Exhibit A- Technical Evaluation - Subfactor 1.docx

DOCX document 18 KB Posted

Attached to
Renovate Operations Building 2A - Scotia, NY
Solicitation number
W50S8J-21-R-0004
Issued by

About this file

This document contains a technical evaluation worksheet and related federal contract opportunity notice. The technical evaluation worksheet is a template for offerors to submit details on up to three relevant past construction contracts to demonstrate experience with projects similar in size, scope and complexity to the anticipated work. It includes sections for basic project information and narratives relating each past project to evaluation criteria covering various construction subfactors. The related federal contract opportunity is a renovation of Operations Building 2A in Scotia, New York for the Department of the Army New York Army National Guard. Interested parties are directed to attend a mandatory combined pre-proposal conference and site visit on April 28, 2021 and must register by April 26. Safety protocols for COVID-19 are outlined, and offerors are advised to not attend if experiencing any symptoms.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

Technical Evaluation - Subfactor 1 Worksheet General Construction and Renovation Experience This form shall be submitted by each offeror outlining the three (3) most relevant contracts (Government or Commercial) which are currently in performance or have been completed by the offeror within the past five (5) year period. Submit one (1) form per project; Limit page count to six (6) pages per project, to include Part 1: Project Information.

The intent of this information is to give the Government insight into the offerors experience managing multi-discipline renovation projects, focusing on the relevance and extent that contracts submitted for review are similar in size, scope and complexity to the work anticipated under this project.

The offeror shall fill in PARTS 1 & 2 below for each project submitted. Part 2 shall include a brief narrative relating the size, scope and complexity of the identified project to each Key Point. If the scope of an identified project does not include one or more of the Key Points, the offeror shall insert “N/A”. Offerors are cautioned that projects submitted for review which contain relevant experience with more (or all) of the Key Points listed above will be evaluated more favorably than projects that contain less (or none) of the Key Points.

PART 1 – PROJECT INFORMATION

Contract Number:

Project Title:

Date of Award:

Period of Performance (Days)

Project Completion Date:

Project Location:

Dollar Value (Original/ Final):
$ / $

Brief Description of Project:

Your role in referenced contract (Prime/ Sub):

PART 2 – EXPERIENCE NARRATIVE

KEY POINT #1: Substructure/Superstructure (construction of a structure ~2,000SF in size) Note: Contractors may tailor the amount of space provided for each Key Point and are not limited to the space provided. With that said, the total page count for each Exhibit A shall not exceed six (6) pages (to include Part 1, Project Information. [Contractors shall delete this note prior to submission] KEY POINT #2: Roofing/ Ballast Work

KEY POINT #3: Exterior Closures

KEY POINT #4: Interior Construction/ Finishes

KEY POINT #5: Plumbing

KEY POINT #6: HVAC (ductwork, VAVs, RTU Installation, Split Unit Removal and Installation)

KEY POINT #7: Electrical Power/ Lighting Systems

KEY POINT #8: Selective Building Demolition

KEY POINT #9: HVAC (ductwork, VAVs, RTU Installation, Split Unit Removal and Installation)

KEY POINT #10: Electrical Power/ Lighting Systems

KEY POINT #11: Selective Building Demolition