Attachment 7 Past Performance Questionnaire
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_9_Questions_ _Answers.pdf | ||
| Atch_11_Site_Visit__Statement_of_Events.docx | DOCX document | |
| Atch_5_Price_Schedule_-_Revision_1.xlsx | XLSX spreadsheet | |
| FA2521-15-R-0008-0003.pdf | ||
| FA2521-15-R-0008-0002.pdf | ||
| FA2521-15-R-0008-0001.pdf | ||
| Atch_9_Question_and_Answer_Template.docx | DOCX document | |
| Atch_10_Installation_Access_List.docx | DOCX document | |
| Atch_6_Technical_Evaluation_Sample_Project_Form.docx | DOCX document | |
| Atch_1_Specifications.pdf | ||
| Atch_3_Hazardous_Waste_Form.doc | DOC document | |
| Atch_2_Specifications_Addendum.pdf | ||
| Atch_8_Davis_Bacon_Wage_Determination_8MAY15.pdf | ||
| FA2521-15-R-0008 _Solicitation.pdf | ||
| Atch_4_GPP.pdf | ||
| Atch_5_Price_Schedule.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE QUESTIONAIRE
A. Project Information Project Number (Check one) |_|Proj 1 |_|Proj 2 |_|Proj 3 |_|Proj 4 |_|Proj 5
Project Title
Project Location
Award Date:
Completion Date:
| Work Performed by: |
| |_| Offeror (Prime) |_| Offeror (working as Subcontractor) |
Contract #:
Delivery Order/ Task Order:
Total $ Amount:
| Type of Work |
| |_|New Construction |_|Renovation/Repair |_|Other (Specify) _________________________________ |
B. Technical Experience Included in Project
| Interior Coating Systems (Specify Substrate) |
| |_|Drywall |_|Gypsum |_|Concrete Block |_|Transite |_|Plaster |_|Wood |
| Exterior Repairs |
| |_|Wood |_|Masonry |_|Synthetics |_|Concrete |
| Exterior Coating Systems (Specify Substrate) |
| |_|Concrete Block |_|EIFS |_|Stucco |_|Asbestos |_|Metal |
| Lead Abatement with Containment |
| |_| |
| High Performance Coating Systems on Metal |
| |_| |
C. Details Provide a detailed description of the technical qualifications documented by this project, including scope of work performed, types of coatings and product names of materials (e.g., abrasive and applied coatings and linings), equipment used for surface preparation and coating/lining operations, type and number of personnel who supervised/performed the work, application methods, substrates, repair processes, abatement processes, and any special requirements such as safety, environmental compliance or traffic control (include square footage of each item, its relevance to the overall project, and any unique considerations).
Photographs are encouraged but not required to demonstrate technical ability.
Clearly mark which example project is supported by any accompanying documentation.
| D. Respondent Information | |
| Name of Respondent: |
Title:
Address:
Telephone Number:
Fax Number:
Email Address:
E. Respondent Evaluation of Contractor
EMAIL COMPLETED SURVEY FORM TO: Patricia A. Bates at patricia.bates@us.af.mil, or Christina Johnsen, at christina.johnsen@us.af.mil.
PERFORMANCE INFORMATION: Choose the appropriate rating on the scale (Acceptable or Unacceptable) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY OVERALL RATING OF UNACCEPTABLE.
PERFORMANCE EVALUATION RATING: Use the following performance evaluation rating description when providing information on the matrix below:
Acceptable = Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable = Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
CONTRACTOR’S NAME: _____________________ CONTRACT NUMBER: ____________________________
Place an “X” in the appropriate column using the definitions matrix above.
| The contractor: |
| Acceptable |
| Unacceptable |
| 1. |
| Used specified or equal material or products. |
| 2. |
| Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements. |
| 3. |
| Effectively supervised job site and insured site was safe and secure. |
| 4. |
| Delegated authority to project managers and supervisors commensurate with contract requirements. |
| 5. |
| Provided effective quality control and/or inspection procedures to meet contract requirements. |
| 6. |
| Corrected deficiencies in a timely manner and pursuant to their quality control procedures. |
| 7. |
| Identified problems as they occurred & promptly notified site manager. |
| 8. |
| Suggested alternative approaches and displayed initiative to solve problems. |
| 9. |
| Adequately cleaned all work and storage areas at end of each day. |
| 10. |
| Developed realistic progress schedules and stayed on schedule. |
| 11. |
| Completed punch-list items. |
| 12. |
| Provided timely resolution of warranty defects. |
Overall Rating:
CONTRACTOR’S NAME: __________________________ CONTRACT NUMBER: _______________________
Remarks:__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________