SABERIndustry DaySlides .pdf
PDF 842 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award Federal contract opportunity
- Solicitation number
- FA2517-08-R-5002
About this file
Slides from Industry Day held on 13 April 2009
View the file
Other files for this federal contract opportunity
Show all 50
Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Air Force Space Command Guardians of the High Frontier
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Welcome to the Front Range
SABER Industry Day
UNCLASSIFIED
Welcome
• Opening Remarks
– Colonel Carlos Cruz-Gonzales
• AFSPC Deputy A4/7
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Air Force Space Command
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
SABER Industry Day
Mr. John Rea
SABER Contracting Officer
21st Contracting Squadron
UNCLASSIFIED
Captain Matthew Joseph
SABER Program Manager
21st Civil Engineer Squadron
Agenda
• Acquisition Plan
– Front Range Locations
– Contract Risks
– Specifications
• Contract Award
• Technical Capability
• Past Performance
• Price/Cost
• Coefficients
• Basis of Award
• Proposal Preparation
• Bonding
• Contract
Administration
• Project Oversight
• Open Discussion
• Set-Aside: Competitive 8(a) set-aside/Colorado and Wyoming Districts/
Joint Ventures & Mentor Programs are expected and encouraged
• Contract Type: Firm Fixed Price, Multiple award IDIQ
– Minimum Guarantee is $100K per contract, base year only
– Task Orders based on LPTA
• Awards: Up to three contracts
• Selection: Price performance trade off, with technical acceptability
• Term: One base year with four one year options
• NAICS # 236220, Commercial and Institutional Construction
• Classification Code: Z, Maintenance, repair, and alteration of real property
Acquisition Plan
• Source of Requirement:
– Peterson AFB
– Ft Carson Army Post
– Cheyenne Mountain Air Force Station
– Buckley AFB
– FE Warren AFB
– Schriever AFB
– United States Air Force Academy
Front Range Locations
Contract Risks
• Six Program Risks Identified
– Contractor cannot respond to EOY Surge at all 7
Installations
– Contractor fails to perform, mission could fail
– One Contractor fails, lack of competition
– Government pay too much/too little, cost fluctuations
– Material cost fluctuate faster than CCI can compensate
– Increased cost and less responsive at smaller installations
Specifications
• Draft Division 1 Discussion
• Installation Specifics
– Environmental
– Security
– Design Guides and FEPs
– Work-Arounds and Special Events
Contract Award
• Technical Evaluation
– Organizational Management
– Demonstration Project
• Past Performance Documentation
• Price Analysis and Trade-Offs
• Organizational Management Plan (Subfactor 1)
– Spec. Section 01 31 01
– One (1) hour contractor response time for each installation—contractors have the flexibility to move personnel as needed
• Key Personnel
– Program Manager
– Installation Construction Manager
– Job Foreman
– Quality Control Officer
Technical Capability
Technical Capability
• Demonstration Project (Subfactor 2)
– Proposal
– Design Assumptions/Interpretations
– Cost estimates will be generated using a RS
MEANS based cost estimating program
Past Performance
• Recency
– Within three (3) years of solicitation issuance
• Relevancy
– Similar scope, magnitude and complexity
– Multiple installations
• Quality
– Questionnaires, CCASS, PPIPRS, other sources
Price/Cost
• One single price factor will be developed on each proposal based on the proposed overall contractor coefficient multiplied by $200M
• Contractor coefficients for each installation will be a weighted average of the contractor coefficients for each CLIN
• Overall contractor coefficient will be a weighted average of the contractor coefficients for each installation
Coefficients
• Contract Line Item Numbering (CLIN)
– Secured/Non-Secured
– Standard Hours/Non-Standard Hours
– Under $750K/Over $750K
• Non-Prepriced Item CLIN
– Covers Contractors overhead and profit
• RS MEANS Guide
– Updated Annually
– City Cost Index updated Quarterly
Basis of Award
• Up to three technically acceptable proposals representing the best overall value to the government based on the total evaluated coefficient and the past performance confidence rating will be selected for award
• The government reserves the right to award a contract to other than the lowest priced offeror if the lowest priced offeror is judged to have a performance confidence assessment of ―Satisfactory Confidence‖ or lower. In that event, the Source Selection Authority shall make an integrated assessment best value award decision
Proposal Preparation
I n t e g r i t y - S e r v i c e - E x c e l l e n h e
• Time Line: RFP Estimated Release Date 18 June
– Pre-proposal Conference 10 days after release of RFP
– Past Performance Data will be required 15 days after
RFP release
– 45 calendar days to submit proposal to RFP
• Data Submission Limitations
– Identified in Sections L and M of the solicitation
– Is there enough capacity identified (page limitation), in order to submit a good proposal in accordance with the solicitation
Bonding
• Blanket Bonds - $8M estimated performance and payments bonds that will cover all installations
• Additional bonds required on task orders over
$750K
• Estimated Program Magnitude $150M - $300M
• Contractors must ensure they meet the bonding capacities
Contract Administration
• 21st Contracting Squadron Infrastructure Flight
Contracting Officer retains contract authority for the contract(s)
• Each installation Contracting Officer will have contract authority to solicit, negotiate, and administer project requirements at the task order level
• Fair Opportunity shall be provided for each Task Order at all installations unless the following exceptions apply
- Urgent requirement - Unique or Highly specialized
- Logical follow-on - Meet minimum guarantee
Project Oversight
• Contractor efforts will be monitored by Government QAE representatives
• Progress reports will be required for each task order
• Progress schedule requirements will be identified at the task order level
• Weekly meetings will be conducted with contractor and
Government representatives at installation level
• Contractor performance will be reported in Construction
Contractor Appraisal Support System (CCASS)
Questions and Comments?
Open Discussion
Thank
You!