Submittal Register
| TITLE: | IDIQ Demo, CCAFS | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | ||||||||||||||||||||
| LOCATION: | ||||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |||
| Line | Activity # | Trans-mittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Lifting Operation Plan | 3.7.1 | G | ||||||||||||||
| 2 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Utility Outage Requests | 1.9.1 | G | ||||||||||||||
| 3 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Connection Requests | 1.9.1 | G | ||||||||||||||
| 4 | 01 11 00.00 30 | 01 | Preconstruction Submittals | AF 3952 | 1.7.4 | G | ||||||||||||||
| 5 | 01 11 00.00 30 | 01 | Preconstruction Submittals | SOLID WASTE DISPOSAL DIVERSION TRACKING | 1.10.6 | G | ||||||||||||||
| 6 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Premises/Access Plan | 1.6 | G | ||||||||||||||
| 7 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Storage Area Request | 1.7.1 | G | ||||||||||||||
| 8 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Contractor Survey Record Drawings | 3.6.1 | G | ||||||||||||||
| 9 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Superintendent Contact and Qualifications | 3.8 | G | ||||||||||||||
| 10 | 01 33 00 | 01 | Preconstruction Submittals | Submittal Register | 1.7 | G | ||||||||||||||
| 11 | 01 35 26 | 01 | Preconstruction Submittals | Accident Prevention Plan (APP) | 1.7 | G | ||||||||||||||
| 12 | 01 35 26 | 06 | Test Reports | Monthly Exposure Reports | 1.4 | |||||||||||||||
| 13 | 01 35 26 | 06 | Test Reports | Notifications and Reports | 1.12 | |||||||||||||||
| 14 | 01 35 26 | 06 | Test Reports | Accident Reports | 1.12.2 | G | ||||||||||||||
| 15 | 01 35 26 | 06 | Test Reports | LHE Inspection Reports | 1.12.3 | |||||||||||||||
| 16 | 01 35 26 | 07 | Certificates | Crane Operators/Riggers | 1.6.1.5 | |||||||||||||||
| 17 | 01 35 26 | 07 | Certificates | Standard Lift Plan | 1.7.2.2 | G | ||||||||||||||
| 18 | 01 35 26 | 07 | Certificates | Critical Lift Plan | 1.7.2.3 | G | ||||||||||||||
| 19 | 01 35 26 | 07 | Certificates | Naval Architecture Analysis | 1.7.2.4 | G | ||||||||||||||
| 20 | 01 35 26 | 07 | Certificates | Activity Hazard Analysis (AHA) | 1.8 | |||||||||||||||
| 21 | 01 35 26 | 07 | Certificates | Confined Space Entry Permit | 1.9.1 | |||||||||||||||
| 22 | 01 35 26 | 07 | Certificates | Hot Work Permit | 1.9.1 | |||||||||||||||
| 23 | 01 35 26 | 07 | Certificates | Certificate of Compliance | 1.12.4 | |||||||||||||||
| 24 | 01 35 26 | 07 | Certificates | License Certificates | 1.14 | |||||||||||||||
| 25 | 01 35 26 | 07 | Certificates | Radiography Operation Planning Work Sheet | 1.14.1 | G | ||||||||||||||
| 26 | 01 35 26 | 07 | Certificates | Portable Gauge Operations Planning Worksheet | 1.14.1 | G | ||||||||||||||
| 27 | 01 57 19 | 01 | Preconstruction Submittals | Preconstruction Survey | 1.5.1 | |||||||||||||||
| 28 | 01 57 19 | 01 | Preconstruction Submittals | Solid Waste Management Permit | 1.9 | G | ||||||||||||||
| 29 | 01 57 19 | 01 | Preconstruction Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 30 | 01 57 19 | 01 | Preconstruction Submittals | Environmental Protection Plan | 1.6 | G | ||||||||||||||
| 31 | 01 57 19 | 01 | Preconstruction Submittals | Stormwater Notice of Intent | 3.2.1.2 | G | ||||||||||||||
| 32 | 01 57 19 | 01 | Preconstruction Submittals | Dirt and Dust Control Plan | 1.6.9.1 | G | ||||||||||||||
| 33 | 01 57 19 | 01 | Preconstruction Submittals | Employee Training Records | 1.5.5 | G | ||||||||||||||
| 34 | 01 57 19 | 01 | Preconstruction Submittals | Environmental Manager Qualifications | 1.5.4 | G | ||||||||||||||
| 35 | 01 57 19 | 06 | Test Reports | Laboratory Analysis | 3.7.1.1.2 | |||||||||||||||
| 36 | 01 57 19 | 06 | Test Reports | Inspection Reports | 3.2.1.3 | |||||||||||||||
| 37 | 01 57 19 | 06 | Test Reports | Solid Waste Management Report | 3.7.2.1 | G | ||||||||||||||
| 38 | 01 57 19 | 07 | Certificates | Employee Training Records | 1.5.5 | G | ||||||||||||||
| 39 | 01 57 19 | 07 | Certificates | Erosion and Sediment Control Inspector | 1.5.5 | |||||||||||||||
| 40 | 01 57 19 | 11 | Closeout Submittals | Stormwater Pollution Prevention Plan Compliance Notebook | 3.2.1.4 | G | ||||||||||||||
| 41 | 01 57 19 | 11 | Closeout Submittals | Stormwater Notice of Termination | 3.2.1.5 | G | ||||||||||||||
| 42 | 01 57 19 | 11 | Closeout Submittals | Waste Determination Documentation | 3.7.1 | G | ||||||||||||||
| 43 | 01 57 19 | 11 | Closeout Submittals | Disposal Documentation for Hazardous and Regulated Waste | 3.7.3.6 | G | ||||||||||||||
| 44 | 01 57 19 | 11 | Closeout Submittals | Assembled Employee Training Records | 1.5.5 | G | ||||||||||||||
| 45 | 01 57 19 | 11 | Closeout Submittals | Solid Waste Management Permit | 1.9 | G | ||||||||||||||
| 46 | 01 57 19 | 11 | Closeout Submittals | Solid Waste Management Report | 3.7.2.1 | G | ||||||||||||||
| 47 | 01 57 19 | 11 | Closeout Submittals | Hazardous Waste/Debris Management | 3.7.3.1 | G | ||||||||||||||
| 48 | 01 57 19 | 11 | Closeout Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 49 | 01 57 19 | 11 | Closeout Submittals | Sales Documentation | 3.7.2.1 | G | ||||||||||||||
| 50 | 01 57 19 | 11 | Closeout Submittals | Contractor Certification | 3.7.2.1 | |||||||||||||||
| 51 | 01 57 19 | 11 | Closeout Submittals | As-Built Topographic Survey | 3.2.1.5 | |||||||||||||||
| 52 | 01 74 19 | 01 | Preconstruction Submittals | Waste Management Plan | 1.6 | G | ||||||||||||||
| 53 | 01 74 19 | 11 | Closeout Submittals | Records | 1.7 | |||||||||||||||
| 54 | 01 78 00 | 03 | Product Data | Warranty Management Plan | 1.6.1 | |||||||||||||||
| 55 | 01 78 00 | 03 | Product Data | Warranty Tags | 1.6.4 | |||||||||||||||
| 56 | 01 78 00 | 03 | Product Data | Spare Parts Data | 1.5 | |||||||||||||||
| 57 | 01 78 00 | 08 | Manufacturer’s Instructions | Instructions | 1.6.1 | |||||||||||||||
| 58 | 01 78 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.2 | G | ||||||||||||||
| 59 | 01 78 00 | 11 | Closeout Submittals | As-Built Drawings | 3.1 | G | ||||||||||||||
| 60 | 01 78 00 | 11 | Closeout Submittals | Certification of EPA Designated Items | 2.1 | G | ||||||||||||||
| 61 | 02 41 00 | 01 | Preconstruction Submittals | Existing Conditions | 1.10 | |||||||||||||||
| 62 | 02 41 00 | 07 | Certificates | Demolition Plan | 1.2.1 | G | ||||||||||||||
| 63 | 02 41 00 | 07 | Certificates | Deconstruction Plan | 1.2.1 | G | ||||||||||||||
| 64 | 02 41 00 | 07 | Certificates | Notification | 1.7 | G | ||||||||||||||
| 65 | 02 41 00 | 11 | Closeout Submittals | Receipts | 3.3.4 | |||||||||||||||
| 66 | 02 42 51 | 01 | Preconstruction Submittals | Proposed Dust-Control Measures | 1.4.2 | |||||||||||||||
| 67 | 02 42 51 | 01 | Preconstruction Submittals | Proposed Packing And Transportation Measures | 1.4.2 | |||||||||||||||
| 68 | 02 42 51 | 01 | Preconstruction Submittals | Schedule of Carpet Reclamation Activities | 1.4.4 | |||||||||||||||
| 69 | 02 42 51 | 01 | Preconstruction Submittals | Carpet Reclamation Agency Records | 1.4.3 | G | ||||||||||||||
| 70 | 02 42 91 | 03 | Product Data | Work Plan | 1.1 | G | ||||||||||||||
| 71 | 02 61 13 | 02 | Shop Drawings | Surveys | 3.1 | G | ||||||||||||||
| 72 | 02 61 13 | 03 | Product Data | Work Plan | 1.3 | G | ||||||||||||||
| 73 | 02 61 13 | 03 | Product Data | Closure Report | 3.9 | G | ||||||||||||||
| 74 | 02 61 13 | 06 | Test Reports | Backfill | 2.2 | G | ||||||||||||||
| 75 | 02 61 13 | 06 | Test Reports | Surveys | 3.1 | G | ||||||||||||||
| 76 | 02 61 13 | 06 | Test Reports | Confirmation Sampling and Analysis | 3.5 | G | ||||||||||||||
| 77 | 02 61 13 | 06 | Test Reports | Compaction | 3.7.2 | G | ||||||||||||||
| 78 | 02 81 00 | 03 | Product Data | Onsite Hazardous Waste Management | 3.1 | G | ||||||||||||||
| 79 | 02 81 00 | 03 | Product Data | Notices of Non-Compliance and Notices of Violation | 3.2 | |||||||||||||||
| 80 | 02 81 00 | 03 | Product Data | Packaging Notifications | 2.1.1 | |||||||||||||||
| 81 | 02 81 00 | 06 | Test Reports | Recordkeeping | 3.6 | G | ||||||||||||||
| 82 | 02 81 00 | 06 | Test Reports | Spill Response | 3.7 | |||||||||||||||
| 83 | 02 81 00 | 06 | Test Reports | Exception Report | 3.6 | G | ||||||||||||||
| 84 | 02 81 00 | 07 | Certificates | Certification | 1.4.3 | |||||||||||||||
| 85 | 02 81 00 | 07 | Certificates | Security Plan | 3.2.4 | |||||||||||||||
| 86 | 02 81 00 | 07 | Certificates | Transportation and Disposal Coordinator | 1.4.1 | G | ||||||||||||||
| 87 | 02 81 00 | 07 | Certificates | Training | 1.4.2 | G | ||||||||||||||
| 88 | 02 81 00 | 07 | Certificates | EPA Offsite Policy | 3.2.2 | |||||||||||||||
| 89 | 02 81 00 | 07 | Certificates | Certificates of Disposal | 3.2.5 | |||||||||||||||
| 90 | 02 81 00 | 07 | Certificates | Shipping Documents and Packagings Certification | 3.2.3 | G | ||||||||||||||
| 91 | 02 81 00 | 07 | Certificates | Waste Minimization | 3.5 | G | ||||||||||||||
| 92 | 02 82 13.00 98 | 01 | Preconstruction Submittals | Asbestos Consultant's License | 1.5.1 | G | ||||||||||||||
| 93 | 02 82 13.00 98 | 01 | Preconstruction Submittals | Asbestos Contractor's License | 1.5.1 | G | ||||||||||||||
| 94 | 02 82 13.00 98 | 01 | Preconstruction Submittals | Training Certifications | 1.1 | G | ||||||||||||||
| 95 | 02 82 13.00 98 | 01 | Preconstruction Submittals | Implementation Plan | 1.7 | G | ||||||||||||||
| 96 | 02 82 13.00 98 | 01 | Preconstruction Submittals | Air Monitoring Plan | 1.7.1 | G | ||||||||||||||
| 97 | 02 82 13.00 98 | 01 | Preconstruction Submittals | Written (OSHA Compliant) Respiratory Protection Plan | 1.7.1 | G | ||||||||||||||
| 98 | 02 82 13.00 98 | 01 | Preconstruction Submittals | Work Schedule | 1.9 | G | ||||||||||||||
| 99 | 02 82 13.00 98 | 01 | Preconstruction Submittals | Notification of Demolition/Renovation | 1.7 | G | ||||||||||||||
| 100 | 02 82 13.00 98 | 02 | Shop Drawings | Coordination Drawings | 1.7 | G | ||||||||||||||
| 101 | 02 82 13.00 98 | 02 | Shop Drawings | Detailed Drawings | 1.7 | G | ||||||||||||||
| 102 | 02 82 13.00 98 | 06 | Test Reports | Initial Exposure Assessments | 1.9 | G | ||||||||||||||
| 103 | 02 82 13.00 98 | 06 | Test Reports | Air Monitoring Reports | 1.8 | G | ||||||||||||||
| 104 | 02 82 13.00 98 | 06 | Test Reports | Work Site Entry Logs | 1.7.2 | |||||||||||||||
| 105 | 02 82 13.00 98 | 06 | Test Reports | Daily Site Inspection Logs | 3.10.2 | G | ||||||||||||||
| 106 | 02 82 13.00 98 | 06 | Test Reports | Waste Inventory | 3.11.1.1 | |||||||||||||||
| 107 | 02 82 13.00 98 | 06 | Test Reports | Waste Shipment Record (WSR) | 3.11.1.1 | G | ||||||||||||||
| 108 | 02 82 13.00 98 | 07 | Certificates | Training Certifications | 1.1 | G | ||||||||||||||
| 109 | 02 82 13.00 98 | 07 | Certificates | Proficiency Analytical Test | 1.5.2 | |||||||||||||||
| 110 | 02 82 13.00 98 | 08 | Manufacturer’s Instructions | Safety Data Sheets | 1.5.3 | |||||||||||||||
| 111 | 02 82 13.00 98 | 08 | Manufacturer’s Instructions | Implementation Plan | 1.7 | G | ||||||||||||||
| 112 | 02 82 13.00 98 | 11 | Closeout Submittals | Notification of Demolition/Renovation | 1.7 | G | ||||||||||||||
| 113 | 02 82 13.00 98 | 11 | Closeout Submittals | Waste Disposal Permit | 1.5.1 | G | ||||||||||||||
| 114 | 02 82 13.00 98 | 11 | Closeout Submittals | Disposal Shipping Manifests and Tickets | 1.5.1 | G | ||||||||||||||
| 115 | 02 82 13.00 98 | 11 | Closeout Submittals | Daily Site Inspection Logs | 3.10.2 | G | ||||||||||||||
| 116 | 02 82 13.00 98 | 11 | Closeout Submittals | OSHA Compliance Inspection Records | 3.14.1 | G | ||||||||||||||
| 117 | 02 82 13.00 98 | 11 | Closeout Submittals | Air Monitoring Reports | 1.8 | G | ||||||||||||||
| 118 | 02 82 13.00 98 | 11 | Closeout Submittals | Calibration Records | 3.14.1 | G | ||||||||||||||
| 119 | 02 82 13.00 98 | 11 | Closeout Submittals | Waste Stream Inventory | 3.14.1 | G | ||||||||||||||
| 120 | 02 82 33.13 20 | 03 | Product Data | Vacuum Filters | 1.6.4 | G | ||||||||||||||
| 121 | 02 82 33.13 20 | 03 | Product Data | Respirators | 1.6.1 | G | ||||||||||||||
| 122 | 02 82 33.13 20 | 06 | Test Reports | sampling results | 1.5.2.3 | G | ||||||||||||||
| 123 | 02 82 33.13 20 | 06 | Test Reports | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 124 | 02 82 33.13 20 | 07 | Certificates | Qualifications of CP | 1.5.1.1 | G | ||||||||||||||
| 125 | 02 82 33.13 20 | 07 | Certificates | Testing Laboratory | 1.5.1.3 | G | ||||||||||||||
| 126 | 02 82 33.13 20 | 07 | Certificates | Training Certification | 1.5.1.2 | G | ||||||||||||||
| 127 | 02 82 33.13 20 | 07 | Certificates | Notification of the Commencement of LBP Hazard Abatement | 3.1.1.1 | G | ||||||||||||||
| 128 | 02 82 33.13 20 | 07 | Certificates | Third Party Consultant Qualifications | 1.5.1.4 | G | ||||||||||||||
| 129 | 02 82 33.13 20 | 07 | Certificates | lead-based paint/paint with lead removal/control plan | 1.5.3 | G | ||||||||||||||
| 130 | 02 82 33.13 20 | 07 | Certificates | Rental equipment notification | 1.6.3 | G | ||||||||||||||
| 131 | 02 82 33.13 20 | 07 | Certificates | Respiratory Protection Program | 1.5.2.6 | G | ||||||||||||||
| 132 | 02 82 33.13 20 | 07 | Certificates | Hazard Communication Program | 1.5.2.7 | G | ||||||||||||||
| 133 | 02 82 33.13 20 | 07 | Certificates | State approved hazardous waste treatment, storage, or disposal facility | 3.5.2 | G | ||||||||||||||
| 134 | 02 82 33.13 20 | 07 | Certificates | Lead Waste Management Plan | 1.5.2.8 | G | ||||||||||||||
| 135 | 02 82 33.13 20 | 07 | Certificates | Vacuum filters | 1.6.4 | G | ||||||||||||||
| 136 | 02 82 33.13 20 | 07 | Certificates | Clearance Certification | 3.5.1.1 | G | ||||||||||||||
| 137 | 02 82 33.13 20 | 11 | Closeout Submittals | hazardous waste manifest | 3.5.2.1 | G | ||||||||||||||
| 138 | 02 82 33.13 20 | 11 | Closeout Submittals | Medical Examinations | 1.5.2.4 | G | ||||||||||||||
| 139 | 02 82 33.13 20 | 11 | Closeout Submittals | Training Certification | 1.5.1.2 | G | ||||||||||||||
| 140 | 02 82 33.13 20 | 11 | Closeout Submittals | turn-in documents or weight tickets | 3.5.2.1 | G | ||||||||||||||
| 141 | 02 84 33 | 07 | Certificates | Training certification | 1.5.1.1 | |||||||||||||||
| 142 | 02 84 33 | 07 | Certificates | Training certification | 1.8.1 | |||||||||||||||
| 143 | 02 84 33 | 07 | Certificates | CIH Qualifications | 1.5.2.1 | G | ||||||||||||||
| 144 | 02 84 33 | 07 | Certificates | CIH Qualifications | 1.8.2 | G | ||||||||||||||
| 145 | 02 84 33 | 07 | Certificates | PCB removal work plan | 1.8.3 | G | ||||||||||||||
| 146 | 02 84 33 | 07 | Certificates | PCB disposal plan | 1.8.4 | G | ||||||||||||||
| 147 | 02 84 33 | 07 | Certificates | Protection Plan | 1.5.5 | G | ||||||||||||||
| 148 | 02 84 33 | 07 | Certificates | PCB Contaminated Water Handling Plan | 1.5.6 | G | ||||||||||||||
| 149 | 02 84 33 | 07 | Certificates | PCB Contaminated Soil Removal Plan | 1.8.3.1 | |||||||||||||||
| 150 | 02 84 33 | 07 | Certificates | Sampling and Testing Plan | 1.5.7 | G | ||||||||||||||
| 151 | 02 84 33 | 07 | Certificates | Confirmatory Grid Sampling Plan | 3.2.4.2 | G | ||||||||||||||
| 152 | 02 84 33 | 07 | Certificates | Notification | 1.8.5 | |||||||||||||||
| 153 | 02 84 33 | 07 | Certificates | Transporter certification | 3.10 | |||||||||||||||
| 154 | 02 84 33 | 07 | Certificates | Certification of Decontamination | 3.7.4 | |||||||||||||||
| 155 | 02 84 33 | 07 | Certificates | Post cleanup sampling | 3.7.5 | G | ||||||||||||||
| 156 | 02 84 33 | 07 | Certificates | Certificate of disposal | 3.10.2 | G | ||||||||||||||
| 157 | 03 30 53 | 03 | Product Data | Air-Entraining Admixture | 2.2.3.1 | |||||||||||||||
| 158 | 03 30 53 | 03 | Product Data | Accelerating Admixture | 2.2.3.2 | |||||||||||||||
| 159 | 03 30 53 | 03 | Product Data | Water-Reducing or Retarding Admixture | 2.2.3.3 | |||||||||||||||
| 160 | 03 30 53 | 03 | Product Data | Curing Materials | 2.2.11 | |||||||||||||||
| 161 | 03 30 53 | 03 | Product Data | Expansion Joint Filler Strips, Premolded | 2.2.6 | |||||||||||||||
| 162 | 03 30 53 | 03 | Product Data | Joint Sealants - Field Molded Sealants | 2.2.7 | |||||||||||||||
| 163 | 03 30 53 | 03 | Product Data | Waterstops | 2.4.1 | |||||||||||||||
| 164 | 03 30 53 | 03 | Product Data | mix design data | 2.3 | |||||||||||||||
| 165 | 03 30 53 | 06 | Test Reports | Aggregates | 2.2.2 | |||||||||||||||
| 166 | 03 30 53 | 07 | Certificates | Cementitious Materials | 2.2.1 | |||||||||||||||
| 167 | 03 30 53 | 07 | Certificates | Pozzolan | 2.2.1.2 | |||||||||||||||
| 168 | 03 30 53 | 07 | Certificates | Aggregates | 2.2.2 | |||||||||||||||
| 169 | 03 30 53 | 07 | Certificates | Delivery Tickets | 2.3 | |||||||||||||||
| 170 | 03 30 53 | 08 | Manufacturer’s Instructions | Chemical Floor Hardener | 2.4.2 | |||||||||||||||
| 171 | 03 30 53 | 08 | Manufacturer’s Instructions | Curing Compound | 2.4.3 | |||||||||||||||
| 172 | 09 90 00 | 02 | Shop Drawings | Piping identification | 3.9 | |||||||||||||||
| 173 | 09 90 00 | 02 | Shop Drawings | stencil | 3.9 | |||||||||||||||
| 174 | 09 90 00 | 03 | Product Data | Coating | 2.1 | |||||||||||||||
| 175 | 09 90 00 | 03 | Product Data | Manufacturer's Technical Data Sheets | 2.1 | |||||||||||||||
| 176 | 09 90 00 | 04 | Samples | Color | 1.10 | G | ||||||||||||||
| 177 | 09 90 00 | 07 | Certificates | Applicator's qualifications | 1.3 | |||||||||||||||
| 178 | 09 90 00 | 07 | Certificates | Qualification Testing | 1.4.1 | |||||||||||||||
| 179 | 09 90 00 | 08 | Manufacturer’s Instructions | Application instructions | 3.3.1 | |||||||||||||||
| 180 | 09 90 00 | 08 | Manufacturer’s Instructions | Mixing | 3.6.2 | |||||||||||||||
| 181 | 09 90 00 | 08 | Manufacturer’s Instructions | Manufacturer's Safety Data Sheets | 1.7.2 | |||||||||||||||
| 182 | 22 00 00 | 02 | Shop Drawings | Plumbing System | 3.9.1 | G | ||||||||||||||
| 183 | 22 00 00 | 03 | Product Data | Fixtures | 2.5 | |||||||||||||||
| 184 | 22 00 00 | 03 | Product Data | Flush Valve Water Closets | 2.5.2 | |||||||||||||||
| 185 | 22 00 00 | 03 | Product Data | Flush Valve Urinals | 2.5.3 | |||||||||||||||
| 186 | 22 00 00 | 03 | Product Data | Flush Tank Water Closets | 2.5.5 | |||||||||||||||
| 187 | 22 00 00 | 03 | Product Data | Wall Hung Lavatories | 2.5.6 | |||||||||||||||
| 188 | 22 00 00 | 03 | Product Data | Countertop Lavatories | 2.5.7 | |||||||||||||||
| 189 | 22 00 00 | 03 | Product Data | Kitchen Sinks | 2.5.8 | |||||||||||||||
| 190 | 22 00 00 | 03 | Product Data | Service Sinks | 2.5.9 | |||||||||||||||
| 191 | 22 00 00 | 03 | Product Data | Drinking-Water Coolers | 2.5.10 | G | ||||||||||||||
| 192 | 22 00 00 | 03 | Product Data | Water Heaters | 2.11 | G | ||||||||||||||
| 193 | 22 00 00 | 03 | Product Data | Pumps | 2.13 | G | ||||||||||||||
| 194 | 22 00 00 | 03 | Product Data | Backflow Prevention Assemblies | 3.9.1.1 | G | ||||||||||||||
| 195 | 22 00 00 | 03 | Product Data | Shower Faucets | 2.7.2 | G | ||||||||||||||
| 196 | 22 00 00 | 03 | Product Data | Swimming Pool and Spa Suction Fittings | 2.7.9 | G | ||||||||||||||
| 197 | 22 00 00 | 03 | Product Data | Pool Water Pump Safety Vacuum Release System | 2.17 | G | ||||||||||||||
| 198 | 22 00 00 | 03 | Product Data | Welding | 1.5.1 | |||||||||||||||
| 199 | 22 00 00 | 03 | Product Data | Vibration-Absorbing Features | 3.4 | G | ||||||||||||||
| 200 | 22 00 00 | 03 | Product Data | Plumbing System | 3.9.1 | |||||||||||||||
| 201 | 22 00 00 | 06 | Test Reports | Tests, Flushing and Disinfection | 3.9 | |||||||||||||||
| 202 | 22 00 00 | 06 | Test Reports | Test of Backflow Prevention Assemblies | 3.9.1.1 | G | ||||||||||||||
| 203 | 22 00 00 | 07 | Certificates | Materials and Equipment | 1.3 | |||||||||||||||
| 204 | 22 00 00 | 07 | Certificates | Bolts | 2.2.1 | |||||||||||||||
| 205 | 22 00 00 | 10 | Operation and Maintenance Data | Plumbing System | 3.9.1 | G | ||||||||||||||
| 206 | 22 00 00 | 11 | Closeout Submittals | Water-Efficient Products | 2.1.1 | S | ||||||||||||||
| 207 | 22 00 00 | 11 | Closeout Submittals | Energy-Efficient Water Heaters | 2.1.2 | S | ||||||||||||||
| 208 | 23 00 00 | 02 | Shop Drawings | Detail Drawings | 1.4.5 | G | ||||||||||||||
| 209 | 23 00 00 | 03 | Product Data | Metallic Flexible Duct | 2.10.1.1 | |||||||||||||||
| 210 | 23 00 00 | 03 | Product Data | Insulated Nonmetallic Flexible Duct Runouts | 2.10.1.2 | |||||||||||||||
| 211 | 23 00 00 | 03 | Product Data | Duct Connectors | 2.10.1.2 | |||||||||||||||
| 212 | 23 00 00 | 03 | Product Data | Duct Access Doors | 2.10.2 | G | ||||||||||||||
| 213 | 23 00 00 | 03 | Product Data | Fire Dampers | 2.10.3 | |||||||||||||||
| 214 | 23 00 00 | 03 | Product Data | Manual Balancing Dampers | 2.10.4 | G | ||||||||||||||
| 215 | 23 00 00 | 03 | Product Data | Manual Balancing Dampers | 2.10.5 | G | ||||||||||||||
| 216 | 23 00 00 | 03 | Product Data | Automatic Smoke-Fire Dampers | 2.10.7 | |||||||||||||||
| 217 | 23 00 00 | 03 | Product Data | Automatic Smoke Dampers | 2.10.8 | |||||||||||||||
| 218 | 23 00 00 | 03 | Product Data | Sound Attenuation Equipment | 2.10.12 | |||||||||||||||
| 219 | 23 00 00 | 03 | Product Data | Acoustical Duct Liner | 2.10.12.3 | |||||||||||||||
| 220 | 23 00 00 | 03 | Product Data | Diffusers | 2.10.13.1 | |||||||||||||||
| 221 | 23 00 00 | 03 | Product Data | Registers and Grilles | 2.10.13.2 | |||||||||||||||
| 222 | 23 00 00 | 03 | Product Data | Louvers | 2.10.14 | |||||||||||||||
| 223 | 23 00 00 | 03 | Product Data | Air Vents, Penthouses, and Goosenecks | 2.10.15 | |||||||||||||||
| 224 | 23 00 00 | 03 | Product Data | Centrifugal Fans | 2.11.1.1 | |||||||||||||||
| 225 | 23 00 00 | 03 | Product Data | In-Line Centrifugal Fans | 2.11.1.2 | |||||||||||||||
| 226 | 23 00 00 | 03 | Product Data | Axial Flow Fans | 2.11.1.3 | |||||||||||||||
| 227 | 23 00 00 | 03 | Product Data | Panel Type Power Wall Ventilators | 2.11.1.4 | |||||||||||||||
| 228 | 23 00 00 | 03 | Product Data | Centrifugal Type Power Wall Ventilators | 2.11.1.5 | |||||||||||||||
| 229 | 23 00 00 | 03 | Product Data | Centrifugal Type Power Roof Ventilators | 2.11.1.6 | |||||||||||||||
| 230 | 23 00 00 | 03 | Product Data | Propeller Type Power Roof Ventilators | 2.11.1.7 | |||||||||||||||
| 231 | 23 00 00 | 03 | Product Data | Ceiling Exhaust Fans | 2.11.1.8 | |||||||||||||||
| 232 | 23 00 00 | 03 | Product Data | Air Handling Units | 2.12 | G | ||||||||||||||
| 233 | 23 00 00 | 03 | Product Data | Room Fan-Coil Units | 2.13.1 | G | ||||||||||||||
| 234 | 23 00 00 | 03 | Product Data | Variable Volume, Single Duct Terminal Units | 2.13.2.1 | G | ||||||||||||||
| 235 | 23 00 00 | 03 | Product Data | Dual Duct Terminal Units | 2.13.2 | G | ||||||||||||||
| 236 | 23 00 00 | 03 | Product Data | Reheat Units | 2.13.2.7 | G | ||||||||||||||
| 237 | 23 00 00 | 03 | Product Data | Test Procedures | 1.4.6 | |||||||||||||||
| 238 | 23 00 00 | 03 | Product Data | Diagrams | 1.2.1.2 | G | ||||||||||||||
| 239 | 23 00 00 | 06 | Test Reports | Performance Tests | 3.12 | G | ||||||||||||||
| 240 | 23 00 00 | 06 | Test Reports | Damper Acceptance Test | 3.10 | |||||||||||||||
| 241 | 23 00 00 | 07 | Certificates | Bolts | 2.6 | |||||||||||||||
| 242 | 23 00 00 | 07 | Certificates | Certification | 1.4.3 | |||||||||||||||
| 243 | 23 00 00 | 08 | Manufacturer’s Instructions | Manufacturer's Installation Instructions | 3.2 | |||||||||||||||
| 244 | 23 00 00 | 08 | Manufacturer’s Instructions | Operation and Maintenance Training | 3.14.2 | |||||||||||||||
| 245 | 23 00 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.14.1 | G | ||||||||||||||
| 246 | 23 00 00 | 10 | Operation and Maintenance Data | Fire Dampers | 2.10.3 | G | ||||||||||||||
| 247 | 23 00 00 | 10 | Operation and Maintenance Data | Manual Balancing Dampers | 2.10.4 | G | ||||||||||||||
| 248 | 23 00 00 | 10 | Operation and Maintenance Data | Manual Balancing Dampers | 2.10.5 | G | ||||||||||||||
| 249 | 23 00 00 | 10 | Operation and Maintenance Data | Automatic Smoke-Fire Dampers | 2.10.7 | G | ||||||||||||||
| 250 | 23 00 00 | 10 | Operation and Maintenance Data | Automatic Smoke Dampers | 2.10.8 | G | ||||||||||||||
| 251 | 23 00 00 | 10 | Operation and Maintenance Data | Centrifugal Fans | 2.11.1.1 | G | ||||||||||||||
| 252 | 23 00 00 | 10 | Operation and Maintenance Data | In-Line Centrifugal Fans | 2.11.1.2 | G | ||||||||||||||
| 253 | 23 00 00 | 10 | Operation and Maintenance Data | Axial Flow Fans | 2.11.1.3 | G | ||||||||||||||
| 254 | 23 00 00 | 10 | Operation and Maintenance Data | Panel Type Power Wall Ventilators | 2.11.1.4 | G | ||||||||||||||
| 255 | 23 00 00 | 10 | Operation and Maintenance Data | Centrifugal Type Power Wall Ventilators | 2.11.1.5 | G | ||||||||||||||
| 256 | 23 00 00 | 10 | Operation and Maintenance Data | Centrifugal Type Power Roof Ventilators | 2.11.1.6 | G | ||||||||||||||
| 257 | 23 00 00 | 10 | Operation and Maintenance Data | Propeller Type Power Roof Ventilators | 2.11.1.7 | G | ||||||||||||||
| 258 | 23 00 00 | 10 | Operation and Maintenance Data | Ceiling Exhaust Fans | 2.11.1.8 | G | ||||||||||||||
| 259 | 23 00 00 | 10 | Operation and Maintenance Data | Air Handling Units | 2.12 | G | ||||||||||||||
| 260 | 23 00 00 | 10 | Operation and Maintenance Data | Room Fan-Coil Units | 2.13.1 | G | ||||||||||||||
| 261 | 23 00 00 | 10 | Operation and Maintenance Data | Variable Volume, Single Duct Terminal Units | 2.13.2.1 | G | ||||||||||||||
| 262 | 23 00 00 | 10 | Operation and Maintenance Data | Dual Duct Terminal Units | 2.13.2 | G | ||||||||||||||
| 263 | 23 00 00 | 10 | Operation and Maintenance Data | Reheat Units | 2.13.2.7 | G | ||||||||||||||
| 264 | 26 05 00.00 40 | 01 | Preconstruction Submittals | Material, Equipment, and Fixture Lists | 2.1 | |||||||||||||||
| 265 | 26 05 00.00 40 | 03 | Product Data | Conduits and Raceways | 2.1.1 | G | ||||||||||||||
| 266 | 26 05 00.00 40 | 03 | Product Data | Wire and Cable | 2.1.3 | G | ||||||||||||||
| 267 | 26 05 00.00 40 | 03 | Product Data | Splices and Connectors | 3.2.1.9 | G | ||||||||||||||
| 268 | 26 05 00.00 40 | 03 | Product Data | Switches | 2.1.4 | G | ||||||||||||||
| 269 | 26 05 00.00 40 | 03 | Product Data | Receptacles | 2.1.5 | G | ||||||||||||||
| 270 | 26 05 00.00 40 | 03 | Product Data | Outlet Boxes, Pull Boxes and Junction Boxes | 2.1.6 | G | ||||||||||||||
| 271 | 26 05 00.00 40 | 03 | Product Data | Circuit Breakers | 2.1.8 | G | ||||||||||||||
| 272 | 26 05 00.00 40 | 03 | Product Data | Panelboards | 2.1.7 | G | ||||||||||||||
| 273 | 26 05 00.00 40 | 03 | Product Data | Lamps and Lighting Fixtures | 2.1.9 | G | ||||||||||||||
| 274 | 26 05 00.00 40 | 03 | Product Data | Dry-Type Distribution Transformers | 2.1.12 | G | ||||||||||||||
| 275 | 26 05 00.00 40 | 06 | Test Reports | Continuity Test | 3.3 | G | ||||||||||||||
| 276 | 26 05 00.00 40 | 06 | Test Reports | Phase-Rotation Tests | 3.3 | G | ||||||||||||||
| 277 | 26 05 00.00 40 | 06 | Test Reports | Insulation Resistance Test | 3.3 | G | ||||||||||||||
| 278 | 26 05 00.00 40 | 08 | Manufacturer’s Instructions | Manufacturer's Instructions | 3.1 | |||||||||||||||
| 279 | 31 00 00 | 01 | Preconstruction Submittals | Shoring | 3.3 | |||||||||||||||
| 280 | 31 00 00 | 01 | Preconstruction Submittals | Dewatering Work Plan | 3.2.4 | |||||||||||||||
| 281 | 31 00 00 | 07 | Certificates | Testing | 3.16 | |||||||||||||||
| 282 | 32 01 17.61 | 03 | Product Data | Installation of Sealant | 3.3 | |||||||||||||||
| 283 | 32 01 17.61 | 04 | Samples | Materials | 2.2 | G | ||||||||||||||
| 284 | 32 01 19.61 | 03 | Product Data | Joint sealant | 2.1.1 | |||||||||||||||
| 285 | 32 01 19.61 | 04 | Samples | Joint filler | 3.1.1 | |||||||||||||||
| 286 | 32 01 19.61 | 04 | Samples | Separating tape | 2.1.3.2 | |||||||||||||||
| 287 | 32 01 19.61 | 04 | Samples | backer rod | 2.1.3.1 | |||||||||||||||
| 288 | 32 01 19.61 | 04 | Samples | Joint sealant | 2.1.1 | |||||||||||||||
| 289 | 32 01 19.61 | 06 | Test Reports | Joint sealant | 2.1.1 | |||||||||||||||
| 290 | 32 01 19.61 | 07 | Certificates | Equipment list | 1.6 | |||||||||||||||
| 291 | 32 01 19.61 | 08 | Manufacturer’s Instructions | Joint sealant | 2.1.1 | |||||||||||||||
| 292 | 32 10 00 | 03 | Product Data | Precast car stops | 2.8 | |||||||||||||||
| 293 | 32 10 00 | 06 | Test Reports | Trial batch | 1.3.4 | |||||||||||||||
| 294 | 32 10 00 | 06 | Test Reports | Mix design | 1.3.5 | |||||||||||||||
| 295 | 32 10 00 | 06 | Test Reports | Asphalt concrete | 2.1 | |||||||||||||||
| 296 | 32 10 00 | 06 | Test Reports | Density | 3.3.1.1 | |||||||||||||||
| 297 | 32 31 13.53 | 02 | Shop Drawings | Fence Installation | 1.3.2 | |||||||||||||||
| 298 | 32 31 13.53 | 02 | Shop Drawings | Fence Installation | 3.1 | |||||||||||||||
| 299 | 32 31 13.53 | 02 | Shop Drawings | Installation Drawings | 1.3.2 | |||||||||||||||
| 300 | 32 31 13.53 | 02 | Shop Drawings | Location of gate, corner, end, and pull posts | 1.3.2 | |||||||||||||||
| 301 | 32 31 13.53 | 02 | Shop Drawings | Gate Assembly | 1.3.2 | |||||||||||||||
| 302 | 32 31 13.53 | 02 | Shop Drawings | Gate Assembly | 2.6.1 | |||||||||||||||
| 303 | 32 31 13.53 | 02 | Shop Drawings | Gate Assembly | 2.6.1 | |||||||||||||||
| 304 | 32 31 13.53 | 02 | Shop Drawings | Gate Hardware and Accessories | 1.3.2 | |||||||||||||||
| 305 | 32 31 13.53 | 02 | Shop Drawings | Gate Hardware and Accessories | 2.6.3 | |||||||||||||||
| 306 | 32 31 13.53 | 03 | Product Data | Fence Installation | 1.3.2 | |||||||||||||||
| 307 | 32 31 13.53 | 03 | Product Data | Fence Installation | 3.1 | |||||||||||||||
| 308 | 32 31 13.53 | 03 | Product Data | Gate Assembly | 1.3.2 | |||||||||||||||
| 309 | 32 31 13.53 | 03 | Product Data | Gate Assembly | 2.6.1 | |||||||||||||||
| 310 | 32 31 13.53 | 03 | Product Data | Gate Assembly | 2.6.1 | |||||||||||||||
| 311 | 32 31 13.53 | 03 | Product Data | Gate Hardware and Accessories | 1.3.2 | |||||||||||||||
| 312 | 32 31 13.53 | 03 | Product Data | Gate Hardware and Accessories | 2.6.3 | |||||||||||||||
| 313 | 32 31 13.53 | 04 | Samples | Fabric | 2.1.1 | |||||||||||||||
| 314 | 32 31 13.53 | 04 | Samples | Posts | 2.2 | |||||||||||||||
| 315 | 32 31 13.53 | 04 | Samples | Post Caps | 2.2.2 | |||||||||||||||
| 316 | 32 31 13.53 | 04 | Samples | Braces | 2.3 | |||||||||||||||
| 317 | 32 31 13.53 | 04 | Samples | Line Posts | 2.3 | |||||||||||||||
| 318 | 32 31 13.53 | 04 | Samples | Sleeves | 3.1.3 | |||||||||||||||
| 319 | 32 31 13.53 | 04 | Samples | Bottom Rail | 2.3 | |||||||||||||||
| 320 | 32 31 13.53 | 04 | Samples | Tension Wire | 2.2.2 | |||||||||||||||
| 321 | 32 31 13.53 | 04 | Samples | Barbed Wire | 2.4.2 | |||||||||||||||
| 322 | 32 31 13.53 | 04 | Samples | Barbed Wire Supporting Arms | 2.2.2 | |||||||||||||||
| 323 | 32 31 13.53 | 04 | Samples | Stretcher Bars | 2.1.1 | |||||||||||||||
| 324 | 32 31 13.53 | 04 | Samples | Gate Posts | 2.1.1 | |||||||||||||||
| 325 | 32 31 13.53 | 04 | Samples | Gate Hardware and Accessories | 1.3.2 | |||||||||||||||
| 326 | 32 31 13.53 | 04 | Samples | Gate Hardware and Accessories | 2.6.3 | |||||||||||||||
| 327 | 32 31 13.53 | 04 | Samples | Wire Ties | 2.4.1 | |||||||||||||||
| 328 | 32 31 13.53 | 06 | Test Reports | zinc coating | 1.3.1 | |||||||||||||||
| 329 | 32 31 13.53 | 06 | Test Reports | PVC coating | 1.3.1 | |||||||||||||||
| 330 | 32 31 13.53 | 06 | Test Reports | aluminum alloy coating | 1.3.1 | |||||||||||||||
| 331 | 32 31 13.53 | 07 | Certificates | Chain Link Fence | 2.2.1 | |||||||||||||||
| 332 | 32 31 13.53 | 07 | Certificates | reports | 1.3.1 | |||||||||||||||
| 333 | 32 31 13.53 | 07 | Certificates | reports | 1.3.1 | |||||||||||||||
| 334 | 32 31 13.53 | 07 | Certificates | Zinc Coating | 1.3.1 | |||||||||||||||
| 335 | 32 31 13.53 | 07 | Certificates | PVC coating | 1.3.1 | |||||||||||||||
| 336 | 32 31 13.53 | 07 | Certificates | aluminum alloy coating | 1.3.1 | |||||||||||||||
| 337 | 32 31 13.53 | 07 | Certificates | Fabric | 2.1.1 | |||||||||||||||
| 338 | 32 31 13.53 | 07 | Certificates | Barbed Wire | 2.4.2 | |||||||||||||||
| 339 | 32 31 13.53 | 07 | Certificates | Stretcher Bars | 2.1.1 | |||||||||||||||
| 340 | 32 31 13.53 | 07 | Certificates | Gate Hardware and Accessories | 1.3.2 | |||||||||||||||
| 341 | 32 31 13.53 | 07 | Certificates | Gate Hardware and Accessories | 2.6.3 | |||||||||||||||
| 342 | 32 31 13.53 | 07 | Certificates | Concrete | 2.5 | |||||||||||||||
| 343 | 32 31 13.53 | 07 | Certificates | GATE OPERATOR | 2.7 | |||||||||||||||
| 344 | 32 31 13.53 | 08 | Manufacturer’s Instructions | Fence Installation | 1.3.2 | |||||||||||||||
| 345 | 32 31 13.53 | 08 | Manufacturer’s Instructions | Fence Installation | 3.1 | |||||||||||||||
| 346 | 32 31 13.53 | 08 | Manufacturer’s Instructions | Gate Assembly | 1.3.2 | |||||||||||||||
| 347 | 32 31 13.53 | 08 | Manufacturer’s Instructions | Gate Assembly | 2.6.1 | |||||||||||||||
| 348 | 32 31 13.53 | 08 | Manufacturer’s Instructions | Gate Assembly | 2.6.1 | |||||||||||||||
| 349 | 32 31 13.53 | 08 | Manufacturer’s Instructions | Hardware Assembly | 3.6 | |||||||||||||||
| 350 | 32 31 13.53 | 08 | Manufacturer’s Instructions | Accessories | 1.3.1 | |||||||||||||||
| 351 | 32 31 13.53 | 10 | Operation and Maintenance Data | Gate Operator | 2.7 | |||||||||||||||
| 352 | 32 31 13.53 | 10 | Operation and Maintenance Data | operating and maintenance instructions | 3.6 | |||||||||||||||
| 353 | 32 92 19 | 03 | Product Data | Wood cellulose fiber mulch | 2.3.3 | |||||||||||||||
| 354 | 32 92 19 | 07 | Certificates | seed | 2.1 | |||||||||||||||
| 355 | 32 92 23 | 07 | Certificates | sods | 2.1 | |||||||||||||||
| 356 | 33 11 00 | 03 | Product Data | Pipe, Fittings, Joints and Couplings | 2.2 | G | ||||||||||||||
| 357 | 33 11 00 | 03 | Product Data | Valves | 2.3 | G | ||||||||||||||
| 358 | 33 11 00 | 03 | Product Data | Indicator Posts | 2.3.6 | G | ||||||||||||||
| 359 | 33 11 00 | 03 | Product Data | Valve Boxes | 2.3.7 | G | ||||||||||||||
| 360 | 33 11 00 | 03 | Product Data | Hydrants | 2.4.1 | G | ||||||||||||||
| 361 | 33 11 00 | 03 | Product Data | Meters | 2.5 | G | ||||||||||||||
| 362 | 33 11 00 | 03 | Product Data | Pipe Anchorage | 2.2.5 | G | ||||||||||||||
| 363 | 33 11 00 | 03 | Product Data | Tapping Sleeves | 2.6.1 | G | ||||||||||||||
| 364 | 33 11 00 | 03 | Product Data | Corporation Stops | 2.6.4.1 | G | ||||||||||||||
| 365 | 33 11 00 | 03 | Product Data | Fire Department Connections | 2.6.5 | G | ||||||||||||||
| 366 | 33 11 00 | 03 | Product Data | Backflow Preventers | 1.3.2.1 | G | ||||||||||||||
| 367 | 33 11 00 | 03 | Product Data | Railroad Crossing Casing Pipe | 2.2.4 | G | ||||||||||||||
| 368 | 33 11 00 | 06 | Test Reports | Backflow Preventer Tests | 3.3.1 | |||||||||||||||
| 369 | 33 11 00 | 06 | Test Reports | Bacteriological Samples | 3.2.9 | G | ||||||||||||||
| 370 | 33 11 00 | 07 | Certificates | Pipe, Fittings, Joints and Couplings | 2.2 | |||||||||||||||
| 371 | 33 11 00 | 07 | Certificates | Lining | 2.2.1.1 | |||||||||||||||
| 372 | 33 11 00 | 07 | Certificates | Lining for Fittings | 2.2.2.1.1 | |||||||||||||||
| 373 | 33 11 00 | 07 | Certificates | Valves | 2.3 | |||||||||||||||
| 374 | 33 11 00 | 07 | Certificates | Hydrants | 2.4.1 | |||||||||||||||
| 375 | 33 11 00 | 07 | Certificates | Meters | 2.5 | |||||||||||||||
| 376 | 33 11 00 | 07 | Certificates | Backflow Prevention Training Certificate | 1.3.2.1.2 | |||||||||||||||
| 377 | 33 11 00 | 07 | Certificates | Backflow Tester | 1.3.2.1.1 | |||||||||||||||
| 378 | 33 11 00 | 07 | Certificates | Disinfection Procedures | 3.2.9 | |||||||||||||||
| 379 | 33 11 00 | 08 | Manufacturer’s Instructions | Manufacturer's Instructions | 3.2.1 | |||||||||||||||
| 380 | 33 30 00 | 01 | Preconstruction Submittals | Existing Conditions | 1.5 | |||||||||||||||
| 381 | 33 30 00 | 02 | Shop Drawings | Drawings | 1.3.2 | |||||||||||||||
| 382 | 33 30 00 | 02 | Shop Drawings | Precast concrete manhole | 2.3.1.1 | |||||||||||||||
| 383 | 33 30 00 | 02 | Shop Drawings | Metal items | 2.3.2 | |||||||||||||||
| 384 | 33 30 00 | 02 | Shop Drawings | Frames, covers, and gratings | 2.3.2.1 | |||||||||||||||
| 385 | 33 30 00 | 03 | Product Data | Pipeline materials | 2.1 | |||||||||||||||
| 386 | 33 30 00 | 06 | Test Reports | Reports | 2.6 | |||||||||||||||
| 387 | 33 30 00 | 07 | Certificates | Portland Cement | 2.2.2 | |||||||||||||||
| 388 | 33 30 00 | 07 | Certificates | Gaskets | 1.4.1.1 | |||||||||||||||
| 389 | 33 40 00 | 03 | Product Data | Placing Pipe | 3.3 | |||||||||||||||
| 390 | 33 40 00 | 04 | Samples | Pipe for Culverts and Storm Drains | 2.1 | |||||||||||||||
| 391 | 33 40 00 | 07 | Certificates | Resin Certification | 2.1.1 | |||||||||||||||
| 392 | 33 40 00 | 07 | Certificates | Resin Certification | 2.1.2 | |||||||||||||||
| 393 | 33 40 00 | 07 | Certificates | Determination of Density | 3.5.4 |