FA2521-15-R-0008 _Solicitation.pdf
PDF 636 KB Posted
- Attached to
- Painting IDIQ, Various Facilities Federal contract opportunity
- Solicitation number
- FA2521-15-R-0008
About this file
FA2521-15-R-0008 Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_5_Price_Schedule_-_Revision_1.xlsx | XLSX spreadsheet | |
| FA2521-15-R-0008-0003.pdf | ||
| Atch_9_Questions_ _Answers.pdf | ||
| Atch_11_Site_Visit__Statement_of_Events.docx | DOCX document | |
| FA2521-15-R-0008-0002.pdf | ||
| Atch_10_Installation_Access_List.docx | DOCX document | |
| FA2521-15-R-0008-0001.pdf | ||
| Atch_9_Question_and_Answer_Template.docx | DOCX document | |
| Atch_6_Technical_Evaluation_Sample_Project_Form.docx | DOCX document | |
| Atch_4_GPP.pdf | ||
| Atch_5_Price_Schedule.xlsx | XLSX spreadsheet | |
| Atch_3_Hazardous_Waste_Form.doc | DOC document | |
| Atch_2_Specifications_Addendum.pdf | ||
| Atch_8_Davis_Bacon_Wage_Determination_8MAY15.pdf | ||
| Atch_1_Specifications.pdf | ||
| Atch_7_Past_Performance_Questionaire.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: Painting IDIQ, Various Facilities
Project Number: SXHT 13-1015
Project Location: Patrick AFB & Cape Canaveral AFS, FL
This acquisition is a total Small Business Set-aside.
NAICS: 238320; Size Standard: $15,000,000
The guaranteed minimum of this contract is $25,000.00; the total maximum obligation is $4,999,999.00
Solicitation w ill result in a single aw ard f irm-fixed price IDIQ contract.
JANIE GRAY 321-494-9971
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
16-Jun-2015
(RFP)
(IFB)
X
CALL:
Painting IDIQ
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________15 Jul 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
45 CONS/LGCAB
1201 EDWARD H WHITE II ST
PATRICK AFB FL 32925-3237
FA2521
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
SXHT 13-1015
8. ADDRESS OFFER TO (If Other Than Item 7)
321-494-6193FAX:TEL: 321-494-5229 TEL: FAX:
FA2521-15-R-0008 59
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA2521-15-R-0008
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 9 Each Base Year
FFP
Painting IDIQ at Patrick AFB and Cape Canaveral AFS. See attached contract line item listing and specifications. Funding and performance period to be cited on individual task orders.
FOB: Destination
NET AMT
1001 9 Each OPTION Option Year One
FFP
Painting IDIQ at Patrick AFB and Cape Canaveral AFS. See attached contract line item listing and specifications. Funding and performance period to be cited on
2001 9 Each OPTION Option Year Two
FFP
Painting IDIQ at Patrick AFB and Cape Canaveral AFS. See attached contract line item listing and specifications. Funding and performance period to be cited on
3001 9 Each OPTION Option Year Three
FFP
Painting IDIQ at Patrick AFB and Cape Canaveral AFS. See attached contract line item listing and specifications. Funding and performance period to be cited on
4001 9 Each OPTION Option Year Four
FFP
Painting IDIQ at Patrick AFB and Cape Canaveral AFS. See attached contract line item listing and specifications. Funding and performance period to be cited on
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
1001 Destination Government Destination Government
2001 Destination Government Destination Government
3001 Destination Government Destination Government
4001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 17-AUG-2015 TO
16-AUG-2016
N/A 45 CES/CEAN-F3K3DU
REGINA DIXON-BUTLER
1224 JUPITER ST BLDG 534
PATRICK AFB FL 32925
321-4762927
F3K3DU
1001 POP 17-AUG-2016 TO
16-AUG-2017
N/A 45 CES/CEC - F3K3DD
ASTRA FREET
1142 JUPITER ST BLDG 535
PATRICK AFB FL 32925-3237
494-1867
F3K3DD
2001 POP 17-AUG-2017 TO
16-AUG-2018
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 17-AUG-2018 TO
16-AUG-2019
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 17-AUG-2019 TO
16-AUG-2020
N/A (SAME AS PREVIOUS LOCATION)
52.211-13 Time Extensions SEP 2000
52.211-18 Variation in Estimated Quantity APR 1984
52.242-14 Suspension of Work APR 1984
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the date identified in each task order. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) Liquidated Damages shall apply as necessary to all Task Orders exceeding $650,000.00 or as otherwise directed by the Contracting Officer.
(b) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $326.60 for the first day and $256.97 for each day thereafter for each calendar day of delay until the work is completed or accepted.
(c) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Section G - Contract Administration Data
ORDERING PROCEDURES
ORDERING PROCEDURES:
a. For performance under the terms of this contract, the Contracting Officer or his authorized representative will notify the Contractor..
b. The Contractor shall have permanent, full-time representation to receive such notification.
c. Upon receipt of this notification, the Contractor shall respond to the needs of the Government within 3 working days by visiting the proposed work site in the company of the Contracting Officer or his authorized representative. In accordance with contract clause 52.216-19, Order Limitations, if the Contractor does not wish to provide the services requested on a task order, which are below the minimum order amount or above the maximum order amount as specified herein they must submit in writing within 3 days of receipt of notification an explanation of non-intent.
d. Upon establishment of the scope of the individual requirement, the Contractor shall then prepare his proposal for accomplishment of the task. It is the Contractor’s responsibility to ensure the proposal includes all costs associated with meeting the requirements of federal, state, and local laws or enforcing codes, as well as the requirements of the Technical Specifications. It shall be the responsibility of the Contractor to ensure that all the requirements of the statement of work have been included in their proposal. No adjustment will be made after the issuance of a task order to account for items left out of the Contractor’s proposal.
e. The Bid Schedule will serve as the basis for establishing the value of the work to be performed on a unit price basis.
f. Non-pre-priced work to be included in the task order shall be presented by the Contractor in a separate category, showing itemized material, labor, and equipment costs. If a single non-priced item exceeds $2,000, the
Contractor shall provide at least three (3) price quotes, if possible, to substantiate the proposed price. In the instance that three quotes cannot be obtained, the Contractor shall notify Contracting Officer to this effect with written explanation. More than one quote may be required for non-priced items less than $2,000 if, in the Contracting
Officer’s discretion it is determined necessary. These quotes shall be made available to the contracting officer upon request.
g. The normal time frame for submittal of Contractor’s proposal for each individual requirement will be:
(1) 10 business days for routine task orders.
(2) 5 calendar days for mission critical/emergency task orders.
h. Upon receipt of the Contractor’s proposal, the Government will, within a reasonable time, review the proposal for completeness. The Government will negotiate all non-priced items and performance times with the
Contractor.
i. The Contracting Officer, using Defense Department (DD) 1155 or agency equivalent form, will then issue a task order. Each task order will include the following information:
(1) Date of the task order.
(2) Contract number and task order number.
(3) Statement of Work.
(4) Task order price, task or performance data.
(5) Accounting and appropriation data, and paying office.
(6) Any other pertinent data.
j. If conditions arise where a task order may need to be modified, the Contractor shall inform the
Contracting Officer as soon as possible. Modifications to task orders can only be issued by the Contracting Officer.
Modifications to a task order will be subject to the same coefficient as the original task order, regardless of the contract year in which the modification is awarded.
k. To expedite year-end or emergency requirements, orders may be pre-negotiated prior to receipt of funds.
In such cases, prior to requesting the Contractor’s proposal, the Contracting Officer shall request from the Contractor a no cost agreement if order is not awarded. No task order may be awarded until funds are received.
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
252.204-7006 Billing Instructions OCT 2005
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through
WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Construction Payment Invoice
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
Inspect by: DoDAAC F3K3DD
Accept by: DoDAAC FA2521
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC F03000
Issue By DoDAAC FA2521
Admin DoDAAC FA2521
Inspect By DoDAAC F3K3DD
Ship To Code F3K3DD
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
CO DoDAAC FA2521
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional
Email Notifications” field of WAWF once a document is submitted in the system.
Contracting Officer: patricia.bates@us.af.mil
Contract Manager: janie.gray.1@us.af.mil
Contract Specialist: linda.lutz@us.af.mil
Program Manager: regina.butler.1@us.af.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Not applicable.
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(h) WAWF clause will be edited on each Task Order to ensure correct payment instructions.
mailto:patricia.bates@us.af.mil mailto:janie.gray.1@us.af.mil mailto:linda.lutz@us.af.mil mailto:regina.butler.1@us.af.mil
Section H - Special Contract Requirements
5352.242-9000 Contractor Access to Air Force Installations
1. CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (NOV 2012)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate to obtain a vehicle pass.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel
Security Program Management.
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) Failure to comply with these requirements may result in withholding of final payment.
2. CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS – ADDITIONAL REQUIREMENTS
This Special Contract Requirement, Contractor Access to Air Force Installations, by adding the following additional requirements:
(a) Contractors must have an approved request letter on file at Security Forces with employees name and the required data.
(b) Subcontracts: The contractor shall include this Special Contract Requirement in subcontracts of any tier.
(c) Unescorted Access to Installations:
(1) To request access to Patrick AFB, prior to their proposed business or contract requirements, all contractor personnel shall provide a current completed “45th Security Forces Pass & Registration Badging Request Form”.
(2) To request access to Cape Canaveral AFS, prior to their proposed business or contract requirements, all contractor personnel shall provide a current completed “CCAFS Badging Request Form”.
(3) Contractor personnel must complete and sign the applicable form cited above before the required background check (see d. and e. below) can be performed.
(d) All personnel entering Patrick AFB and Cape Canaveral AFS must provide two forms of identification (one must be a photo ID) as required by AFI 10-245, and have a background check.
(1) For unescorted entry into non-restricted areas of the installations, personnel must obtain, from AF security personnel, favorable National Criminal Information Center (NCIC) check, and have complete social security employment verifications prior to being issued badges (to include temporary passes.
(2) Prior to being issued restricted area badges for unescorted entry into restricted areas of the installations, U.S. citizens working as contractor employees must obtain a favorable National Agency Check (NAC).
(3) All required information shall be provided to support background checks, and citizenship verification
(i.e., birth certificate, passport, voter registration card, resident alien card, or certificate of naturalization).
(e) Escorted Access-Temporary Passes: Personnel may receive a temporary pass, Air Force Form 75/Visitor and
Vehicle Pass, for no more than 30 total days in one 365 day period. This pass is issued without a criminal background check, but requires a Wants & Warrants check. Persons with temporary passes receive escorted access rights only, i. e.; they must be escorted at all times by an escort official. Escorted personnel must be with their escort official (the escort official must be in plain view) at all times while on the installation.
(f) Personnel Background Checks
(1) The 45th Security Forces will conduct the background check at no cost to the applicant. Refusal to submit to the background check will result in denial of access. Applicants shall be denied installation access based on an arrest record including, but not limited to the following crimes:
(i) Murder
(ii) Manslaughter
(iii) Rape
(iv) Aggravated Assault
(v) Burglary
(vi) Arson
(vii) Other forms of Sexual Assaults (lewd, malicious acts to a child, etc.)
(viii) Any other felony
(ix) Outstanding warrants
(x) Misdemeanor convictions less that 5-year involving moral turpitude offenses (theft, worthless checks, etc.)
(xi) FBI Terrorist Watch List
(2) Individuals who do not meet the criteria for unescorted base access may still be granted escorted access on a case-by-case basis. The determination will be made based on the results of the background investigation, totality of the criminal record and the types of crime reported.
(3) Individuals may appeal denial of escorted/unescorted installation access through the Security Forces. It shall be the responsibility of the applicant who is denied access to submit supporting documents such as court, police or arrest records, evidence of community involvement, letters of recommendation to the denial authority for reconsideration.
(4) For the purposes of this policy, convictions are considered to include the following: Guilty verdicts or a
Nolo Contendere plea, disposition of cases resulting in deferred adjudication or pretrial diversion and expunged offenses resulting in convictions of crimes enumerated in subparagraph (e)(1) above.
(5) Contractors should allow 14 days for background checks to be finalized. The contractor should provide the required form (see c. above) for each of its personnel to the government 14 days before the contract start date whenever possible. Background checks cannot be performed from only a list of names.
(g) The Government will not be held responsible for contractual impacts or delays caused by the contractor’s failure to take prompt action in providing the required information and documentation to obtain access to Patrick
AFB and Cape Canaveral AFS.
Section I - Contract Clauses
252.203-7999 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements. (DEVIATION
2015-O0010)
(End of Clause)
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Persoonnel JAN 2006
52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
JUL 2013
52.204-13 System for Award Management Maintenance JUL 2013
52.204-15 Service Contract Reporting Requirements for Indefinite-
Delivery Contracts
JAN 2014
52.204-18 Commercial and Government Entity Code Maintenance NOV 2014
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
AUG 2013
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
DEC 2014
52.215-2 Audit and Records--Negotiation OCT 2010
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.217-2 Cancellation Under Multiyear Contracts OCT 1997
52.217-7 Option For Increased Quantity-Separately Priced Line Item MAR 1989
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011
52.219-8 Utilization of Small Business Concerns OCT 2014
52.219-14 Limitations On Subcontracting NOV 2011
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014
52.222-7 Withholding of Funds MAY 2014
52.222-8 Payrolls and Basic Records MAY 2014
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) MAY 2014
52.222-12 Contract Termination-Debarment MAY 2014
52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility MAY 2014
52.222-21 Prohibition Of Segregated Facilities FEB 1999
52.222-26 Equal Opportunity MAR 2007
52.222-27 Affirmative Action Compliance Requirements for
Construction
FEB 1999
52.222-30 Construction Wage Rate Requirements--Price Adjustment
(None or Separately Specified Method)
MAY 2014
52.222-34 Project Labor Agreement MAY 2010
52.222-35 Equal Opportunity for Veterans JUL 2014
52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014
52.222-37 Employment Reports on Veterans JUL 2014
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons FEB 2009
52.222-54 Employment Eligibility Verification AUG 2013
52.222-55 Minimum Wages Under Executive Order 13658 DEC 2014
52.222-99 (Dev) Establishing a Minimum Wage for Contractors (Deviation
2014-O0017)
JUN 2014
52.223-1 Biobased Product Certification MAY 2012
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-6 Drug-Free Workplace MAY 2001
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.224-1 Privacy Act Notification APR 1984
52.224-2 Privacy Act APR 1984
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.228-2 Additional Bond Security OCT 1997
52.228-5 Insurance - Work On A Government Installation JAN 1997
52.228-11 Pledges Of Assets JAN 2012
52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014
52.228-14 Irrevocable Letter of Credit NOV 2014
52.228-15 Performance and Payment Bonds--Construction OCT 2010
52.229-3 Federal, State And Local Taxes FEB 2013
52.232-17 Interest MAY 2014
52.232-23 Assignment Of Claims MAY 2014
52.232-27 Prompt Payment for Construction Contracts MAY 2014
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-17 Layout of Work APR 1984
52.236-21 Specifications and Drawings for Construction FEB 1997
52.236-26 Preconstruction Conference FEB 1995
52.242-13 Bankruptcy JUL 1995
52.243-4 Changes JUN 2007
52.244-5 Competition In Subcontracting DEC 1996
52.244-6 Subcontracts for Commercial Items OCT 2014
52.246-21 Warranty of Construction MAR 1994
52.248-3 Value Engineering-Construction OCT 2010
52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7000 Disclosure Of Information AUG 2013
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A System for Award Management Alternate A FEB 2014
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
DEC 2014
252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7048 Export-Controlled Items JUN 2013
252.232-7010 Levies on Contract Payments DEC 2006
252.236-7000 Modification Proposals-Price Breakdown DEC 1991
252.236-7001 Contract Drawings, and Specifications AUG 2000
252.236-7005 Airfield Safety Precautions DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment DEC 2012
252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military
Operations
OCT 2010
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC
2014)
The Contractor's representations and certifications, including those completed electronically via the System for
Award Management (SAM), are incorporated by reference into the contract.
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of $1M;
(2) Any order for a combination of items in excess of 2M; or,
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal
Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the
Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.
Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and
Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after date of expiration of period of performance of final task order..
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 15 days;
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five years.
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JULY 2013)
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts--
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The
Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the
Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in
SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 238320- assigned to
RFP number FA2521-15-R-0008.
(Contractor to sign and date and insert authorized signer's name and title).
52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-
DESIGNATED ITEMS (MAY 2008)
Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall--
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to Regina Butler at regina.butler.1@us.af.mil
52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2001)
(a) Definition. Ozone-depleting substance, as used in this clause, means any substance the Environmental Protection
Agency designates in 40 CFR part 82 as--
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform;
or
(2) Class II, including, but not limited to, hydrochlorofluorocarbons.
(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:
“WARNING: Contains (or manufactured with, if applicable), a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.”----------------------------
The Contractor shall insert the name of the substance(s).
mailto:regina.butler.1@us.af.mil
52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph
(b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty
(whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the
Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the
Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) \1\
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 % of the Total Proposed Price.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
This is the start of the file's text. The full file is on GovTribe.