Exhibit A.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
BOILER MAINTENANCE
Solicitation number
ARFQ 0512 WSH2700000003 1
Issued by
Kanawha County, West Virginia

About this file

This is a bi-annual inspection and maintenance schedule exhibit for boiler maintenance services in West Virginia. The document outlines a comprehensive list of components and items requiring periodic inspection, testing, and maintenance to ensure safe and efficient boiler operation. Key service requirements include flame safeguard checks and component replacement per manufacturer recommendations, annual pilot turndown tests, hot refractory tests, firing rate control checks, combustion tuning with NOx emission verification, pilot and main fuel valve inspections including coil, diaphragm, and interlock switch checks, safety shutdown control valve leak tests, low pressure air switch testing and adjustment, modulating damper switch verification, linkage and fuel cam inspection with replacement as needed, flue gas recirculation (FGR) control valve and shutoff valve cleaning and lubrication, FGR shutoff valve switch operation verification, FGR duct inspection and cleaning, combustion air fan cleaning, and AutoFlame controls full operation checks with printout documentation provided to the facility.

The document does not specify pricing terms, contract value, set-asides, incumbent information, funding sources, or other financial details. No response dates, due dates, bid submission deadlines, award dates, or contract term lengths are identified in this exhibit. The schedule serves as a technical specification document outlining the scope of maintenance activities required on a bi-annual basis to maintain boiler system compliance and operational safety standards.

View the file

Other files

File Type Posted
Bid Bond Form.pdf PDF
OSAFederalFundsContractClauseAddendum.pdf PDF
Final_ARFQ_0512_WSH2700000003_1_WV_ARFQ_FORM.PDF PDF
TCA.pdf PDF
RFQ Specifications.docx DOCX document
BondPerform.pdf PDF
Bid Bond Instructions.pdf PDF
BondLaborMat.pdf PDF
Exhibit C.xlsx XLSX spreadsheet
WV43.pdf PDF
WV72 Drug Free Coversheet.pdf PDF
WV36.pdf PDF
WV73 Drug Free Affidavit.pdf PDF
Purchasing Affidavit.pdf PDF
Exhibit B.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Exhibit A
Bi-Annual Inspection and Maintenance Schedule
Component / ItemAction or Test
Flame SafeguardCheck Flame Safeguard Components Including Scanner
Flame SafeguardReplace flame safeguard components in accordance manufacturers recommendations
Pilot Turndown TestConduct Annually or after any component change
Hot Refractory TestConduct Annually or after any component change
Firing Rate ControlCheck firing rate and verify settings
Combustion TuningConduct combustion test, verify seting and Nox emission levels
Pilot & Main Fuel ValvesCheck all coils, diaphragms, interlock switch & all other parts of safety shut-off valves
Pilot & Main Fuel ValvesPerform leak tests on allsafety shutdown control valves
Low Pressure Air SwitchTest low air pressure switch for proper adjusment
Mod Damper SwitchCheck damper low fire proving switch
Linkage and Fuel CamsCheck linkage and cams for wear and replace if necessary
FGR Control ValveClean and Lubricate
FGR Shutoff ValveClean and Lubricate
FGR Shutoff Valve SwitchCheck operation for full rotation and position proving switch
FGR DuctInspect and Clean
Combustion Air FanClean fan and housing
AutoFlame ControlsCheck full operation and provide printout to facility