Exhibit A.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- BOILER MAINTENANCE
- Solicitation number
- ARFQ 0512 WSH2700000003 1
- Issued by
- Kanawha County, West Virginia
About this file
This is a bi-annual inspection and maintenance schedule exhibit for boiler maintenance services in West Virginia. The document outlines a comprehensive list of components and items requiring periodic inspection, testing, and maintenance to ensure safe and efficient boiler operation. Key service requirements include flame safeguard checks and component replacement per manufacturer recommendations, annual pilot turndown tests, hot refractory tests, firing rate control checks, combustion tuning with NOx emission verification, pilot and main fuel valve inspections including coil, diaphragm, and interlock switch checks, safety shutdown control valve leak tests, low pressure air switch testing and adjustment, modulating damper switch verification, linkage and fuel cam inspection with replacement as needed, flue gas recirculation (FGR) control valve and shutoff valve cleaning and lubrication, FGR shutoff valve switch operation verification, FGR duct inspection and cleaning, combustion air fan cleaning, and AutoFlame controls full operation checks with printout documentation provided to the facility.
The document does not specify pricing terms, contract value, set-asides, incumbent information, funding sources, or other financial details. No response dates, due dates, bid submission deadlines, award dates, or contract term lengths are identified in this exhibit. The schedule serves as a technical specification document outlining the scope of maintenance activities required on a bi-annual basis to maintain boiler system compliance and operational safety standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Bond Form.pdf | ||
| OSAFederalFundsContractClauseAddendum.pdf | ||
| Final_ARFQ_0512_WSH2700000003_1_WV_ARFQ_FORM.PDF | ||
| TCA.pdf | ||
| RFQ Specifications.docx | DOCX document | |
| BondPerform.pdf | ||
| Bid Bond Instructions.pdf | ||
| BondLaborMat.pdf | ||
| Exhibit C.xlsx | XLSX spreadsheet | |
| WV43.pdf | ||
| WV72 Drug Free Coversheet.pdf | ||
| WV36.pdf | ||
| WV73 Drug Free Affidavit.pdf | ||
| Purchasing Affidavit.pdf | ||
| Exhibit B.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Exhibit A | |
| Bi-Annual Inspection and Maintenance Schedule | |
| Component / Item | Action or Test |
| Flame Safeguard | Check Flame Safeguard Components Including Scanner |
| Flame Safeguard | Replace flame safeguard components in accordance manufacturers recommendations |
| Pilot Turndown Test | Conduct Annually or after any component change |
| Hot Refractory Test | Conduct Annually or after any component change |
| Firing Rate Control | Check firing rate and verify settings |
| Combustion Tuning | Conduct combustion test, verify seting and Nox emission levels |
| Pilot & Main Fuel Valves | Check all coils, diaphragms, interlock switch & all other parts of safety shut-off valves |
| Pilot & Main Fuel Valves | Perform leak tests on allsafety shutdown control valves |
| Low Pressure Air Switch | Test low air pressure switch for proper adjusment |
| Mod Damper Switch | Check damper low fire proving switch |
| Linkage and Fuel Cams | Check linkage and cams for wear and replace if necessary |
| FGR Control Valve | Clean and Lubricate |
| FGR Shutoff Valve | Clean and Lubricate |
| FGR Shutoff Valve Switch | Check operation for full rotation and position proving switch |
| FGR Duct | Inspect and Clean |
| Combustion Air Fan | Clean fan and housing |
| AutoFlame Controls | Check full operation and provide printout to facility |