ (1,054.79)5206.2619043377$ (5,206.26)
23 05 0210 1031HVAC - Remove Boiler5EA$ - 0$ 645.00$ 665.00$ (665.00)3374.9134957767$ (3,374.91)
23 05 0210 1041HVAC - Remove Water Heater5EA$ - 0$ 61.50$ 63.50$ (63.50)321.8199805935$ (321.82)
31 23 1642 4200EXCAVATING, BULK BANK MEASURE$ - 0$ - 0
31 23 1642 4201Fill and Compact 6" Lifts1000SY$ - 0$ 4.50$ 4.58$ (4.58)4714.36223986$ (4,714.36)
31 23 1642 4401Fill Dirt1000CY$ - 0$ 3.50$ 4.19$ (4.19)3667.877434968$ (3,667.88)
31 23 1642 4601Bulk Excavation1000CY$ - 0$ 3.40$ 4.30$ (4.30)3553.903842356$ (3,553.90)
32 91 1323 1321Sift Sand Through 1/2" Screen500CY$ - 0$ 8.50$ 9.20$ (9.20)4450.150729714$ (4,450.15)
32 91 1323 1331Protection Of Earth Surfaces5000SF$ - 0$ 0.93$ 0.99$ (0.99)4869.78077524$ (4,869.78)
32 91 1323 2300SOIL PREP$ - 0$ - 0
32 91 1323 2311Root Rake Sites1000SY$ - 0$ 2.12$ 2.25$ (2.25)2217.304438088$ (2,217.30)
32 91 1323 2321Demo/Remove Storm Debris2000CF$ - 0$ 2.91$ 3.09$ (3.09)6092.406586896$ (6,092.41)
32 92 0000 0000TURF and GRASSES$ - 0$ - 0
32 92 1913 1301SEEDING$ - 0$ - 0
32 92 1913 1301Topsoil Fill, Including Fine Grade20CY$ - 0$ 33.80$ 34.01$ (34.01)707.4651730498$ (707.47)
32 92 1913 1311Seeding, 1 - 500 Sy, Including Topsoil And Maintenance250SY$ - 0$ 2.46$ 2.60$ (2.60)642.396612904$ (642.40)
32 92 1913 1321Seeding, 501 - 4,840 Sy, (1 Acre)2420SY$ - 0$ 0.19$ 0.20$ (0.20)476.4096171182$ (476.41)
32 92 1913 1331Seeding, 4,841 - 24,200 Sy, (1 - 5 Acres)10000SY$ - 0$ 0.19$ 0.20$ (0.20)1968.63478148$ (1,968.63)
32 92 1913 1341Seeding, > 24,201 Sy, (5 Acres Or More)25000SY$ - 0$ 0.19$ 0.20$ (0.20)4921.5869537$ (4,921.59)
32 92 2310 1000SODDING$ - 0$ - 0
32 92 2310 1001Sodding, 1 - 1000 Sf, (2 Pallets), Including Topsoil And Maintenance500SF$ - 0$ 0.46$ 0.66$ (0.66)238.308420916$ (238.31)
32 92 2310 1011Sodding, 1,000 - 4,000 Sf, (2 - 8 Pallets)1500SF$ - 0$ 0.39$ 0.54$ (0.54)606.132287982$ (606.13)
32 92 2310 1021Sodding, > 4,000 Sf, (8 Pallets Or More)5000SF$ - 0$ 0.34$ 0.49$ (0.49)1761.41006764$ (1,761.41)
32 96 4320 1000REMOVE TREES INCLUDING STUMPS$ - 0$ - 0
32 96 4320 10014"< Diameter5EA$ - 0$ 218.10$ 238.60$ (238.60)1141.1864991169$ (1,141.19)
32 96 4320 20015" - 12" Diameter5EA$ - 0$ 377.50$ 408.50$ (408.50)1975.2659723229$ (1,975.27)
32 96 4320 300113"- 24"5EA$ - 0$ 466.00$ 502.50$ (502.50)2438.3095953984$ (2,438.31)
32 96 4320 400124"> Diameter5EA$ - 0$ 624.00$ 670.50$ (670.50)3265.032591263$ (3,265.03)
$ - 0$ - 0
Concrete core drilling, core, reinforced concrete slab, 6" diameter, up to 14" thick slab, includes bit cost, layout and set up time1EA$ - 0$ - 0$ 238.60$ (238.60)1141.1864991169$ (1,141.19)
Building demolition, large urban projects, steel, includes 20 mile haul, excludes foundation demolition, dump fees1CF$ - 0$ - 0$ 408.50$ (408.50)1975.2659723229$ (1,975.27)
Steel disposal savings, unit cost credit, excludes handling, packaging, or disposal costs1LB$ - 0$ - 0$ 502.50$ (502.50)2438.3095953984$ (2,438.31)
FDOT No 57 Stone (3/4")1CY$ - 0$ - 0$ 670.50$ (670.50)3265.032591263$ (3,265.03)
SELECTIVE SITE DEMOLITION$ - 0$ 519,468.49
SUBTOTAL ASBESTOS REMOVAL$ - 0$ 76,739.03
SUBTOTAL LEAD REMOVAL$ - 0$ 18,238.75
SUBTOTAL NEW CONSTRUCTION$ - 0$ 23,450.00
SUBTOTAL BUILDING DEMOLITION$ - 0$ 40,939.50
SUBTOTAL$ - 0$ 678,835.77
$ 6,788.36
1ST YEAR ESTIMATED TOTAL PRICE$ - 0$ 685,624.13$ (685,624.13)
AGGREGATE TOTALS
1ST YEAR ESTIMATED TOTAL PRICE$ - 0
2ND YEAR ESTIMATED TOTAL PRICE$ - 0
3RD YEAR ESTIMATED TOTAL PRICE$ - 0
TOTAL ESTIMATED AGGREGATE PRICE$ - 0

Yr Two

IDIQ DEMOLITION PRICING SHEET (Second Year)SOLICITATION NUMBERDATE
TBD
PROJECT: DEMOLITION DIVISION 2
PROJECT NO.WORK ORDER NO.
N/A
ITEM DESCRIPTIONESTIMATED QUANTITYCOSTOLD COST
NO.UNITNEW YR 1
UNITSMEASPER UNITTOTALPER UNITTOTAL
02 41 1300 0000SELECTIVE SITE DEMOLITION
02 41 1317 5000DEMOLISH, REMOVE PAVEMENT and CURBS
02 41 1317 5111.1Asphalt to 3" Thick300SY$ - 0$ 4.14$ 1,293.50$ 1,293.50
02 41 1317 5121.1Asphalt 4" to 6" Thick200SY$ - 0$ 6.67$ 1,414.85$ 1,414.85
02 41 1317 5131.1Asphalt 7" to 10" Thick200SY$ - 0$ 7.68$ 1,812.98$ 1,812.98
02 41 1317 5141.1Asphalt 11" to 14" Thick200SY$ - 0$ 9.55$ 2,202.36$ 2,202.36
02 41 1317 5151.1Asphalt 15" to 18" Thick200SY$ - 0$ 11.43$ 2,596.17$ 2,596.17
02 41 1317 5201.1Concrete to 6" Thick - Mesh Reinf5000SY$ - 0$ 10.97$ 58,334.94$ 58,334.94
02 41 1317 5301.1Concrete to 6" Thick - Rod Reinf500SY$ - 0$ 13.99$ 7,399.04$ 7,399.04
02 41 1317 5401.1Concrete 7" to 24" Plain200Cy$ - 0$ 84.84$ 18,079.00$ 18,079.00
02 41 1317 5501.1Concrete 7" to 24" Rein200Cy$ - 0$ 116.66$ 24,645.06$ 24,645.06
02 41 1317 6001.1Curbing, plain1000LF$ - 0$ 3.45$ 3,692.11$ 3,692.11
02 41 1317 6101.1Curb and Gutter, Concrete1000LF$ - 0$ 4.53$ 4,832.67$ 4,832.67
02 41 1317 6301.1Curb and Gutter, Bituminous200LF$ - 0$ 2.36$ 504.27$ 504.27
02 41 1317 6401.1Demo gravel driveway1875CY$ - 0$ 4.14$ 8,709.15$ 8,709.15
02 41 1323 2300DEMOLITION OF DRAINAGE STRUCTURE$ - 0
02 41 1323 2301.1Concrete Pipe up to 12" Diameter200LF$ - 0$ 7.11$ 1,520.97$ 1,520.97
02 41 1323 2401.112"< Concrete Pipe < 15" Diameter200LF$ - 0$ 16.61$ 3,463.36$ 3,463.36
02 41 1323 2501.115"< Concrete Pipe < 24" Diameter200LF$ - 0$ 20.86$ 4,323.53$ 4,323.53
02 41 1323 2601.124" < concrete Pipe <36" Diameter200LF$ - 0$ 27.83$ 5,768.03$ 5,768.03
02 41 1323 2801.1Concrete Pad500SY$ - 0$ 8.32$ 4,154.95$ 4,154.95
02 41 1323 2901.1Catch Basin/Manhole5EA$ - 0$ 178.77$ 951.93$ 951.93
02 41 1330 3000SELECTIVE DEMOLITION$ - 0
02 41 1330 3001.1Wood Decking, including Framing600SF$ - 0$ 1.92$ 1,221.86$ 1,221.86
02 41 1330 3011.1Wood Friction Piles700VLF$ - 0$ 9.60$ 5,779.20$ 5,779.20
02 41 1330 3021.1Above Ground Piping, 1/2” to 6” Diameter, Including Supports400LF$ - 0$ 2.02$ 856.55$ 856.55
02 41 1330 3031.1Above Ground Piping, 7” to 12” Diameter, Including Supports200LF$ - 0$ 2.88$ 610.93$ 610.93
02 41 1330 3041.1UG Piping, Beyond 5’ From Building Perimeter, 1/2” to 6” Diameter, no excavation200LF$ - 0$ 4.80$ 1,018.22$ 1,018.22
02 41 1330 3051.1UG Piping, Beyond 5’ From Building Perimeter, Greater Than 6” Diameter, no excavation200LF$ - 0$ 9.39$ 1,990.21$ 1,990.21
02 41 1330 3061.1Fire Hydrant & Valve5EA$ - 0$ 1,073.63$ 5,666.10$ 5,666.10
02 41 1330 3071.1Duct Bank, Reinforced Concrete100CY$ - 0$ 19.86$ 2,105.70$ 2,105.70
02 41 1330 3081.1Fencing, Wood200LF$ - 0$ 1.45$ 310.14$ 310.14
02 41 1330 3091.1Pits with Metal Covers5EA$ - 0$ 157.91$ 833.23$ 833.23
02 41 1330 4001.1Masonry Wall3600CF$ - 0$ 1.94$ 7,566.00$ 7,566.00
02 41 1330 5001.1Steel Tower900TON$ - 0$ 61.61$ 754.34$ 754.34
02 41 1330 6001.1Electrical Switch/Panel Hookups/Equipment20EA$ - 0$ 115.14$ 2,040.20$ 2,040.20
02 41 1330 6011.1Floodlight, Low Pressure Sodium5EA$ - 0$ 199.98$ 106.05$ 106.05
02 41 1330 6021.1Floodlight, Mercury Vapor5EA$ - 0$ 199.98$ 113.63$ 113.63
02 41 1330 7001.1Remove large capacity surge pumps3EA$ - 0$ 9,393.00$ 95.45$ 95.45
02 41 1360 2000REMOVE WIRE FENCING$ - 0
02 41 1360 2001.1Barbed Wire to 5 Strand500LF$ - 0$ 1.92$ 1,025.68$ 1,025.68
02 41 1360 2011.1Chain Link to 10' High, post & fabric without foundation500LF$ - 0$ 2.81$ 1,490.92$ 1,490.92
02 41 1360 2031.1Chain Link to 8’ Height Including Posts & Foundation500LF$ - 0$ 3.12$ 1,669.99$ 1,669.99
02 41 1360 2041.1Demo Gates,10-12' wide8EA$ - 0$ 78.28$ 666.64$ 666.64
02 41 1613 1300BUILDING DEMOLITION -EXCL SALVAGE, FOUNDATION DEMO OR DUMP FEES$ - 0
02 41 1613 1321.1Wood Frame, CF volume of inside structure92500CF$ - 0$ 0.29$ 28,675.00$ 28,675.00
02 41 1613 1351.1Reinforced Masonry, CF volume of inside structure50000CF$ - 0$ 0.30$ 15,500.00$ 15,500.00
02 41 1613 1361.1Reinforced Concrete, CF volume of inside structure50000CF$ - 0$ 0.38$ 19,500.00$ 19,500.00
02 41 1613 1371.1Metal (Steel), CF volume of inside structure50000CF$ - 0$ 0.27$ 14,500.00$ 14,500.00
02 41 1617 1031.1Concrete, 25” to 48” Thick, Reinforced100CY$ - 0$ 85.85$ 9,100.86$ 9,100.86
02 41 1617 1041.1Concrete, 49” to 72” Thick, Reinforced100CY$ - 0$ 95.95$ 10,171.55$ 10,171.55
02 41 1617 1711.12' Wide X 1' Thick Footing600LF$ - 0$ 11.62$ 5,844.35$ 5,844.35
02 41 1617 1721.13' Wide X 2' Thick Footing600LF$ - 0$ 19.90$ 10,042.93$ 10,042.93
02 41 1617 1731.1Walls, Masonry or Concrete, Solid Including Foundation6000SF$ - 0$ 0.96$ 7,093.89$ 7,093.89
02 41 1617 1741.1Walls, Masonry, Cavity including Foundation6000SF$ - 0$ 0.80$ 5,893.67$ 5,893.67
02 41 1617 1751.1Concrete, 7” to 24” Thick, Plain200CY$ - 0$ 57.57$ 12,205.87$ 12,205.87
02 41 1617 1000DEMO SOG$ - 0
02 41 1617 1001.1Slab on Grade - Plain200CY$ - 0$ 77.77$ 18,079.00$ 18,079.00
02 41 1617 1011.1Slab on Grade - Mesh Reinf.200CY$ - 0$ 105.55$ 22,379.54$ 22,379.54
02 41 1617 1021.1Slab on Grade - Rod Reinf.200CY$ - 0$ 139.89$ 24,644.88$ 24,644.88
02 41 1617 1700BUILDING DEMO FOOTINGS AND FOUNDATION WALLS$ - 0
02 41 1920 2000SELECTIVE DEMOLITION, DUMP CHARGES$ - 0
02 41 1920 2001.1Disposal and Dump Fees10TON$ - 0$ 95.95$ 797.90$ 797.90
02 41 1925 1000SELECTIVE DEMOLITION, SAW CUTTING$ - 0
02 41 1925 1001.1Saw Cut Asphalt 1"-6"200LF$ - 0$ 1.19$ 246.07$ 246.07
02 41 1925 1011.1Saw Cut Asphalt 7"-10"200LF$ - 0$ 5.25$ 1,207.50$ 1,207.50
02 41 1925 1021.1Saw Cut Asphalt 11"-14"200LF$ - 0$ 9.31$ 1,894.31$ 1,894.31
02 41 1925 1031.1Saw Cut Asphalt 15"-18"200LF$ - 0$ 11.34$ 2,306.37$ 2,306.37
02 65 1030 10190UNDERGROUND STORAGE TANK REMOVAL (FIBERGLASS/STEEL)$ - 0
02 65 1030 10191.13000 gal to 5000 gal tank1EACH$ - 0$ 454.00$ 465.11$ 465.11
02 65 1030 10191.16000 gal tank to 8000 gal tank1EACH$ - 0$ 757.50$ 747.40$ 747.40
02 65 1030 10191.19000 gal to 12000 gal tank1EACH$ - 0$ 1,131.20$ 1,126.15$ 1,126.15
02 65 1030 10191.1Remove Residual Fuel, Diesel Or Gas200GAL$ - 0$ 0.22$ 44.00$ 44.00
02 65 1030 10191.1Remove & Dispose Contaminated Soil10CY$ - 0$ 247.96$ 2,439.20$ 2,439.20
02 82 1339 1300ASBESTOS ABATEMENT$ - 0
02 82 1339 1301.1Ceiling, Gypsum Board400SF$ - 0$ 1.10$ 440.00$ 440.00
02 82 1339 1311.1Partitions (Transite Panels)400SF$ - 0$ 1.99$ 323.25$ 323.25
02 82 1339 1321.1Floor Tile & Tile Mastic and Carpet, Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.30$ 232.00$ 232.00
02 82 1339 1331.1Ceiling Tile & Grid System, Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.19$ 524.00$ 524.00
02 82 1339 1341.1Built-Up Roofing Material, Roofing Felt, Flashing, Expansion Joint Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.75$ 360.00$ 360.00
02 82 1339 1351.1Spray Applied Asbestos, Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 1.92$ 814.57$ 814.57
02 82 1339 1361.1Wire with Asbestos Covering, Pre-clean Remove, Bag and Dispose of at Landfill400LF$ - 0$ 0.20$ 83.97$ 83.97
02 82 1339 1371.1Wall Tile & Mastic, Pre-clean Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.20$ 83.97$ 83.97
02 82 1339 1381.1Mudded Joints, Remove, Bag and Dispose of at Landfill10EA$ - 0$ 38.38$ 406.86$ 406.86
02 82 1339 1391.1Mudded Fittings, Remove, Bag and Dispose of at Landfill500SF$ - 0$ 3.84$ 2,036.43$ 2,036.43
02 82 1339 1401.1Refrigeration Putty3SF$ - 0$ 8.08$ 25.70$ 25.70
02 82 1339 1411.1Transite Panels and Wallboard, Interior, Pre-clean, Remove, Bag and Dispose of at Landfill3500SF$ - 0$ 1.94$ 7,200.97$ 7,200.97
02 82 1339 1421.1Transite Panels, Exterior, Pre-clean, Remove, Bag and Dispose of at Landfill800SF$ - 0$ 2.83$ 727.71$ 727.71
02 82 1339 1431.1Transite Piping. Pre-clean Remove, Bag and Dispose of at Landfill200LF$ - 0$ 5.81$ 1,232.35$ 1,232.35
02 82 1339 1441.1Debris, Remove, Bag and Dispose of at Landfill200SF$ - 0$ 1.82$ 386.30$ 386.30
02 82 1339 1451.1Soil Removed, Pre-clean, Remove, Bag and Dispose of at Landfill50CF$ - 0$ 11.11$ 588.88$ 588.88
02 82 1339 1461.1Containment: Initial 500 SF of Containment; to Include All Set Up, Decontamination, Tear Down, Disposal, Etc.6EA$ - 0$ 3,131.00$ 19,914.83$ 19,914.83
02 82 1339 1471.1Containment: Add to Bid Item Above Amount For Each Additional 500 SF of Floor Space Subject to Containment6EA$ - 0$ 2,121.00$ 13,490.69$ 13,490.69
02 82 1339 1481.1Containment: Free Standing Exterior Containment; all Inclusive for Exterior Facility Components (HVAC, Etc.)200SF$ - 0$ 9.09$ 1,927.24$ 1,927.24
02 82 1339 1491.1Thermal System Insulation, Blown-In. 15,000 Remove, Bag, and Dispose of at Landfill15000SF$ - 0$ 0.12$ 1,908.16$ 1,908.16
02 82 1339 1501.1Concrete with Asbestos100CF$ - 0$ 13.47$ 1,428.29$ 1,428.29
02 82 1343 2200BULK ASBESTOS REMOVAL$ - 0
02 82 1343 2201.1Boiler Asbestos Insulation200SF$ - 0$ 5.87$ 1,171.98$ 1,171.98
02 82 1343 2211.1Exterior of Duct Insulation, Pre-clean Remove, Bag and Dispose of at Landfill200SF$ - 0$ 1.52$ 233.07$ 233.07
02 82 1343 2221.1Remove Entire Duct With insulation, Pre-clean, Remove, Bag and Dispose of at Landfill200SF$ - 0$ 2.78$ 630.81$ 630.81
02 82 1343 2231.11/2” Thru 4” Size of Pipe Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose of at Landfill200LF$ - 0$ 5.81$ 614.34$ 614.34
02 82 1343 2241.1Pipe 4" to 8" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 5.90$ 693.40$ 693.40
02 82 1343 2251.1Pipe 10" to 12" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 6.39$ 791.68$ 791.68
02 82 1343 2261.1Pipe 14" to 16" Diameter Including Fittings, Valves, Etc. Pre-clean, Remove and Bag all Covering, and Dispose200LF$ - 0$ 8.21$ 1,003.66$ 1,003.66
02 82 1345 4500OSHA TESTING$ - 0
02 82 1345 4501.1Air Monitoring & Testing10DAY$ - 0$ 757.50$ 3,585.50$ 3,585.50
02 82 1345 4502.1RCRA8 Heavy Metals Report2EACH$ - 0$ 248.46$ 578.52$ 578.52
02 82 1345 4503.1TCLP Testing2EACH$ - 0$ 606.00$ 1,284.83$ 1,284.83
02 82 1345 4504.1Final Field Tech Report1DAY$ - 0$ 1,111.00$ 1,177.76$ 1,177.76
02 82 1346 10260ABATEMENT RESILIENT FLOOR TILE REMOVAL$ - 0
02 82 1346 10261.1Abatement Resilient Floor Tile Removal (< 500 Sf)250SF$ - 0$ 0.43$ 145.00$ 145.00
02 82 1346 10271.1Abatement Resilient Floor Tile Removal (> 500 Sf - < 1000 Sf)750SF$ - 0$ 0.43$ 435.00$ 435.00
02 82 1346 10281.1Abatement Resilient Floor Tile Removal (> 1000 Sf)1500SF$ - 0$ 0.31$ 683.50$ 683.50
02 82 1347 10200ABATEMENT MASTIC FLOOR REMOVAL$ - 0
02 82 1347 10271.1Abatement Mastic Floor Removal1000SF$ - 0$ 2.32$ 1,160.00$ 1,160.00
02 82 1348 10200ABATEMENT CERAMIC FLOOR TILE REMOVAL$ - 0
02 82 1348 10271.1Abatement Ceramic Floor Tile Removal (< 500 Sf)250SF$ - 0$ 0.70$ 186.34$ 186.34
02 82 1348 10281.1Abatement Ceramic Floor Tile Removal (> 500 Sf - < 1000 Sf)750SF$ - 0$ 0.70$ 559.02$ 559.02
02 82 1348 10291.1Abatement Ceramic Floor Tile Removal (> 1000 Sf)1500SF$ - 0$ 0.65$ 1,039.34$ 1,039.34
02 82 1349 10200ABATEMENT BASE BOARD REMOVAL$ - 0
02 82 1349 10271.1Abatement Base Board Removal (< 500 Sf)250SF$ - 0$ 0.35$ 91.84$ 91.84
02 82 1349 10281.1Abatement Base Board Removal (> 500 Sf - < 1000 Sf)750SF$ - 0$ 0.28$ 220.41$ 220.41
02 82 1349 10291.1Abatement Base Board Removal (> 1000 Sf)1500SF$ - 0$ 0.22$ 346.37$ 346.37
02 82 1350 10300ABATEMENT SUBFLOOR REMOVAL$ - 0
02 82 1350 10371.1Abatement Subfloor Removal (< 500 Sf)250SF$ - 0$ 0.69$ 183.72$ 183.72
02 82 1350 10381.1Abatement Subfloor Removal (> 500 Sf - < 1000 Sf)750SF$ - 0$ 0.69$ 551.15$ 551.15
02 82 1350 10391.1Abatement Subfloor Removal (> 1000 Sf)1500SF$ - 0$ 0.69$ 1,102.30$ 1,102.30
02 83 19 2600LEAD BASED PAINT REMEDIATION$ - 0
02 83 19 2601.1Scraping500SF$ - 0$ 7.99$ 3,897.75$ 3,897.75
02 83 19 2611.1Chemical Removal500SF$ - 0$ 4.89$ 2,308.61$ 2,308.61
02 83 19 2621.1Lead Base Paint Encap.500SF$ - 0$ 0.99$ 525.31$ 525.31
02 83 19 2631.1Doors5000SF$ - 0$ 0.76$ 23,408.00$ 23,408.00
02 83 19 2641.1Walls, Ceilings, Etc.15000SF$ - 0$ 0.20$ 12,750.00$ 12,750.00
02 83 19 2651.1Windows5000LF$ - 0$ 0.76$ 3,180.74$ 3,180.74
02 83 19 2751.1Concrete PCB Abatement500SF$ - 0$ 1.77$ 939.51$ 939.51
09 91 03 9000RESTORATION & TOUCH UP$ - 0
09 91 03 9001.1Prep & Paint Gypsum wall1000SF$ - 0$ 0.75$ 800.68$ 800.68
09 91 03 9011.1Prep & Paint Masonry, Concrete, Stucco Wall1000SF$ - 0$ 1.28$ 1,330.39$ 1,330.39
09 91 03 9021.1Prep & Paint Metals1000SF$ - 0$ 1.50$ 1,598.66$ 1,598.66
10 91 03 9031.1Restoration of CMU1000SF$ - 0$ 5.56$ 5,857.57$ 5,857.57
11 91 03 9041.1Restoration of Concrete1000SF$ - 0$ 5.30$ 5,583.66$ 5,583.66
12 91 03 9051.1Restoration of Wood Construction1000SF$ - 0$ 4.44$ 4,677.63$ 4,677.63
13 91 03 9061.1Restoration of Steel Construction1000SF$ - 0$ 4.85$ 5,109.57$ 5,109.57
22 05 0510 1000REMOVE PVC SERVICE LINES (NOTE: THESE UTILITY LINES MAY BE FOR POTABLE WATER, SEWER, OR STORM WATER DRAINAGE. PRICE TO INCLUDE TERMINATING AND CAPPING AT SERVICE MAIN)$ - 0
22 05 0510 1001.1Up To 1-1/2" Pipe Diameter200LF$ - 0$ 2.24$ 308.76$ 308.76
22 05 0510 1021.12"< Pipe Diam. < 3"200LF$ - 0$ 2.62$ 386.42$ 386.42
22 05 0510 1031.14" < Pipe Diam < 6"200LF$ - 0$ 4.35$ 694.39$ 694.39
22 05 0510 1041.18" < Pipe Diam < 14"200LF$ - 0$ 5.68$ 927.80$ 927.80
22 05 0510 1051.1Pipe Diam 16"200LF$ - 0$ 8.13$ 1,383.61$ 1,383.61
22 05 0510 1100REMOVE CONCRETE, TRANSITE, RCP, TERRA COTTA CLAY SERVICE LINES (NOTE: THESE UTILITY LINES MAY BE FOR POTABLE WATER, SEWER, CHILL WATER, OR STORM WATER DRAINAGE. PRICE TO INCLUDE TERMINATING AND CAPPING AT SERVICE MAIN)$ - 0
22 05 0510 1101.112" Pipe Diameter200LF$ - 0$ 8.12$ 1,520.99$ 1,520.99
22 05 0510 1111.115"< Pipe Diam. < 18"200LF$ - 0$ 18.13$ 3,464.40$ 3,464.40
22 05 0510 1121.121" < Pipe Diam < 24"200LF$ - 0$ 22.37$ 4,322.51$ 4,322.51
22 05 0510 1131.127" < Pipe Diam < 36"200LF$ - 0$ 29.59$ 5,766.52$ 5,766.52
22 05 0510 1141.1Steel Welded Connection, 4" Diameter200LF$ - 0$ 9.08$ 1,662.48$ 1,662.48
22 05 0510 1151.1Steel Welded Connection, 10" Diameter200LF$ - 0$ 16.84$ 3,337.69$ 3,337.69
22 07 1910 1000RE-INSULATION OF ABATED PIPES$ - 0
22 07 1910 1001.1< 4" PIPES200LF$ - 0$ 5.98$ 1,363.68$ 1,363.68
22 07 1910 1061.1> 4" - < 8" PIPES200LF$ - 0$ 9.85$ 2,283.18$ 2,283.18
22 07 1910 1101.1> 8" - < 12" PIPES200LF$ - 0$ 11.97$ 2,757.65$ 2,757.65
23 05 0210 1000SELECTIVE DEMOLITION FOR HVAC$ - 0
23 05 0210 1011.1HVAC - Remove A/C-to 3 Ton5EA$ - 0$ 353.50$ 1,818.00$ 1,818.00
23 05 0210 1021.1HVAC - Remove A/C-3 to 10 Ton5EA$ - 0$ 1,004.95$ 5,326.68$ 5,326.68
23 05 0210 1031.1HVAC - Remove Boiler5EA$ - 0$ 651.45$ 3,358.25$ 3,358.25
23 05 0210 1041.1HVAC - Remove Water Heater5EA$ - 0$ 62.12$ 320.70$ 320.70
31 23 1642 4200EXCAVATING, BULK BANK MEASURE$ - 0
31 23 1642 4201.1Fill and Compact 6" Lifts1000SY$ - 0$ 4.55$ 4,634.26$ 4,634.26
31 23 1642 4401.1Fill Dirt1000CY$ - 0$ 3.54$ 4,237.89$ 4,237.89
31 23 1642 4601.1Bulk Excavation1000CY$ - 0$ 3.43$ 4,337.94$ 4,337.94
32 91 1323 1321.1Sift Sand Through 1/2" Screen500CY$ - 0$ 8.59$ 4,648.71$ 4,648.71
32 91 1323 1331.1Protection Of Earth Surfaces5000SF$ - 0$ 0.94$ 4,986.13$ 4,986.13
32 91 1323 2300SOIL PREP$ - 0
32 91 1323 2311.1Root Rake Sites1000SY$ - 0$ 2.14$ 2,267.32$ 2,267.32
32 91 1323 2321.1Demo/Remove Storm Debris2000CF$ - 0$ 2.94$ 6,240.79$ 6,240.79
32 92 0000 0000TURF and GRASSES$ - 0
32 92 1913 1301SEEDING$ - 0
32 92 1913 1301.1Topsoil Fill, Including Fine Grade20CY$ - 0$ 34.14$ 687.04$ 687.04
32 92 1913 1311.1Seeding, 1 - 500 Sy, Including Topsoil And Maintenance250SY$ - 0$ 2.48$ 656.04$ 656.04
32 92 1913 1321.1Seeding, 501 - 4,840 Sy, (1 Acre)2420SY$ - 0$ 0.19$ 490.39$ 490.39
32 92 1913 1331.1Seeding, 4,841 - 24,200 Sy, (1 - 5 Acres)10000SY$ - 0$ 0.19$ 2,026.40$ 2,026.40
32 92 1913 1341.1Seeding, > 24,201 Sy, (5 Acres Or More)25000SY$ - 0$ 0.19$ 5,066.00$ 5,066.00
32 92 2310 1000SODDING$ - 0
32 92 2310 1001.1Sodding, 1 - 1000 Sf, (2 Pallets), Including Topsoil And Maintenance500SF$ - 0$ 0.46$ 332.00$ 332.00
32 92 2310 1011.1Sodding, 1,000 - 4,000 Sf, (2 - 8 Pallets)1500SF$ - 0$ 0.39$ 804.75$ 804.75
32 92 2310 1021.1Sodding, > 4,000 Sf, (8 Pallets Or More)5000SF$ - 0$ 0.34$ 2,437.50$ 2,437.50
32 96 4320 1000REMOVE TREES INCLUDING STUMPS$ - 0
32 96 4320 1001.14"< Diameter5EA$ - 0$ 220.28$ 1,204.92$ 1,204.92
32 96 4320 2001.15" - 12" Diameter5EA$ - 0$ 381.28$ 2,062.95$ 2,062.95
32 96 4320 3001.113"- 24"5EA$ - 0$ 470.66$ 2,537.63$ 2,537.63
32 96 4320 4001.124"> Diameter5EA$ - 0$ 630.24$ 3,386.03$ 3,386.03
$ - 0
Concrete core drilling, core, reinforced concrete slab, 6" diameter, up to 14" thick slab, includes bit cost, layout and set up time1EA$ - 0$ - 0$ 1,204.92$ 1,204.92
Building demolition, large urban projects, steel, includes 20 mile haul, excludes foundation demolition, dump fees1CF$ - 0$ - 0$ 2,062.95$ 2,062.95
Steel disposal savings, unit cost credit, excludes handling, packaging, or disposal costs1LB$ - 0$ - 0$ 2,537.63$ 2,537.63
FDOT No 57 Stone (3/4")1CY$ - 0$ - 0$ 3,386.03$ 3,386.03
SELECTIVE SITE DEMOLITION$ - 0$ 523,548.59
SUBTOTAL ASBESTOS REMOVAL$ - 0$ 75,213.96
SUBTOTAL LEAD REMOVAL$ - 0$ 18,420.00
SUBTOTAL NEW CONSTRUCTION$ - 0$ 23,680.00
SUBTOTAL BUILDING DEMOLITION$ - 0$ 41,350.10
SUBTOTAL$ - 0$ 682,212.65
$ 6,822.13
2ND YEAR ESTIMATED TOTAL PRICE$ - 0$ 689,034.78$ (689,034.78)

Yr Three

IDIQ DEMOLITION PRICING SHEET (Third Year)SOLICITATION NUMBERDATE
TBD
PROJECT: DEMOLITION DIVISION 2
PROJECT NO.WORK ORDER NO.
N/A
ITEM DESCRIPTIONESTIMATED QUANTITYCOSTOLD COST
NO.UNIT
UNITSMEASPER UNITTOTALPER UNIT
02 41 1300 0000SELECTIVE SITE DEMOLITION
02 41 1317 5000DEMOLISH, REMOVE PAVEMENT and CURBS
02 41 1317 5111.2Asphalt to 3" Thick300SY$ - 0$ 4.18
02 41 1317 5121.2Asphalt 4" to 6" Thick200SY$ - 0$ 6.74
02 41 1317 5131.2Asphalt 7" to 10" Thick200SY$ - 0$ 7.76
02 41 1317 5141.2Asphalt 11" to 14" Thick200SY$ - 0$ 9.65
02 41 1317 5151.2Asphalt 15" to 18" Thick200SY$ - 0$ 11.54
02 41 1317 5201.2Concrete to 6" Thick - Mesh Reinf5000SY$ - 0$ 11.08
02 41 1317 5301.2Concrete to 6" Thick - Rod Reinf500SY$ - 0$ 14.13
02 41 1317 5401.2Concrete 7" to 24" Plain200Cy$ - 0$ 85.69
02 41 1317 5501.2Concrete 7" to 24" Rein200Cy$ - 0$ 117.83
02 41 1317 6001.2Curbing, plain1000LF$ - 0$ 3.48
02 41 1317 6101.2Curb and Gutter, Concrete1000LF$ - 0$ 4.58
02 41 1317 6301.2Curb and Gutter, Bituminous200LF$ - 0$ 2.38
02 41 1317 6401.2Demo gravel driveway1875CY$ - 0$ 4.18
02 41 1323 2300DEMOLITION OF DRAINAGE STRUCTURE
02 41 1323 2301.2Concrete Pipe up to 12" Diameter200LF$ - 0$ 7.18
02 41 1323 2401.212"< Concrete Pipe < 15" Diameter200LF$ - 0$ 16.78
02 41 1323 2501.215"< Concrete Pipe < 24" Diameter200LF$ - 0$ 21.07
02 41 1323 2601.224" < concrete Pipe <36" Diameter200LF$ - 0$ 28.11
02 41 1323 2801.2Concrete Pad500SY$ - 0$ 8.40
02 41 1323 2901.2Catch Basin/Manhole5EA$ - 0$ 180.56
02 41 1330 3000SELECTIVE DEMOLITION
02 41 1330 3001.2Wood Decking, including Framing600SF$ - 0$ 1.94
02 41 1330 3011.2Wood Friction Piles700VLF$ - 0$ 9.70
02 41 1330 3021.2Above Ground Piping, 1/2” to 6” Diameter, Including Supports400LF$ - 0$ 2.04
02 41 1330 3031.2Above Ground Piping, 7” to 12” Diameter, Including Supports200LF$ - 0$ 2.91
02 41 1330 3041.2UG Piping, Beyond 5’ From Building Perimeter, 1/2” to 6” Diameter, no excavation200LF$ - 0$ 4.85
02 41 1330 3051.2UG Piping, Beyond 5’ From Building Perimeter, Greater Than 6” Diameter, no excavation200LF$ - 0$ 9.48
02 41 1330 3061.2Fire Hydrant & Valve5EA$ - 0$ 1,084.37
02 41 1330 3071.2Duct Bank, Reinforced Concrete100CY$ - 0$ 20.06
02 41 1330 3081.2Fencing, Wood200LF$ - 0$ 1.46
02 41 1330 3091.2Pits with Metal Covers5EA$ - 0$ 159.49
02 41 1330 4001.2Masonry Wall3600CF$ - 0$ 1.96
02 41 1330 5001.2Steel Tower900TON$ - 0$ 62.23
02 41 1330 6001.2Electrical Switch/Panel Hookups/Equipment20EA$ - 0$ 116.29
02 41 1330 6011.2Floodlight, Low Pressure Sodium5EA$ - 0$ 201.98
02 41 1330 6021.2Floodlight, Mercury Vapor5EA$ - 0$ 201.98
02 41 1330 7001.2Remove large capacity surge pumps3EA$ - 0$ 9,486.93
02 41 1360 2000REMOVE WIRE FENCING
02 41 1360 2001.2Barbed Wire to 5 Strand500LF$ - 0$ 1.94
02 41 1360 2011.2Chain Link to 10' High, post & fabric without foundation500LF$ - 0$ 2.84
02 41 1360 2031.2Chain Link to 8’ Height Including Posts & Foundation500LF$ - 0$ 3.15
02 41 1360 2041.2Demo Gates,10-12' wide8EA$ - 0$ 79.06
02 41 1613 1300BUILDING DEMOLITION -EXCL SALVAGE, FOUNDATION DEMO OR DUMP FEES
02 41 1613 1321.2Wood Frame, CF volume of inside structure92500CF$ - 0$ 0.29
02 41 1613 1351.2Reinforced Masonry, CF volume of inside structure50000CF$ - 0$ 0.30
02 41 1613 1361.2Reinforced Concrete, CF volume of inside structure50000CF$ - 0$ 0.38
02 41 1613 1371.2Metal (Steel), CF volume of inside structure50000CF$ - 0$ 0.27
02 41 1617 1031.2Concrete, 25” to 48” Thick, Reinforced100CY$ - 0$ 86.71
02 41 1617 1041.2Concrete, 49” to 72” Thick, Reinforced100CY$ - 0$ 96.91
02 41 1617 1711.22' Wide X 1' Thick Footing600LF$ - 0$ 11.74
02 41 1617 1721.23' Wide X 2' Thick Footing600LF$ - 0$ 20.10
02 41 1617 1731.2Walls, Masonry or Concrete, Solid Including Foundation6000SF$ - 0$ 0.97
02 41 1617 1741.2Walls, Masonry, Cavity including Foundation6000SF$ - 0$ 0.81
02 41 1617 1751.2Concrete, 7” to 24” Thick, Plain200CY$ - 0$ 58.15
02 41 1617 1000DEMO SOG
02 41 1617 1001.2Slab on Grade - Plain200CY$ - 0$ 78.55
02 41 1617 1011.2Slab on Grade - Mesh Reinf.200CY$ - 0$ 106.61
02 41 1617 1021.2Slab on Grade - Rod Reinf.200CY$ - 0$ 141.29
02 41 1617 1700BUILDING DEMO FOOTINGS AND FOUNDATION WALLS
02 41 1920 2000SELECTIVE DEMOLITION, DUMP CHARGES
02 41 1920 2001.2Disposal and Dump Fees10TON$ - 0$ 96.91
02 41 1925 1000SELECTIVE DEMOLITION, SAW CUTTING
02 41 1925 1001.2Saw Cut Asphalt 1"-6"200LF$ - 0$ 1.20
02 41 1925 1011.2Saw Cut Asphalt 7"-10"200LF$ - 0$ 5.30
02 41 1925 1021.2Saw Cut Asphalt 11"-14"200LF$ - 0$ 9.40
02 41 1925 1031.2Saw Cut Asphalt 15"-18"200LF$ - 0$ 11.45
02 65 1030 10190UNDERGROUND STORAGE TANK REMOVAL (FIBERGLASS/STEEL)
02 65 1030 10191.23000 gal to 5000 gal tank1GAL$ - 0$ 458.54
02 65 1030 10191.26000 gal tank to 8000 gal tank1GAL$ - 0$ 765.08
02 65 1030 10191.29000 gal to 12000 gal tank1GAL$ - 0$ 1,142.51
02 65 1030 10191.2Remove Residual Fuel, Diesel Or Gas200GAL$ - 0$ 0.22
02 65 1030 10191.2Remove & Dispose Contaminated Soil10CY$ - 0$ 250.44
02 82 1339 1300ASBESTOS ABATEMENT
02 82 1339 1301.2Ceiling, Gypsum Board400SF$ - 0$ 1.11
02 82 1339 1311.2Partitions (Transite Panels)400SF$ - 0$ 2.01
02 82 1339 1321.2Floor Tile & Tile Mastic and Carpet, Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.30
02 82 1339 1331.2Ceiling Tile & Grid System, Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.19
02 82 1339 1341.2Built-Up Roofing Material, Roofing Felt, Flashing, Expansion Joint Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.76
02 82 1339 1351.2Spray Applied Asbestos, Pre-clean, Remove, Bag and Dispose of at Landfill400SF$ - 0$ 1.94
02 82 1339 1361.2Wire with Asbestos Covering, Pre-clean Remove, Bag and Dispose of at Landfill400LF$ - 0$ 0.20
02 82 1339 1371.2Wall Tile & Mastic, Pre-clean Remove, Bag and Dispose of at Landfill400SF$ - 0$ 0.20
02 82 1339 1381.2Mudded Joints, Remove, Bag and Dispose of at Landfill10EA$ - 0$ 38.76
02 82 1339 1391.2Mudded Fittings, Remove, Bag and Dispose of at Landfill500SF$ - 0$ 3.88
02 82 1339 1401.2Refrigeration Putty3SF$ - 0$ 8.16
02 82 1339 1411.2Transite Panels and Wallboard, Interior, Pre-clean, Remove, Bag and Dispose of at Landfill3500SF$ - 0$ 1.96
02 82 1339 1421.2Transite Panels, Exterior, Pre-clean, Remove, Bag and Dispose of at Landfill800SF$ - 0$ 2.86
02 82 1339 1431.2Transite Piping. Pre-clean Remove, Bag and Dispose of at Landfill200LF$ - 0$ 5.87
02 82 1339 1441.2Debris, Remove, Bag and Dispose of at Landfill200SF$ - 0$ 1.84
02 82 1339 1451.2Soil Removed, Pre-clean, Remove, Bag and Dispose of at Landfill50CF$ - 0$ 11.22
02 82 1339 1461.2Containment: Initial 500 SF of Containment; to Include All Set Up, Decontamination, Tear Down, Disposal, Etc.6EA$ - 0$ 3,162.31
02 82 1339 1471.2Containment: Add to Bid Item Above Amount For Each Additional 500 SF of Floor Space Subject to Containment6EA$ - 0$ 2,142.21
02 82 1339 1481.2Containment: Free Standing Exterior Containment; all Inclusive for Exterior Facility Components (HVAC, Etc.)200SF$ - 0$ 9.18
02 82 1339 1491.2Thermal System Insulation, Blown-In. 15,000 Remove, Bag, and Dispose of at Landfill15000SF$ - 0$ 0.12
02 82 1339 1501.2Concrete with Asbestos100CF$ - 0$ 13.60
02 82 1343 2200BULK ASBESTOS REMOVAL
02 82 1343 2201.2Boiler Asbestos Insulation200SF$ - 0$ 5.93
02 82 1343 2211.2Exterior of Duct Insulation, Pre-clean Remove, Bag and Dispose of at Landfill200SF$ - 0$ 1.54
02 82 1343 2221.2Remove Entire Duct With insulation, Pre-clean, Remove, Bag and Dispose of at Landfill200SF$ - 0$ 2.81