Attachment 5 Price Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_9_Questions_ _Answers.pdf | ||
| Atch_11_Site_Visit__Statement_of_Events.docx | DOCX document | |
| Atch_5_Price_Schedule_-_Revision_1.xlsx | XLSX spreadsheet | |
| FA2521-15-R-0008-0003.pdf | ||
| FA2521-15-R-0008-0002.pdf | ||
| FA2521-15-R-0008-0001.pdf | ||
| Atch_9_Question_and_Answer_Template.docx | DOCX document | |
| Atch_10_Installation_Access_List.docx | DOCX document | |
| Atch_6_Technical_Evaluation_Sample_Project_Form.docx | DOCX document | |
| Atch_1_Specifications.pdf | ||
| Atch_7_Past_Performance_Questionaire.docx | DOCX document | |
| Atch_3_Hazardous_Waste_Form.doc | DOC document | |
| Atch_2_Specifications_Addendum.pdf | ||
| Atch_8_Davis_Bacon_Wage_Determination_8MAY15.pdf | ||
| FA2521-15-R-0008 _Solicitation.pdf | ||
| Atch_4_GPP.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS
| INSTRUCTIONS |
| 1 - Enter the proposed unit pricing in the yellow highlighted fields on the "BASE YR" and Each "OPT YR" tab. |
2 -The Summary page will automatically popualte once the Year is filled in.
SUMMARY
YEAR TOTAL ESTIMATED COST
| BASE YEAR | $0.00 |
| OPTION YEAR 1 | $0.00 |
| OPTION YEAR 2 | $0.00 |
| OPTION YEAR 3 | $0.00 |
| OPTION YEAR 4 | $0.00 |
5 YEAR TOTAL $0.00
&"-,Bold"&18PRICE SCHEDULE SUMMARY SHEET PAFB Paint IDIQ Design, SXHT 13-1015
BASE YR
CLINS No. DESCRIPTION PRIMARY TECHNICAL REFERENCE(S) EST. QTY. UNIT UNIT COST TOTAL ESTIMATED COST
| SUBSTRATE REPAIR | ||||||
| These work items consist of minor repairs to substrate materials for maintenance painting. These items can be used with the Systems or with itemized paint products as required. All unit costs are fully burdened.3 | ||||||
| COMMON SURFACE REPAIRS | ||||||
| 1 | AA | Repair masonry/stucco/concrete cracks (small) | 09 90 01; 3.11.2 | 1100 | LF | $0.00 |
| 1 | AB | Repair masonry/stucco/concrete cracks (large) | 09 90 01; 3.11.2 | 850 | LF | $0.00 |
| 1 | AC | Patch masonry/concrete/stucco surfaces | 09 90 01; 3.11.2 | 300 | SF | $0.00 |
| 1 | AD | Repair spalling concrete w/exposed reinforcement bar (unit: cubic foot) | 09 90 01; 3.11.1.2 | 120 | CF | $0.00 |
| 1 | AE | Repair EIFS (synthetic stucco) | 09 90 01; 3.11.3 | 2500 | SF | $0.00 |
| 1 | AF | Repair portland stucco | 09 90 01; 3.11.2 | 300 | SF | $0.00 |
| 1 | AG | Repair acrylic stucco cladding | 09 90 01; 3.11.2 | 300 | SF | $0.00 |
| 1 | AH | Patch drywall | 09 29 00; 3.4 | 300 | SF | $0.00 |
| 1 | AI | Patch cement board | 09 90 02; 3.8.2 | 300 | SF | $0.00 |
| 1 | AJ | Fill/putty wood (unit: square inch) | 09 90 01;3.11.4/09 90 02;3.8.1 | 500 | SI | $0.00 |
| ANCILLARY WORK ITEMS | ||||||
| These work items consist of the removal and/or replacement of substrate materials and appurtenances for maintenance or painting. These items can be used with the Systems or with itemized paint products as required. All unit costs are fully burdened.3 | ||||||
| METAL | ||||||
| 1 | BA | Replace copper gutter | 07 62 10; 3.10 | 110 | LF | $0.00 |
| 1 | BB | Replace copper downspout | 07 62 10; 3.9 | 66 | LF | $0.00 |
| 1 | BC | Replace metal louver/vent, stainless steel | 08 91 00; 3.1 | 10 | SF | $0.00 |
| 1 | BD | Replace copper fascia and flashing | 07 62 10; 3.6 | 50 | SF | $0.00 |
| 1 | BE | Replace copper flashing | 07 62 10; 3.6 | 10 | SF | $0.00 |
| 1 | BF | Replace metal siding, factory finished aluminum | 07 42 13; 3.3 | 100 | SF | $0.00 |
| 1 | BG | Replace metal siding, factory finished galvanized steel | 07 42 13; 3.3 | 100 | SF | $0.00 |
| 1 | BH | Replace aluminum balcony and/or stair handrail | 05 52 00; 3.2 | 200 | LF | $0.00 |
| 1 | BI | Replace/add metal framing stud and/or channel | 09 22 00; 3.1 | 200 | LF | $0.00 |
| 1 | BJ | Replace soffit with vented aluminum soffit | 07 42 13: 3.5.4 | 650 | SF | $0.00 |
| WOOD | ||||||
| 1 | CA | Replace sub fascia boards | 06 10 00; 3.1 | 100 | BF | $0.00 |
| 1 | CB | Replace wood fascia | 06 20 00; 3.3 | 200 | BF | $0.00 |
| 1 | CC | Replace wood trim | 06 20 00; 3.3 | 100 | BF | $0.00 |
| 1 | CD | Replace wood soffit/soffit vent | 06 20 00; 3.2 | 200 | BF | $0.00 |
| 1 | CE | Replace/add 2 x 4 | 06 10 00; 3.1 | 100 | BF | $0.00 |
| 1 | CF | Replace/add 2 x 6 | 06 10 00; 3.1 | 50 | BF | $0.00 |
| 1 | CG | Replace/add 2 x 8 | 06 10 00; 3.1 | 126 | BF | $0.00 |
| OTHER MISCELLANEOUS ITEMS | ||||||
| 1 | DA | Install concrete block (CMU) infill | 04 20 00; 3.2 | 350 | SF | $0.00 |
| 1 | DB | Remove/demo gypsum board | 09 29 00; 1.5 | 500 | SF | $0.00 |
| 1 | DC | Install new gypsum board | 09 29 00; 3.2 | 500 | SF | $0.00 |
| 1 | DD | Gypsum board texture, medium texture orange peel | 09 29 00; 3.4.2.1 | 750 | SF | $0.00 |
| 1 | DE | Gypsum board texture, knock down (ceilings) | 09 29 00; 3.4.2.2 | 750 | SF | $0.00 |
| 1 | DF | Gypsum board finish Level 1 | 09 29 00; 3.4 | 750 | SF | $0.00 |
| 1 | DG | Gypsum board finish Level 2 | 09 29 00; 3.4 | 100 | SF | $0.00 |
| 1 | DH | Gypsum board finish Level 3 | 09 29 00; 3.4 | 100 | SF | $0.00 |
| 1 | DI | Gypsum board finish Level 4 | 09 29 00; 3.4 | 400 | SF | $0.00 |
| 1 | DJ | Gypsum board finish Level 5 | 09 29 00; 3.4.1 | 100 | SF | $0.00 |
| 1 | DK | Replace/add acoustical ceiling panels | 09 51 00; 3.1.3 | 400 | SF | $0.00 |
| 1 | DL | Replace rubber wall base | 09 29 00; 3.6 | 250 | LF | $0.00 |
| 1 | DM | Replace rubber wall base with wood wall base | 06 20 00; 3.4 | 250 | LF | $0.00 |
| 1 | DN | Replace aluminum door/frame (anodized, 3' x 7', including closer) | 08 11 16; 3.1 | 2 | EA | $0.00 |
| 1 | DO | Replace hinge | 08 71 00; 3.1 | 2 | SET (3) | $0.00 |
| 1 | DP | Replace weather-stripping | 08 71 00; 3.1.1 | 2 | EA | $0.00 |
| 1 | DQ | Replace threshold | 08 71 00; 3.1.3 | 2 | EA | $0.00 |
| 1 | DR | Replace door hardware (including lockset) | 08 71 00; 3.1 | 2 | EA | $0.00 |
| 1 | DS | Replace stops | 08 71 00; 3.1 | 3 | EA | $0.00 |
| 1 | DT | Replace door bumpers | 08 71 00; 3.1 | 3 | EA | $0.00 |
| 1 | DU | Replace glass | 08 81 00; 3.2 | 150 | SF | $0.00 |
| 1 | DV | Replace blast proof windows | 08 56 53; 3.1 | 25 | SF | $0.00 |
| 1 | DW | Replace hurricane-rated glass | 08 56 53; 3.1 | 25 | EA | $0.00 |
| 1 | DX | Remove/reinstall exterior building signage after completion of painting work | 09 90 01; 3.2.2 | 59 | EA | $0.00 |
| 1 | DY | Replace/install (new) exterior signage after completion of painting work | 09 90 01; 3.2.2 | 25 | EA | $0.00 |
| 1 | DZ | Remove/reinstall interior building signage after completion of painting work | 09 90 02; 3.2, 09 90 01; 3.2.2 | 25 | EA | $0.00 |
| 1 | DAA | Replace/install (new) interior signage after completion of painting work | 09 90 02; 3.2, 09 90 01; 3.2.2 | 25 | EA | $0.00 |
| 1 | DAB | Replace asbestos corrugated siding with fiberglass corrugated siding (includes abatement) | 07 42 13; 3.3.3 | 25 | SF | $0.00 |
| 1 | DAC | Caulk windows | 09 90 01; 3.10 | 4400 | LF | $0.00 |
| 1 | DAD | Interior caulking | 09 90 02; 3.8.3 | 1000 | LF | $0.00 |
| 1 | DAE | Exterior caulking | 09 90 01; 3.11.5.2 | 1000 | LF | $0.00 |
| 1 | DAF | Replace/add joint sealant (less than .25'' width) | 07 92 00; 3.3 | 100 | LF | $0.00 |
| 1 | DAG | Replace/add joint sealant (.25'' to .5'' width) | 07 92 00; 3.3 | 500 | LF | $0.00 |
| 1 | DAH | Replace/add joint sealant (.5'' to 1''width) | 07 92 00; 3.3 | 200 | LF | $0.00 |
| EXTERIOR PAINTING SYSTEMS | ||||||
| These all-inclusive work systems include the materials, labor, equipment and any other resources or steps required to safely perform the required surface preparation and painting; including cleaning, feathering of edges, minor spackling, scaffolding, and containment (excluding lead based paint) for protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3 | ||||||
| CONCRETE AND CMU | ||||||
| 1 | EA | Acrylic latex over new bare concrete/masonry block | 09 90 01; EN1 | 500 | SF | $0.00 |
| 1 | EB | Elastomeric spot repair on concrete/masonry block over elastomeric | 09 90 01; ES2 | 100 | SF | $0.00 |
| 1 | EC | Acrylic latex overcoat on concrete/masonry block with moderately weathered acrylic latex | 09 90 01; EO3 | 61000 | SF | $0.00 |
| 1 | ED | Elastomeric overcoat on concrete/masonry block with moderately weathered acrylic latex | 09 90 01; EO4 | 500 | SF | $0.00 |
| 1 | EE | Elastomeric overcoat on concrete/masonry block with moderately weathered elastomeric | 09 90 01; EO4 | 500 | SF | $0.00 |
| 1 | EF | Spot repair on concrete/masonry block of acrylic latex | 09 90 01; ES5 | 500 | SF | $0.00 |
| 1 | EG | Complete removal and new coating on concrete/masonry block of acrylic latex | 09 90 01; EN6 | 1000 | SF | $0.00 |
| STUCCO | ||||||
| 1 | FA | Acrylic latex over new bare stucco | 09 90 01; EN1 | 1000 | SF | $0.00 |
| 1 | FB | Spot repair of acrylic latex over stucco | 09 90 01; ES5 | 1000 | SF | $0.00 |
| 1 | FC | Spot repair of elastomeric over stucco | 09 90 01; ES2 | 1000 | SF | $0.00 |
| 1 | FD | Acrylic latex overcoat on stucco with moderately weathered acrylic latex | 09 90 01; EO3 | 10000 | SF | $0.00 |
| 1 | FE | Elastomeric overcoat on stucco with moderately weathered acrylic latex | 09 90 01; EO4 | 500 | SF | $0.00 |
| 1 | FF | Elastomeric overcoat on stucco with moderately weathered elastomeric | 09 90 01; EO4 | 500 | SF | $0.00 |
| 1 | FG | Complete removal and new coating on stucco with acrylic latex | 09 90 01; EN6 | 100 | SF | $0.00 |
| EIFS | ||||||
| 1 | GA | Spot repair of acrylic latex over EIFS | 09 90 01; ES5 | 1000 | SF | $0.00 |
| 1 | GB | Spot repair of elastomeric over EIFS | 09 90 01; ES2 | 500 | SF | $0.00 |
| 1 | GC | Acrylic latex overcoat on EIFS with moderately weathered acrylic latex | 09 90 01; EO3 | 9000 | SF | $0.00 |
| 1 | GD | Elastomeric overcoat on EIFS with moderately weathered acrylic latex | 09 90 01; EO4 | 500 | SF | $0.00 |
| 1 | GE | Elastomeric overcoat on EIFS with moderately weathered elastomeric | 09 90 01; EO4 | 500 | SF | $0.00 |
| WOOD | ||||||
| 1 | HA | Acrylic latex over bare wood | 09 90 01; EN7 | 275 | SF | $0.00 |
| 1 | HB | Acrylic latex spot repair on wood over acrylic latex | 09 90 01; ES9 | 100 | SF | $0.00 |
| 1 | HC | Acrylic latex overcoat on wood with moderately weathered acrylic latex | 09 90 01; EO8 | 100 | SF | $0.00 |
| 1 | HD | Acrylic latex over bare wood using chemical stripping for surface preparation | 09 90 01; EN10 | 100 | SF | $0.00 |
| BUILDING PANELS | ||||||
| 1 | IA | Epoxy tie coat and fluoropolymer finish over moderately weathered metal panels, no previous field applied coating | 09 90 01; EO12 | 100 | SF | $0.00 |
| 1 | IB | New coating on HANGAR metal pipes | 09 90 01; EN25 | 100 | SF | $0.00 |
| IC | Spot repair of acrylic latex over asbestos panels | 09 90 01; ES9 | 100 | SF | $0.00 | |
| ID | Acrylic latex overcoat of weathered asbestos wall panels | 09 90 01; EO8 | 100 | SF | $0.00 | |
| 1 | IE | Acrylic latex over bare asbestos wall panels | 09 90 01; EN11 | 100 | SF | $0.00 |
| 1 | IF | Alkyd overcoat of weathered factory finish metal wall panels | 09 90 01; EO24 | 100 | SF | $0.00 |
| 1 | IG | Epoxy spot repair of factory finish on metal wall panels prior to full overcoat | 09 90 01; ES26 | 100 | SF | $0.00 |
| FERROUS METAL | ||||||
| 1 | JA | Spot repair of ferrous metals with previously applied long oil alkyd | 09 90 01; ES17 | 100 | SF | $0.00 |
| 1 | JB | Acrylic latex spot repair of ferrous metals with previously applied acrylic latex | 09 90 01; ES15 | 100 | SF | $0.00 |
| 1 | JC | Aliphatic urethane topcoat spot repair of ferrous metals with isolated coating damage on urethane finish | 09 90 01; ES19 | 100 | SF | $0.00 |
| 1 | JD | Alkyd overcoat of ferrous metal over moderately weathered alkyd | 09 90 01; EO16 | 100 | SF | $0.00 |
| 1 | JE | Acrylic latex overcoat of ferrous metal over moderately weathered acrylic latex | 09 90 01; EO14 | 1000 | SF | $0.00 |
| 1 | JF | Epoxy and aliphatic urethane system on ferrous metal over moderately weathered urethane finish | 09 90 01; EO21 | 100 | SF | $0.00 |
| 1 | JG | Complete removal and new coating on ferrous metal of epoxy and aliphatic polyurethane topcoat system | 09 90 01; EN23 | 1700 | SF | $0.00 |
| 1 | JH | HANGAR interior exposed metal urethane alkyd enamel spot repair of structural steel | 09 90 01; ES28 | 100 | SF | $0.00 |
| 1 | JI | Overcoat of HANGAR interior exposed shop primed aged alkyd structural steel with long oil alkyd and urethane alkyd enamel | 09 90 01; EO27 | 100 | SF | $0.00 |
| GALVANIZED STEEL | ||||||
| 1 | KA | Acrylic latex over unpainted galvanized steel | 09 90 01; EN18 | 400 | SF | $0.00 |
| 1 | KB | Aliphatic urethane topcoat spot repair over galvanized steel | 09 90 01; ES19 | 100 | SF | $0.00 |
| 1 | KC | Acrylic latex overcoat on galvanized metal with moderately weathered acrylic latex | 09 90 01; ES20 | 750 | SF | $0.00 |
| 1 | KD | Multi-purpose epoxy and aliphatic urethane overcoat over moderately weathered acrylic latex | 09 90 01; EO29 | 400 | SF | $0.00 |
| INTERIOR PAINTING SYSTEMS | ||||||
| These all-inclusive work Systems include the materials, labor, equipment and any other resources or steps to perform the required surface preparations and painting ; including cleaning, normal spackling, feathering of edges, scaffolding, and containment (excluding lead based paint) for protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3 | ||||||
| BLOCK | ||||||
| 1 | LA | Acrylic latex over new bare concrete/masonry block | 09 90 02; IN1 | 100 | SF | $0.00 |
| 1 | LB | Acrylic latex spot repair on concrete/masonry block with aged acrylic latex | 09 90 02; IS5 | 100 | SF | $0.00 |
| 1 | LC | Acrylic overcoat on concrete/masonry block with aged acrylic latex | 09 90 02; IO4 | 200 | SF | $0.00 |
| 1 | LD | New coating on concrete/masonry block of acrylic latex | 09 90 02; IN6 | 100 | SF | $0.00 |
| DRYWALL/TRANSITE/PLASTER | ||||||
| 1 | MA | Acrylic latex over new bare drywall/gypsum | 09 90 02; IN2 | 500 | SF | $0.00 |
| 1 | MB | Acrylic latex spot repair of drywall/gypsum over acrylic latex | 09 90 02; IS7 | 100 | SF | $0.00 |
| 1 | MC | Acrylic overcoat on drywall/gypsum with intact acrylic latex | 09 90 02; IO4 | 7200 | SF | $0.00 |
| 1 | MD | Complete removal and new coating on drywall/gypsum of acrylic latex | 09 90 02; IN9 | 100 | SF | $0.00 |
| 1 | ME | Spot repair of acrylic plaster over transite | 09 90 01; ES9 | 100 | SF | $0.00 |
| 1 | MF | Acrylic latex overcoat on transite with moderately weathered acrylic latex | 09 90 01; EO8 | 100 | SF | $0.00 |
| 1 | MG | Acrylic latex overcoat on plaster with aged acrylic latex | 09 90 02; IO4 | 100 | SF | $0.00 |
| 1 | MH | Alkali resistant primer and acrylic latex over new plaster | 09 90 02; IN3 | 100 | SF | $0.00 |
| 1 | MI | Spot repair of acrylic latex on plaster | 09 90 02; IS5 | 100 | SF | $0.00 |
| 1 | MJ | Complete removal and new coating on walls and ceilings with acrylic latex | 09 90 02; IN8 | 100 | SF | $0.00 |
| WOOD | ||||||
| 1 | NA | Acrylic latex over bare wood | 09 90 02; IN2 | 100 | SF | $0.00 |
| 1 | NB | Acrylic latex spot repair on wood over acrylic latex | 09 90 02; IS5 | 100 | SF | $0.00 |
| 1 | NC | Acrylic latex overcoat on wood with aged acrylic latex | 09 90 02; IO4 | 100 | SF | $0.00 |
| 1 | ND | Complete removal and new coating on wood with acrylic latex | 09 90 02: IN8 | 100 | SF | $0.00 |
| METAL SURFACES | ||||||
| 1 | OA | Acrylic latex overcoat on metal surfaces with aged acrylic latex | 09 90 02; IO4 | 100 | SF | $0.00 |
| HIGH PERFORMANCE PAINTING SYSTEMS AND FLOORING SYSTEMS |
| For high performance painting, these all inclusive work Systems include the materials, labor, equipment and any other resources to perform the required surface preparation and painting; including cleaning, scaffolding, containment (excluding lead based paint) and protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3 |
For flooring systems, these all inclusive composite work Systems include the materials, labor, equipment, and any other resources or requirements to perform all of the work detailed in, or related to, the referenced specification section. Unit costs are based on a typical project size of at least 5,000 square feet for aged concrete (coated or uncoated), and at least 1,000 square feet for new concrete. All unit costs are fully burdened rates3 and the reflect the total compensastion to be received by the contractor for authorized work.
| HIGH PERFORMANCE PAINTING SYSTEMS | |||||||
| 1 | PA | Inorganic zinc (System I) | 09 97 00; HP1 | 1000 | SF | $0.00 | |
| 1 | PB | Inorganic zinc with acrylic latex color coding | 09 97 00; HP1 with color coding | 500 | SF | $0.00 | |
| 1 | PC | 3 coat system (System II) | 09 97 00; HP2 | 500 | SF | $0.00 | |
| FLOORING SYSTEM 1: FUEL RESISTIVE RESINOUS FLOORING (FRRF) SYSTEM | |||||||
| 1 | PD | FRRF, New Uncoated Concrete | 09 67 23.16 | 1000 | SF | $0.00 | |
| 1 | PE | FRRF, Aged Uncoated Concrete (contaminated) | 09 67 23.16 | 10000 | SF | $0.00 | |
| 1 | PF | FRRF, Remove Existing Flooring and Install | 09 67 23.16 | 5000 | SF | $0.00 | |
| FLOORING SYSTEM 1: FRRF SYSTEM OPTIONS | |||||||
| 1 | PG | Moisture Reducing System (MRS) for FRRF System | 09 67 23.16; 2.3.1, | ||||
| 09 67 23.16; 3.12.3 | 5000 | SF | $0.00 | ||||
| 1 | PH | Crack Treament for FRRF System | 09 67 23.16; 3.9 | 300 | LF | $0.00 | |
| FLOORING SYSTEM 2: CHEMICALLY RESISTANT ELECTROSTATIC DISSIPATIVE RESINOUS FLOORING (CRESDRF) SYSTEM | |||||||
| 1 | PI | CRESDRF System, Aged Uncoated Concrete (contaminated) | 09 67 23.15 | 10000 | SF | $0.00 | |
| 1 | PJ | CRESDRF System, Remove Existing Flooring and Install | 09 67 23.15 | 10000 | SF | $0.00 | |
| FLOORING SYSTEM 2: CRESDF SYSTEM OPTIONS | |||||||
| 1 | PK | MRS for CRESDRF system | 09 67 23.15; 1.4.1.3, | ||||
| 09 67 23.15; 3.15.1 | 20000 | SF | $0.00 | ||||
| 1 | PL | Crack Treament for CRESDRF system | 09 67 23.15; 3.8 | 300 | LF | $0.00 |
| UNIT PRICED PAINT WORK ITEMS | ||||||
| These are specific items to be painted on a unit price basis that includes all materials, labor, equipment, and any other resources to perform the required surface preparation and painting (excluding lead based paint) including protection of surrounding areas. All unit costs are fully burdened.3 | ||||||
| 1 | QA | Prepare and paint existing fire hydrant | 09 97 00, HP-1 with color-coding | 5 | EA | $0.00 |
| 1 | QB | Prepare and paint existing backflow preventer (<100 ft2) | 09 97 00, HP-1 with color coding | 48 | EA | $0.00 |
| 1 | QC | Prepare and paint steel bollard | 09 97 00, HP-2 | 15 | EA | $0.00 |
| 1 | QD | Prepare and paint misc steel item < 50 ft2 | 09 97 00, HP-1 | 10 | EA | $0.00 |
| 1 | QE | Prepare and paint misc steel item between 50 and 100 ft2 | 09 97 00, HP-1 | 5 | EA | $0.00 |
| 1 | QF | Prepare and paint misc steel item < 50 ft2 | 09 97 00, HP-2 | 10 | EA | $0.00 |
| 1 | QG | Prepare and paint misc steel item between 50 and 100 ft2 | 09 97 00, HP-2 | 5 | EA | $0.00 |
| ITEMIZED CLEANING & SURFACE PREPARATION | ||||||
| These items are to be used individually or in combination with other items, exclusive of a System application, to perform specialized cleaning, surface preparation, paint repair or maintenance that may not be represented in a System. These items include all materials, labor, equipment or other resources required to perform the work item. All unit costs are fully burdened.3 | ||||||
| 1 | RA | Pressure wash/low pressure water cleaning (LPWC) | 09 90 01; 3.9.10.1 | 100 | SF | $0.00 |
| 1 | RB | Pressure wash (LPWC), incl. mildew treatment and removal | 09 90 01; 3.9.10.1 | 355 | SF | $0.00 |
| 1 | RC | High-pressure water cleaning (HPWC) | 09 90 01; 3.9.10.2 | 100 | SF | $0.00 |
| 1 | RD | Water jetting (WJ-1) | 09 90 01; 3.9.10.4.1 | 100 | SF | $0.00 |
| 1 | RE | Water jetting (WJ-2) | 09 90 01; 3.9.10.4.2 | 100 | SF | $0.00 |
| 1 | RF | Water jetting (WJ-3) | 09 90 01; 3.9.10.4.3 | 100 | SF | $0.00 |
| 1 | RG | Water jetting (WJ-4) | 09 90 01; 3.9.10.4.4 | 100 | SF | $0.00 |
| 1 | RH | Sponge media blasting (SP-6) | 09 90 01; 3.9.11.2 | 100 | SF | $0.00 |
| 1 | RI | Sponge media blasting (SP-7) | 09 90 01; 3.9.11.3 | 100 | SF | $0.00 |
| 1 | RJ | Sponge media blasting (SP-10) | 09 90 01; 3.9.11.1 | 100 | SF | $0.00 |
| 1 | RK | Sponge media blasting (SP-14) | 09 90 01; 3.9.11.4 | 100 | SF | $0.00 |
| 1 | RL | Sponge media blasting (SP-16) | 09 90 01; 3.9.11.3 | 100 | SF | $0.00 |
| 1 | RM | Chemical stripping | 09 90 01; 3.9.13 | 100 | SF | $0.00 |
| 1 | RN | Hand tool cleaning | 09 90 01; 3.9.5 | 100 | SF | $0.00 |
| 1 | RO | Power tool cleaning (SP-3) | 09 90 01; 3.9.7 | 100 | SF | $0.00 |
| 1 | RP | Power tool cleaning (SP-11) | 09 90 01; 3.9.8 | 120 | SF | $0.00 |
| 1 | RQ | Power tool cleaning (SP-15) | 09 90 01; 3.9.9 | 100 | SF | $0.00 |
| 1 | RS | Abrasive blasting (SP-7) | 09 90 01; 3.9.11.3 | 100 | SF | $0.00 |
| 1 | RT | Abrasive blasting (SP-6) | 09 90 01; 3.9.11.2 | 100 | SF | $0.00 |
| 1 | RU | Abrasive blasting (SP-10) | 09 90 01; 3.9.11.1 | 100 | SF | $0.00 |
| 1 | RV | Abrasive blasting (SP-14) | 09 90 01; 3.9.11.4 | 100 | SF | $0.00 |
| 1 | RW | Abrasive blasting (SP-16) | 09 90 01 3.9.11.3 | 100 | SF | $0.00 |
| 1 | RX | Wet abrasive blasting (SP-7), low dust | 09 90 01; 3.9.10.3 | 100 | SF | $0.00 |
| 1 | RY | Wet abrasive blasting (SP-6), low dust | 09 90 01; 3.9.10.3 | 100 | SF | $0.00 |
| 1 | RZ | Wet abrasive blasting (SP-10), low dust | 09 90 01; 3.9.10.3 | 100 | SF | $0.00 |
| 1 | RAA | Wet abrasive blasting (SP-14), low dust | 09 90 01; 3.9.10.3 | 100 | SF | $0.00 |
| 1 | RAB | Wet abrasive blasting (SP-16), low dust | 09 90 01; 3.9.10.3 | 100 | SF | $0.00 |
| 1 | RAC | Prep concrete (SP-13, light service), with ICRI 1-3 profile | 09 90 01; 3.9.12 | 100 | SF | $0.00 |
| 1 | RAD | Prep concrete (SP-13, severe service), with ICRI 3-6 profile | 09 90 01; 3.9.12 | 100 | SF | $0.00 |
| Note: hand tool, power tool, and all blasting methods (i.e; sponge, wet, dry) require pre-cleaning as part of the surface preparation method. |
| ITEMIZED PAINTING PRODUCTS | ||||||
| These items are to be used individually, exclusive of a System application to perform specialized paint repair or maintenance that may not be represented in a System. These items include all materials, application labor and equipment associated with ONE COAT of the installed product. These items do not include surface preparation to be performed in conjunction with these items. Surface preparation shall be selected as a separate cost item. All unit costs are fully burdened.3 | ||||||
| EXTERIOR PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION | ||||||
| 1 | SA | Alkali resistant block filler | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SB | High-build acrylic latex primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SC | High-build acrylic latex topcoat | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SD | Alkali resistant primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SE | Elastomeric patching compound | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SF | Elastomeric topcoat | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SG | Exterior acrylic latex bonding primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SH | Exterior acrylic latex (flat) | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SI | Exterior acrylic latex (eggshell/satin) | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SJ | Exterior acrylic latex (gloss/semi-gloss) | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SK | Water-based universal primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SL | Polyamide epoxy primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SM | Fluoropolymer finish | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SN | Organic zinc primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SO | Inorganic zinc primer | 09 90 01; 2.13 | 185 | SF | $0.00 |
| 1 | SP | Multi-purpose epoxy | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SQ | Acrylic aliphatic polyurethane | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SR | Water-based urethane finish | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SS | Urethane alkyd enamel | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | ST | Alkyd universal primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SU | Waterborne direct-to-metal primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SV | Exterior wood primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SW | Water-based acrylic epoxy | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SX | Penetrating epoxy sealer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SY | Biodegradable surface cleaner | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SZ | Concrete primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAA | 100% solids epoxy filler | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAB | Urethane elastomer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAC | Pigmented sealer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAE | Calcium sulfonate sealer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAF | Calcium sulfonate primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAG | Calcium sulfonate topcoat | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAH | Rebar bonding agent and reinforcement protection | 09 90 01; 2.13 | 100 | SF | $0.00 |
| INTERIOR PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION | ||||||
| 1 | TA | Alkali resistant block filler | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TB | Alkali resistant primer | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TC | Interior latex sealer | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TD | Interior acrylic latex (flat) | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TE | Interior acrylic latex (eggshell/satin) | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TF | Interior acrylic latex (semi-gloss/gloss) | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TG | Water-based acrylic universal primer | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TH | Waterborne direct-to-metal primer | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TI | Biodegradable surface cleaner | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TJ | Primer for scuff resistance coatings | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TK | Scuff resistant base coat | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TL | Scuff resistant pattern coat | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TM | Wood stain: touch-up & overcoat | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TN | Wood stain: complete removal and recoat | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TO | Floor marking: overcoat or recoat | 09 90 02; 2.11 | 100 | SF | $0.00 |
| HIGH PERFORMANCE PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION | ||||||
| 1 | UA | Inorganic zinc rich primer - Per System I | 09 97 00; 2.12 | 100 | SF | $0.00 |
| 1 | UB | Inorganic zinc rich primer - Per System II | 09 97 00; 2.12 | 100 | SF | $0.00 |
| 1 | UC | Epoxy intermediate coat | 09 97 00; 2.12 | 100 | SF | $0.00 |
| 1 | UD | Aliphatic polyurethane finish coat | 09 97 00; 2.12 | 100 | SF | $0.00 |
| 1 | UE | Exterior acrylic latex (gloss/semi-gloss) | 09 97 00; 2.12 | 100 | SF | $0.00 |
| ABATEMENT OR DISTURBANCE OF TOXIC SUBSTANCE | ||||||
| These cost items are added to projects that involve work on existing facility surfaces that contain toxic substances. These all-inclusive unit prices provide compensation to cover all additional costs associated with the disturbance or removal of the toxic material. This includes, but is not limited to, hazard assessment, testing, containment, worker protection, environmental protection, air monitoring, waste collection/segregation/disposal and full compliance with all applicable regulatory requirements. Cost items associated with toxic metal content that is below RCRA limits shall only apply if the required work processes are proven to result in exposures above regulatory action levels. Note that trace detectable levels that are below RCRA limits still require exposure testing (OSHA 1910.1025), but rarely result in worker exposures above action levels. All unit costs are fully burdened.3 | ||||||
| HAZARDOUS PAINT - ADD FOR TOXIC METAL(S) CONTENT ABOVE RCRA LIMITS (TOTAL METALS) AND EXPOSURE ACTION LEVELS | ||||||
| 1 | VA | Hazardous paint disturbance 1 | 09 90 01; 3.3, 09 97 00; 3.3 | 5000 | SF | $0.00 |
| 1 | VB | Haz paint (i.e. Lead) abatement, including class 1a containment | 09 90 01; 3.6, 09 97 00; 3.5 | 2000 | SF | $0.00 |
| 1 | VC | Haz paint (i.e. Lead) abatement, including class 1w containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VD | Haz paint (i.e. Lead) abatement, including class 1p containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VE | Haz paint (i.e. Lead) abatement, including class 1c containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VF | Haz paint (i.e. Lead) abatement, including class 2a containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VG | Haz paint (i.e. Lead) abatement, including class 2w containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VH | Haz paint (i.e. Lead) abatement, including class 2p containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VI | Haz paint (i.e. Lead) abatement, including class 2c containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VJ | Haz paint (i.e. Lead) abatement, including class 3a containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VK | Haz paint (i.e. Lead) abatement, includingclass 3w containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VL | Haz paint (i.e. Lead) abatement, including class 3p containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VM | Haz paint (i.e. Lead) abatement, including class 3c containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VN | Haz paint (i.e. Lead) abatement, including class 4a containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| 1 | VO | Haz paint (i.e. Lead) abatement, including class 4w containment | 09 90 01; 3.6, 09 97 00; 3.5 | 1000 | SF | $0.00 |
| HAZARDOUS PAINT- ADD FOR TOXIC METAL(S) DETECTED-CONTENT LEVELS BELOW RCRA LIMITS (TOTAL METALS) BUT RESULTS IN EXPOSURE ABOVE ACTION LEVELS | ||||||
| 1 | WA | Hazardous paint disturbance 1 | 09 90 01; 3.3, 09 97 00; 3.3 | 1000 | SF | $0.00 |
| 1 | WB | Haz paint (i.e. Lead) abatement, including class 1a containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WC | Haz paint (i.e. Lead) abatement, including class 1w containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WD | Haz paint (i.e. Lead) abatement, including class 1p containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WE | Haz paint (i.e. Lead) abatement, including class 1c containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WF | Haz paint (i.e. Lead) abatement, including class 2a containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WG | Haz paint (i.e. Lead) abatement, includingclass 2w containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WH | Haz paint (i.e. Lead) abatement, including class 2p containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WI | Haz paint (i.e. Lead) abatement, including class 2c containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WJ | Haz paint (i.e. Lead) abatement, including class 3a containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WK | Haz paint (i.e. Lead) abatement, including class 3w containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WL | Haz paint (i.e. Lead) abatement, including class 3p containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WM | Haz paint (i.e. Lead) abatement, including class 3c containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WN | Haz paint (i.e. Lead) abatement, including class 4a containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| 1 | WO | Haz paint (i.e. Lead) abatement, including class 4w containment | 09 90 01; 3.6, 09 97 00; 3.5 | 500 | SF | $0.00 |
| ADD FOR TOXIC METAL(S) DETECTED-CONTENT LEVELS BELOW RCRA LIMITS (TOTAL METALS) AND EXPOSURE BELOW ACTION LEVELS | ||||||
| 1 | XA | Initial air sampling to verify worker exposures using selected processes below action levels (per system/process) | 02 83 13 00.20 | 40 | LS | $0.00 |
| ADD FOR ASBESTOS CONTAMINATED MATERIAL | ||||||
| 1 | YA | Asbestos removal | 02 82 16.00 20 | 250 | SF | $0.00 |
| 1 | YB | Asbestos removal/segmented containment | 02 82 16.00 20 | 500 | SF | $0.00 |
| 1 | YC | Asbestos removal/ total containment | 02 82 16.00 20 | 500 | SF | $0.00 |
| TOXIC SUBSTANCE PRE-SCREENING, INCLUDING SAMPLE COLLECTION AND LAB FEES (WHEN NOT PROVIDED IN ADVANCE BY GOVT). | ||||||
| 1 | ZA | Regulated metals testing (i.e. 8 RCRA metals, AA/ICP TOTAL CONSTITUENT ANALYSIS) | 09 90 01; 3.3, 09 90 02; 3.3, etc. | 10 | EA | $0.00 |
| 1 | ZB | Asbestos testing | 02 82 16.00 20 | 10 | EA | $0.00 |
| 1 | ZC | PCBs | 09 90 01; 3.3, 09 90 02; 3.3, etc. | 10 | EA | $0.00 |
| COST MODIFIERS | ||||||
| These cost items may be used by the Government to modify (increase/decrease) the cost of work items to compensate for task specific conditions that are, in the sole opinion of the Government, outside of typical or normal conditions that would be reasonably anticipated for the task being performed. All unit costs are fully burdened.3 | ||||||
| ADD FOR EXCESSIVE/UNUSUAL CONDITIONS | ||||||
| 1 | AAA | Interior spackling of defects (i.e. nail hole) > 1 per 10ft2 (Unit area applies to total area being prepared/painted) | 09 29 00; 3.8 | 2000 | SF | $0.00 |
| 1 | AAB | Exterior spackling of defects > 1 per 10ft2 (Unit area applies to total area being prepared/painted) | 09 29 00; 3.8 | 15000 | SF | $0.00 |
| 1 | AAC | Edge feathering exceeding 1LF per 100ft2 | 09 90 01; 3.9.3/09 90 02; 3.6.3 | 1500 | LF | $0.00 |
| 1 | AAD | Removal of coatings >20 mils thick | NA | 2000 | SF | $0.00 |
| ADD FOR NACE INSPECTION | ||||||
| 1 | ACA | Upgrade to full-time, third party, NACE Certified Inspector in lieu of QC Inspector | 09 90 01; 1.12.1, 09 90 02; 1.12.1, 09 97 00; 1.13.1 | 45 | DAY | $0.00 |
TOTALS $ - 0
| 1 Overcoat applications where lead surfaces are disturbed by cleaning or sanding, but removal not required. |
| 2 Job size modifiers do not apply to unit priced work items. |
| 3 The term "fully burdened" includes, but is not limited to, all equipment, materials, labor, incidentals, Other Direct Costs, resources, subcontracts, overhead, profit, and bond. |
&"-,Bold"&14PRICE SCHEDULE&"-,Regular"&11 &"-,Bold"&12OPTION YEAR FOUR &10IDIQ PAINT VARIOUS FACILITIES
DBEH 10-1720
&"-,Bold"&14PRICE SCHEDULE&"-,Regular"&11 BASE YEAR &10PAFB Paint IDIQ Design, SXHT 13-1015
OPT YR 1
CLINS No. DESCRIPTION PRIMARY TECHNICAL REFERENCE(S) EST. QTY. UNIT UNIT COST TOTAL ESTIMATED COST (Including escalation)
| SUBSTRATE REPAIR | ||||||
| These work items consist of minor repairs to substrate materials for maintenance painting. These items can be used with the Systems or with itemized paint products as required. All unit costs are fully burdened.3 | ||||||
| COMMON SURFACE REPAIRS | ||||||
| 1 | AA | Repair masonry/stucco/concrete cracks (small) | 09 90 01; 3.11.2 | 1050 | LF | $0.00 |
| 1 | AB | Repair masonry/stucco/concrete cracks (large) | 09 90 01; 3.11.2 | 700 | LF | $0.00 |
| 1 | AC | Patch masonry/concrete/stucco surfaces | 09 90 01; 3.11.2 | 2100 | SF | $0.00 |
| 1 | AD | Repair spalling concrete w/exposed reinforcement bar (unit: cubic foot) | 09 90 01; 3.11.1.2 | 100 | CF | $0.00 |
| 1 | AE | Repair EIFS (synthetic stucco) | 09 90 01; 3.11.3 | 2500 | SF | $0.00 |
| 1 | AF | Repair portland stucco | 09 90 01; 3.11.2 | 2500 | SF | $0.00 |
| 1 | AG | Repair acrylic stucco cladding | 09 90 01; 3.11.2 | 2200 | SF | $0.00 |
| 1 | AH | Patch drywall | 09 29 00; 3.4 | 562 | SF | $0.00 |
| 1 | AI | Patch cement board | 09 90 02; 3.8.2 | 541 | SF | $0.00 |
| 1 | AJ | Fill/putty wood (unit: square inch) | 09 90 01;3.11.4/09 90 02;3.8.1 | 950 | SI | $0.00 |
| ANCILLARY WORK ITEMS | ||||||
| These work items consist of the removal and/or replacement of substrate materials and appurtenances for maintenance or painting. These items can be used with the Systems or with itemized paint products as required. All unit costs are fully burdened.3 | ||||||
| METAL | ||||||
| 1 | BA | Replace copper gutter | 07 62 10; 3.10 | 120 | LF | $0.00 |
| 1 | BB | Replace copper downspout | 07 62 10; 3.9 | 66 | LF | $0.00 |
| 1 | BC | Replace metal louver/vent, stainless steel | 08 91 00; 3.1 | 10 | SF | $0.00 |
| 1 | BD | Replace copper fascia and flashing | 07 62 10; 3.6 | 50 | SF | $0.00 |
| 1 | BE | Replace copper flashing | 07 62 10; 3.6 | 10 | SF | $0.00 |
| 1 | BF | Replace metal siding, factory finished aluminum | 07 42 13; 3.3 | 100 | SF | $0.00 |
| 1 | BG | Replace metal siding, factory finished galvanized steel | 07 42 13; 3.3 | 100 | SF | $0.00 |
| 1 | BH | Replace aluminum balcony and/or stair handrail | 05 52 00; 3.2 | 200 | LF | $0.00 |
| 1 | BI | Replace/add metal framing stud and/or channel | 09 22 00; 3.1 | 200 | LF | $0.00 |
| 1 | BJ | Replace soffit with vented aluminum soffit | 07 42 13: 3.5.4 | 750 | SF | $0.00 |
| WOOD | ||||||
| 1 | CA | Replace sub fascia boards | 06 10 00; 3.1 | 100 | BF | $0.00 |
| 1 | CB | Replace wood fascia | 06 20 00; 3.3 | 200 | BF | $0.00 |
| 1 | CC | Replace wood trim | 06 20 00; 3.3 | 200 | BF | $0.00 |
| 1 | CD | Replace wood soffit/soffit vent | 06 20 00; 3.2 | 250 | BF | $0.00 |
| 1 | CE | Replace/add 2 x 4 | 06 10 00; 3.1 | 100 | BF | $0.00 |
| 1 | CF | Replace/add 2 x 6 | 06 10 00; 3.1 | 45 | BF | $0.00 |
| 1 | CG | Replace/add 2 x 8 | 06 10 00; 3.1 | 110 | BF | $0.00 |
| OTHER MISCELLANEOUS ITEMS | ||||||
| 1 | DA | Install concrete block (CMU) infill | 04 20 00; 3.2 | 320 | SF | $0.00 |
| 1 | DB | Remove/demo gypsum board | 09 29 00; 1.5 | 375 | SF | $0.00 |
| 1 | DC | Install new gypsum board | 09 29 00; 3.2 | 375 | SF | $0.00 |
| 1 | DD | Gypsum board texture, medium texture orange peel | 09 29 00; 3.4.2.1 | 650 | SF | $0.00 |
| 1 | DE | Gypsum board texture, knock down (ceilings) | 09 29 00; 3.4.2.2 | 650 | SF | $0.00 |
| 1 | DF | Gypsum board finish Level 1 | 09 29 00; 3.4 | 650 | SF | $0.00 |
| 1 | DG | Gypsum board finish Level 2 | 09 29 00; 3.4 | 100 | SF | $0.00 |
| 1 | DH | Gypsum board finish Level 3 | 09 29 00; 3.4 | 100 | SF | $0.00 |
| 1 | DI | Gypsum board finish Level 4 | 09 29 00; 3.4 | 350 | SF | $0.00 |
| 1 | DJ | Gypsum board finish Level 5 | 09 29 00; 3.4.1 | 100 | SF | $0.00 |
| 1 | DK | Replace/add acoustical ceiling panels | 09 51 00; 3.1.3 | 350 | SF | $0.00 |
| 1 | DL | Replace rubber wall base | 09 29 00; 3.6 | 200 | LF | $0.00 |
| 1 | DM | Replace rubber wall base with wood wall base | 06 20 00; 3.4 | 200 | LF | $0.00 |
| 1 | DN | Replace aluminum door/frame (anodized, 3' x 7', including closer) | 08 11 16; 3.1 | 3 | EA | $0.00 |
| 1 | DO | Replace hinge | 08 71 00; 3.1 | 2 | SET (3) | $0.00 |
| 1 | DP | Replace weather-stripping | 08 71 00; 3.1.1 | 2 | EA | $0.00 |
| 1 | DQ | Replace threshold | 08 71 00; 3.1.3 | 2 | EA | $0.00 |
| 1 | DR | Replace door hardware (including lockset) | 08 71 00; 3.1 | 2 | EA | $0.00 |
| 1 | DS | Replace stops | 08 71 00; 3.1 | 3 | EA | $0.00 |
| 1 | DT | Replace door bumpers | 08 71 00; 3.1 | 3 | EA | $0.00 |
| 1 | DU | Replace glass | 08 81 00; 3.2 | 150 | SF | $0.00 |
| 1 | DV | Replace blast proof windows | 08 56 53; 3.1 | 25 | SF | $0.00 |
| 1 | DW | Replace hurricane-rated glass | 08 56 53; 3.1 | 25 | EA | $0.00 |
| 1 | DX | Remove/reinstall exterior building signage after completion of painting work | 09 90 01; 3.2.2 | 59 | EA | $0.00 |
| 1 | DY | Replace/install (new) exterior signage after completion of painting work | 09 90 01; 3.2.2 | 20 | EA | $0.00 |
| 1 | DZ | Remove/reinstall interior building signage after completion of painting work | 09 90 02; 3.2, 09 90 01; 3.2.2 | 25 | EA | $0.00 |
| 1 | DAA | Replace/install (new) interior signage after completion of painting work | 09 90 02; 3.2, 09 90 01; 3.2.2 | 10 | EA | $0.00 |
| 1 | DAB | Replace asbestos corrugated siding with fiberglass corrugated siding (includes abatement) | 07 42 13; 3.3.3 | 25 | SF | $0.00 |
| 1 | DAC | Caulk windows | 09 90 01; 3.10 | 4200 | LF | $0.00 |
| 1 | DAD | Interior caulking | 09 90 02; 3.8.3 | 1000 | LF | $0.00 |
| 1 | DAE | Exterior caulking | 09 90 01; 3.11.5.2 | 1800 | LF | $0.00 |
| 1 | DAF | Replace/add joint sealant (less than .25'' width) | 07 92 00; 3.3 | 100 | LF | $0.00 |
| 1 | DAG | Replace/add joint sealant (.25'' to .5'' width) | 07 92 00; 3.3 | 950 | LF | $0.00 |
| 1 | DAH | Replace/add joint sealant (.5'' to 1''width) | 07 92 00; 3.3 | 350 | LF | $0.00 |
| EXTERIOR PAINTING SYSTEMS | ||||||
| These all-inclusive work systems include the materials, labor, equipment and any other resources or steps required to safely perform the required surface preparation and painting; including cleaning, feathering of edges, minor spackling, scaffolding, and containment (excluding lead based paint) for protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3 | ||||||
| CONCRETE AND CMU | ||||||
| 1 | EA | Acrylic latex over new bare concrete/masonry block | 09 90 01; EN1 | 500 | SF | $0.00 |
| 1 | EB | Elastomeric spot repair on concrete/masonry block over elastomeric | 09 90 01; ES2 | 100 | SF | $0.00 |
| 1 | EC | Acrylic latex overcoat on concrete/masonry block with moderately weathered acrylic latex | 09 90 01; EO3 | 50000 | SF | $0.00 |
| 1 | ED | Elastomeric overcoat on concrete/masonry block with moderately weathered acrylic latex | 09 90 01; EO4 | 500 | SF | $0.00 |
| 1 | EE | Elastomeric overcoat on concrete/masonry block with moderately weathered elastomeric | 09 90 01; EO4 | 500 | SF | $0.00 |
| 1 | EF | Spot repair on concrete/masonry block of acrylic latex | 09 90 01; ES5 | 1000 | SF | $0.00 |
| 1 | EG | Complete removal and new coating on concrete/masonry block of acrylic latex | 09 90 01; EN6 | 3000 | SF | $0.00 |
| STUCCO | ||||||
| 1 | FA | Acrylic latex over new bare stucco | 09 90 01; EN1 | 1000 | SF | $0.00 |
| 1 | FB | Spot repair of acrylic latex over stucco | 09 90 01; ES5 | 1000 | SF | $0.00 |
| 1 | FC | Spot repair of elastomeric over stucco | 09 90 01; ES2 | 1000 | SF | $0.00 |
| 1 | FD | Acrylic latex overcoat on stucco with moderately weathered acrylic latex | 09 90 01; EO3 | 17000 | SF | $0.00 |
| 1 | FE | Elastomeric overcoat on stucco with moderately weathered acrylic latex | 09 90 01; EO4 | 500 | SF | $0.00 |
| 1 | FF | Elastomeric overcoat on stucco with moderately weathered elastomeric | 09 90 01; EO4 | 500 | SF | $0.00 |
| 1 | FG | Complete removal and new coating on stucco with acrylic latex | 09 90 01; EN6 | 100 | SF | $0.00 |
| EIFS | ||||||
| 1 | GA | Spot repair of acrylic latex over EIFS | 09 90 01; ES5 | 850 | SF | $0.00 |
| 1 | GB | Spot repair of elastomeric over EIFS | 09 90 01; ES2 | 500 | SF | $0.00 |
| 1 | GC | Acrylic latex overcoat on EIFS with moderately weathered acrylic latex | 09 90 01; EO3 | 14000 | SF | $0.00 |
| 1 | GD | Elastomeric overcoat on EIFS with moderately weathered acrylic latex | 09 90 01; EO4 | 500 | SF | $0.00 |
| 1 | GE | Elastomeric overcoat on EIFS with moderately weathered elastomeric | 09 90 01; EO4 | 500 | SF | $0.00 |
| WOOD | ||||||
| 1 | HA | Acrylic latex over bare wood | 09 90 01; EN7 | 300 | SF | $0.00 |
| 1 | HB | Acrylic latex spot repair on wood over acrylic latex | 09 90 01; ES9 | 100 | SF | $0.00 |
| 1 | HC | Acrylic latex overcoat on wood with moderately weathered acrylic latex | 09 90 01; EO8 | 400 | SF | $0.00 |
| 1 | HD | Acrylic latex over bare wood using chemical stripping for surface preparation | 09 90 01; EN10 | 100 | SF | $0.00 |
| BUILDING PANELS | ||||||
| 1 | IA | Epoxy tie coat and fluoropolymer finish over moderately weathered metal panels, no previous field applied coating | 09 90 01; EO12 | 100 | SF | $0.00 |
| 1 | IB | New coating on HANGAR metal pipes | 09 90 01; EN25 | 100 | SF | $0.00 |
| IC | Spot repair of acrylic latex over asbestos panels | 09 90 01; ES9 | 100 | SF | $0.00 | |
| ID | Acrylic latex overcoat of weathered asbestos wall panels | 09 90 01; EO8 | 100 | SF | $0.00 | |
| 1 | IE | Acrylic latex over bare asbestos wall panels | 09 90 01; EN11 | 100 | SF | $0.00 |
| 1 | IF | Alkyd overcoat of weathered factory finish metal wall panels | 09 90 01; EO24 | 100 | SF | $0.00 |
| 1 | IG | Epoxy spot repair of factory finish on metal wall panels prior to full overcoat | 09 90 01; ES26 | 100 | SF | $0.00 |
| FERROUS METAL | ||||||
| 1 | JA | Spot repair of ferrous metals with previously applied long oil alkyd | 09 90 01; ES17 | 1100 | SF | $0.00 |
| 1 | JB | Acrylic latex spot repair of ferrous metals with previously applied acrylic latex | 09 90 01; ES15 | 100 | SF | $0.00 |
| 1 | JC | Aliphatic urethane topcoat spot repair of ferrous metals with isolated coating damage on urethane finish | 09 90 01; ES19 | 100 | SF | $0.00 |
| 1 | JD | Alkyd overcoat of ferrous metal over moderately weathered alkyd | 09 90 01; EO16 | 100 | SF | $0.00 |
| 1 | JE | Acrylic latex overcoat of ferrous metal over moderately weathered acrylic latex | 09 90 01; EO14 | 1300 | SF | $0.00 |
| 1 | JF | Epoxy and aliphatic urethane system on ferrous metal over moderately weathered urethane finish | 09 90 01; EO21 | 100 | SF | $0.00 |
| 1 | JG | Complete removal and new coating on ferrous metal of epoxy and aliphatic polyurethane topcoat system | 09 90 01; EN23 | 2000 | SF | $0.00 |
| 1 | JH | HANGAR interior exposed metal urethane alkyd enamel spot repair of structural steel | 09 90 01; ES28 | 100 | SF | $0.00 |
| 1 | JI | Overcoat of HANGAR interior exposed shop primed aged alkyd structural steel with long oil alkyd and urethane alkyd enamel | 09 90 01; EO27 | 100 | SF | $0.00 |
| GALVANIZED STEEL | ||||||
| 1 | KA | Acrylic latex over unpainted galvanized steel | 09 90 01; EN18 | 1200 | SF | $0.00 |
| 1 | KB | Aliphatic urethane topcoat spot repair over galvanized steel | 09 90 01; ES19 | 100 | SF | $0.00 |
| 1 | KC | Acrylic latex overcoat on galvanized metal with moderately weathered acrylic latex | 09 90 01; ES20 | 1100 | SF | $0.00 |
| 1 | KD | Multi-purpose epoxy and aliphatic urethane overcoat over moderately weathered acrylic latex | 09 90 01; EO29 | 486 | SF | $0.00 |
| INTERIOR PAINTING SYSTEMS | ||||||
| These all-inclusive work Systems include the materials, labor, equipment and any other resources or steps to perform the required surface preparations and painting ; including cleaning, normal spackling, feathering of edges, scaffolding, and containment (excluding lead based paint) for protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3 | ||||||
| BLOCK | ||||||
| 1 | LA | Acrylic latex over new bare concrete/masonry block | 09 90 02; IN1 | 50 | SF | $0.00 |
| 1 | LB | Acrylic latex spot repair on concrete/masonry block with aged acrylic latex | 09 90 02; IS5 | 50 | SF | $0.00 |
| 1 | LC | Acrylic overcoat on concrete/masonry block with aged acrylic latex | 09 90 02; IO4 | 373 | SF | $0.00 |
| 1 | LD | New coating on concrete/masonry block of acrylic latex | 09 90 02; IN6 | 318 | SF | $0.00 |
| DRYWALL/TRANSITE/PLASTER | ||||||
| 1 | MA | Acrylic latex over new bare drywall/gypsum | 09 90 02; IN2 | 1000 | SF | $0.00 |
| 1 | MB | Acrylic latex spot repair of drywall/gypsum over acrylic latex | 09 90 02; IS7 | 100 | SF | $0.00 |
| 1 | MC | Acrylic overcoat on drywall/gypsum with intact acrylic latex | 09 90 02; IO4 | 7500 | SF | $0.00 |
| 1 | MD | Complete removal and new coating on drywall/gypsum of acrylic latex | 09 90 02; IN9 | 100 | SF | $0.00 |
| 1 | ME | Spot repair of acrylic plaster over transite | 09 90 01; ES9 | 100 | SF | $0.00 |
| 1 | MF | Acrylic latex overcoat on transite with moderately weathered acrylic latex | 09 90 01; EO8 | 100 | SF | $0.00 |
| 1 | MG | Acrylic latex overcoat on plaster with aged acrylic latex | 09 90 02; IO4 | 100 | SF | $0.00 |
| 1 | MH | Alkali resistant primer and acrylic latex over new plaster | 09 90 02; IN3 | 100 | SF | $0.00 |
| 1 | MI | Spot repair of acrylic latex on plaster | 09 90 02; IS5 | 100 | SF | $0.00 |
| 1 | MJ | Complete removal and new coating on walls and ceilings with acrylic latex | 09 90 02; IN8 | 100 | SF | $0.00 |
| WOOD | ||||||
| 1 | NA | Acrylic latex over bare wood | 09 90 02; IN2 | 100 | SF | $0.00 |
| 1 | NB | Acrylic latex spot repair on wood over acrylic latex | 09 90 02; IS5 | 100 | SF | $0.00 |
| 1 | NC | Acrylic latex overcoat on wood with aged acrylic latex | 09 90 02; IO4 | 100 | SF | $0.00 |
| 1 | ND | Complete removal and new coating on wood with acrylic latex | 09 90 02: IN8 | 100 | SF | $0.00 |
| METAL SURFACES | ||||||
| 1 | OA | Acrylic latex overcoat on metal surfaces with aged acrylic latex | 09 90 02; IO4 | 100 | SF | $0.00 |
| HIGH PERFORMANCE PAINTING SYSTEMS AND FLOORING SYSTEMS |
| For high performance painting, these all inclusive work Systems include the materials, labor, equipment and any other resources to perform the required surface preparation and painting; including cleaning, scaffolding, containment (excluding lead based paint) and protection of surrounding areas. This does not include potential cost modifiers. All unit costs are fully burdened.3 |
For flooring systems, these all inclusive composite work Systems include the materials, labor, equipment, and any other resources or requirements to perform all of the work detailed in, or related to, the referenced specification section. Unit costs are based on a typical project size of at least 5,000 square feet for aged concrete (coated or uncoated), and at least 1,000 square feet for new concrete. All unit costs are fully burdened rates3 and the reflect the total compensastion to be received by the contractor for authorized work.
| HIGH PERFORMANCE PAINTING SYSTEMS | |||||||
| 1 | PA | Inorganic zinc (System I) | 09 97 00; HP1 | 1100 | SF | $0.00 | |
| 1 | PB | Inorganic zinc with acrylic latex color coding | 09 97 00; HP1 with color coding | 750 | SF | $0.00 | |
| 1 | PC | 3 coat system (System II) | 09 97 00; HP2 | 1000 | SF | $0.00 | |
| FLOORING SYSTEM 1: FUEL RESISTIVE RESINOUS FLOORING (FRRF) SYSTEM | |||||||
| 1 | PD | FRRF, New Uncoated Concrete | 09 67 23.16 | 1000 | SF | $0.00 | |
| 1 | PE | FRRF, Aged Uncoated Concrete (contaminated) | 09 67 23.16 | 20000 | SF | $0.00 | |
| 1 | PF | FRRF, Remove Existing Flooring and Install | 09 67 23.16 | 5000 | SF | $0.00 | |
| FLOORING SYSTEM 1: FRRF SYSTEM OPTIONS | |||||||
| 1 | PG | Moisture Reducing System (MRS) for FRRF System | 09 67 23.16; 2.3.1, | ||||
| 09 67 23.16; 3.12.3 | 20000 | SF | $0.00 | ||||
| 1 | PH | Crack Treament for FRRF System | 09 67 23.16; 3.9 | 300 | LF | $0.00 |
| UNIT PRICED PAINT WORK ITEMS | ||||||
| These are specific items to be painted on a unit price basis that includes all materials, labor, equipment, and any other resources to perform the required surface preparation and painting (excluding lead based paint) including protection of surrounding areas. All unit costs are fully burdened.3 | ||||||
| 1 | QA | Prepare and paint existing fire hydrant | 09 97 00, HP-1 with color-coding | 5 | EA | $0.00 |
| 1 | QB | Prepare and paint existing backflow preventer (<100 ft2) | 09 97 00, HP-1 with color coding | 4 | EA | $0.00 |
| 1 | QC | Prepare and paint steel bollard | 09 97 00, HP-2 | 10 | EA | $0.00 |
| 1 | QD | Prepare and paint misc steel item < 50 ft2 | 09 97 00, HP-1 | 5 | EA | $0.00 |
| 1 | QE | Prepare and paint misc steel item between 50 and 100 ft2 | 09 97 00, HP-1 | 5 | EA | $0.00 |
| 1 | QF | Prepare and paint misc steel item < 50 ft2 | 09 97 00, HP-2 | 5 | EA | $0.00 |
| 1 | QG | Prepare and paint misc steel item between 50 and 100 ft2 | 09 97 00, HP-2 | 5 | EA | $0.00 |
| ITEMIZED CLEANING & SURFACE PREPARATION | ||||||
| These items are to be used individually or in combination with other items, exclusive of a System application, to perform specialized cleaning, surface preparation, paint repair or maintenance that may not be represented in a System. These items include all materials, labor, equipment or other resources required to perform the work item. All unit costs are fully burdened.3 | ||||||
| 1 | RA | Pressure wash/low pressure water cleaning (LPWC) | 09 90 01; 3.9.10.1 | 4000 | SF | $0.00 |
| 1 | RB | Pressure wash (LPWC), incl. mildew treatment and removal | 09 90 01; 3.9.10.1 | 5200 | SF | $0.00 |
| 1 | RC | High-pressure water cleaning (HPWC) | 09 90 01; 3.9.10.2 | 100 | SF | $0.00 |
| 1 | RD | Water jetting (WJ-1) | 09 90 01; 3.9.10.4.1 | 100 | SF | $0.00 |
| 1 | RE | Water jetting (WJ-2) | 09 90 01; 3.9.10.4.2 | 100 | SF | $0.00 |
| 1 | RF | Water jetting (WJ-3) | 09 90 01; 3.9.10.4.3 | 100 | SF | $0.00 |
| 1 | RG | Water jetting (WJ-4) | 09 90 01; 3.9.10.4.4 | 100 | SF | $0.00 |
| 1 | RH | Sponge media blasting (SP-6) | 09 90 01; 3.9.11.2 | 100 | SF | $0.00 |
| 1 | RI | Sponge media blasting (SP-7) | 09 90 01; 3.9.11.3 | 100 | SF | $0.00 |
| 1 | RJ | Sponge media blasting (SP-10) | 09 90 01; 3.9.11.1 | 100 | SF | $0.00 |
| 1 | RK | Sponge media blasting (SP-14) | 09 90 01; 3.9.11.4 | 100 | SF | $0.00 |
| 1 | RL | Sponge media blasting (SP-16) | 09 90 01; 3.9.11.3 | 100 | SF | $0.00 |
| 1 | RM | Chemical stripping | 09 90 01; 3.9.13 | 100 | SF | $0.00 |
| 1 | RN | Hand tool cleaning | 09 90 01; 3.9.5 | 100 | SF | $0.00 |
| 1 | RO | Power tool cleaning (SP-3) | 09 90 01; 3.9.7 | 100 | SF | $0.00 |
| 1 | RP | Power tool cleaning (SP-11) | 09 90 01; 3.9.8 | 290 | SF | $0.00 |
| 1 | RQ | Power tool cleaning (SP-15) | 09 90 01; 3.9.9 | 100 | SF | $0.00 |
| 1 | RS | Abrasive blasting (SP-7) | 09 90 01; 3.9.11.3 | 3000 | SF | $0.00 |
| 1 | RT | Abrasive blasting (SP-6) | 09 90 01; 3.9.11.2 | 3000 | SF | $0.00 |
| 1 | RU | Abrasive blasting (SP-10) | 09 90 01; 3.9.11.1 | 100 | SF | $0.00 |
| 1 | RV | Abrasive blasting (SP-14) | 09 90 01; 3.9.11.4 | 100 | SF | $0.00 |
| 1 | RW | Abrasive blasting (SP-16) | 09 90 01 3.9.11.3 | 100 | SF | $0.00 |
| 1 | RX | Wet abrasive blasting (SP-7), low dust | 09 90 01; 3.9.10.3 | 100 | SF | $0.00 |
| 1 | RY | Wet abrasive blasting (SP-6), low dust | 09 90 01; 3.9.10.3 | 100 | SF | $0.00 |
| 1 | RZ | Wet abrasive blasting (SP-10), low dust | 09 90 01; 3.9.10.3 | 100 | SF | $0.00 |
| 1 | RAA | Wet abrasive blasting (SP-14), low dust | 09 90 01; 3.9.10.3 | 100 | SF | $0.00 |
| 1 | RAB | Wet abrasive blasting (SP-16), low dust | 09 90 01; 3.9.10.3 | 100 | SF | $0.00 |
| 1 | RAC | Prep concrete (SP-13, light service), with ICRI 1-3 profile | 09 90 01; 3.9.12 | 100 | SF | $0.00 |
| 1 | RAD | Prep concrete (SP-13, severe service), with ICRI 3-6 profile | 09 90 01; 3.9.12 | 100 | SF | $0.00 |
| Note: hand tool, power tool, and all blasting methods (i.e; sponge, wet, dry) require pre-cleaning as part of the surface preparation method. |
| ITEMIZED PAINTING PRODUCTS | ||||||
| These items are to be used individually, exclusive of a System application to perform specialized paint repair or maintenance that may not be represented in a System. These items include all materials, application labor and equipment associated with ONE COAT of the installed product. These items do not include surface preparation to be performed in conjunction with these items. Surface preparation shall be selected as a separate cost item. All unit costs are fully burdened.3 | ||||||
| EXTERIOR PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION | ||||||
| 1 | SA | Alkali resistant block filler | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SB | High-build acrylic latex primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SC | High-build acrylic latex topcoat | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SD | Alkali resistant primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SE | Elastomeric patching compound | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SF | Elastomeric topcoat | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SG | Exterior acrylic latex bonding primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SH | Exterior acrylic latex (flat) | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SI | Exterior acrylic latex (eggshell/satin) | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SJ | Exterior acrylic latex (gloss/semi-gloss) | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SK | Water-based universal primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SL | Polyamide epoxy primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SM | Fluoropolymer finish | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SN | Organic zinc primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SO | Inorganic zinc primer | 09 90 01; 2.13 | 179 | SF | $0.00 |
| 1 | SP | Multi-purpose epoxy | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SQ | Acrylic aliphatic polyurethane | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SR | Water-based urethane finish | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SS | Urethane alkyd enamel | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | ST | Alkyd universal primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SU | Waterborne direct-to-metal primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SV | Exterior wood primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SW | Water-based acrylic epoxy | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SX | Penetrating epoxy sealer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SY | Biodegradable surface cleaner | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SZ | Concrete primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAA | 100% solids epoxy filler | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAB | Urethane elastomer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAC | Pigmented sealer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAE | Calcium sulfonate sealer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAF | Calcium sulfonate primer | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAG | Calcium sulfonate topcoat | 09 90 01; 2.13 | 100 | SF | $0.00 |
| 1 | SAH | Rebar bonding agent and reinforcement protection | 09 90 01; 2.13 | 100 | SF | $0.00 |
| INTERIOR PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION | ||||||
| 1 | TA | Alkali resistant block filler | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TB | Alkali resistant primer | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TC | Interior latex sealer | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TD | Interior acrylic latex (flat) | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TE | Interior acrylic latex (eggshell/satin) | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TF | Interior acrylic latex (semi-gloss/gloss) | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TG | Water-based acrylic universal primer | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TH | Waterborne direct-to-metal primer | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TI | Biodegradable surface cleaner | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TJ | Primer for scuff resistance coatings | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TK | Scuff resistant base coat | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TL | Scuff resistant base coat | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TM | Wood stain: touch-up & overcoat | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TN | Wood stain: complete removal and recoat | 09 90 02; 2.11 | 100 | SF | $0.00 |
| 1 | TO | Floor marking: overcoat or recoat | 09 90 02; 2.11 | 100 | SF | $0.00 |
| HIGH PERFORMANCE PAINT PRODUCTS USED OUTSIDE OF SYSTEM APPLICATION | ||||||
| 1 | UA | Inorganic zinc rich primer - Per System I | 09 97 00; 2.12 | 100 | SF | $0.00 |
| 1 | UB | Inorganic zinc rich primer - Per System II | 09 97 00; 2.12 | 100 | SF | $0.00 |
| 1 | UC | Epoxy intermediate coat | 09 97 00; 2.12 | 100 | SF | $0.00 |