01 57 20.00 10 Environmental Protection.pdf
PDF 121 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award Federal contract opportunity
- Solicitation number
- FA2517-08-R-5002
About this file
Specifications
View the file
Other files for this federal contract opportunity
Show all 50
Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SABER Solicitation FA2517-08-R-5002
01 57 20.00 10 - 1 02/09/09
SECTION 01 57 20.00 10
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.1 REFERENCES
1.1.1 The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. Unless otherwise noted, the latest published version and/or revision shall be used.
1.1.1.1 U.S. AIR FORCE (USAF)
a. AFI 32-1053 (1999) Pest Management Program
1.1.1.2 U.S. ARMY (DA)
a. DA AR 200-5 (1999) Pest Management
1.1.1.3 U.S. ARMY CORPS OF ENGINEERS (USACE)
a. EM 385-1-1 (2003) Safety -- Safety and Health Requirements
b. WETLAND MANUAL Corps of Engineers Wetlands Delineation Manual
Technical Report Y-87-1
1.1.1.4 U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
a. 33 CFR 328 Definitions of Waters of the United States
b. 40 CFR 152 - 186 Pesticide Programs
c. 40 CFR 260 Hazardous Waste Management System: General
d. 40 CFR 261 Identification and Listing of Hazardous Waste
e. 40 CFR 262 Standards Applicable to Generators of Hazardous Waste
f. 40 CFR 279 Standards for the Management of Used Oil
g. 40 CFR 302 Designation, Reportable Quantities, and Notification
h. 40 CFR 355 Emergency Planning and Notification
i. 40 CFR 68 Chemical Accident Prevention Provisions
j. 49 CFR 171 - 178 Hazardous Materials Regulations
1.2 DEFINITIONS
1.2.1 Environmental Pollution and Damage
1.2.1.1 Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter eco-logical balances of importance to human life; affect other species of importance to hu-mankind; or degrade the environment aesthetically, culturally and/or historically.
1.2.2 Environmental Protection
01 57 20.00 10 - 2 02/09/09
1.2.2.1 Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollu-tion and damage requires consideration of land, water, and air; biological and cultural re-sources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.
1.2.3 Contractor Generated Hazardous Waste
1.2.3.1 Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically con-sist of material brought on site by the Contractor to execute work, but are not fully con-sumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners, excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.
1.2.4 Installation Pest Management Coordinator
1.2.4.1 Installation Pest Management Coordinator (IPMC) is the individual officially designated by the Installation Commander to oversee the Installation Pest Management Program and the Installation Pest Management Plan.
1.2.5 Project Pesticide Coordinator
1.2.5.1 The Project Pesticide Coordinator (PPC) is an individual that resides at a Civil Works
Project office and that is responsible for oversight of pesticide application on Project grounds.
1.2.6 Land Application for Discharge Water
1.2.6.1 The term "Land Application" for discharge water implies that the Contractor must dis-charge water at a rate which allows the water to percolate into the soil. No sheeting ac-tion, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur. Land Application must be in compliance with all applicable Federal, State, and local laws and regulations.
1.2.7 Pesticide
1.2.7.1 Pesticide is defined as any substance or mixture of substances intended for preventing, de-stroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defo-liant or desiccant.
1.2.8 Pests
1.2.8.1 The term "pests" means arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, al-gae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.
1.2.9 Surface Discharge
1.2.9.1 The term "Surface Discharge" implies that the water is discharged with possible sheeting
01 57 20.00 10 - 3 02/09/09 action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "waters of the United States" and would require a permit to discharge water from the governing agency.
1.2.10 Waters of the United States
1.2.10.1 All waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR
328.
1.2.11 Wetlands
1.2.11.1 Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a preva-lence of vegetation typically adapted for life in saturated soil conditions. Wetlands gener-ally include swamps, marshes, and bogs. Official determination of whether or not an area is classified as a wetland must be done in accordance with the WETLAND MANUAL.
1.3 GENERAL REQUIREMENTS
1.3.1 Minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract.
Comply with all applicable environmental Federal, State, and local laws and regulations. Any delays resulting from failure to comply with environmental laws and regulations will be the
Contractor's responsibility.
1.4 SUBCONTRACTORS
1.4.1 Ensure compliance with this section by subcontractors.
1.5 PAYMENT
1.5.1 No separate payment will be made for work covered under this section. Payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor, and payment of all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and regulations are the Contractor's responsibility. All costs associated with this section must be included in the contract price.
1.6 SUBMITTALS
1.6.1 Government approval is required for submittals with a "G" designation; submittals not having a
"G" designation are for [Contractor Quality Control approval.] [information only.] When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
1.6.1.1 SD-01 Preconstruction Submittals
a. Environmental Protection Plan[; G][; G, [_____]]
(1) The environmental protection plan.
01 57 20.00 10 - 4 02/09/09
1.7 ENVIRONMENTAL PROTECTION PLAN
1.7.1 Prior to commencing construction activities or delivery of materials to the site, submit an
Environmental Protection Plan for review and approval by the Contracting Officer. The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction. Issues of concern must be defined within the Environmental Protection Plan as outlined in this section.
Address each topic at a level of detail commensurate with the environmental issue and required construction task(s). Topics or issues which are not identified in this section, but are considered necessary, must be identified and discussed after those items formally identified in this section.
Prior to submittal of the Environmental Protection Plan, meet with the Contracting Officer for the purpose of discussing the implementation of the initial Environmental Protection Plan; possible subsequent additions and revisions to the plan including any reporting requirements; and methods for administration of the Contractor's Environmental Plans. The Environmental Protection Plan must be current and maintained onsite by the Contractor.
1.7.1.1 Compliance
a. No requirement in this Section will relieve the Contractor of any applicable Federal, State, and local environmental protection laws and regulations. During Construction, the Contractor will be responsible for identifying, implementing, and submitting for approval any additional re-quirements to be included in the Environmental Protection Plan.
1.7.1.2 Contents
a. Include in the environmental protection plan, but not limit it to, the following :
(1) Name(s) of person(s) within the Contractor's organization who is(are) responsible for en-suring adherence to the Environmental Protection Plan .
(2) Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site, if applicable.
(3) Name(s) and qualifications of person(s) responsible for training the Contractor's envi-ronmental protection personnel.
(4) Description of the Contractor's environmental protection personnel training program.
(5) An erosion and sediment control plan which identifies the type and location of the ero-sion and sediment controls to be provided. The plan must include monitoring and report-ing requirements to assure that the control measures are in compliance with the erosion and sediment control plan, Federal, State, and local laws and regulations. A Storm Water
Pollution Prevention Plan (SWPPP) may be substituted for this plan.
(6) Drawings showing locations of proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, and stock-piles of excess or spoil materials including methods to control runoff and to contain mate-rials on the site.
(7) Traffic control plans including measures to reduce erosion of temporary roadbeds by con-struction traffic, especially during wet weather. Plan shall include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff.
(8) Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas including methods for protection of features to be preserved within autho-rized work areas.
01 57 20.00 10 - 5 02/09/09
(9) Drawing showing the location of borrow areas.
(10) Include in the Spill Control plan the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR
355, and/or regulated under State or Local laws and regulations. The Spill Control Plan supplements the requirements of EM 385-1-1 [and the [_____]]. Include in this plan, as a minimum:
(a) The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation. This individual will immediate-ly notify the Contracting Officer and [the local Fire Department] [Facility Fire Depart-ment] [Facility Response Personnel] [Facility Environmental Office] in addition to the legally required Federal, State, and local reporting channels (including the National Re-sponse Center 1-800-424-8802) if a reportable quantity is released to the environment.
Include in the plan a list of the required reporting channels and telephone numbers.
(b) The name and qualifications of the individual who will be responsible for implement-ing and supervising the containment and cleanup.
(c) Training requirements for Contractor's personnel and methods of accomplishing the training.
(d) A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified.
(e) The names and locations of suppliers of containment materials and locations of addi-tional fuel oil recovery, cleanup, restoration, and material-placement equipment availa-ble in case of an unforeseen spill emergency.
(f) The methods and procedures to be used for expeditious contaminant cleanup.
(11) A non-hazardous solid waste disposal plan identifying methods and locations for solid waste disposal including clearing debris and schedules for disposal.
(a) Identify any subcontractors responsible for the transportation and disposal of solid waste. Submit licenses or permits for solid waste disposal sites that are not a commer-cial operating facility.
(b) Evidence of the disposal facility's acceptance of the solid waste must be attached to this plan during the construction. Attach a copy of each of the Non-hazardous Solid Waste
Diversion Reports to the disposal plan. Submit the report for the previous quarter on the first working day after the first quarter that non-hazardous solid waste has been dis-posed and/or diverted (e.g. the first working day of January, April, July, and October).
(c) Indicate in the report the total amount of waste generated and total amount of waste di-verted in cubic meters (yards) or tons along with the percent that was diverted.
(d) A recycling and solid waste minimization plan with a list of measures to reduce con-sumption of energy and natural resources. Detail in the plan the Contractor's actions to comply with and to participate in Federal, State, Regional, and local government spon-sored recycling programs to reduce the volume of solid waste at the source.
(12) An air pollution control plan detailing provisions to assure that dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
(13) A contaminant prevention plan that: identifies potentially hazardous substances to be used on the job site; identifies the intended actions to prevent introduction of such mate-rials into the air, water, or ground; and details provisions for compliance with Federal, State, and local laws and regulations for storage and handling of these materials. In accordance with EM 385-1-1, a copy of the Material Safety Data Sheets (MSDS) and the
01 57 20.00 10 - 6 02/09/09 maximum quantity of each hazardous material to be onsite at any given time must be included in the contaminant prevention plan. Update the plan as new hazardous materials are brought onsite or removed from the site.
(14) A waste water management plan that identifies the methods and procedures for manage-ment and/or discharge of waste waters which are directly derived from construction activities, such as concrete curing water, clean-up water, dewatering of ground water, dis-infection water, hydrostatic test water, and water used in flushing of lines. If a settling/retention pond is required, the plan must include the design of the pond including drawings, removal plan, and testing requirements for possible pollutants. If land applica-tion will be the method of disposal for the waste water, the plan must include a sketch showing the location for land application along with a description of the pretreatment me-thods to be implemented. If surface discharge will be the method of disposal, include a copy of the permit and associated documents as an attachment prior to discharging the waste water. If disposal is to a sanitary sewer, the plan must include documentation that the Waste Water Treatment Plant Operator has approved the flow rate, volume, and type of discharge.
(15) A historical, archaeological, cultural resources biological resources and wetlands plan that defines procedures for identifying and protecting historical, archaeological, cultural resources, biological resources and wetlands known to be on the project site: and/or iden-tifies procedures to be followed if historical archaeological, cultural resources, biological resources and wetlands not previously known to be onsite or in the area are discovered during construction. Include in the plan methods to assure the protection of known or discovered resources, identifying lines of communication between Contractor personnel and the Contracting Officer.
(16) Include and update a pesticide treatment plan, as information becomes available. Include in the plan: sequence of treatment, dates, times, locations, pesticide trade name, EPA reg-istration numbers, authorized uses, chemical composition, formulation, original and applied concentration, application rates of active ingredient (i.e. pounds of active ingre-dient applied), equipment used for application and calibration of equipment. Federal, State, Regional and Local pest management record keeping and reporting requirements as well as any additional Installation Project Office specific requirements are the Contrac-tor's responsibility in conformance with [DA AR 200-5 Pest Management, Chapter 2, Section III "Pest Management Records and Reports"] [AFI 32-1053 Sections 3.4.13 and
3.4.14] for data required to be reported to the Installation.
1.7.1.3 Appendix
a. Attach to the Environmental Protection Plan, as an appendix, copies of all environmental per-mits, permit application packages, approvals to construct, notifications, certifications, reports, and termination documents.
1.8 PROTECTION FEATURES
1.8.1 This paragraph supplements the Contract Clause PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS. Prior to start of any onsite construction activities, the Contractor and the Contracting Officer will make a joint condition survey. Immediately following the survey, the Contractor will prepare a brief report including a plan describing the features requiring protection under the provisions of the Contract
Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as
01 57 20.00 10 - 7 02/09/09 applicable. This survey report will be signed by both the Contractor and the Contracting Officer upon mutual agreement as to its accuracy and completeness. The Contractor must protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference which their preservation may cause to the work under the contract.
1.9 SPECIAL ENVIRONMENTAL REQUIREMENTS
1.9.1 Comply with the special environmental requirements listed here [_____] and attached at the end of this section.
1.10 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS
1.10.1 Any deviations from the drawings, plans and specifications, requested by the Contractor and which may have an environmental impact, will be subject to approval by the Contracting Officer and may require an extended review, processing, and approval time. The Contracting Officer reserves the right to disapprove alternate methods, even if they are more cost effective, if the
Contracting Officer determines that the proposed alternate method will have an adverse environmental impact.
1.11 NOTIFICATION
1.11.1 The Contracting Officer will notify the Contractor in writing of any observed noncompliance with Federal, State or local environmental laws or regulations, permits, and other elements of the
Contractor's Environmental Protection plan. After receipt of such notice, the Contractor will inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted or equitable adjustments allowed for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the contract, or in accordance with the
Federal Acquisition Regulation or Federal Law.
1.12 HTRW PERIMETER AIR MONITORING
1.12.1 For the protection of public health, monitor and control contaminant emissions to the air from
HTRW remedial action area sources to minimize short term risks that might be posed to the community during implementation of the remedial alternative in accordance with the following.
1.12.1.1 Perimeter Air Contaminant of Concern
a. [_____]
1.12.1.2 Time Averaged Perimeter Action Levels
a. [_____]
(1) Concentration [_____]
(2) Time [_____]
b. Perimeter Sampling/Monitoring Location[s]
(1) [_____]
c. Monitoring Instruments/Sampling and Analysis Methods
01 57 20.00 10 - 8 02/09/09
(1) [_____]
d. Staffing
(1) [_____]
1.13 RELATED REQUIREMENTS
1.13.1 The information provided in this section applies to all other specification sections that are applicable to project.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS
3.1.1 [This paragraph supplements the Contractor's responsibility under the contract clause "PERMITS
AND RESPONSIBILITIES" to the extent that the Government has obtained the [_____].
Comply with the terms and conditions of the attached [_____] at the end of this section.]
[Obtaining and complying with all environmental permits and commitments required by Federal, State, Regional, and local environmental laws and regulations is the Contractor's responsibility.]
3.2 LAND RESOURCES
3.2.1 Confine all activities to areas defined by the drawings and specifications. Identify any land resources to be preserved within the work area prior to the beginning of any construction. Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and land forms without approval, except in areas indicated on the drawings or specified to be cleared. Ropes, cables, or guys will not be fastened to or attached to any trees for anchorage unless specifically authorized. Provide effective protection for land and vegetation resources at all times, as defined in the following subparagraphs. Remove stone, soil, or other materials displaced into uncleared areas.
3.2.1.1 Work Area Limits
a. Mark the areas that need not be disturbed under this contract prior to commencing construction activities. Mark or fence isolated areas within the general work area which are not to be dis-turbed. Protect monuments and markers before construction operations commence. Where construction operations are to be conducted during darkness, any markers must be visible in the dark. The Contractor's personnel must be knowledgeable of the purpose for marking and/or protecting particular objects.
3.2.1.2 Landscape
a. Trees, shrubs, vines, grasses, land forms and other landscape features indicated and defined on the drawings to be preserved must be clearly identified by marking, fencing, or wrapping with boards, or any other approved techniques. Restore landscape features damaged or destroyed during construction operations outside the limits of the approved work area.
3.2.1.3 Erosion and Sediment Controls
01 57 20.00 10 - 9 02/09/09
a. Providing erosion and sediment control measures in accordance with Federal, State, and local laws and regulations is the Contractor's responsibility. The erosion and sediment controls se-lected and maintained by the Contractor shall be such that water quality standards are not vi-olated as a result of construction activities. The area of bare soil exposed at any one time by construction operations should be kept to a minimum. Construct or install temporary and per-manent erosion and sediment control best management practices (BMPs) [as indicated on the drawings] [as specified in Section 01 57 23.00 10 STORM WATER POLLUTION
PREVENTION MEASURES]. BMPs may include, but not be limited to, vegetation cover, stream bank stabilization, slope stabilization, silt fences, construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation ba-sins. [The Contractor's best management practices must also be in accordance with the [_____]
National Pollutant Discharge Elimination System (NPDES) Storm Water Pollution Prevention
Plan (SWPPP) which may be reviewed at the [_____] Environmental Office.] Remove any temporary measures after the area has been stabilized.
3.2.1.4 Contractor Facilities and Work Areas
a. Place field offices, staging areas, stockpile storage, and temporary buildings in areas designated on the drawings or as directed by the Contracting Officer. Temporary movement or relocation of Contractor facilities will be made only when approved. Erosion and sediment controls must be provided for onsite borrow and spoil areas to prevent sediment from entering nearby waters.
Temporary excavation and embankments for plant and/or work areas must be controlled to pro-tect adjacent areas.
3.3 WATER RESOURCES
3.3.1 Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated. For construction activities immediately adjacent to impaired surface waters, the
Contractor must be capable of quantifying sediment or pollutant loading to that surface water when required by State or Federally issued Clean Water Act permits.
3.3.1.1 Cofferdams, Diversions, and Dewatering Operations
a. Construction operations for dewatering, removal of cofferdams, tailrace excavation, and tunnel closure will be controlled at all times to maintain compliance with existing State water quality standards and designated uses of the surface water body. Comply with [the State of [_____] water quality standards and anti-degradation provisions] [and] [the Clean Water Act Section
404, Nation Wide Permit No. [_____]].
3.3.1.2 Stream Crossings
a. Stream crossings must allow movement of materials or equipment without violating water pol-lution control standards of the Federal, State, and local governments.[ Construction of stream crossing structures will be in compliance with Clean Water Act Section 404, Nation Wide Per-mit No. [_____].]
3.3.1.3 Wetlands
a. Do not enter, disturb, destroy, or allow discharge of contaminants into any wetlands[.] [except as authorized herein.] The protection of wetlands shown on the drawings in accordance with paragraph ENVIRONMENTAL PERMITS, REVIEWS, AND APPROVALS is the Contrac-tor's responsibility. Authorization to enter specific wetlands identified will not relieve the Con-tractor from any obligation to protect other wetlands within, adjacent to, or in the vicinity of the
../01%2057%2023.00%2010.doc
01 57 20.00 10 - 10 02/09/09 construction site and associated boundaries.]
3.4 AIR RESOURCES
3.4.1 Equipment operation, activities, or processes will be in accordance with all Federal and State air emission and performance laws and standards.
3.4.1.1 Particulates
a. Dust particles; aerosols and gaseous by-products from construction activities; and processing and preparation of materials, such as from asphaltic batch plants; must be controlled at all times, including weekends, holidays and hours when work is not in progress. Maintain excava-tions, stockpiles, haul roads, permanent and temporary access roads, plant sites, spoil areas, borrow areas, and other work areas within or outside the project boundaries free from particu-lates which would cause the Federal, State, and local air pollution standards to be exceeded or which would cause a hazard or a nuisance. Sprinkling, chemical treatment of an approved type, baghouse, scrubbers, electrostatic precipitators or other methods will be permitted to control particulates in the work area. Sprinkling, to be efficient, must be repeated to keep the disturbed area damp at all times. Provide sufficient, competent equipment available to accomplish these tasks. Perform particulate control as the work proceeds and whenever a particulate nuisance or hazard occurs. Comply with all State and local visibility regulations.
3.4.1.2 Odors
a. Odors from construction activities must be controlled at all times. The odors must be in com-pliance with State regulations and/or local ordinances and may not constitute a health hazard.
3.4.1.3 Sound Intrusions
a. Keep construction activities under surveillance and control to minimize environment damage by noise. Comply with the provisions of the State of [_____] rules.
3.4.1.4 Burning
a. [Burning is prohibited on the Government premises.] [Burning will not be allowed on the project site unless specified in other sections of the specifications or authorized in writing by the Contracting Officer. The specific time, location, and manner of burning will be subject to approval.] [Confine fires to a closed vessel, guarded at all times, and under constant surveil-lance until contents have burned out or have been extinguished.] [Burning must completely re-duce the materials to ashes.]
3.5 HTRW AIR EMISSION CONTROL
3.5.1 Implement the following control(s) to meet or exceed performance levels identified in HTRW
PERIMETER AIR MONITORING.
3.5.1.1 Air Emission Control to Meet Action Levels
a. [_____]
3.5.1.2 Excavation/Production/Processing Rate Reduction
a. [_____]
3.5.1.3 Exposed Surface Area Reduction
01 57 20.00 10 - 11 02/09/09
a. [_____]
3.6 CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL
3.6.1 Disposal of wastes will be as directed below, unless otherwise specified in other sections and/or shown on the drawings.
3.6.1.1 Solid Wastes
a. Place solid wastes (excluding clearing debris) in containers which are emptied on a regular schedule. Handling, storage, and disposal must be conducted to prevent contamination. Em-ploy segregation measures so that no hazardous or toxic waste will become co-mingled with solid waste. [Transport solid waste off Government property and dispose of it in compliance with Federal, State, and local requirements for solid waste disposal. A Subtitle D RCRA per-mitted landfill will be the minimum acceptable offsite solid waste disposal option. Verify that the selected transporters and disposal facilities have the necessary permits and licenses to oper-ate.] [Waste materials will be hauled to the Government landfill site [shown on the drawings]
[designated by the Contracting Officer].] [Comply with [site procedures] [Federal, State, and local laws and regulations] pertaining to the use of landfill areas.]
3.6.1.2 Chemicals and Chemical Wastes
a. Dispense chemicals ensuring no spillage to the ground or water. Perform and document period-ic inspections of dispensing areas to identify leakage and initiate corrective action. This docu-mentation will be periodically reviewed by the Government. Collect chemical waste in corro-sion resistant, compatible containers. Collection drums must be monitored and removed to a staging or storage area when contents are within 150 mm (6 inches) of the top. Wastes will be classified, managed, stored, and disposed of in accordance with Federal, State, and local laws and regulations.
3.6.1.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials
a. Hazardous wastes are defined in 40 CFR 261, or are as defined by applicable State and local regulations. Hazardous materials are defined in 49 CFR 171 - 178. At a minimum, manage and store hazardous waste in compliance with 40 CFR 262 [in accordance with the [Installa-tion] [Project Office] hazardous waste management plan]. Take sufficient measures to prevent spillage of hazardous and toxic materials during dispensing. Segregate hazardous waste from other materials and wastes, protect it from the weather by placing it in a safe covered location, and take precautionary measures such as berming or other appropriate measures against acci-dental spillage. Storage, describing, packaging, labeling, marking, and placarding of hazardous waste and hazardous material in accordance with 49 CFR 171 - 178, State, and local laws and regulations is the Contractor's responsibility. Transport Contractor generated hazardous waste off Government property within [60][_____] days in accordance with the Environmental Pro-tection Agency and the Department of Transportation laws and regulations. Dispose of hazard-ous waste in compliance with Federal, State and local laws and regulations. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer [and the Facility
Environmental Office]. Cleanup and cleanup costs due to spills are the Contractor's responsi-bility. [The disposition of Contractor generated hazardous waste and excess hazardous mate-rials are the Contractor's responsibility.] [Coordinate the disposition of hazardous waste with the [Facility's] [Project Office's] Hazardous Waste Manager and the Contracting Officer.]
3.6.1.4 Fuel and Lubricants
a. Storage, fueling and lubrication of equipment and motor vehicles must be conducted in a man-
01 57 20.00 10 - 12 02/09/09 ner that affords the maximum protection against spill and evaporation. Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regula-tions. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed in accordance with 40 CFR 279, State, and local laws and regulations. [Storage of fuel on the project site is not allowed. Fuel must be brought to the project site each day that work is performed.] [Storage of fuel on the project site will be in ac-cordance with all Federal, State, and local laws and regulations.]
3.6.1.5 Waste Water
a. Disposal of waste water will be as specified below:
(1) Waste water from construction activities, such as onsite material processing, concrete curing, foundation and concrete clean-up, water used in concrete trucks, forms, etc. will not be allowed to enter water ways or to be discharged prior to being treated to remove pollutants. Dispose of the construction related waste water [off-Government property in accordance with all Federal, State, Regional and Local laws and regulations] [by collect-ing and placing it in a retention pond where suspended material can be settled out and/or the water can evaporate to separate pollutants from the water.] The site for the retention pond must be coordinated and approved with the Contracting Officer. The residue left in the pond prior to completion of the project will be removed, tested, and disposed off-
Government property in accordance with Federal, State, and local laws and regulations.
The area must be backfilled to the original grade, top-soiled and seeded/sodded. [Test the water in the retention pond for [_____] and have the results reviewed and approved by the Contracting Officer, prior to being discharged or disposed off-Government property].]
(2) For discharge of ground water, the Contractor will [obtain a State or Federal permit spe-cific for pumping and discharging ground water prior to surface discharging.] [surface discharge in accordance with all Federal, State, and local laws and regulations.] [surface discharge in accordance with the requirements of the NPDES or State STORM WATER
DISCHARGES FROM CONSTRUCTION SITES permit.] [land apply on the project site in accordance with all Federal, State, Regional, and/or Local laws and regulations for pumping and land applying ground water.]
(3) Water generated from the flushing of lines after [disinfection or disinfection in conjunc-tion with hydrostatic testing] [hydrostatic testing] will be [land applied in accordance with all Federal, State, and local laws and regulations for land application] [discharged into the sanitary sewer with prior approval and/or notification to the Waste Water Treat-ment Plant's Operator.]
3.7 RECYCLING AND WASTE MINIMIZATION
3.7.1 Participate in State and local government sponsored recycling programs. The Contractor [is further encouraged to minimize solid waste generation throughout the duration of the project.]
[must participate in the following recycling and waste minimization activities to divert non-hazardous solid waste:[_____].]
3.8 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT
3.8.1 Maintain an inventory of non-hazardous solid waste diversion and disposal of construction and demolition debris. Submit a report to [_____] through the Contracting Officer on the first working day after each fiscal year quarter, starting the first quarter that non-hazardous solid waste has been generated. Include the following in the report:
01 57 20.00 10 - 13 02/09/09
3.8.1.1 Construction and Demolition (C&D) Debris Disposed = [_____] in cubic meters ( cubic yards or tons), as appropriate.
3.8.1.2 Construction and Demolition (C&D) Debris Recycled = [_____] in cubic meters (cubic yards or tons), as appropriate.
3.8.1.3 Total C&D Debris Generated = [_____] in cubic meters (cubic yards or tons), as appropri-ate.
3.8.1.4 Waste Sent to Waste-To-Energy Incineration Plant (This amount should not be included in the recycled amount) = [_____] in cubic meters (cubic yards or tons), as appropriate.
3.9 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
3.9.1 [Existing historical, archaeological, and cultural resources within the Contractor's work area are shown on the drawings. Protect these resources and be responsible for their preservation during the life of the Contract.] If during excavation or other construction activities any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found, all activities that may damage or alter such resources will be temporarily suspended.
Resources covered by this paragraph include but are not limited to: any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits; rock or coral alignments, pavings, wall, or other constructed features; and any indication of agricultural or other human activities. Upon such discovery or find, immediately notify the Contracting Officer so that the appropriate authorities may be notified and a determination made as to their significance and what, if any, special disposition of the finds should be made. Cease all activities that may result in impact to or the destruction of these resources. Secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources.
3.10 BIOLOGICAL RESOURCES
3.10.1 Minimize interference with, disturbance to, and damage to fish, wildlife, and plants including their habitat. The protection of threatened and endangered animal and plant species, including their habitat, is the Contractor's responsibility in accordance with Federal, State, Regional, and local laws and regulations.
3.11 INTEGRATED PEST MANAGEMENT
3.11.1 In order to minimize impacts to existing fauna and flora, the Contractor through the Contracting
Officer, must coordinate with the Installation Pest Management Coordinator (IPMC) Project
Pesticide Coordinator (PPC) at the earliest possible time prior to pesticide application. Discuss integrated pest management strategies with the [IPMC] [PPC] and receive concurrence from the
[IPMC] [PPC] through the COR prior to the application of any pesticide associated with these specifications. Installation Project Office Pest Management personnel will be given the opportunity to be present at all meetings concerning treatment measures for pest or disease control and during application of the pesticide. [For termiticide requirements see Section 31 31
16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL.] The use and management of pesticides are regulated under 40 CFR 152 – 186.
3.11.1.1 Pesticide Delivery and Storage
a. Deliver pesticides to the site in the original, unopened containers bearing legible labels indicat-ing the EPA registration number and the manufacturer's registered uses. Store pesticides ac-
01 57 20.00 10 - 14 02/09/09 cording to manufacturer's instructions and under lock and key when unattended.
3.11.1.2 Qualifications
a. For the application of pesticides, use the services of a subcontractor whose principal business is pest control. The subcontractor must be licensed and certified in the state where the work is to be performed.
3.11.1.3 Pesticide Handling Requirements
a. Formulate, treat with, and dispose of pesticides and associated containers in accordance with label directions and use the clothing and personal protective equipment specified on the labe-ling for use during all phases of the application. Furnish Material Safety Data Sheets (MSDS) for all pesticide products.
3.11.1.4 Application
a. Apply pesticides using a State Certified Pesticide Applicator in accordance with EPA label re-strictions and recommendation. The Certified Applicator must wear clothing and personal pro-tective equipment as specified on the pesticide label. The Contracting Officer will designate locations for water used in formulating. Do not allow the equipment to overflow. All equip-ment must be inspected for leaks, clogging, wear, or damage and repaired prior to application of pesticide.
3.12 Previously Used Equipment
3.12.1 Clean all previously used construction equipment prior to bringing it onto the project site. Ensure that the equipment is free from soil residuals, egg deposits from plant pests, noxious weeds, and plant seeds. Consult with the USDA jurisdictional office for additional cleaning requirements.
3.13 Maintenance of Pollution Facilities
3.13.1 Maintain permanent and temporary pollution control facilities and devices for the duration of the contract or for that length of time construction activities create the particular pollutant.
3.14 Military Munitions
3.14.1 In the event military munitions, as defined in 40 CFR 260, are discovered or uncovered, the
Contractor will immediately stop work in that area and immediately inform the Contracting
Officer.
3.15 Training of Contractor Personnel
3.15.1 The Contractor's personnel must be trained in all phases of environmental protection and pollution control. Conduct environmental protection/pollution control meetings for all personnel prior to commencing construction activities. Additional meetings must be conducted for new personnel and when site conditions change. Include in the training and meeting agenda: methods of detecting and avoiding pollution; familiarization with statutory and contractual pollution standards; installation and care of devices, vegetative covers, and instruments required for monitoring purposes to ensure adequate and continuous environmental protection/pollution control; anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants;
recognition and protection of archaeological sites, artifacts, wetlands, and endangered species and
01 57 20.00 10 - 15 02/09/09 their habitat that are known to be in the area.
3.16 CONTAMINATED MEDIA MANAGEMENT
3.16.1 Manage contaminated environmental media consisting of, but not limited to, ground water, soils, and sediments in accordance with Section [_____].
3.17 POST CONSTRUCTION CLEANUP
3.17.1 The Contractor will clean up all areas used for construction in accordance with Contract Clause:
"Cleaning Up". Unless otherwise instructed in writing by the Contracting Officer, obliterate all signs of temporary construction facilities such as haul roads, work area, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other vestiges of construction prior to final acceptance of the work. The disturbed area must be graded, filled and the entire area seeded unless otherwise indicated.
END OF SECTION 01 57 20.00 10