EXHIBIT A1 - TECHNICAL REQUIREMENTS.pdf
PDF 1 MB Posted
- Solicitation number
- DR135523
- Issued by
- California
About this file
Summary
This is a Technical Requirements Exhibit for a state and local contract opportunity issued by the Los Angeles County Metropolitan Transportation Authority (LACMTA or Metro) for the procurement of one hi-rail backhoe with trailer and ballast tamper (Specification Number MA-24-31). The primary product is a John Deere model 710-P or approved equal four-wheel drive backhoe with a fully enclosed cab, ROPS/FOPS protection, minimum 4.5L 150 horsepower diesel engine, and EPA Tier 4 Final and CARB compliance. The equipment must include a multipurpose 4-in-1 loader bucket, multiple backhoe bucket configurations (24-inch with teeth, 36-inch without teeth, 8-inch railroad cribbing bucket, and 18-inch pavement removal bucket), and a ballast tamper system with specific hydraulic requirements. The unit shall be mounted on a Trail King TK40LP or approved equal trailer with 40,000-pound payload capacity, dual axles rated at 22,500 pounds each, and a minimum 26-foot deck length. Sealed bids must be submitted via email to anayag@metro.net by 10:00 a.m. PDT on August 4, 2026. Questions and requests for approved equals must be submitted by 2:00 p.m. PDT on July 10, 2026. Award will be based on best value considering price, lead time, and past performance.
The specification document establishes comprehensive technical requirements including hi-rail gear specifications designed to meet Metro's light rail system requirements with a 100-foot radius curvature, maximum 14-foot height, 8-foot 6-inch width, and 28,000-pound maximum vertical load capacity. Bidders must provide complete compliance responses for all highlighted yellow line items, including warranty terms of two years or 2,000 hours minimum for the tractor and manufacturer's standard warranties for the trailer, hi-rail gear, and ballast tamper. The successful bidder must provide three copies each of operator manuals, maintenance and repair manuals, and electrical schematics at pre-delivery inspection and conduct onsite operator and maintenance training for up to ten Metro personnel within thirty calendar days after final acceptance. All warranty work shall include zero deductible, and warranty service must be available within the Los Angeles area through local dealers if the bidder is located more than 60 miles from Los Angeles. Track testing and final acceptance will be conducted by Metro personnel on Metro rail property at no additional cost to the agency.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A1 – TECHNICAL REQUIREMENTS
Specification Number MA-24-31 Hi-rail Backhoe with Trailer and Ballast Tamper
May 26, 2026
Bidder: _______________________________ Specification No. MA-24-31
TECHNICAL REQUIREMENTS
HI-RAIL BACKHOE WITH TRAILER AND BALLAST TAMPER
Instructions for completing this form.
A. State your company name in the “Bidder” field above.
B. Submit your Bid with column “C” COMPLETELY FILLED OUT. In order to be considered responsive to the technical requirements, Bidder must respond to ALL specified line items highlighted in yellow below by stating “In compliance”. For minimum or maximum value requirements, indicate value offered. “In compliance” shall be part of your response, for example:
A B C
Bucket Rotation 190 deg.
As specified, 190 deg.
Fuel Tank 45 gallons minimum
In compliance, 46 gallons
A. PLEASE REFER TO LOI-10 FOR DETAILS RELATED TO THE APPROVED EQUALS
(GOODS) PROCESS. BIDDERS SEEKING LACMTA’S AUTHORIZATION FOR
SUBSTITUTION OF GOODS OR PROCESSES, INCLUDING THE SPECIFICATIONS
BELOW, MUST SUBMIT A WRITTEN REQUEST FOR AN “OR EQUAL” SUBSTITUTION
TOGETHER WITH DATA SUBSTANTIATING THE BIDDER’S REPRESENTATION THAT
THE NON-SPECIFIED ITEM IS OF EQUAL QUALITY TO THE ITEM SPECIFIED.
B. By submitting your Bid, you agree to supply an item(s) in full compliance with this specification.
DO NOT modify columns A and B as it may render your Bid to be non-responsive. PLEASE
REFER TO THE IFB DOCUMENT LOI-10 APPROVED EQUALS (GOODS) AND LOI-14
CRITICAL DATES FOR ADDITIONAL DETAILS AND DEADLINE TO SUBMIT REQUESTS
FOR APPROVED EQUALS.
1.0 Features
# A B C Complete This
Column
1.1
Model John Deere model 710-P or approved equal meeting all performance requirements herein.
Please state make and model offered.
1.2
Drive 4-wheel drive.
1.3
Cab Fully enclosed.
1.4
Operator Station
Roll and falling over protection system (ROPS/FOPS) design.
1.5
Turning Radius
(on-road)
180 inches maximum.
1.6
Wheelbase 102 inches maximum.
1.7
Engine Minimum 4.5L, 150 hp Gross Peak Power at 2, 240 rpm.
Please state the engine model, capacity and power rating.
1.8
Digging Depth
Extended backhoe 260 inches nominal.
1.9
Bucket Rotation
190 deg. nominal.
1.10
Loader Lift Capacity
Loader lifting capacity to full height shall be not less than 9,500 lb.
Please state loader lift capacity.
1.11
Height Overall height to top of cab shall be 117 inches maximum.
1.12
Engine Cooling System
Engine cooling system must be capable of maintaining operating temperature in reverse operation.
1.13 Engine
Exhaust System
Engine and exhaust aftertreatment shall be fully compliant with EPA Tier 4 Final and CARB requirements for off-road diesel equipment.
1.14
Alternator 160 amps. Minimum.
1.15
Transmission Manufacturer’s standard.
1.16
Reversing Gearbox
Manufacturer’s standard, 3 or 4 speed synchromesh with hydraulically actuated clutches and electric forward/reverse control.
1.17
Main Battery 12V, Group 31, Heavy duty starting system with 950 minimum CCA rating.
1.18
Body Construction
All steel unitized mainframe, heavy-duty steel plate.
1.19
Fuel Type Diesel.
1.20
Fuel Tank 45 gallons minimum.
1.21
Seats Heavy-duty with spring suspension, vinyl, manufacturer’s darkest standard color.
1.22
Brakes Service Brakes: Power assisted, hydraulically actuated.
Parking Brakes: spring applied hydraulically released.
1.23
Steering Power assisted.
1.24
Differential Lock
Push button or foot actuated hydraulically engaged mechanical lock.
1.25
Exterior Color Manufacturer’s standard, safety yellow color.
1.26
Loader Bucket
Multipurpose, 4 in 1 type. 92” nominal.
1.27 Backhoe
Bucket
▪ 24” with teeth.
▪ 36” with no teeth.
▪ 8” railroad cribbing bucket for digging between railroad ties.
▪ 18” pavement removal bucket with side sheets cut out to permit the teeth to slide under the edge of a concrete slab and lift it onto a truck or spoil pile.
1.28
Dipper Cribs Serrated teeth located on the dipper stick used for picking up items.
1.29
Hydraulic
Hydraulic system shall provide sufficient flow and pressure to operate all specified attachments and ballast tamper functions continuously.
1.30 Hydraulic
requirement for Ballast Tamper
• Drain line for the motor circuit required.
• Circuit 1-Vibrator motor Type: Uni-directional + case drain line required.
Case drain line size min -08 size (1/2” hose) Flow GPM/PSI (min/max): 18-21 / 3000
• Circuit 2-Tine Squeeze Arms Type: Bi-directional circuit for open/close function Case drain line size min -08 size (1/2” hose) Flow GPM/PSI (min/max): 10-15 / 3000
• Circuit 3-Rotation Type: Electro-hydraulic Requires installation of wire cable kit provided for operating solenoid on diverter valve Valve mounted on tamper work head
• Jumper hose lines from attachment bulkhead to machine lines with disconnects
1.31
Tires All tires shall be compatible in size and rating with the vehicle and its maximum rated load range.
Full size spare tire with its wheel shall be provided. This shall include one spare tire for front and one for rear, if different. Mini-spare tires will not be acceptable.
1.32
Lights ▪ Whelen, Super-LED beacon strobe light, L360 series, model L31HAF or approved equal, with light protection cage mounted in the center of roof cab.
Four work lights, two in front and two in rear. Pioneer Floodlight- 75 watts LED package with 6,000 lumens.
1.33
Keys The vehicle shall be provided with a minimum of six
(6) sets of keys.
Duplicate keys shall be provided with OEM parts and can be made by local labor. However, non-OEM key parts will not be acceptable.
1.34
Backhoe Coupler Type
Mechanical type coupler shall be provided to allow quick change out of the backhoe attachments.
2.0 Accessories
Complete This
2.1
Mirrors Outside right and left rear view mirrors. Factory standard.
2.2
Back-Up Alarm
Preco model CEO 45AA Solid state or approved equal.
2.3
Fire Extinguisher
5 lb. rechargeable fire extinguisher, ABC class, with mounting bracket, supplied loose.
2.4
Other Accessories
- 3” retractable seat belt.
- 1500 lb. front counterweight.
- Factory installed ride control.
- Extendahoe.
- Stabilizer, per manufacturer recommendation.
- Manufacturer’s type two-lever style backhoe controls.
- Hour meter.
- Single or dual parallel dump cylinders.
- Bucket position indicator.
- Toolbox.
- Sun visor.
- Lift and tie down eyes.
- One hook on each bucket to hold 3/8” chain.
- Railroad tie handler suitable for concrete and wood ties of approximately 750 lbs, Mitchell Equipment or approved equal.
2.5 Hammer
Hydraulically actuated hammer. Case model CH750, Huskie model HH750 or approved equal:
▪ Impact energy: 825 ft. Lbs.
▪ Max. weight: 1,175 lbs.
▪ Required oil flow: 13 to 25 gpm.
▪ Blows/minute: 600 to 1,080.
Tool diameter: 3”.
2.6 Hi-Rail Gear Removable High-rail gear as attachment.
3.0 Trailer
Complete This
Column
3.1 Model Trail King TK40LP or approved equal meeting all
performance requirements herein.
3.2
Payload Capacity
40,000 lbs. minimum.
3.3
Deck Length Minimum 21 feet flat deck with 5 feet beavertail, 26 feet total deck length minimum.
Please state the length.
3.4
Axles Dual Axle (22,500 lbs per axle)
3.5 Tow Hitch Adjustable height hitch (16.5 inches to 32 inches)
3.6
Brakes Air brakes
3.7 Tires Continental, 215/75R17.5 HTL2, 18 ply or approved
equal.
3.8 Loading
Ramp
Adjustable dual loading ramp.
3.9 Electrical
Per DOT Regulations
3.10 Features • Safety chains with grab hooks
• Lockable Toolbox
• Safety headboard
• Registration holder
• LED lights
• Red & white conspicuity markings
• D-rings (10 minimum)
4.0 Ballast Tamper
Complete This
Column
4.1 Model Dymax Rail Series 14-270 degree rotation x 1 motor-backhoe loader-class 20, Model No. DX-BT-DYM14- 270x1-BL-20 or approved equal meeting all performance requirements herein.
4.2 Features • 14 in tine spacing
• 270-degree rotation
• 2” thick AR400 tines with weld on replaceable pads
• DymaxRail Heavy Duty Vibrator Group
• Single cylinder, center mounted
• Machine adapter pins
• 12V Electro Hydraulic valve mounted on workhead with cable kit
• Transport stand with tie downs included
5.0 Hi Rail Gear Design Requirements and Rail Drive System
Complete This
Column
5.1 Rail Track
Design & Clearance
Requirements
Metro Light Rail system requirements for Overhead Catenary System Only.
Most Restrictive Curvature Radius
100’ radius
Maximum Grade 6.0 Grade
Rail 115 RE
Rail Cant 1:40
Track Gauge Std gauge 56.5”
Super Elevation 0” to 6”
Most restrictive turnout 190’ radius
Maximum Vertical Load 28,000 lbs.
Max Vehicle Dimensions on Rail
14’ High, 8’-6” Wide, 3’- 3” above rail (Platform Height).
Drawings Rail Drawings are shown in specification section 10.
Please provide documentation that unit as configured will meet the curvature radius specified.
5.2 Manufacturer Hi-rail gear shall be provided by a qualified manufacturer experienced in rail guidance systems for backhoe loaders and shall meet all requirements specified in Section 5.1.
All vehicles specified must be able to meet the light and heavy rail clearance envelope. The heavy rail is the most restrictive around the third rail area and most large vehicles will require super singles as the outer set of dual rear tires usually comes in contact with the third rail in switches and some curves. The proposed vehicle must meet the clearance envelope.
Please state the manufacturer & model of the hi-rail system.
5.3 Material of
Construction
The gears shall be all steel construction with standard flange cast steel wheels. The gauge is standard 56½” steel with tapered roller bearings. Hi-Rail gear shall be non-insulated with pin type lock.
5.4 Shunting
Shunt system shall be provided. When on track, the machine shall be able to shunt between the 2 rails.
A control switch shall be provided inside the cab with ON and OFF switch to allow the operator to either select or deselect shunting the track.
5.5 Brakes Hi-Rail gear shall have rail brake assist.
5.6 Locking
Mechanism
The Hi-rail gear shall be equipped with a locking pin mechanism with easy access to the operator to allow locking the gears in place in stowed position.
5.7 Welding All welding shall be done by certified welders.
6.0
Warranty
Complete This
Column
6.1 Warranty Terms Warranty for all components shall commence no later than 30 days from date of delivery to the METRO providing there are no pending acceptance issues.
Warranty for all specified equipment including aftermarket accessories shall be the responsibility of the prime contractor. All warranties shall be with $0.00 deductible.
6.2
Tractor Warranty The successful bidder shall warrant the tractor furnished including the drive train (engine with accessories, transmission, and drive axles) to be free from defects in design, material, and workmanship for a period of two (2) years or 2,000 hours minimum, or manufacturer’s standard warranty, whichever is greater.
Please state the warranty terms offered.
6.3 Trailer Warranty The successful bidder shall warrant the trailer specified in 3.0, with manufacturer’s standard warranty.
6.4 Hi-Rail Gear
The successful bidder shall warrant the hi-rail gear, with manufacturer’s standard warranty.
6.5 Ballast tamper
The successful bidder shall warrant the ballast tamper specified in Section 4.0, with manufacturer’s standard warranty.
6.6 Warranty
Coverage
Bids received from dealers outside 60-mile distance radius from Los Angeles will be accepted based on the warranty being fully recognized and accepted by a local like dealer. The local dealer shall offer the same full warranty service coverage as the original Bidder. The Bidder shall certify that full warranty service coverage is available in the Los Angeles area by providing names of local dealers that will perform all warranty coverage services.
7.0
Instruction & Parts Manuals The following manuals and schematics shall be furnished at the pre-delivery inspection. If unable to provide any or all of the following manuals and schematics at the pre-delivery inspection, please submit, in writing, to the designated METRO Contract Administrator the reason for non-compliance with this specification requirement and provide a specific date that the manuals and schematics will be delivered to the METRO.
# A B C Complete This
7.1
Operator’s Manual.
Three (3) complete copies of the operator’s manual.
7.2
Maintenance, Repair, And Parts Manuals.
Three (3) complete sets of the maintenance, repair, and parts manuals and for any optional items or accessories specified. Digital versions of OEM manual are acceptable.
7.3
Electrical Schematics
Three (3) complete sets of electrical schematics and for any optional items or accessories specified, unless said schematics are already included in the maintenance, repair, and parts manuals. Digital versions of OEM manual are acceptable.
8.0 Track Testing & Unit Acceptance
Complete This
8.1
Final acceptance shall be made by Metro after inspection and successful completion of track testing to verify compliance with this specification.
Performance testing shall be conducted by Metro personnel on Metro rail property. A vendor representative may be present during testing if requested. The unit shall demonstrate satisfactory operation on track, including negotiation of specified track curvature, grades, clearances, hi-rail system operation, braking, and all safety systems and installed equipment, as applicable.
Metro test personnel shall perform a minimum of two (2) runs in each direction, or as otherwise determined by Metro.
If the unit fails to meet any specified requirement, the Contractor shall make all necessary corrections, adjustments, repairs, or modifications at no additional cost to Metro.
Final acceptance shall not occur until all testing is completed successfully, all deficiencies are corrected, and all required manuals, training, warranties, and deliverables have been provided.
9.0
Training Requirements
Complete This
9.1
Training Requirements
As part of the final acceptance process, the Contractor shall provide onsite training for Metro personnel.
Training shall be provided by the vehicle OEM, hi-rail system manufacturer, or an OEM-authorized representative.
Training shall be conducted at a Metro facility designated by Metro and shall be completed within thirty (30) calendar days after final acceptance, unless otherwise approved by Metro.
Contractor shall provide all training materials, operator guides, and service references at the time of training.
Training costs shall be separately identified in the bid price.
9.2 Operator Training
The Contractor shall provide a minimum of four (4) hours of operator training for up to ten (10) Metro personnel.
Training shall include, but not be limited to:
• Vehicle familiarization and safety systems
• Vehicle and/or equipment operating procedures
• Pre-trip inspection procedures
• Road operation and worksite operation
• Hi-rail gear deployment and stowage procedures
• Road-to-rail and rail-to-road transition procedures
• Rail travel operation, braking, and steering characteristics
• Emergency operating procedures
• Safe operation of all installed attachments, auxiliary systems, and body equipment, as applicable
9.3 Maintenance
Training
The Contractor shall provide a minimum of four (4) hours of maintenance training for up to ten (10) Metro maintenance personnel.
Training shall include, but not be limited to:
• Preventive maintenance requirements
• Mechanical, hydraulic, pneumatic, and electrical systems, as equipped
• OEM diagnostic systems and fault code interpretation
• Troubleshooting and repair procedures
• Service intervals and lubrication requirements
• Inspection, adjustment, and replacement of hi-rail system components
• Emergency recovery procedures
10. Drawings
10.1
10.2
10.3
10.4
10.5
10.6