The document is a detailed quantitative breakdown of Green Infrastructure Sites for multiple locations within a county or municipal jurisdiction, likely in California. The infrastructure sites are categorized into three main groups: FMO (Facilities Management Operations) Green Infrastructure Sites, Engineering Green Infrastructure Sites, and Health & Hospital Green Infrastructure Sites. The sites include locations such as the Maple Street Correctional Center, Navigation Center, ROC, Coyote Point Animal Shelter, North Fair Oaks Parking Lot, Radio Shop, Parking Structure, County Office Building, Middlefield Rd Project, Safe Route to Schools, Fair Oaks Medical Clinic, and Serenity House.
The green infrastructure implementation focuses on three primary types of environmental infrastructure elements: Bioretention Areas, Flow-Through Planters, and Tree Well Filters, with some sites also including Pervious Pavement. The most significant installations are at the Maple Street Correctional Center (11 Bioretention Areas and 7 Flow-Through Planters), County Office Building (14 Flow-Through Planters), and Middlefield Rd Project (17 Bioretention Areas and 6 Tree Well Filters). Most other sites have more modest quantities, ranging from 1-5 infrastructure elements. The document provides a systematic quantitative overview of green infrastructure deployment across various county facilities, suggesting a comprehensive approach to sustainable water management and urban environmental design.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FMO Green Infrastructure Sites Bioretention Area
Quantity Flow-Through Planter
Quantity Tree Well
Filter Quantity
Maple Street Correctional Center 11 7 0
Navigation Center 5 0 0
ROC 4 0 0
Coyote Point Animal Shelter 3 0 0 North Fair Oaks Parking Lot (Middlefield Rd Parking Lot)
3 0 0
Radio Shop 2 0 0 Parking Structure 2 2 0 0 County Office Building 3 14 0 0
Engineering Green Infrastructure Sites
Bioretention Area Quantity
Flow-Through Planter Quantity
Tree Well Filter Quantity
Middlefield Rd Project 17 0 6 Safe Route to Schools 1 0 0
Health & Hospital Green Infrastructure Sites
Bioretention Area Quantity
Flow-Through Planter Quantity
Tree Well Filter Quantity
Fair Oaks Medical Clinic 1 1 0 Serenity House 4 0 0
Pervious Pavement Quantity
Pervious Pavement Quantity