This is a sample contract document provided by the Maryland Department of General Services (DGS) that establishes the standard terms and conditions for state contracts in Maryland. The contract template is designed for use with various types of procurement activities and includes provisions for fixed-price contracts, time-and-materials arrangements, and IDIQ (Indefinite Delivery/Indefinite Quantity) contracts. The document specifies that the contract term begins on the effective date following required approvals, including Board of Public Works approval if necessary, and continues until a specified end date. The contractor must not begin work until receiving a written Notice to Proceed (NTP) from the Department. The contract term encompasses all phases of performance including pre-construction services, construction activities, and post-construction administrative closeout. The Construction Duration is measured in calendar days from the date of the NTP, with extension or modification available only through written contract modification.
Payment to the contractor is made according to prices quoted in the bid or financial proposal, with total contract payments not exceeding the contracted amount unless properly modified. The state shall pay the contractor within 30 days (or 15 days for SBR contracts) of receipt of a proper invoice, with late payment interest available at 9% per annum under specified conditions. The contractor is responsible for all subcontractor payments within 10 days of receiving progress or final payments. The contract includes comprehensive provisions regarding intellectual property rights, data confidentiality, compliance with Maryland and federal laws, nondiscrimination requirements, MBE participation goals with associated liquidated damages for non-compliance, and audit rights. Liquidated damages for failure to complete work within the Construction Duration are specified in the individual solicitation. The contract is governed by Maryland law and subject to State Finance and Procurement Article regulations and COMAR Title 21.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT
Department of General Services (DGS)
“<<solicitationTitle>>”
<<solicitationNumber>>
THIS CONTRACT (the “Contract”) is made this ________ day of ___________, ___________ by and between (Contractor’s name) and the STATE OF MARYLAND, acting through the MARYLAND DEPARTMENT OF GENERAL SERVICES (“DGS” or the “Department”).
In consideration of the promises and the covenants herein contained, the adequacy and sufficiency of which are hereby acknowledged by the parties, the parties agree as follows:
1. Definitions
In this Contract, the following words have the meanings indicated:
1.1 “Bid” means the Contractor’s Bid dated ______________.
1.2 “COMAR” means Code of Maryland Regulations.
1.3 “Contractor” means the entity first named above whose principal business address is (Contractor’s primary address) and whose principal office in Maryland is (Contractor’s local address), whose Federal Employer Identification Number or Social Security Number is (Contractor’s FEIN), and whose eMaryland Marketplace Advantage vendor ID number is (eMMA Number).1.4 “IFB” means the Invitation for Bids for <<solicitationTitle>>, Solicitation # <<solicitationNumber>>, and any amendments, addenda, and attachments thereto issued in writing by the State.
1.5 “Minority Business Enterprise (MBE)” means any legal entity certified as defined at COMAR 21.01.02.01B (54) which is certified by the Maryland Department of Transportation under COMAR 21.11.03.
1.6 “State” means the State of Maryland.
1.7 “Veteran-owned Small Business Enterprise (VSBE)” means a business that is verified by the Center for Verification and Evaluation (CVE) of the United States Department of Veterans Affairs as a veteran-owned small business. See Code of Maryland Regulations (COMAR) 21.11.13.
1.8 Capitalized terms not defined herein shall be ascribed the meaning given to them in the IFB.
2. Scope of Contract
2.1 The Contractor shall perform in accordance with this Contract and Exhibits A-C, which are listed below and incorporated herein by reference. If there is any conflict between this Contract and the Exhibits, the terms of the Contract shall control. If there is any conflict among the Exhibits, the following order of precedence shall determine the prevailing provision:
Exhibit A – The IFB
Exhibit B – The Contract Affidavit, executed by the Contractor and dated ____________
Exhibit C – The Bid
2.2 Without limiting the rights of the Procurement Officer under Section 39, the Contract may be modified by mutual agreement of the parties, provided: (a) the modification is made in writing; (b) all parties sign the modification; and (c) all approvals by the required agencies as described in COMAR Title 21, are obtained.
3. Period of Performance
3.1 The term of this Contract begins on the date it is signed by the Department following any required prior approvals, including approval by the Board of Public Works, if such approval is required (the “Effective Date”), and shall continue until __________________ (the “Contract Term”), unless otherwise modified in accordance with this Contract. The Contract Term includes all phases necessary to support completion of the project, including, but not limited to, pre-construction services, construction activities, and post-construction administrative closeout.
3.2 Notice to Proceed and Completion of Work
The Contractor shall begin work only upon receipt of a written Notice to Proceed (NTP) issued by the Department. Work performed prior to receipt of an NTP shall be at the Contractor’s risk and will not be eligible for payment.
The Contractor shall complete all construction work (both pre-construction activities and construction activities) within the time specified in the IFB and confirmed in the NTP , which is ______ calendar days from the date of the NTP (the “Construction Duration”). The Department may extend or modify the Construction Duration only by written modification in accordance with the terms of this Contract.
If the construction is not completed within the Construction Duration, the Contractor shall be liable for liquidated damages in the amount of $__________ per calendar day.
The Construction Duration applies solely to construction work required under the IFB (and excludes punch list work). The Contract Term identified in Section 3.1 may extend beyond the Construction Duration for purposes of administrative closeout, final reconciliation, retainage release, and other post-construction obligations.
3.3 The Contractor’s obligation to pay invoices to subcontractors providing products/services in connection with this Contract, as well as the audit; confidentiality; document retention; patents, copyrights & intellectual property; warranty; indemnification obligations; and limitations of liability under this Contract; and any other obligations specifically identified, shall survive expiration or termination of the Contract.
3.4 No-Cost Extensions. In accordance with BPW Advisory 1995-1 item 7.b, in the event there are unspent funds remaining on the Contract, prior to the Contract's expiration date the Procurement Officer may modify the Contract to extend the Contract beyond its expiration date for a period up to, but not exceeding, one-third of the base term of the Contract (e.g., eight-month extension on a two-year contract) for the performance of work within the Contract's scope of work. Notwithstanding anything to the contrary, no funds may be added to the Contract in connection with any such extension.
4. Consideration and Payment
4.1 In consideration of the satisfactory performance of the work set forth in this Contract, the Department shall pay the Contractor in accordance with the terms of this Contract and at the prices quoted in the Bid or Financial Proposal. Unless properly modified (see above Section 2), payment to the Contractor pursuant to this Contract, including the Initial Term and any Renewal Term, shall not exceed the Contracted amount.
The total payment under a fixed price Contract or the fixed price element of a combined fixed price – time and materials Contract shall be the firm fixed price submitted by the Contractor in its Bid or Financial Proposal.
For time and materials Contracts, IDIQ Contracts, or Contracts which include either or both a time and materials or IDIQ element(s), total payments to the Contractor pursuant to this Contract for the time and materials and IDIQ portion(s) may not exceed ______________________.
4.2 The Contractor shall e-mail the original of each invoice and signed authorization to invoice to the Contract Monitor. Unless a payment is unauthorized, deferred, delayed, or set-off under COMAR 21.02.07, payments to the Contractor pursuant to this Contract shall be made no later than 30 days, or within 15 days for an SBR contract, after the Department’s receipt of a proper invoice from the Contractor as required by IFB section 3.3.
The Contractor may be eligible to receive late payment interest at the rate of 9% per annum if:
(1) The Contractor submits an invoice for the late payment interest within thirty days after the date of the State’s payment of the amount on which the interest accrued; and
(2) A contract claim has not been filed under State Finance and Procurement Article, Title 15, Subtitle 2, Annotated Code of Maryland.
The State is not liable for interest:
(1) Accruing more than one year after the 31st day after the agency receives the proper invoice; or
(2) On any amount representing unpaid interest. Charges for late payment of invoices are authorized only as prescribed by Title 15, Subtitle 1, of the State Finance and Procurement Article, Annotated Code of Maryland, or by the Public Service Commission of Maryland with respect to regulated public utilities, as applicable.
Final payment under this Contract will not be made until after certification is received from the Comptroller of the State that all taxes have been paid.
Electronic funds transfer shall be used by the State to pay Contractor pursuant to this Contract and any other State payments due Contractor unless the State Comptroller’s Office grants Contractor an exemption.
4.3 In addition to any other available remedies, if, in the opinion of the Procurement Officer, the Contractor fails to perform in a satisfactory and timely manner, the Procurement Officer may refuse or limit approval of any invoice for payment, and may cause payments to the Contractor to be reduced or withheld until such time as the Contractor meets performance standards as established by the Procurement Officer.
4.4 Payment of an invoice by the Department is not evidence that services were rendered as required under this Contract.
5. Rights to Records
5.1 The Contractor agrees that all documents and materials including, but not limited to, software, reports, drawings, studies, specifications, estimates, tests, maps, photographs, designs, graphics, mechanical, artwork, computations, and data prepared by the Contractor for purposes of this Contract shall be the sole property of the State and shall be available to the State at any time. The State shall have the right to use the same without restriction and without compensation to the Contractor other than that specifically provided by this Contract.
5.2 The Contractor agrees that at all times during the term of this Contract and thereafter, works created as a Deliverable under this Contract (as defined in Section 7.2), and services performed under this Contract shall be “works made for hire” as that term is interpreted under U.S. copyright law. To the extent that any products created as a Deliverable under this Contract are not works made for hire for the State, the Contractor hereby relinquishes, transfers, and assigns to the State all of its rights, title, and interest (including all intellectual property rights) to all such products created under this Contract, and will cooperate reasonably with the State in effectuating and registering any necessary assignments.
5.3 The Contractor shall report to the Contract Monitor, promptly and in written detail, each notice or claim of copyright infringement received by the Contractor with respect to all data delivered under this Contract.
5.4 The Contractor shall not affix any restrictive markings upon any data, documentation, or other materials provided to the State hereunder and if such markings are affixed, the State shall have the right at any time to modify, remove, obliterate, or ignore such warnings.
5.5 Upon termination or expiration of the Contract, the Contractor, at its own expense, shall deliver any equipment, software or other property provided by the State to the place designated by the Procurement Officer.
6. Exclusive Use
6.1 The State shall have the exclusive right to use, duplicate, and disclose any data, information, documents, records, or results, in whole or in part, in any manner for any purpose whatsoever, that may be created or generated by the Contractor in connection with this Contract. If any material, including software, is capable of being copyrighted, the State shall be the copyright owner and Contractor may copyright material connected with this project only with the express written approval of the State.
6.2 Except as may otherwise be set forth in this Contract, Contractor shall not use, sell, sub-lease, assign, give, or otherwise transfer to any third party any other information or material provided to Contractor by the Department or developed by Contractor relating to the Contract, except as provided for in Section 8. Confidential or Proprietary Information and Documentation.
7. Patents, Copyrights, and Intellectual Property
7.1. All copyrights, patents, trademarks, trade secrets, and any other intellectual property rights existing prior to the Effective Date of this Contract shall belong to the party that owned such rights immediately prior to the Effective Date (“Pre-Existing Intellectual Property”). If any design, device, material, process, or other item provided by Contractor is covered by a patent or copyright or which is proprietary to or a trade secret of another, the Contractor shall obtain the necessary permission or license to permit the State to use such item or items pursuant to its rights granted under the Contract.
7.2 Except for (1) information created or otherwise owned by the Department or licensed by the Department from third parties, including all information provided by the Department to Contractor;
(2) materials created by Contractor or its subcontractor(s) specifically for the State under the Contract (“Deliverables”), except for any Contractor Pre-Existing Intellectual Property included therein; and
(3) the license rights granted to the State, all right, title, and interest in the intellectual property embodied in the solution, including the know-how and methods by which the solution is provided and the processes that make up the solution, will belong solely and exclusively to Contractor and its licensors, and the Department will have no rights to the same except as expressly granted in this Contract. Any SaaS Software developed by Contractor during the performance of the Contract will belong solely and exclusively to Contractor and its licensors. For all Software provided by the Contractor under the Contract, Contractor hereby grants to the State a nonexclusive, irrevocable, unlimited, perpetual, non-cancelable, and non-terminable right to use and make copies of the Software and any modifications to the Software. For all Contractor Pre-Existing Intellectual Property embedded in any Deliverables, Contractor grants to the State a license to use such Contractor Pre-Existing Intellectual Property in connection with its permitted use of such Deliverable. During the period between delivery of a Deliverable by Contractor and the date of payment therefor by the State in accordance with this Contract (including throughout the duration of any payment dispute discussions), subject to the terms and conditions contained herein, Contractor grants the State a royalty-free, non-exclusive, limited license to use such Deliverable and to use any Contractor Materials contained therein in accordance with this Contract.
7.3. Subject to the terms of Section 10, Contractor shall defend, indemnify and hold harmless the State and its agents and employees, from and against any and all claims, costs, losses, damages, liabilities, judgments and expenses (including without limitation reasonable attorneys’ fees) arising out of or in connection with any third party claim that the Contractor-provided products/services infringe, misappropriate or otherwise violate any third party intellectual property rights. Contractor shall not enter into any settlement involving third party claims that contains any admission of or stipulation to any guilt, fault, liability or wrongdoing by the State or that adversely affects the State’s rights or interests, without the State’s prior written consent.
7.4 Without limiting Contractor’s obligations under Section 7.3, if an infringement claim occurs, or if the State or the Contractor believes such a claim is likely to occur, Contractor (after consultation with the State and at no cost to the State): (a) shall procure for the State the right to continue using the allegedly infringing component or service in accordance with its rights under this Contract; or (b) replace or modify the allegedly infringing component or service so that it becomes non-infringing and remains compliant with all applicable specifications.
7.5 Except as otherwise provided herein, Contractor shall not acquire any right, title or interest (including any intellectual property rights subsisting therein) in or to any goods, Software, technical information, specifications, drawings, records, documentation, data or any other materials (including any derivative works thereof) provided by the State to the Contractor. Notwithstanding anything to the contrary herein, the State may, in its sole and absolute discretion, grant the Contractor a license to such materials, subject to the terms of a separate writing executed by the Contractor and an authorized representative of the State as well as all required State approvals.
7.6 Without limiting the generality of the foregoing, neither Contractor nor any of its subcontractors shall use any Software or technology in a manner that will cause any patents, copyrights or other intellectual property which are owned or controlled by the State or any of its affiliates (or for which the State or any of its subcontractors has received license rights) to become subject to any encumbrance or terms and conditions of any third party or open source license (including, without limitation, any open source license listed on http://www.opensource.org/licenses/alphabetical) (each an “Open Source License”).
These restrictions, limitations, exclusions and conditions shall apply even if the State or any of its subcontractors becomes aware of or fails to act in a manner to address any violation or failure to comply therewith. No act by the State or any of its subcontractors that is undertaken under this Contract as to any Software or technology shall be construed as intending to cause any patents, copyrights or other intellectual property that are owned or controlled by the State (or for which the State has received license rights) to become subject to any encumbrance or terms and conditions of any open source license.
7.7 The Contractor shall report to the Department, promptly and in written detail, each notice or claim of copyright infringement received by the Contractor with respect to all Deliverables delivered under this Contract.
7.8 The Contractor shall not affix (or permit any third party to affix), without the Department’s consent, any restrictive markings upon any Deliverables that are owned by the State, and if such markings are affixed, the Department shall have the right at any time to modify, remove, obliterate, or ignore such warnings.
8. Confidential or Proprietary Information and Documentation
8.1 Subject to the Maryland Public Information Act and any other applicable laws including, without limitation, HIPAA, the HI-TECH Act, and the Maryland Medical Records Act and regulations promulgated pursuant thereto, all confidential or proprietary information and documentation relating to either party (including without limitation, any information or data stored within the Contractor’s computer systems or cloud infrastructure, if applicable) shall be held in confidence by the other party.
Each party shall, however, be permitted to disclose, as provided by and consistent with applicable law, relevant confidential information to its officers, agents, and Contractor Personnel to the extent that such disclosure is necessary for the performance of their duties under this Contract. Each officer, agent, and Contractor Personnel to whom any of the State’s confidential information is to be disclosed shall be advised by Contractor provided that each officer, agent, and Contractor Personnel to whom any of the State’s confidential information is to be disclosed shall be advised by Contractor of the obligations hereunder, and bound by, confidentiality at least as restrictive as those of set forth in this Contract.
8.2 The provisions of this section shall not apply to information that: (a) is lawfully in the public domain;
(b) has been independently developed by the other party without violation of this Contract; (c) was already rightfully in the possession of such party; (d) was supplied to such party by a third party lawfully in possession thereof and legally permitted to further disclose the information; or (e) which such party is required to disclose by law.
9. Loss of Data
9.1 In the event of loss of any State data or records where such loss is due to the act or omission of the Contractor or any of its subcontractors or agents, the Contractor shall be responsible for restoring or recreating, as applicable, such lost data in the manner and on the schedule set by the Contract Monitor.
The Contractor shall ensure that all data is backed up and recoverable by the Contractor. At no time shall any Contractor actions (or any failures to act when Contractor has a duty to act) damage or create any vulnerabilities in data bases, systems, platforms, and applications with which the Contractor is working hereunder.
9.2 In accordance with prevailing federal or state law or regulations, the Contractor shall report the loss of non-public data.
9.3 Protection of data and personal privacy shall be an integral part of the business activities of the Contractor to ensure there is no inappropriate or unauthorized use of State information at any time.
To this end, the Contractor shall safeguard the confidentiality, integrity and availability of State information.
10. Indemnification and Notification of Legal Requests
10.1. At its sole cost and expense, Contractor shall (i) indemnify and hold the State, its employees and agents harmless from and against any and all claims, demands, actions, suits, damages, liabilities, losses, settlements, judgments, costs and expenses (including but not limited to attorneys’ fees and costs), whether or not involving a third party claim, which arise out of or relate to the Contractor’s, or any of its subcontractors’, performance of this Contract and (ii) cooperate, assist, and consult with the State in the defense or investigation of any such claim, demand, action or suit. Contractor shall not enter into any settlement involving third party claims that contains any admission of or stipulation to any guilt, fault, liability or wrongdoing by the State or that adversely affects the State’s rights or interests, without the State’s prior written consent.
10.2. The State has no obligation: (i) to provide legal counsel or defense to the Contractor or its subcontractors in the event that a suit, claim or action of any character is brought against the Contractor or its subcontractors as a result of or relating to the Contractor’s obligations or performance under this Contract, or (ii) to pay any judgment or settlement of any such suit, claim or action. Notwithstanding the foregoing, the Contractor shall promptly notify the Procurement Officer of any such claims, demands, actions, or suits.
10.3. Notification of Legal Requests. In the event the Contractor receives a subpoena or other validly issued administrative or judicial process, or any discovery request in connection with any litigation, requesting State Pre-Existing Intellectual Property, of other information considered to be the property of the State, including but not limited to State data stored with or otherwise accessible by the Contractor, the Contractor shall not respond to such subpoena, process or other legal request without first notifying the State, unless prohibited by law from providing such notice The Contractor shall promptly notify the State of such receipt providing the State with a reasonable opportunity to intervene in the proceeding before the time that Contractor is required to comply with such subpoena, other process or discovery request.
11. Non-Hiring of Employees
No official or employee of the State, as defined under Md. Code Ann., General Provisions Article, § 5-101, whose duties as such official or employee include matters relating to or affecting the subject matter of this Contract, shall, during the pendency and term of this Contract and while serving as an official or employee of the State, become or be an employee of the Contractor or any entity that is a subcontractor on this Contract.
12. Disputes
12.1. This Contract is subject to the provisions of State Finance and Procurement Article, Title 15, Subtitle 2, Annotated Code of Maryland, and COMAR 21.10.
12.2 Except as otherwise provided in this Contract or by law, all disputes arising under or as a result of a breach of this Contract that are not disposed of by mutual agreement shall be resolved in accordance with this Section.
12.3 As used herein, claim means a written demand or assertion by one of the parties seeking, as a legal right, the payment of money, adjustment or interpretation of contract terms, or other relief, arising under or relating to this Contract. A voucher, invoice, or request for payment that is not in dispute when submitted is not a claim under this clause. However, if the submission subsequently is not acted upon in a reasonable time, or is disputed as to liability or amount, it may be converted to a claim for the purpose of this clause.
12.4 Within 30 days after contractor knows or should have known of the basis for a claim relating to this Contract, the Contractor shall file a written notice of claim with the procurement officer.
12.5 Contemporaneously with, or within 90 days after, the filing of a notice of claim, the Contractor shall submit the written claim to the procurement officer. If the Contractor so requests, the procurement officer, on conditions the procurement officer deems satisfactory to the unit, may extend the time in which contractor must submit the claim. An example of when a procurement officer may grant an extension includes situations in which the procurement officer finds that a contemporaneous or timely cost quantification following the filing of the notice of claim is impossible or impractical.
12.6 The claim shall set forth all the facts surrounding the controversy. The Contractor, at the discretion of the procurement officer, may be afforded an opportunity to be heard and to offer evidence in support of the claim.
12.7 The procurement officer shall mail or deliver written notification of the final decision within:
(A) 90 days after the procurement officer receives the claim if the claim is an amount for which the Appeals Board accelerated procedure, set forth in COMAR 21.10.06.12, may be used;
(B) 180 days after the procurement officer receives the claim for a claim not covered under §G(1) of this regulation; or
(C) A longer period that the procurement officer and the Contractor agree to in writing.
12.8 The final decision may award a contract claim only for those expenses incurred not more than 30 days before contractor was initially required to have filed the notice of claim.
12.9 The procurement officer's decision is the final action of the agency. If the procurement officer fails to render a final decision within the time required, the Contractor may deem the failure to be a final decision not to pay the claim.
12.10 If the final decision grants the claim in part and denies the claim in part, the agency shall pay the Contractor the undisputed amount. Payment of the partial claim is not an admission of liability by the agency and does not preclude the agency from recovering the amount paid if a subsequent determination modifies the final decision.
12.11 The Contractor may file a written appeal with the Maryland State Board of Contract Appeals within 30 days of receipt of notice of the decision.
12.12 Pending resolution of a claim, the Contractor shall proceed diligently with the performance of the Contract in accordance with the procurement officer's decision.
13. Maryland Law Prevails
13.1 This Contract shall be construed, interpreted, and enforced according to the laws of the State of Maryland.
13.2 The Maryland Uniform Computer Information Transactions Act (Commercial Law Article, Title 22 of the Annotated Code of Maryland) does not apply to this Contract or any purchase order, task order, or Notice to Proceed issued thereunder, or any software, or any software license acquired hereunder.
13.3 Any and all references to the Maryland Code, annotated and contained in this Contract,) shall be construed to refer to such Code sections as are from time to time amended.
14. Nondiscrimination in Employment
The Contractor agrees: (a) not to discriminate in any manner against an employee or applicant for employment because of race, color, religion, creed, age, sex, sexual orientation, gender identification, marital status, national origin, ancestry, genetic information, or any otherwise unlawful use of characteristics, or disability of a qualified individual with a disability unrelated in nature and extent so as to reasonably preclude the performance of the employment, or the individual’s refusal to submit to a genetic test or make available the results of a genetic test; (b) to include a provision similar to that contained in subsection (a), above, in any underlying subcontract except a subcontract for standard commercial supplies or raw materials; and (c) to post and to cause subcontractors to post in conspicuous places available to employees and applicants for employment, notices setting forth the substance of this clause.
15. Contingent Fee Prohibition
The Contractor warrants that it has not employed or retained any person, partnership, corporation, or other entity, other than a bona fide employee or agent working for the Contractor to solicit or secure the Contract, and that the Contractor has not paid or agreed to pay any person, partnership, corporation, or other entity, other than a bona fide employee or agent, any fee or any other consideration contingent on the making of this Contract.
16. Non-Availability of Funding
If the General Assembly fails to appropriate funds or if funds are not otherwise made available for continued performance for any fiscal period of this Contract succeeding the first fiscal period, this Contract shall be canceled automatically as of the beginning of the fiscal year for which funds were not appropriated or otherwise made available; provided, however, that this will not affect either the State’s or the Contractor’s rights under any termination clause in this Contract. The effect of termination of the Contract hereunder will be to discharge both the Contractor and the State from future performance of the Contract, but not from their rights and obligations existing at the time of termination. The Contractor shall be reimbursed for the reasonable value of any nonrecurring costs incurred but not amortized in the price of the Contract. The State shall notify the Contractor as soon as it has knowledge that funds may not be available for the continuation of this Contract for each succeeding fiscal period beyond the first.
17. Termination for Default-Damages for Delay--Time Extensions
17.1 If the Contractor refuses or fails to prosecute the work, or any separable part thereof, with such diligence as shall insure its completion within the time specified in this Contract, or any extension thereof, fails to complete said work within this time, or fails to provide any required annual and renewable bond 30 days prior to expiration of the current bond then in effect, the State may, by written notice to the Contractor, terminate the Contractor's right to proceed with the work or the part of the work as to which there has been delay. In this event the State may take over the work and prosecute the same to completion, by contract or otherwise, and may take possession of and utilize in completing the work the materials, appliances, and plant as may be on the site of the work and necessary therefor. Whether or not the Contractor's right to proceed with the work is terminated, the Contractor and its sureties shall be liable for any damage to the State resulting from the Contractor's refusal or failure to complete the work within the specified time.
17.2 If fixed and agreed liquidated damages are provided in the Contract and if the State so terminates the Contractor's right to proceed, the resulting damage shall consist of such liquidated damages until a reasonable time as may be required for final completion of the work together with any increased costs occasioned the State in completing the work.
17.3 If fixed and agreed liquidated damages are provided in the Contract and if the State does not so terminate the Contractor's right to proceed, the resulting damage shall consist of these liquidated damages until the work is completed or accepted.
17.4 The Contractor’s right to proceed may not be so terminated nor the Contractor charged with resulting damages if:
(a) The delay in the completion of the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to, acts of God, acts of the public enemy, acts of the State in either its sovereign or contractual capacity, acts of another Contractor in the performance of a contract with the State, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, unusually severe weather, or delays of subcontractors or suppliers arising from unforeseeable causes beyond the control and without the fault or negligence of either the Contractor or the subcontractors or suppliers; and
(b) The Contractor, within 10 days from the beginning of any such delay (unless the procurement officer grants a further period of time before the date of final payment under the Contract), notifies the procurement officer in writing of the causes of delay. The procurement officer shall ascertain the facts and the extent of the delay and extend the time for completing the work when, in the procurement officer's judgement, the findings of fact justify such an extension, and the procurement officer's findings of fact shall be final and conclusive on the parties, subject only to appeal as provided in the “Disputes” Section of this Contract.
17.5 If, after notice of termination of the Contractor's right to proceed under the provisions of this Section, it is determined for any reason that the Contractor was not in default under the provisions of this clause, or that the delay was excusable under the provisions of this Section, the rights and obligations of the parties shall, if the Contract contains a clause providing for termination for convenience of the State, be the same as if the notice of termination had been issued pursuant to the clause. If, in the foregoing circumstances, this Contract does not contain a clause providing for termination for convenience of the State, the Contract shall be equitably adjusted to compensate for the termination and the Contract modified accordingly; failure to agree to any such adjustment shall be a dispute concerning a question of fact within the meaning of the Section of this Contract entitled “Disputes”.
17.6 The rights and remedies of the State provided in this Section 17 are in addition to any other rights and remedies provided by law or under this contract.
17.7 As used in Section 17.4(a) of this Contract, the term “subcontractors or suppliers” means subcontractors or suppliers at any tier.”
18. Termination for Convenience
A. Termination for Convenience of the State
(1) The performance of work under this Contract may be terminated by the State in accordance with this clause in whole, or from time to time in part, whenever the procurement officer shall determine that such termination is in the best interest of the State. Any such termination shall be effected by delivery to the Contractor of a Notice of Termination specifying the extent to which performance of work under the Contract is terminated, and the date upon which such termination becomes effective.
(2) After receipt of a Notice of Termination, and except as otherwise directed by the procurement officer, the Contractor shall:
(a) Stop work under the Contract on the date and to the extent specified in the Notice of Termination;
(b) Place no further orders or subcontracts for materials, services or facilities, except as may be necessary for completion of the portion of the work under the Contract as is not terminated;
(c) Terminate all orders and subcontracts to the extent that they relate to the performance of work terminated by Notice of Termination;
(d) Assign to the State in the manner, at the times, and to the extent directed by the procurement officer, all of the right, title, and interest of the Contractor under the orders and subcontracts so terminated, in which case the State shall have the right, in its discretion, to settle or pay any or all claims arising out of the termination of such orders and subcontracts;
(e) Settle all outstanding liabilities and all claims arising out of the termination of orders and subcontracts, with the approval or ratification of the procurement officer, to the extent the procurement officer may require, which approval or ratification shall be final for all the purposes of this clause;
(f) Transfer title and deliver to the State, in the manner, at the times and to the extent, if any, directed by the procurement officer, (i) the fabricated or unfabricated parts, work in process, completed work, supplies, and other material produced as a part of, or acquired in connection with the performance of, the work terminated by the Notice of Termination, and (ii) the completed or partially completed plans, drawings, information, and other property which, if the Contract had been completed, would have been required to be furnished to the State;
(g) Use the Contractor's best effort to sell, in the manner, at the times, to the extent, and at the price or prices directed or authorized by the procurement officer, any property of the types referred to in
(f) of this clause; provided, however, that the Contractor (i) shall not be required to extend credit to any purchaser, and (ii) may acquire any such property under the conditions prescribed by and at a price or prices approved by the procurement officer; and provided further that the proceeds of any such transfer or disposition shall be applied in reduction of any payments to be made by the State to the Contractor under this Contract or shall otherwise be credited to the price or cost of the work covered by this Contract or paid in such other manner as the procurement officer may direct;
(h) Complete performance of such part of the work as may not have been terminated by the Notice of Termination; and
(i) Take such action as may be necessary, or as the procurement officer may direct, for the protection and preservation of the property related to this Contract which is in the possession of the Contractor and in which the State has or may acquire an interest. The Contractor may submit to the procurement officer a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by the procurement officer, and may request the State to remove such items or enter into a storage agreement covering them. Not later than 15 days thereafter, the State shall accept title to such items and remove them or enter into a storage agreement covering the same; provided, that the list submitted shall be subject to verification by the procurement officer upon removal of the items, or if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustment to correct the list as submitted shall be made prior to final settlement.
(3) After receipt of a Notice of Termination, the Contractor shall submit to the procurement officer the Contractor's termination claim, in the form and with certification prescribed by the procurement officer. Such claim shall be submitted promptly but in no event later than one year from the effective date of termination, unless one or more extensions in writing are granted by the procurement officer, upon request of the Contractor made in writing within such one year period or authorized extension thereof. However, if the procurement officer determines that the facts justify such action, the procurement officer may receive and act upon any such termination claim at any time after such one year period or any extension thereof. Upon failure of the Contractor to submit its termination claim within the time allowed, the procurement officer may determine, on the basis of information available to the procurement officer, the amount, if any, due to the Contractor by reason of the termination and shall thereupon pay to the Contractor the amount so determined.
(4) Subject to the provisions of Section 18(A)(3) of this Contract, the contractor and the procurement officer may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant to this clause, which amount or amounts may include a reasonable allowance for profit on work done; provided, that such agreed amount or amounts, exclusive of settlement costs, shall not exceed the total Contract price as reduced by the amount of payments otherwise made and as further reduced by the contract price of work not terminated. The Contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. Nothing in Section 18(A)(5) of this Contract, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor and the procurement officer to agree upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this clause, shall be deemed to limit, restrict, or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph.
(5) In the event of the failure of the Contractor and the procurement officer to agree, as provided in Section 18(A)(4) of this Contract, upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this clause, the procurement officer shall pay to the Contractor the amounts determined by the procurement officer as follows, but without duplication of any amounts agreed upon in accordance with Section 18(A)(4) of this Contract.
(a) With respect to all Contract work performed before the effective date of the Notice of Termination, the total (without duplication of any items) of:
(i) The cost of the work;
(ii) The cost of settling and paying claims arising out of the termination of work under subcontracts or orders as provided in Section 18(A)(2)(e) of this Contract, exclusive of the amounts paid or payable on account of supplies or materials delivered or services furnished by the subcontractor before the effective date of the Notice of Termination of Work under this Contract, which amounts shall be included in the cost on account of which payment is made under subdivision (i) above; and
(iii) A sum, as profit on subdivision (i) above, determined by the procurement officer, to be fair and reasonable; provided, however, that if it appears that the Contractor would have sustained a loss on the entire Contract had it been completed, no profit shall be included or allowed under this subdivision (iii) above and an appropriate adjustment shall be made reducing the amount of the settlement to reflect the indicated rate of loss; and
(b) The reasonable cost of the preservation and protection of property, incurred pursuant to Section 18(A)(2)(i) of this Contract; and any other reasonable cost incidental to termination of work under this Contract, including expense incidental to the determination of the amount due to the Contractor as the result of the termination of work under this Contract.
The total sum to be paid to the Contractor under Section 18(A)(5)(a) of this contract, shall not exceed the total Contract price as reduced by the amount of payments otherwise made and as further reduced by the Contract price of work not terminated. Except for normal spoilage, and except to the extent that the State shall have otherwise expressly assumed the risk of loss, there shall be excluded from the amounts payable to the Contractor under paragraph (a) of this clause, the fair value, as determined by the procurement officer, of property which is destroyed, lost, stolen, or damaged so as to become undeliverable to the State, or to a buyer pursuant to Section 18(A)(2)(g) f this clause.
(6) Costs claimed, agreed to, or determined pursuant to Section 18(A)(3), 18(A)(4), 18(A)(5), and 18(A)(9) hereof shall be in accordance with COMAR 21.09 as in effect on the date of this Contract.
(7) The Contractor shall have the right of appeal, under the clause of this Contract entitled “Disputes”, from any determination made by the procurement officer under Section 18(A)(2), 18(A)(5), or 18(A)(9) hereof, except that if the Contractor has failed to submit its claim within the time provided in Section 18(A)(3) or 18(A)(9) hereof, and has failed to request extension of such time, the Contractor shall have no such right of appeal. In any case where the procurement officer has made a determination of the amount due under Section 18(A)(3), 18(A)(5), or 18(A)(9) hereof, the State shall pay to the Contractor the following: (a) if there is no right of appeal hereunder or if no timely appeal has been taken, the amount so determined by the procurement officer, or (b) if an appeal has been taken, the amount finally determined on such appeal.
(8) In arriving at the amount due the Contractor under this Section there shall be deducted (a) all unliquidated advance or other payments or account theretofore made to the Contractor, applicable to the terminated portion of this Contract, (b) any claim which the State may have against the Contractor in connection with this Contract, and (c) the agreed price for, or the proceeds of sale of any materials, supplies, or other things acquired by the Contractor or sold, pursuant to the provisions of this Section, and not otherwise recovered by or credited to the State.
(9) If the termination hereunder be partial, the Contractor may file with the procurement officer a claim for an equitable adjustment of the price or prices specified in the Contract relating to the continued portion of the Contract (the portion not terminated by the Notice of Termination), and such equitable adjustment as may be agreed upon shall be made in such price or prices. Any claim by the Contractor for an equitable adjustment under this clause shall be asserted within ninety (90) days from the effective date of the termination notice, unless an extension is granted in writing by the procurement officer.
(10) The State may from time to time, under such terms and conditions as it may prescribe, make partial payments and payments on account against costs incurred by the Contractor in connection with the terminated portion of this Contract whenever in the opinion of the procurement officer the aggregate of such payments shall be within the amount to which the Contractor shall be entitled hereunder. If the total of such payments is in excess of the amount finally agreed or determined to be due under this clause, such excess shall be payable by the Contractor to the State upon demand, together with interest computed at the legal rate for the period from the date such excess payment is received by the Contractor to the date on which the excess is repaid to the State; provided, however, that no interest shall be charged with respect to any such excess payment attributable to a reduction in the Contractor's claim by reason of retention or other disposition of termination inventory until ten days after the date of the retention or disposition, or a later date as determined by the procurement officer by reason of the circumstances.
(11) Unless otherwise provided for in this Contract, or by applicable statute, the Contractor shall, from the effective date of termination until the expiration of three years after final settlement under this Contract, preserve and make available to the State at all reasonable times at the office of the Contractor but without direct charge to the State, all its books, records, documents and other evidence bearing on the costs and expenses of the Contractor under this Contract and relating to the work terminated hereunder, or, to the extent approved by the procurement officer, photographs, microphotographs, or other authentic reproductions thereof.
19. Reserved.
20. Suspension of Work
20.1 The State unilaterally may order the Contractor in writing to suspend, delay, or interrupt all or any part of the work for a period of time as the procurement officer may determine to be appropriate for the convenience of the State.
20.2 If the performance of all or any part of the work is for an unreasonable period of time, suspended, delayed, or interrupted by an act of the procurement officer in the administration of this Contract, or by the procurement officer's failure to act within the time specified in this Contract (or if no time is specified, within a reasonable time), an adjustment shall be made for any increase in the cost of performance of this Contract (excluding profit) necessarily caused by an unreasonable suspension, delay, or interruption and the Contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent (1) that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor or (2) for which an equitable adjustment is provided for or excluded under any provision of this Contract.
20.3 No claim under this clause shall be allowed (1) for any costs incurred more than 20 days before the Contractor shall have notified the procurement officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order), and (2) unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of a suspension, delay, or interruption, but not later than the date of final payment under the Contract.
21. Pre-Existing Regulations
In accordance with the provisions of Section 11-206 of the State Finance and Procurement Article, Annotated Code of Maryland, the regulations set forth in Title 21 of the Code of Maryland Regulations (COMAR 21) in effect on the date of execution of this Contract are applicable to this Contract.
22. Political Contribution Disclosure
22.1 The Contractor shall…