Exhibit B - Project Plans.docx

DOCX document 16 KB Posted

Attached to
TRANSITIONAL LIVING FACILITY HVAC REPLACEMENT
Solicitation number
ARFQ 0512 WSH2700000005 3
Issued by
Kanawha County, West Virginia

About this file

This is an Exhibit B project plan document for a Transitional Living Facility HVAC Replacement project in West Virginia. The project requires the contractor to remove existing HVAC equipment and replace it with specified Trane units: Model 5TXCC009AS3HCA air handler with Model 5TTR5036A1 condensing unit, and two installations of Model 5TXCD010AS3HCA air handlers paired with Model 5TTR5060A1 condensing units. All specified equipment allows for "or equal" substitutions, which must be submitted with supporting data for approval or disapproval during the question and answer period. Additionally, the contractor must remove all existing ductwork and install a combination of insulated rigid round duct and flexible ductwork, with flexible supply duct limited to a maximum of 5 feet from the main trunk line. All rigid and flexible duct must match the size of existing duct, and rigid duct insulation must comply with the specifications outlined in Exhibit C.

The contractor is also responsible for connecting the new units to the existing control system and testing for proper operation. No specific pricing terms, contract duration, award dates, site visit requirements, or bidder conference details are provided in this project plan document.

View the file

Other files

File Type Posted
Bid Bond Instructions.pdf PDF
Addendum #1.pdf PDF
WV73 Drug Free Affidavit.pdf PDF
Purchasing Affidavit.pdf PDF
HIPPA-BAA.pdf PDF
OSAFederalFundsContractClauseAddendum.pdf PDF
Addendum #2.pdf PDF
Final_ARFQ_0512_WSH2700000005_1_WV_ARFQ_FORM.PDF PDF
WV36.pdf PDF
Exhibit A - Pricing Page.xlsx XLSX spreadsheet
Exhibit C.pdf PDF
BondLaborMat.pdf PDF
WV43.pdf PDF
Final_ARFQ_0512_WSH2700000005_2_WV_ARFQ_FORM.PDF PDF
WV72 Drug Free Coversheet.pdf PDF
Bid Bond Form.pdf PDF
TCA.pdf PDF
RFQ Specifications.docx DOCX document
BondPerform.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B – PROJECT PLANS

· HVAC Replacement Specifications

· Contractor shall remove existing HVAC equipment and replace the units with the following:

· Trane Model 5TXCC009AS3HCA “or equal” Air Handler/DX and Trane Model 5TTR5036A1 Condensing unit “or equal”.

· Trane Model 5TXCD010AS3HCA “or equal” Air Handler/DX and Trane 5TTR5060A1 Condensing Unit “or equal”.

· Trane Model 5TXCD010AS3HCA “or equal” Air Handler/DX and Trane Model 5TTR5060A1 Condensing unit “or equal”.

“Or equal” shall be presented with data to be approved or disapproved during the question and answer period.

· Contractor shall remove all existing duct work and replace it with a combination of insulated rigid round duct and flexible duct work.

· All flexible supply duct shall be limited to maximum of 5 feet from the main trunk line.

· All rigid and flexible duct shall match size of existing duct.

· All rigid duct shall be insulated in accordance with Duct Insulation schedule Exhibit C.

· Contractor shall connect new units to existing control system and test for proper operation.