Enclosure 6 - RTO 2 WFF Fiberoptics EA.pdf

PDF 14 KB Posted

Attached to
Environmental Services Follow-on Federal contract opportunity
Solicitation number
80GSFC20R0005
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document includes a request for task order proposal and statement of work for an environmental assessment. NASA is seeking contractor support to prepare an Environmental Assessment for the proposed installation of a redundant fiber optic communications network at Wallops Flight Facility in Virginia. The contractor will assist with identifying project alternatives and affected resources, conduct formal wetland delineation and agency consultations, develop spatial analysis and GIS mapping, facilitate public involvement including three meetings, and author the EA document. The contractor must employ recognized wetland ecology experts and maintain an administrative record. Key deliverables include meeting minutes, draft and final versions of the DOPAA, EA, wetland delineation, agency assessments, public notices, and all GIS data. The period of performance is not to exceed two years from award.

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Services Follow-on, newest first.
File Type Posted
Set 4 Environmental Questions and Answers 80GSFC20R0005.pdf PDF
Amendment 4.pdf PDF
Set 1 Environmental Questions and Answers 80GSFC20R0005.pdf PDF
SF30 Amendment 3 to 80GSFC20R0005.pdf PDF
Enclosure 1 - RFP Clauses - 6-9-20.pdf PDF
Attachment C - Wallops IAGP_list 6-9-20.pdf PDF
Set 2 Envrionmental Questions and Answsers 80GSFC20R0005.pdf PDF
Final Amendment 2 Pg 2 - 29.pdf PDF
Enclosure 8 - SF1408 Cover Page.pdf PDF
Attachment C - IAGP MEMD EquipRpt GB 6-9-20.pdf PDF
Attachment C - Cover Pg Govt Property - 6-9-20.pdf PDF
Signed SF30 Amend 2 to 80GSFC20R0005.pdf PDF
Attachment F - Work Breakdown Struction - replace pge 3 WBS 20200518 corrected.pdf PDF
SF30 - Amendment 1 to 80GSFC20R0005 - CO Signed.pdf PDF
Enclosure 1 - Form -- SF33-14a - Amendment 1.pdf PDF
Enclosure 7 - Work Load Indicators Document - corrected.pdf PDF
Enclosure 1 - RFP Clauses - 5-15-20.pdf PDF
Amendment 1 Pg 2 - 4.pdf PDF
Set 1 Envrionmental Questions and Answsers 80GSFC20R0005.pdf PDF
Attachment A - SOW.pdf PDF
Enclosure 6 - Cover Pg RTOs.pdf PDF
Enclosure 2 - IT Security Management Plan Template.pdf PDF
Attachment I - OCI Avoidance Plan.pdf PDF
GPM Exhibits 1A-1B Hybrid Core-IDIQ Std by CY MAR 2016.pdf PDF
Enclosure 8 - Contract Historical Data.pdf PDF
signed Cover Letter Final RFP.pdf PDF
Enclosure 4 - QASP.pdf PDF
Enclosure 1 - Cover Pg - SF33 Clauses w Attachments.pdf PDF
Enclosure 5 - GPM-Specified Non-Mgmt DL Categories DL Hours and PDs Enclosure.pdf PDF
Enclosure 3 - OCI Cover Pg.pdf PDF
Enclosure 6 - RTO 1 Release Response and Remediation.pdf PDF
Enclosure 2 - IT Sec Mgmt Plan Cover Pg.pdf PDF
Enclosure 1 - RFP Clauses.pdf PDF
Attachment F WBS Breakdown.pdf PDF
Enclosure 1 - Form -- SF33-14a.pdf PDF
Attachment C - IAGP MEMD EquipmentRpt.pdf PDF
Attachment B - PIV Attachment.pdf PDF
Attachment K - IT Security Applicable Documents List.pdf PDF
EXHIBITS 1 - 18 Cost Exhibits Cover Pg.pdf PDF
Enclosure 7 - Work Load Indicators Document.pdf PDF
Attachment E - Safety and Health Plan.pdf PDF
Attachment G - Contract Historical Data.pdf PDF
Enclosure 3 - Template OCI Avoidance Plan Outline.pdf PDF
GPM Exhibits 2-18 Hybrid Core-IDIQ by CY OCT 2016.pdf PDF
Attachment D - 533 Attach Core and IDIQ--Both Onsite and Offsite.pdf PDF
Attachment C - Cover Pg Govt Property.pdf PDF
Attachment C - Wallops IAGP_list Feb 2020.pdf PDF
Attachment H - Rate Matrix.pdf PDF
Attachment A - SOW.pdf PDF
Attachment J - IT Sec Mgmt Plan.pdf PDF
Show all 50

Environmental Services Follow-on has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RTO2

Representative ID/IQ Task Order

Request for Task Plan Environmental Service Contract

Marsh Fiber Environmental Assessment

Projected Task Period of Performance:

The period of performance shall not exceed two years from award.

Task Objective:

In accordance with the National Environmental Policy Act, the contractor shall support NASA's preparation of an Environmental Assessment (EA) document for the proposed installation of a redundant fiber optic communications utility network from Wallops Flight Facility Main Base to the Yet-To-Be-Named Island Support Infrastructure on Wallops Island. It should be noted that the EA will be tiered from the 2019 Wallops Flight Facility Site-wide Programmatic Environmental Impact Statement employing incorporation by reference to the maximum extent practicable, and will only focus on the important issues related to the project.

Task Background:

NA

Task Description:

The contractor shall perform the following:

Assist the government with identifying the following:

- The purpose and need for the proposed action,

- Alternatives to the proposed action (assume up to 5 alternatives in detail, including no action),

- Resources potentially affected by the proposed action and alternatives.

Preparation of analysis and documentation in support of the following:

- Description of Proposed Action Alternative (DOPAA) for Scoping,

- Formal Wetland Delineation,

- National Marine Fisheries Service (NMFS) Section 7 and Essential Fish Habitat

(EFH) consultations,

- National Wildlife Refuge consultation,

- Spatial analysis and preparation of geographic information system (GIS) quality maps and figures (assume up to 10 original maps/figures),

- Public meeting information including up to three posters and a fact sheet,

- Original text as required to complete the EA. Note that Affected Environment and

Environmental Consequences shall be combined into a single chapter.

In addition to the core document content described above, the contractor shall be responsible for preparing:

- Table of contents/figures/tables,

- List of references cited,

- List of preparers and contacts made,

- Summary of Comments received on Draft EA,

- "Administrative" compilation of any necessary appendices (e.g., summary of

Endangered Species Act consultation conducted by the Government under separate scope), and

- Public notice of availability (including publication) of Draft EA and Final EA/FONSI (if warranted) in three local newspapers (i.e., Eastern Shore Post, Eastern Shore News, and the Chincoteague Beacon).

The government expects that the issues of agency and public concern will be potential environmental impacts such as water quality, wetlands, commercial and recreational fishing, private oyster leases and shellfish grounds, essential fish habitat, and listed in-water species. As the primary concern may focus on impacts to wetlands, the contractor shall employ recognized experts in the field of wetland ecology. The subject matter experts shall assume responsibility for the contents of those sections of the EA and shall provide recommendations for mitigation measures, as required. It is also expected that the subject matter expert will assist the government in responding to comments (of either wetland impacts) on the Draft EA.

Furthermore, it is likely that during the preparation of the subject EA document, there will be meetings with the NASA or Cooperating Agency staff and regulatory agencies, as well as a poster presentation during the public draft comment period. The contractor shall participate in all such meetings and record meeting minutes on behalf of the government.

An on-site kick-off meeting at WFF will be required.

Finally, the contractor shall be responsible for maintaining an up-to-date, organized Administrative Record for the duration of the project. The administrative record delivered to the Government at the conclusion of the project shall also include all GIS data employed in developing maps/figures for the EA.

Task Deliverables: by definition, must meet requirements in contract and SOW.

Meeting minutes (as required) Final Project Schedule DOPAA Version 1 Internal Draft DOPAA Version 2 Final Version 1 Initial Internal Draft EA Version 2 Public Draft EA Version 3 Final EA Notice of Availability for Draft EA Notice of Availability for Final EA Draft and Final Formal Wetland Delineation Draft and Final NMFS Section 7 Assessment Draft and Final NMFS EFH Assessment GIS data used for document maps and analysis Up to three Public Meeting Posters Fact Sheet for Public Meeting

Administrative Record

All deliverables shall be in both pdf and MS word formats. The government will assume responsibility for producing hard and/or CD copies of the EA, should they be necessary.

Note that initial versions of the EA may be delivered as separate chapters for government review and acceptance prior to conducting impact analysis.

Task Constraints:

Location access coordination with other projects and launch activities.

File details come from the government source that posted it. Updated .