Atch_5_Price_Schedule.xlsx

XLSX spreadsheet 1 MB Posted

Attached to
Painting IDIQ, Various Facilities Federal contract opportunity
Solicitation number
FA2521-15-R-0008
Issued by
Department of the Air Force Space Command

About this file

Attachment 5 Price Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Painting IDIQ, Various Facilities, newest first.
File Type Posted
Atch_9_Questions_ _Answers.pdf PDF
Atch_11_Site_Visit__Statement_of_Events.docx DOCX document
Atch_5_Price_Schedule_-_Revision_1.xlsx XLSX spreadsheet
FA2521-15-R-0008-0003.pdf PDF
FA2521-15-R-0008-0002.pdf PDF
FA2521-15-R-0008-0001.pdf PDF
Atch_9_Question_and_Answer_Template.docx DOCX document
Atch_10_Installation_Access_List.docx DOCX document
Atch_6_Technical_Evaluation_Sample_Project_Form.docx DOCX document
Atch_1_Specifications.pdf PDF
Atch_7_Past_Performance_Questionaire.docx DOCX document
Atch_3_Hazardous_Waste_Form.doc DOC document
Atch_2_Specifications_Addendum.pdf PDF
Atch_8_Davis_Bacon_Wage_Determination_8MAY15.pdf PDF
FA2521-15-R-0008 _Solicitation.pdf PDF
Atch_4_GPP.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

INSTRUCTIONS
1 - Enter the proposed unit pricing in the yellow highlighted fields on the "BASE YR" and Each "OPT YR" tab.

2 -The Summary page will automatically popualte once the Year is filled in.

SUMMARY

YEAR TOTAL ESTIMATED COST

BASE YEAR$0.00
OPTION YEAR 1$0.00
OPTION YEAR 2$0.00
OPTION YEAR 3$0.00
OPTION YEAR 4$0.00

5 YEAR TOTAL $0.00

&"-,Bold"&18PRICE SCHEDULE SUMMARY SHEET PAFB Paint IDIQ Design, SXHT 13-1015

BASE YR

CLINS No. DESCRIPTION PRIMARY TECHNICAL REFERENCE(S) EST. QTY. UNIT UNIT COST TOTAL ESTIMATED COST

SUBSTRATE REPAIR
These work items consist of minor repairs to substrate materials for maintenance painting. These items can be used with the Systems or with itemized paint products as required. All unit costs are fully burdened.3
COMMON SURFACE REPAIRS
1AARepair masonry/stucco/concrete cracks (small)09 90 01; 3.11.21100LF$0.00
1ABRepair masonry/stucco/concrete cracks (large)09 90 01; 3.11.2850LF$0.00
1ACPatch masonry/concrete/stucco surfaces09 90 01; 3.11.2300SF$0.00
1ADRepair spalling concrete w/exposed reinforcement bar (unit: cubic foot)09 90 01; 3.11.1.2120CF$0.00
1AERepair EIFS (synthetic stucco)09 90 01; 3.11.32500SF$0.00
1AFRepair portland stucco09 90 01; 3.11.2300SF$0.00
1AGRepair acrylic stucco cladding09 90 01; 3.11.2300SF$0.00
1AHPatch drywall09 29 00; 3.4300SF$0.00
1AIPatch cement board09 90 02; 3.8.2300SF$0.00
1AJFill/putty wood (unit: square inch)09 90 01;3.11.4/09 90 02;3.8.1500SI$0.00
ANCILLARY WORK ITEMS
These work items consist of the removal and/or replacement of substrate materials and appurtenances for maintenance or painting. These items can be used with the Systems or with itemized paint products as required. All unit costs are fully burdened.3
METAL
1BAReplace copper gutter07 62 10; 3.10110LF$0.00
1BBReplace copper downspout07 62 10; 3.966LF$0.00
1BCReplace metal louver/vent, stainless steel08 91 00; 3.110SF$0.00
1BDReplace copper fascia and flashing07 62 10; 3.650SF$0.00
1BEReplace copper flashing07 62 10; 3.610SF$0.00
1BFReplace metal siding, factory finished aluminum07 42 13; 3.3100SF$0.00
1BGReplace metal siding, factory finished galvanized steel07 42 13; 3.3100SF$0.00
1BHReplace aluminum balcony and/or stair handrail05 52 00; 3.2200LF$0.00
1BIReplace/add metal framing stud and/or channel09 22 00; 3.1200LF$0.00
1BJReplace soffit with vented aluminum soffit07 42 13: 3.5.4650SF$0.00
WOOD
1CAReplace sub fascia boards06 10 00; 3.1100BF$0.00
1CBReplace wood fascia06 20 00; 3.3200BF$0.00
1CCReplace wood trim06 20 00; 3.3100BF$0.00
1CDReplace wood soffit/soffit vent06 20 00; 3.2200BF$0.00
1CEReplace/add 2 x 406 10 00; 3.1100BF$0.00
1CFReplace/add 2 x 606 10 00; 3.150BF$0.00
1CGReplace/add 2 x 806 10 00; 3.1126BF$0.00
OTHER MISCELLANEOUS ITEMS
1DAInstall concrete block (CMU) infill04 20 00; 3.2350SF$0.00
1DBRemove/demo gypsum board09 29 00; 1.5500SF$0.00
1DCInstall new gypsum board09 29 00; 3.2500SF$0.00
1DDGypsum board texture, medium texture orange peel09 29 00; 3.4.2.1750SF$0.00
1DEGypsum board texture, knock down (ceilings)09 29 00; 3.4.2.2750SF$0.00
1DFGypsum board finish Level 109 29 00; 3.4750SF$0.00
1DGGypsum board finish Level 209 29 00; 3.4100SF$0.00
1DHGypsum board finish Level 309 29 00; 3.4100SF$0.00
1DIGypsum board finish Level 409 29 00; 3.4400SF$0.00
1DJGypsum board finish Level 509 29 00; 3.4.1100SF$0.00
1DKReplace/add acoustical ceiling panels09 51 00; 3.1.3400SF$0.00
1DLReplace rubber wall base09 29 00; 3.6250LF$0.00
1DMReplace rubber wall base with wood wall base06 20 00; 3.4250LF$0.00
1DNReplace aluminum door/frame (anodized, 3' x 7', including closer)08 11 16; 3.12EA$0.00
1DOReplace hinge08 71 00; 3.12SET (3)$0.00
1DPReplace weather-stripping08 71 00; 3.1.12EA$0.00
1DQReplace threshold08 71 00; 3.1.32EA$0.00
1DRReplace door hardware (including lockset)08 71 00; 3.12EA$0.00
1DSReplace stops08 71 00; 3.13EA$0.00
1DTReplace door bumpers08 71 00; 3.13EA$0.00
1DUReplace glass08 81 00; 3.2150SF$0.00
1DVReplace blast proof windows08 56 53; 3.125SF$0.00
1DWReplace hurricane-rated glass08 56 53; 3.125EA$0.00
1DXRemove/reinstall exterior building signage after completion of painting work09 90 01; 3.2.259EA$0.00
1DYReplace/install (new) exterior signage after completion of painting work09 90 01; 3.2.225EA$0.00
1DZRemove/reinstall interior building signage after completion of painting work09 90 02; 3.2, 09 90 01; 3.2.225EA$0.00
1DAAReplace/install (new) interior signage after completion of painting work09 90 02; 3.2, 09 90 01; 3.2.225EA$0.00
1DABReplace asbestos corrugated siding with fiberglass corrugated siding (includes abatement)07 42 13; 3.3.325SF$0.00
1DACCaulk windows09 90 01; 3.104400LF$0.00
1DADInterior caulking09 90 02; 3.8.31000LF$0.00
1DAEExterior caulking09 90 01; 3.11.5.21000LF$0.00
1DAFReplace/add joint sealant (less than .25'' width)07 92 00; 3.3100LF$0.00
1DAGReplace/add joint sealant (.25'' to .5'' width)07 92 00; 3.3500LF$0.00
1DAHReplace/add joint sealant (.5'' to 1''width)07 92 00; 3.3200LF$0.00
EXTERIOR PAINTING SYSTEMS
These all-inclusive work systems include the materials, labor, equipment and any other resources or steps required to safely perform the required surface preparation and painting; including cleaning, feathering of edges, minor spackling, scaffolding, and containment (excluding lead based paint) for protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3
CONCRETE AND CMU
1EAAcrylic latex over new bare concrete/masonry block09 90 01; EN1500SF$0.00
1EBElastomeric spot repair on concrete/masonry block over elastomeric09 90 01; ES2100SF$0.00
1ECAcrylic latex overcoat on concrete/masonry block with moderately weathered acrylic latex09 90 01; EO361000SF$0.00
1EDElastomeric overcoat on concrete/masonry block with moderately weathered acrylic latex09 90 01; EO4500SF$0.00
1EEElastomeric overcoat on concrete/masonry block with moderately weathered elastomeric09 90 01; EO4500SF$0.00
1EFSpot repair on concrete/masonry block of acrylic latex09 90 01; ES5500SF$0.00
1EGComplete removal and new coating on concrete/masonry block of acrylic latex09 90 01; EN61000SF$0.00
STUCCO
1FAAcrylic latex over new bare stucco09 90 01; EN11000SF$0.00
1FBSpot repair of acrylic latex over stucco09 90 01; ES51000SF$0.00
1FCSpot repair of elastomeric over stucco09 90 01; ES21000SF$0.00
1FDAcrylic latex overcoat on stucco with moderately weathered acrylic latex09 90 01; EO310000SF$0.00
1FEElastomeric overcoat on stucco with moderately weathered acrylic latex09 90 01; EO4500SF$0.00
1FFElastomeric overcoat on stucco with moderately weathered elastomeric09 90 01; EO4500SF$0.00
1FGComplete removal and new coating on stucco with acrylic latex09 90 01; EN6100SF$0.00
EIFS
1GASpot repair of acrylic latex over EIFS09 90 01; ES51000SF$0.00
1GBSpot repair of elastomeric over EIFS09 90 01; ES2500SF$0.00
1GCAcrylic latex overcoat on EIFS with moderately weathered acrylic latex09 90 01; EO39000SF$0.00
1GDElastomeric overcoat on EIFS with moderately weathered acrylic latex09 90 01; EO4500SF$0.00
1GEElastomeric overcoat on EIFS with moderately weathered elastomeric09 90 01; EO4500SF$0.00
WOOD
1HAAcrylic latex over bare wood09 90 01; EN7275SF$0.00
1HBAcrylic latex spot repair on wood over acrylic latex09 90 01; ES9100SF$0.00
1HCAcrylic latex overcoat on wood with moderately weathered acrylic latex09 90 01; EO8100SF$0.00
1HDAcrylic latex over bare wood using chemical stripping for surface preparation09 90 01; EN10100SF$0.00
BUILDING PANELS
1IAEpoxy tie coat and fluoropolymer finish over moderately weathered metal panels, no previous field applied coating09 90 01; EO12100SF$0.00
1IBNew coating on HANGAR metal pipes09 90 01; EN25100SF$0.00
ICSpot repair of acrylic latex over asbestos panels09 90 01; ES9100SF$0.00
IDAcrylic latex overcoat of weathered asbestos wall panels09 90 01; EO8100SF$0.00
1IEAcrylic latex over bare asbestos wall panels09 90 01; EN11100SF$0.00
1IFAlkyd overcoat of weathered factory finish metal wall panels09 90 01; EO24100SF$0.00
1IGEpoxy spot repair of factory finish on metal wall panels prior to full overcoat09 90 01; ES26100SF$0.00
FERROUS METAL
1JASpot repair of ferrous metals with previously applied long oil alkyd09 90 01; ES17100SF$0.00
1JBAcrylic latex spot repair of ferrous metals with previously applied acrylic latex09 90 01; ES15100SF$0.00
1JCAliphatic urethane topcoat spot repair of ferrous metals with isolated coating damage on urethane finish09 90 01; ES19100SF$0.00
1JDAlkyd overcoat of ferrous metal over moderately weathered alkyd09 90 01; EO16100SF$0.00
1JEAcrylic latex overcoat of ferrous metal over moderately weathered acrylic latex09 90 01; EO141000SF$0.00
1JFEpoxy and aliphatic urethane system on ferrous metal over moderately weathered urethane finish09 90 01; EO21100SF$0.00
1JGComplete removal and new coating on ferrous metal of epoxy and aliphatic polyurethane topcoat system09 90 01; EN231700SF$0.00
1JHHANGAR interior exposed metal urethane alkyd enamel spot repair of structural steel09 90 01; ES28100SF$0.00
1JIOvercoat of HANGAR interior exposed shop primed aged alkyd structural steel with long oil alkyd and urethane alkyd enamel09 90 01; EO27100SF$0.00
GALVANIZED STEEL
1KAAcrylic latex over unpainted galvanized steel09 90 01; EN18400SF$0.00
1KBAliphatic urethane topcoat spot repair over galvanized steel09 90 01; ES19100SF$0.00
1KCAcrylic latex overcoat on galvanized metal with moderately weathered acrylic latex09 90 01; ES20750SF$0.00
1KDMulti-purpose epoxy and aliphatic urethane overcoat over moderately weathered acrylic latex09 90 01; EO29400SF$0.00
INTERIOR PAINTING SYSTEMS
These all-inclusive work Systems include the materials, labor, equipment and any other resources or steps to perform the required surface preparations and painting ; including cleaning, normal spackling, feathering of edges, scaffolding, and containment (excluding lead based paint) for protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3
BLOCK
1LAAcrylic latex over new bare concrete/masonry block09 90 02; IN1100SF$0.00
1LBAcrylic latex spot repair on concrete/masonry block with aged acrylic latex09 90 02; IS5100SF$0.00
1LCAcrylic overcoat on concrete/masonry block with aged acrylic latex09 90 02; IO4200SF$0.00
1LDNew coating on concrete/masonry block of acrylic latex09 90 02; IN6100SF$0.00
DRYWALL/TRANSITE/PLASTER
1MAAcrylic latex over new bare drywall/gypsum09 90 02; IN2500SF$0.00
1MBAcrylic latex spot repair of drywall/gypsum over acrylic latex09 90 02; IS7100SF$0.00
1MCAcrylic overcoat on drywall/gypsum with intact acrylic latex09 90 02; IO47200SF$0.00
1MDComplete removal and new coating on drywall/gypsum of acrylic latex09 90 02; IN9100SF$0.00
1MESpot repair of acrylic plaster over transite09 90 01; ES9100SF$0.00
1MFAcrylic latex overcoat on transite with moderately weathered acrylic latex09 90 01; EO8100SF$0.00
1MGAcrylic latex overcoat on plaster with aged acrylic latex09 90 02; IO4100SF$0.00
1MHAlkali resistant primer and acrylic latex over new plaster09 90 02; IN3100SF$0.00
1MISpot repair of acrylic latex on plaster09 90 02; IS5100SF$0.00
1MJComplete removal and new coating on walls and ceilings with acrylic latex09 90 02; IN8100SF$0.00
WOOD
1NAAcrylic latex over bare wood09 90 02; IN2100SF$0.00
1NBAcrylic latex spot repair on wood over acrylic latex09 90 02; IS5100SF$0.00
1NCAcrylic latex overcoat on wood with aged acrylic latex09 90 02; IO4100SF$0.00
1NDComplete removal and new coating on wood with acrylic latex09 90 02: IN8100SF$0.00
METAL SURFACES
1OAAcrylic latex overcoat on metal surfaces with aged acrylic latex09 90 02; IO4100SF$0.00
HIGH PERFORMANCE PAINTING SYSTEMS AND FLOORING SYSTEMS
For high performance painting, these all inclusive work Systems include the materials, labor, equipment and any other resources to perform the required surface preparation and painting; including cleaning, scaffolding, containment (excluding lead based paint) and protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3

For flooring systems, these all inclusive composite work Systems include the materials, labor, equipment, and any other resources or requirements to perform all of the work detailed in, or related to, the referenced specification section. Unit costs are based on a typical project size of at least 5,000 square feet for aged concrete (coated or uncoated), and at least 1,000 square feet for new concrete. All unit costs are fully burdened rates3 and the reflect the total compensastion to be received by the contractor for authorized work.

HIGH PERFORMANCE PAINTING SYSTEMS
1PAInorganic zinc (System I)09 97 00; HP11000SF$0.00
1PBInorganic zinc with acrylic latex color coding09 97 00; HP1 with color coding500SF$0.00
1PC3 coat system (System II)09 97 00; HP2500SF$0.00
FLOORING SYSTEM 1: FUEL RESISTIVE RESINOUS FLOORING (FRRF) SYSTEM
1PDFRRF, New Uncoated Concrete09 67 23.161000SF$0.00
1PEFRRF, Aged Uncoated Concrete (contaminated)09 67 23.1610000SF$0.00
1PFFRRF, Remove Existing Flooring and Install09 67 23.165000SF$0.00
FLOORING SYSTEM 1: FRRF SYSTEM OPTIONS
1PGMoisture Reducing System (MRS) for FRRF System09 67 23.16; 2.3.1,
09 67 23.16; 3.12.35000SF$0.00
1PHCrack Treament for FRRF System09 67 23.16; 3.9300LF$0.00
FLOORING SYSTEM 2: CHEMICALLY RESISTANT ELECTROSTATIC DISSIPATIVE RESINOUS FLOORING (CRESDRF) SYSTEM
1PICRESDRF System, Aged Uncoated Concrete (contaminated)09 67 23.1510000SF$0.00
1PJCRESDRF System, Remove Existing Flooring and Install09 67 23.1510000SF$0.00
FLOORING SYSTEM 2: CRESDF SYSTEM OPTIONS
1PKMRS for CRESDRF system09 67 23.15; 1.4.1.3,
09 67 23.15; 3.15.120000SF$0.00
1PLCrack Treament for CRESDRF system09 67 23.15; 3.8300LF$0.00
UNIT PRICED PAINT WORK ITEMS
These are specific items to be painted on a unit price basis that includes all materials, labor, equipment, and any other resources to perform the required surface preparation and painting (excluding lead based paint) including protection of surrounding areas. All unit costs are fully burdened.3
1QAPrepare and paint existing fire hydrant09 97 00, HP-1 with color-coding5EA$0.00
1QBPrepare and paint existing backflow preventer (<100 ft2)09 97 00, HP-1 with color coding48EA$0.00
1QCPrepare and paint steel bollard09 97 00, HP-215EA$0.00
1QDPrepare and paint misc steel item < 50 ft209 97 00, HP-110EA$0.00
1QEPrepare and paint misc steel item between 50 and 100 ft209 97 00, HP-15EA$0.00
1QFPrepare and paint misc steel item < 50 ft209 97 00, HP-210EA$0.00
1QGPrepare and paint misc steel item between 50 and 100 ft209 97 00, HP-25EA$0.00
ITEMIZED CLEANING & SURFACE PREPARATION
These items are to be used individually or in combination with other items, exclusive of a System application, to perform specialized cleaning, surface preparation, paint repair or maintenance that may not be represented in a System. These items include all materials, labor, equipment or other resources required to perform the work item. All unit costs are fully burdened.3
1RAPressure wash/low pressure water cleaning (LPWC)09 90 01; 3.9.10.1100SF$0.00
1RBPressure wash (LPWC), incl. mildew treatment and removal09 90 01; 3.9.10.1355SF$0.00
1RCHigh-pressure water cleaning (HPWC)09 90 01; 3.9.10.2100SF$0.00
1RDWater jetting (WJ-1)09 90 01; 3.9.10.4.1100SF$0.00
1REWater jetting (WJ-2)09 90 01; 3.9.10.4.2100SF$0.00
1RFWater jetting (WJ-3)09 90 01; 3.9.10.4.3100SF$0.00
1RGWater jetting (WJ-4)09 90 01; 3.9.10.4.4100SF$0.00
1RHSponge media blasting (SP-6)09 90 01; 3.9.11.2100SF$0.00
1RISponge media blasting (SP-7)09 90 01; 3.9.11.3100SF$0.00
1RJSponge media blasting (SP-10)09 90 01; 3.9.11.1100SF$0.00
1RKSponge media blasting (SP-14)09 90 01; 3.9.11.4100SF$0.00
1RLSponge media blasting (SP-16)09 90 01; 3.9.11.3100SF$0.00
1RMChemical stripping09 90 01; 3.9.13100SF$0.00
1RNHand tool cleaning09 90 01; 3.9.5100SF$0.00
1ROPower tool cleaning (SP-3)09 90 01; 3.9.7100SF$0.00
1RPPower tool cleaning (SP-11)09 90 01; 3.9.8120SF$0.00
1RQPower tool cleaning (SP-15)09 90 01; 3.9.9100SF$0.00
1RSAbrasive blasting (SP-7)09 90 01; 3.9.11.3100SF$0.00
1RTAbrasive blasting (SP-6)09 90 01; 3.9.11.2100SF$0.00
1RUAbrasive blasting (SP-10)09 90 01; 3.9.11.1100SF$0.00
1RVAbrasive blasting (SP-14)09 90 01; 3.9.11.4100SF$0.00
1RWAbrasive blasting (SP-16)09 90 01 3.9.11.3100SF$0.00
1RXWet abrasive blasting (SP-7), low dust09 90 01; 3.9.10.3100SF$0.00
1RYWet abrasive blasting (SP-6), low dust09 90 01; 3.9.10.3100SF$0.00
1RZWet abrasive blasting (SP-10), low dust09 90 01; 3.9.10.3100SF$0.00
1RAAWet abrasive blasting (SP-14), low dust09 90 01; 3.9.10.3100SF$0.00
1RABWet abrasive blasting (SP-16), low dust09 90 01; 3.9.10.3100SF$0.00
1RACPrep concrete (SP-13, light service), with ICRI 1-3 profile09 90 01; 3.9.12100SF$0.00
1RADPrep concrete (SP-13, severe service), with ICRI 3-6 profile09 90 01; 3.9.12100SF$0.00
Note: hand tool, power tool, and all blasting methods (i.e; sponge, wet, dry) require pre-cleaning as part of the surface preparation method.
ITEMIZED PAINTING PRODUCTS
These items are to be used individually, exclusive of a System application to perform specialized paint repair or maintenance that may not be represented in a System. These items include all materials, application labor and equipment associated with ONE COAT of the installed product. These items do not include surface preparation to be performed in conjunction with these items. Surface preparation shall be selected as a separate cost item. All unit costs are fully burdened.3
EXTERIOR PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION
1SAAlkali resistant block filler09 90 01; 2.13100SF$0.00
1SBHigh-build acrylic latex primer09 90 01; 2.13100SF$0.00
1SCHigh-build acrylic latex topcoat09 90 01; 2.13100SF$0.00
1SDAlkali resistant primer09 90 01; 2.13100SF$0.00
1SEElastomeric patching compound09 90 01; 2.13100SF$0.00
1SFElastomeric topcoat09 90 01; 2.13100SF$0.00
1SGExterior acrylic latex bonding primer09 90 01; 2.13100SF$0.00
1SHExterior acrylic latex (flat)09 90 01; 2.13100SF$0.00
1SIExterior acrylic latex (eggshell/satin)09 90 01; 2.13100SF$0.00
1SJExterior acrylic latex (gloss/semi-gloss)09 90 01; 2.13100SF$0.00
1SKWater-based universal primer09 90 01; 2.13100SF$0.00
1SLPolyamide epoxy primer09 90 01; 2.13100SF$0.00
1SMFluoropolymer finish09 90 01; 2.13100SF$0.00
1SNOrganic zinc primer09 90 01; 2.13100SF$0.00
1SOInorganic zinc primer09 90 01; 2.13185SF$0.00
1SPMulti-purpose epoxy09 90 01; 2.13100SF$0.00
1SQAcrylic aliphatic polyurethane09 90 01; 2.13100SF$0.00
1SRWater-based urethane finish09 90 01; 2.13100SF$0.00
1SSUrethane alkyd enamel09 90 01; 2.13100SF$0.00
1STAlkyd universal primer09 90 01; 2.13100SF$0.00
1SUWaterborne direct-to-metal primer09 90 01; 2.13100SF$0.00
1SVExterior wood primer09 90 01; 2.13100SF$0.00
1SWWater-based acrylic epoxy09 90 01; 2.13100SF$0.00
1SXPenetrating epoxy sealer09 90 01; 2.13100SF$0.00
1SYBiodegradable surface cleaner09 90 01; 2.13100SF$0.00
1SZConcrete primer09 90 01; 2.13100SF$0.00
1SAA100% solids epoxy filler09 90 01; 2.13100SF$0.00
1SABUrethane elastomer09 90 01; 2.13100SF$0.00
1SACPigmented sealer09 90 01; 2.13100SF$0.00
1SAECalcium sulfonate sealer09 90 01; 2.13100SF$0.00
1SAFCalcium sulfonate primer09 90 01; 2.13100SF$0.00
1SAGCalcium sulfonate topcoat09 90 01; 2.13100SF$0.00
1SAHRebar bonding agent and reinforcement protection09 90 01; 2.13100SF$0.00
INTERIOR PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION
1TAAlkali resistant block filler09 90 02; 2.11100SF$0.00
1TBAlkali resistant primer09 90 02; 2.11100SF$0.00
1TCInterior latex sealer09 90 02; 2.11100SF$0.00
1TDInterior acrylic latex (flat)09 90 02; 2.11100SF$0.00
1TEInterior acrylic latex (eggshell/satin)09 90 02; 2.11100SF$0.00
1TFInterior acrylic latex (semi-gloss/gloss)09 90 02; 2.11100SF$0.00
1TGWater-based acrylic universal primer09 90 02; 2.11100SF$0.00
1THWaterborne direct-to-metal primer09 90 02; 2.11100SF$0.00
1TIBiodegradable surface cleaner09 90 02; 2.11100SF$0.00
1TJPrimer for scuff resistance coatings09 90 02; 2.11100SF$0.00
1TKScuff resistant base coat09 90 02; 2.11100SF$0.00
1TLScuff resistant pattern coat09 90 02; 2.11100SF$0.00
1TMWood stain: touch-up & overcoat09 90 02; 2.11100SF$0.00
1TNWood stain: complete removal and recoat09 90 02; 2.11100SF$0.00
1TOFloor marking: overcoat or recoat09 90 02; 2.11100SF$0.00
HIGH PERFORMANCE PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION
1UAInorganic zinc rich primer - Per System I09 97 00; 2.12100SF$0.00
1UBInorganic zinc rich primer - Per System II09 97 00; 2.12100SF$0.00
1UCEpoxy intermediate coat09 97 00; 2.12100SF$0.00
1UDAliphatic polyurethane finish coat09 97 00; 2.12100SF$0.00
1UEExterior acrylic latex (gloss/semi-gloss)09 97 00; 2.12100SF$0.00
ABATEMENT OR DISTURBANCE OF TOXIC SUBSTANCE
These cost items are added to projects that involve work on existing facility surfaces that contain toxic substances. These all-inclusive unit prices provide compensation to cover all additional costs associated with the disturbance or removal of the toxic material. This includes, but is not limited to, hazard assessment, testing, containment, worker protection, environmental protection, air monitoring, waste collection/segregation/disposal and full compliance with all applicable regulatory requirements. Cost items associated with toxic metal content that is below RCRA limits shall only apply if the required work processes are proven to result in exposures above regulatory action levels. Note that trace detectable levels that are below RCRA limits still require exposure testing (OSHA 1910.1025), but rarely result in worker exposures above action levels. All unit costs are fully burdened.3
HAZARDOUS PAINT - ADD FOR TOXIC METAL(S) CONTENT ABOVE RCRA LIMITS (TOTAL METALS) AND EXPOSURE ACTION LEVELS
1VAHazardous paint disturbance 109 90 01; 3.3, 09 97 00; 3.35000SF$0.00
1VBHaz paint (i.e. Lead) abatement, including class 1a containment09 90 01; 3.6, 09 97 00; 3.52000SF$0.00
1VCHaz paint (i.e. Lead) abatement, including class 1w containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VDHaz paint (i.e. Lead) abatement, including class 1p containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VEHaz paint (i.e. Lead) abatement, including class 1c containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VFHaz paint (i.e. Lead) abatement, including class 2a containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VGHaz paint (i.e. Lead) abatement, including class 2w containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VHHaz paint (i.e. Lead) abatement, including class 2p containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VIHaz paint (i.e. Lead) abatement, including class 2c containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VJHaz paint (i.e. Lead) abatement, including class 3a containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VKHaz paint (i.e. Lead) abatement, includingclass 3w containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VLHaz paint (i.e. Lead) abatement, including class 3p containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VMHaz paint (i.e. Lead) abatement, including class 3c containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VNHaz paint (i.e. Lead) abatement, including class 4a containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
1VOHaz paint (i.e. Lead) abatement, including class 4w containment09 90 01; 3.6, 09 97 00; 3.51000SF$0.00
HAZARDOUS PAINT- ADD FOR TOXIC METAL(S) DETECTED-CONTENT LEVELS BELOW RCRA LIMITS (TOTAL METALS) BUT RESULTS IN EXPOSURE ABOVE ACTION LEVELS
1WAHazardous paint disturbance 109 90 01; 3.3, 09 97 00; 3.31000SF$0.00
1WBHaz paint (i.e. Lead) abatement, including class 1a containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WCHaz paint (i.e. Lead) abatement, including class 1w containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WDHaz paint (i.e. Lead) abatement, including class 1p containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WEHaz paint (i.e. Lead) abatement, including class 1c containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WFHaz paint (i.e. Lead) abatement, including class 2a containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WGHaz paint (i.e. Lead) abatement, includingclass 2w containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WHHaz paint (i.e. Lead) abatement, including class 2p containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WIHaz paint (i.e. Lead) abatement, including class 2c containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WJHaz paint (i.e. Lead) abatement, including class 3a containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WKHaz paint (i.e. Lead) abatement, including class 3w containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WLHaz paint (i.e. Lead) abatement, including class 3p containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WMHaz paint (i.e. Lead) abatement, including class 3c containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WNHaz paint (i.e. Lead) abatement, including class 4a containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
1WOHaz paint (i.e. Lead) abatement, including class 4w containment09 90 01; 3.6, 09 97 00; 3.5500SF$0.00
ADD FOR TOXIC METAL(S) DETECTED-CONTENT LEVELS BELOW RCRA LIMITS (TOTAL METALS) AND EXPOSURE BELOW ACTION LEVELS
1XAInitial air sampling to verify worker exposures using selected processes below action levels (per system/process)02 83 13 00.2040LS$0.00
ADD FOR ASBESTOS CONTAMINATED MATERIAL
1YAAsbestos removal02 82 16.00 20250SF$0.00
1YBAsbestos removal/segmented containment02 82 16.00 20500SF$0.00
1YCAsbestos removal/ total containment02 82 16.00 20500SF$0.00
TOXIC SUBSTANCE PRE-SCREENING, INCLUDING SAMPLE COLLECTION AND LAB FEES (WHEN NOT PROVIDED IN ADVANCE BY GOVT).
1ZARegulated metals testing (i.e. 8 RCRA metals, AA/ICP TOTAL CONSTITUENT ANALYSIS)09 90 01; 3.3, 09 90 02; 3.3, etc.10EA$0.00
1ZBAsbestos testing02 82 16.00 2010EA$0.00
1ZCPCBs09 90 01; 3.3, 09 90 02; 3.3, etc.10EA$0.00
COST MODIFIERS
These cost items may be used by the Government to modify (increase/decrease) the cost of work items to compensate for task specific conditions that are, in the sole opinion of the Government, outside of typical or normal conditions that would be reasonably anticipated for the task being performed. All unit costs are fully burdened.3
ADD FOR EXCESSIVE/UNUSUAL CONDITIONS
1AAAInterior spackling of defects (i.e. nail hole) > 1 per 10ft2 (Unit area applies to total area being prepared/painted)09 29 00; 3.82000SF$0.00
1AABExterior spackling of defects > 1 per 10ft2 (Unit area applies to total area being prepared/painted)09 29 00; 3.815000SF$0.00
1AACEdge feathering exceeding 1LF per 100ft209 90 01; 3.9.3/09 90 02; 3.6.31500LF$0.00
1AADRemoval of coatings >20 mils thickNA2000SF$0.00
ADD FOR NACE INSPECTION
1ACAUpgrade to full-time, third party, NACE Certified Inspector in lieu of QC Inspector09 90 01; 1.12.1, 09 90 02; 1.12.1, 09 97 00; 1.13.145DAY$0.00

TOTALS $ - 0

1 Overcoat applications where lead surfaces are disturbed by cleaning or sanding, but removal not required.
2 Job size modifiers do not apply to unit priced work items.
3 The term "fully burdened" includes, but is not limited to, all equipment, materials, labor, incidentals, Other Direct Costs, resources, subcontracts, overhead, profit, and bond.

&"-,Bold"&14PRICE SCHEDULE&"-,Regular"&11 &"-,Bold"&12OPTION YEAR FOUR &10IDIQ PAINT VARIOUS FACILITIES

DBEH 10-1720

&"-,Bold"&14PRICE SCHEDULE&"-,Regular"&11 BASE YEAR &10PAFB Paint IDIQ Design, SXHT 13-1015

OPT YR 1

CLINS No. DESCRIPTION PRIMARY TECHNICAL REFERENCE(S) EST. QTY. UNIT UNIT COST TOTAL ESTIMATED COST (Including escalation)

SUBSTRATE REPAIR
These work items consist of minor repairs to substrate materials for maintenance painting. These items can be used with the Systems or with itemized paint products as required. All unit costs are fully burdened.3
COMMON SURFACE REPAIRS
1AARepair masonry/stucco/concrete cracks (small)09 90 01; 3.11.21050LF$0.00
1ABRepair masonry/stucco/concrete cracks (large)09 90 01; 3.11.2700LF$0.00
1ACPatch masonry/concrete/stucco surfaces09 90 01; 3.11.22100SF$0.00
1ADRepair spalling concrete w/exposed reinforcement bar (unit: cubic foot)09 90 01; 3.11.1.2100CF$0.00
1AERepair EIFS (synthetic stucco)09 90 01; 3.11.32500SF$0.00
1AFRepair portland stucco09 90 01; 3.11.22500SF$0.00
1AGRepair acrylic stucco cladding09 90 01; 3.11.22200SF$0.00
1AHPatch drywall09 29 00; 3.4562SF$0.00
1AIPatch cement board09 90 02; 3.8.2541SF$0.00
1AJFill/putty wood (unit: square inch)09 90 01;3.11.4/09 90 02;3.8.1950SI$0.00
ANCILLARY WORK ITEMS
These work items consist of the removal and/or replacement of substrate materials and appurtenances for maintenance or painting. These items can be used with the Systems or with itemized paint products as required. All unit costs are fully burdened.3
METAL
1BAReplace copper gutter07 62 10; 3.10120LF$0.00
1BBReplace copper downspout07 62 10; 3.966LF$0.00
1BCReplace metal louver/vent, stainless steel08 91 00; 3.110SF$0.00
1BDReplace copper fascia and flashing07 62 10; 3.650SF$0.00
1BEReplace copper flashing07 62 10; 3.610SF$0.00
1BFReplace metal siding, factory finished aluminum07 42 13; 3.3100SF$0.00
1BGReplace metal siding, factory finished galvanized steel07 42 13; 3.3100SF$0.00
1BHReplace aluminum balcony and/or stair handrail05 52 00; 3.2200LF$0.00
1BIReplace/add metal framing stud and/or channel09 22 00; 3.1200LF$0.00
1BJReplace soffit with vented aluminum soffit07 42 13: 3.5.4750SF$0.00
WOOD
1CAReplace sub fascia boards06 10 00; 3.1100BF$0.00
1CBReplace wood fascia06 20 00; 3.3200BF$0.00
1CCReplace wood trim06 20 00; 3.3200BF$0.00
1CDReplace wood soffit/soffit vent06 20 00; 3.2250BF$0.00
1CEReplace/add 2 x 406 10 00; 3.1100BF$0.00
1CFReplace/add 2 x 606 10 00; 3.145BF$0.00
1CGReplace/add 2 x 806 10 00; 3.1110BF$0.00
OTHER MISCELLANEOUS ITEMS
1DAInstall concrete block (CMU) infill04 20 00; 3.2320SF$0.00
1DBRemove/demo gypsum board09 29 00; 1.5375SF$0.00
1DCInstall new gypsum board09 29 00; 3.2375SF$0.00
1DDGypsum board texture, medium texture orange peel09 29 00; 3.4.2.1650SF$0.00
1DEGypsum board texture, knock down (ceilings)09 29 00; 3.4.2.2650SF$0.00
1DFGypsum board finish Level 109 29 00; 3.4650SF$0.00
1DGGypsum board finish Level 209 29 00; 3.4100SF$0.00
1DHGypsum board finish Level 309 29 00; 3.4100SF$0.00
1DIGypsum board finish Level 409 29 00; 3.4350SF$0.00
1DJGypsum board finish Level 509 29 00; 3.4.1100SF$0.00
1DKReplace/add acoustical ceiling panels09 51 00; 3.1.3350SF$0.00
1DLReplace rubber wall base09 29 00; 3.6200LF$0.00
1DMReplace rubber wall base with wood wall base06 20 00; 3.4200LF$0.00
1DNReplace aluminum door/frame (anodized, 3' x 7', including closer)08 11 16; 3.13EA$0.00
1DOReplace hinge08 71 00; 3.12SET (3)$0.00
1DPReplace weather-stripping08 71 00; 3.1.12EA$0.00
1DQReplace threshold08 71 00; 3.1.32EA$0.00
1DRReplace door hardware (including lockset)08 71 00; 3.12EA$0.00
1DSReplace stops08 71 00; 3.13EA$0.00
1DTReplace door bumpers08 71 00; 3.13EA$0.00
1DUReplace glass08 81 00; 3.2150SF$0.00
1DVReplace blast proof windows08 56 53; 3.125SF$0.00
1DWReplace hurricane-rated glass08 56 53; 3.125EA$0.00
1DXRemove/reinstall exterior building signage after completion of painting work09 90 01; 3.2.259EA$0.00
1DYReplace/install (new) exterior signage after completion of painting work09 90 01; 3.2.220EA$0.00
1DZRemove/reinstall interior building signage after completion of painting work09 90 02; 3.2, 09 90 01; 3.2.225EA$0.00
1DAAReplace/install (new) interior signage after completion of painting work09 90 02; 3.2, 09 90 01; 3.2.210EA$0.00
1DABReplace asbestos corrugated siding with fiberglass corrugated siding (includes abatement)07 42 13; 3.3.325SF$0.00
1DACCaulk windows09 90 01; 3.104200LF$0.00
1DADInterior caulking09 90 02; 3.8.31000LF$0.00
1DAEExterior caulking09 90 01; 3.11.5.21800LF$0.00
1DAFReplace/add joint sealant (less than .25'' width)07 92 00; 3.3100LF$0.00
1DAGReplace/add joint sealant (.25'' to .5'' width)07 92 00; 3.3950LF$0.00
1DAHReplace/add joint sealant (.5'' to 1''width)07 92 00; 3.3350LF$0.00
EXTERIOR PAINTING SYSTEMS
These all-inclusive work systems include the materials, labor, equipment and any other resources or steps required to safely perform the required surface preparation and painting; including cleaning, feathering of edges, minor spackling, scaffolding, and containment (excluding lead based paint) for protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3
CONCRETE AND CMU
1EAAcrylic latex over new bare concrete/masonry block09 90 01; EN1500SF$0.00
1EBElastomeric spot repair on concrete/masonry block over elastomeric09 90 01; ES2100SF$0.00
1ECAcrylic latex overcoat on concrete/masonry block with moderately weathered acrylic latex09 90 01; EO350000SF$0.00
1EDElastomeric overcoat on concrete/masonry block with moderately weathered acrylic latex09 90 01; EO4500SF$0.00
1EEElastomeric overcoat on concrete/masonry block with moderately weathered elastomeric09 90 01; EO4500SF$0.00
1EFSpot repair on concrete/masonry block of acrylic latex09 90 01; ES51000SF$0.00
1EGComplete removal and new coating on concrete/masonry block of acrylic latex09 90 01; EN63000SF$0.00
STUCCO
1FAAcrylic latex over new bare stucco09 90 01; EN11000SF$0.00
1FBSpot repair of acrylic latex over stucco09 90 01; ES51000SF$0.00
1FCSpot repair of elastomeric over stucco09 90 01; ES21000SF$0.00
1FDAcrylic latex overcoat on stucco with moderately weathered acrylic latex09 90 01; EO317000SF$0.00
1FEElastomeric overcoat on stucco with moderately weathered acrylic latex09 90 01; EO4500SF$0.00
1FFElastomeric overcoat on stucco with moderately weathered elastomeric09 90 01; EO4500SF$0.00
1FGComplete removal and new coating on stucco with acrylic latex09 90 01; EN6100SF$0.00
EIFS
1GASpot repair of acrylic latex over EIFS09 90 01; ES5850SF$0.00
1GBSpot repair of elastomeric over EIFS09 90 01; ES2500SF$0.00
1GCAcrylic latex overcoat on EIFS with moderately weathered acrylic latex09 90 01; EO314000SF$0.00
1GDElastomeric overcoat on EIFS with moderately weathered acrylic latex09 90 01; EO4500SF$0.00
1GEElastomeric overcoat on EIFS with moderately weathered elastomeric09 90 01; EO4500SF$0.00
WOOD
1HAAcrylic latex over bare wood09 90 01; EN7300SF$0.00
1HBAcrylic latex spot repair on wood over acrylic latex09 90 01; ES9100SF$0.00
1HCAcrylic latex overcoat on wood with moderately weathered acrylic latex09 90 01; EO8400SF$0.00
1HDAcrylic latex over bare wood using chemical stripping for surface preparation09 90 01; EN10100SF$0.00
BUILDING PANELS
1IAEpoxy tie coat and fluoropolymer finish over moderately weathered metal panels, no previous field applied coating09 90 01; EO12100SF$0.00
1IBNew coating on HANGAR metal pipes09 90 01; EN25100SF$0.00
ICSpot repair of acrylic latex over asbestos panels09 90 01; ES9100SF$0.00
IDAcrylic latex overcoat of weathered asbestos wall panels09 90 01; EO8100SF$0.00
1IEAcrylic latex over bare asbestos wall panels09 90 01; EN11100SF$0.00
1IFAlkyd overcoat of weathered factory finish metal wall panels09 90 01; EO24100SF$0.00
1IGEpoxy spot repair of factory finish on metal wall panels prior to full overcoat09 90 01; ES26100SF$0.00
FERROUS METAL
1JASpot repair of ferrous metals with previously applied long oil alkyd09 90 01; ES171100SF$0.00
1JBAcrylic latex spot repair of ferrous metals with previously applied acrylic latex09 90 01; ES15100SF$0.00
1JCAliphatic urethane topcoat spot repair of ferrous metals with isolated coating damage on urethane finish09 90 01; ES19100SF$0.00
1JDAlkyd overcoat of ferrous metal over moderately weathered alkyd09 90 01; EO16100SF$0.00
1JEAcrylic latex overcoat of ferrous metal over moderately weathered acrylic latex09 90 01; EO141300SF$0.00
1JFEpoxy and aliphatic urethane system on ferrous metal over moderately weathered urethane finish09 90 01; EO21100SF$0.00
1JGComplete removal and new coating on ferrous metal of epoxy and aliphatic polyurethane topcoat system09 90 01; EN232000SF$0.00
1JHHANGAR interior exposed metal urethane alkyd enamel spot repair of structural steel09 90 01; ES28100SF$0.00
1JIOvercoat of HANGAR interior exposed shop primed aged alkyd structural steel with long oil alkyd and urethane alkyd enamel09 90 01; EO27100SF$0.00
GALVANIZED STEEL
1KAAcrylic latex over unpainted galvanized steel09 90 01; EN181200SF$0.00
1KBAliphatic urethane topcoat spot repair over galvanized steel09 90 01; ES19100SF$0.00
1KCAcrylic latex overcoat on galvanized metal with moderately weathered acrylic latex09 90 01; ES201100SF$0.00
1KDMulti-purpose epoxy and aliphatic urethane overcoat over moderately weathered acrylic latex09 90 01; EO29486SF$0.00
INTERIOR PAINTING SYSTEMS
These all-inclusive work Systems include the materials, labor, equipment and any other resources or steps to perform the required surface preparations and painting ; including cleaning, normal spackling, feathering of edges, scaffolding, and containment (excluding lead based paint) for protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3
BLOCK
1LAAcrylic latex over new bare concrete/masonry block09 90 02; IN150SF$0.00
1LBAcrylic latex spot repair on concrete/masonry block with aged acrylic latex09 90 02; IS550SF$0.00
1LCAcrylic overcoat on concrete/masonry block with aged acrylic latex09 90 02; IO4373SF$0.00
1LDNew coating on concrete/masonry block of acrylic latex09 90 02; IN6318SF$0.00
DRYWALL/TRANSITE/PLASTER
1MAAcrylic latex over new bare drywall/gypsum09 90 02; IN21000SF$0.00
1MBAcrylic latex spot repair of drywall/gypsum over acrylic latex09 90 02; IS7100SF$0.00
1MCAcrylic overcoat on drywall/gypsum with intact acrylic latex09 90 02; IO47500SF$0.00
1MDComplete removal and new coating on drywall/gypsum of acrylic latex09 90 02; IN9100SF$0.00
1MESpot repair of acrylic plaster over transite09 90 01; ES9100SF$0.00
1MFAcrylic latex overcoat on transite with moderately weathered acrylic latex09 90 01; EO8100SF$0.00
1MGAcrylic latex overcoat on plaster with aged acrylic latex09 90 02; IO4100SF$0.00
1MHAlkali resistant primer and acrylic latex over new plaster09 90 02; IN3100SF$0.00
1MISpot repair of acrylic latex on plaster09 90 02; IS5100SF$0.00
1MJComplete removal and new coating on walls and ceilings with acrylic latex09 90 02; IN8100SF$0.00
WOOD
1NAAcrylic latex over bare wood09 90 02; IN2100SF$0.00
1NBAcrylic latex spot repair on wood over acrylic latex09 90 02; IS5100SF$0.00
1NCAcrylic latex overcoat on wood with aged acrylic latex09 90 02; IO4100SF$0.00
1NDComplete removal and new coating on wood with acrylic latex09 90 02: IN8100SF$0.00
METAL SURFACES
1OAAcrylic latex overcoat on metal surfaces with aged acrylic latex09 90 02; IO4100SF$0.00
HIGH PERFORMANCE PAINTING SYSTEMS AND FLOORING SYSTEMS
For high performance painting, these all inclusive work Systems include the materials, labor, equipment and any other resources to perform the required surface preparation and painting; including cleaning, scaffolding, containment (excluding lead based paint) and protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3

For flooring systems, these all inclusive composite work Systems include the materials, labor, equipment, and any other resources or requirements to perform all of the work detailed in, or related to, the referenced specification section. Unit costs are based on a typical project size of at least 5,000 square feet for aged concrete (coated or uncoated), and at least 1,000 square feet for new concrete. All unit costs are fully burdened rates3 and the reflect the total compensastion to be received by the contractor for authorized work.

HIGH PERFORMANCE PAINTING SYSTEMS
1PAInorganic zinc (System I)09 97 00; HP11100SF$0.00
1PBInorganic zinc with acrylic latex color coding09 97 00; HP1 with color coding750SF$0.00
1PC3 coat system (System II)09 97 00; HP21000SF$0.00
FLOORING SYSTEM 1: FUEL RESISTIVE RESINOUS FLOORING (FRRF) SYSTEM
1PDFRRF, New Uncoated Concrete09 67 23.161000SF$0.00
1PEFRRF, Aged Uncoated Concrete (contaminated)09 67 23.1620000SF$0.00
1PFFRRF, Remove Existing Flooring and Install09 67 23.165000SF$0.00
FLOORING SYSTEM 1: FRRF SYSTEM OPTIONS
1PGMoisture Reducing System (MRS) for FRRF System09 67 23.16; 2.3.1,
09 67 23.16; 3.12.320000SF$0.00
1PHCrack Treament for FRRF System09 67 23.16; 3.9300LF$0.00
UNIT PRICED PAINT WORK ITEMS
These are specific items to be painted on a unit price basis that includes all materials, labor, equipment, and any other resources to perform the required surface preparation and painting (excluding lead based paint) including protection of surrounding areas. All unit costs are fully burdened.3
1QAPrepare and paint existing fire hydrant09 97 00, HP-1 with color-coding5EA$0.00
1QBPrepare and paint existing backflow preventer (<100 ft2)09 97 00, HP-1 with color coding4EA$0.00
1QCPrepare and paint steel bollard09 97 00, HP-210EA$0.00
1QDPrepare and paint misc steel item < 50 ft209 97 00, HP-15EA$0.00
1QEPrepare and paint misc steel item between 50 and 100 ft209 97 00, HP-15EA$0.00
1QFPrepare and paint misc steel item < 50 ft209 97 00, HP-25EA$0.00
1QGPrepare and paint misc steel item between 50 and 100 ft209 97 00, HP-25EA$0.00
ITEMIZED CLEANING & SURFACE PREPARATION
These items are to be used individually or in combination with other items, exclusive of a System application, to perform specialized cleaning, surface preparation, paint repair or maintenance that may not be represented in a System. These items include all materials, labor, equipment or other resources required to perform the work item. All unit costs are fully burdened.3
1RAPressure wash/low pressure water cleaning (LPWC)09 90 01; 3.9.10.14000SF$0.00
1RBPressure wash (LPWC), incl. mildew treatment and removal09 90 01; 3.9.10.15200SF$0.00
1RCHigh-pressure water cleaning (HPWC)09 90 01; 3.9.10.2100SF$0.00
1RDWater jetting (WJ-1)09 90 01; 3.9.10.4.1100SF$0.00
1REWater jetting (WJ-2)09 90 01; 3.9.10.4.2100SF$0.00
1RFWater jetting (WJ-3)09 90 01; 3.9.10.4.3100SF$0.00
1RGWater jetting (WJ-4)09 90 01; 3.9.10.4.4100SF$0.00
1RHSponge media blasting (SP-6)09 90 01; 3.9.11.2100SF$0.00
1RISponge media blasting (SP-7)09 90 01; 3.9.11.3100SF$0.00
1RJSponge media blasting (SP-10)09 90 01; 3.9.11.1100SF$0.00
1RKSponge media blasting (SP-14)09 90 01; 3.9.11.4100SF$0.00
1RLSponge media blasting (SP-16)09 90 01; 3.9.11.3100SF$0.00
1RMChemical stripping09 90 01; 3.9.13100SF$0.00
1RNHand tool cleaning09 90 01; 3.9.5100SF$0.00
1ROPower tool cleaning (SP-3)09 90 01; 3.9.7100SF$0.00
1RPPower tool cleaning (SP-11)09 90 01; 3.9.8290SF$0.00
1RQPower tool cleaning (SP-15)09 90 01; 3.9.9100SF$0.00
1RSAbrasive blasting (SP-7)09 90 01; 3.9.11.33000SF$0.00
1RTAbrasive blasting (SP-6)09 90 01; 3.9.11.23000SF$0.00
1RUAbrasive blasting (SP-10)09 90 01; 3.9.11.1100SF$0.00
1RVAbrasive blasting (SP-14)09 90 01; 3.9.11.4100SF$0.00
1RWAbrasive blasting (SP-16)09 90 01 3.9.11.3100SF$0.00
1RXWet abrasive blasting (SP-7), low dust09 90 01; 3.9.10.3100SF$0.00
1RYWet abrasive blasting (SP-6), low dust09 90 01; 3.9.10.3100SF$0.00
1RZWet abrasive blasting (SP-10), low dust09 90 01; 3.9.10.3100SF$0.00
1RAAWet abrasive blasting (SP-14), low dust09 90 01; 3.9.10.3100SF$0.00
1RABWet abrasive blasting (SP-16), low dust09 90 01; 3.9.10.3100SF$0.00
1RACPrep concrete (SP-13, light service), with ICRI 1-3 profile09 90 01; 3.9.12100SF$0.00
1RADPrep concrete (SP-13, severe service), with ICRI 3-6 profile09 90 01; 3.9.12100SF$0.00
Note: hand tool, power tool, and all blasting methods (i.e; sponge, wet, dry) require pre-cleaning as part of the surface preparation method.
ITEMIZED PAINTING PRODUCTS
These items are to be used individually, exclusive of a System application to perform specialized paint repair or maintenance that may not be represented in a System. These items include all materials, application labor and equipment associated with ONE COAT of the installed product. These items do not include surface preparation to be performed in conjunction with these items. Surface preparation shall be selected as a separate cost item. All unit costs are fully burdened.3
EXTERIOR PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION
1SAAlkali resistant block filler09 90 01; 2.13100SF$0.00
1SBHigh-build acrylic latex primer09 90 01; 2.13100SF$0.00
1SCHigh-build acrylic latex topcoat09 90 01; 2.13100SF$0.00
1SDAlkali resistant primer09 90 01; 2.13100SF$0.00
1SEElastomeric patching compound09 90 01; 2.13100SF$0.00
1SFElastomeric topcoat09 90 01; 2.13100SF$0.00
1SGExterior acrylic latex bonding primer09 90 01; 2.13100SF$0.00
1SHExterior acrylic latex (flat)09 90 01; 2.13100SF$0.00
1SIExterior acrylic latex (eggshell/satin)09 90 01; 2.13100SF$0.00
1SJExterior acrylic latex (gloss/semi-gloss)09 90 01; 2.13100SF$0.00
1SKWater-based universal primer09 90 01; 2.13100SF$0.00
1SLPolyamide epoxy primer09 90 01; 2.13100SF$0.00
1SMFluoropolymer finish09 90 01; 2.13100SF$0.00
1SNOrganic zinc primer09 90 01; 2.13100SF$0.00
1SOInorganic zinc primer09 90 01; 2.13179SF$0.00
1SPMulti-purpose epoxy09 90 01; 2.13100SF$0.00
1SQAcrylic aliphatic polyurethane09 90 01; 2.13100SF$0.00
1SRWater-based urethane finish09 90 01; 2.13100SF$0.00
1SSUrethane alkyd enamel09 90 01; 2.13100SF$0.00
1STAlkyd universal primer09 90 01; 2.13100SF$0.00
1SUWaterborne direct-to-metal primer09 90 01; 2.13100SF$0.00
1SVExterior wood primer09 90 01; 2.13100SF$0.00
1SWWater-based acrylic epoxy09 90 01; 2.13100SF$0.00
1SXPenetrating epoxy sealer09 90 01; 2.13100SF$0.00
1SYBiodegradable surface cleaner09 90 01; 2.13100SF$0.00
1SZConcrete primer09 90 01; 2.13100SF$0.00
1SAA100% solids epoxy filler09 90 01; 2.13100SF$0.00
1SABUrethane elastomer09 90 01; 2.13100SF$0.00
1SACPigmented sealer09 90 01; 2.13100SF$0.00
1SAECalcium sulfonate sealer09 90 01; 2.13100SF$0.00
1SAFCalcium sulfonate primer09 90 01; 2.13100SF$0.00
1SAGCalcium sulfonate topcoat09 90 01; 2.13100SF$0.00
1SAHRebar bonding agent and reinforcement protection09 90 01; 2.13100SF$0.00
INTERIOR PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION
1TAAlkali resistant block filler09 90 02; 2.11100SF$0.00
1TBAlkali resistant primer09 90 02; 2.11100SF$0.00
1TCInterior latex sealer09 90 02; 2.11100SF$0.00
1TDInterior acrylic latex (flat)09 90 02; 2.11100SF$0.00
1TEInterior acrylic latex (eggshell/satin)09 90 02; 2.11100SF$0.00
1TFInterior acrylic latex (semi-gloss/gloss)09 90 02; 2.11100SF$0.00
1TGWater-based acrylic universal primer09 90 02; 2.11100SF$0.00
1THWaterborne direct-to-metal primer09 90 02; 2.11100SF$0.00
1TIBiodegradable surface cleaner09 90 02; 2.11100SF$0.00
1TJPrimer for scuff resistance coatings09 90 02; 2.11100SF$0.00
1TKScuff resistant base coat09 90 02; 2.11100SF$0.00
1TLScuff resistant base coat09 90 02; 2.11100SF$0.00
1TMWood stain: touch-up & overcoat09 90 02; 2.11100SF$0.00
1TNWood stain: complete removal and recoat09 90 02; 2.11100SF$0.00
1TOFloor marking: overcoat or recoat09 90 02; 2.11100SF$0.00
HIGH PERFORMANCE PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION
1UAInorganic zinc rich primer - Per System I09 97 00; 2.12100SF$0.00
1UBInorganic zinc rich primer - Per System II09 97 00; 2.12100SF$0.00
1UCEpoxy intermediate coat09 97 00; 2.12100SF$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .