Exhibit_A_Green_Infrastructure_Inventory.pdf

PDF 65 KB Posted

Attached to
Landscaping and Grounds Maintenance Services
Solicitation number
2026-RFP-00070
Issued by
San Mateo County, California

About this file

The document is a detailed quantitative breakdown of Green Infrastructure Sites for multiple locations within a county or municipal jurisdiction, likely in California. The infrastructure sites are categorized into three main groups: FMO (Facilities Management Operations) Green Infrastructure Sites, Engineering Green Infrastructure Sites, and Health & Hospital Green Infrastructure Sites. The sites include locations such as the Maple Street Correctional Center, Navigation Center, ROC, Coyote Point Animal Shelter, North Fair Oaks Parking Lot, Radio Shop, Parking Structure, County Office Building, Middlefield Rd Project, Safe Route to Schools, Fair Oaks Medical Clinic, and Serenity House.

The green infrastructure implementation focuses on three primary types of environmental infrastructure elements: Bioretention Areas, Flow-Through Planters, and Tree Well Filters, with some sites also including Pervious Pavement. The most significant installations are at the Maple Street Correctional Center (11 Bioretention Areas and 7 Flow-Through Planters), County Office Building (14 Flow-Through Planters), and Middlefield Rd Project (17 Bioretention Areas and 6 Tree Well Filters). Most other sites have more modest quantities, ranging from 1-5 infrastructure elements. The document provides a systematic quantitative overview of green infrastructure deployment across various county facilities, suggesting a comprehensive approach to sustainable water management and urban environmental design.

View the file

Other files

File Type Posted
Landscaping_and_Grounds_Maintenance_Services_(Addendum_#2_Revision).pdf PDF
Exhibit_K_County_Government_Center_Map.pdf PDF
Exhibit_K_County_Government_Center_Map.pdf PDF
Exhibit_I_Health_&_Hospital_Site_Maps.pdf PDF
Exhibit_I_Health_&_Hospital_Site_Maps.pdf PDF
Exhibit_J_Engineering_Site_Maps.pdf PDF
Exhibit_H_FM&O_Site_Maps.pdf PDF
Exhibit_I_Health_&_Hospital_Site_Maps.pdf PDF
Exhibit_I_Health_&_Hospital_Site_Maps.pdf PDF
Exhibit_J_Engineering_Site_Maps.pdf PDF
Exhibit_H_FM&O_Site_Maps.pdf PDF
Exhibit_G_EPA_Landscape_Installation_Map.jpg JPG image
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Exhibit_G_EPA_Landscape_Installation_Map.jpg JPG image
Exhibit_G_EPA_Landscape_Installation_Map.jpg JPG image
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Exhibit_C_SMCWPPP-BSM-BWM-Supplier-List.pdf PDF
Exhibit_F_Compost-Mulch-Procurement-Reporting-Form.pdf PDF
Exhibit_A_Green_Infrastructure_Inventory.pdf PDF
Exhibit_B_Green_Infrastructure_Assets.pdf PDF
Exhibit_A_Green_Infrastructure_Inventory.pdf PDF
Exhibit_C_SMCWPPP-BSM-BWM-Supplier-List.pdf PDF
Exhibit_D_Approved_Pesticides.pdf PDF
Exhibit_E_Green_Infrastructure_Maintenance_Checklists.pdf PDF
Attachment_H_Middlefield_Road_Plans_and_Specs_for_Landscaping.pdf PDF
Exhibit_B_Green_Infrastructure_Assets.pdf PDF
Exhibit_A_Green_Infrastructure_Inventory.pdf PDF
Exhibit_D_Approved_Pesticides.pdf PDF
Attachment_E_Irrigation_Inspection_Report.pdf PDF
Attachment_G_Landscape_Maintenance_Inspection_Report.pdf PDF
Attachment_B_Resolution_No._080805_Prohibiting_Herbicide_Incentive_Programs.pdf PDF
Attachment_C_Admin_Memo_B-33.pdf PDF
Attachment_G_Landscape_Maintenance_Inspection_Report.pdf PDF
Attachment_E_Irrigation_Inspection_Report.pdf PDF
Attachment_E_Irrigation_Inspection_Report.pdf PDF
Attachment_B_Resolution_No._080805_Prohibiting_Herbicide_Incentive_Programs.pdf PDF
Attachment_H_Admin_Memo_B-31_-_Policy_for_the_Operation_and_Maintenance_of_County_Stormwater_Control_Measures.pdf PDF
Attachment_B_Resolution_No._080805_Prohibiting_Herbicide_Incentive_Programs.pdf PDF
Attachment_D_Fertilization_Usage_Report.pdf PDF
Attachment_B_Resolution_No._080805_Prohibiting_Herbicide_Incentive_Programs.pdf PDF
Attachment_F_Pesticide_Use_Report_Form.xlsx XLSX spreadsheet
Attachment_D_Fertilization_Usage_Report.pdf PDF
Attachment_F_Pesticide_Use_Report_Form.xlsx XLSX spreadsheet
Attachment_D_Fertilization_Usage_Report.pdf PDF
Attachment_E_Irrigation_Inspection_Report.pdf PDF
Attachment_A_IPM_Policy.pdf PDF
Attachment_A_IPM_Policy.pdf PDF
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FMO Green Infrastructure Sites Bioretention Area

Quantity Flow-Through Planter

Quantity Tree Well

Filter Quantity

Maple Street Correctional Center 11 7 0

Navigation Center 5 0 0

ROC 4 0 0

Coyote Point Animal Shelter 3 0 0 North Fair Oaks Parking Lot (Middlefield Rd Parking Lot)

3 0 0

Radio Shop 2 0 0 Parking Structure 2 2 0 0 County Office Building 3 14 0 0

Engineering Green Infrastructure Sites

Bioretention Area Quantity

Flow-Through Planter Quantity

Tree Well Filter Quantity

Middlefield Rd Project 17 0 6 Safe Route to Schools 1 0 0

Health & Hospital Green Infrastructure Sites

Bioretention Area Quantity

Flow-Through Planter Quantity

Tree Well Filter Quantity

Fair Oaks Medical Clinic 1 1 0 Serenity House 4 0 0

Pervious Pavement Quantity

Pervious Pavement Quantity

Pervious Pavement Quantity

File details come from the government source that posted it. Updated .