Exhibit_B_Green_Infrastructure_Assets.pdf
PDF 34 KB Posted
- Attached to
- Landscaping and Grounds Maintenance Services
- Solicitation number
- 2026-RFP-00070
- Issued by
- San Mateo County, California
About this file
The document is a detailed table of Green Infrastructure Sites for multiple county facilities, specifically tracking quantities of bioretention areas, flow-through planters, tree well filters, and pervious pavement across different locations. The sites are categorized into three main groups: FMO (Facilities Management Operations) Green Infrastructure Sites, Engineering Green Infrastructure Sites, and Health & Hospital Green Infrastructure Sites. Key locations include Maple Street Correctional Center, Navigation Center, ROC, Coyote Point Animal Shelter, North Fair Oaks Parking Lot, Radio Shop, Parking Structure, County Office Building, Middlefield Rd Project, Safe Route to Schools, Fair Oaks Medical Clinic, and Serenity House.
The table provides specific infrastructure quantities for each site, with the Maple Street Correctional Center having the most extensive green infrastructure implementation, featuring 11 bioretention areas and 7 flow-through planters. The Middlefield Rd Project stands out in the Engineering Green Infrastructure Sites with 17 bioretention areas and 6 tree well filters. Most sites have zero quantities in at least one category, indicating a tailored approach to green infrastructure implementation based on site-specific needs and constraints. The document appears to be part of a comprehensive infrastructure improvement plan focusing on sustainable water management and environmental design across various county facilities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FMO Green Infrastructure Sites Bioretention Area
Quantity Flow-Through Planter
Quantity Tree Well
Filter Quantity
Maple Street Correctional Center 11 7 0
Navigation Center 5 0 0
ROC 4 0 0
Coyote Point Animal Shelter 3 0 0 North Fair Oaks Parking Lot (Middlefield Rd Parking Lot)
3 0 0
Radio Shop 2 0 0 Parking Structure 2 2 0 0 County Office Building 3 14 0 0
Engineering Green Infrastructure Sites
Bioretention Area Quantity
Flow-Through Planter Quantity
Tree Well Filter Quantity
Middlefield Rd Project 17 0 6 Safe Route to Schools 1 0 0
Health & Hospital Green Infrastructure Sites
Bioretention Area Quantity
Flow-Through Planter Quantity
Tree Well Filter Quantity
Fair Oaks Medical Clinic 1 1 0 Serenity House 4 0 0
Pervious Pavement Quantity
Pervious Pavement Quantity
Pervious Pavement Quantity
File details come from the government source that posted it. Updated .