Enclosure 6 - RTO 1 Release Response and Remediation.pdf

PDF 69 KB Posted

Attached to
Environmental Services Follow-on Federal contract opportunity
Solicitation number
80GSFC20R0005
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document contains a request for task plan for environmental services at two government facilities. The services required include spill/release control, removal, and emergency consultation support at all incidents. Investigations and reports are needed for all supported incidents, and a database must be maintained. Response times and capabilities are specified, along with regulatory notification requirements. The period of performance is one year from award. Relatedly, the federal contract opportunity posted is a final RFP for an environmental services follow-on contract providing assistance meeting regulatory requirements and stewardship objectives at multiple NASA locations. Services include waste management, planning, studies and more. The hybrid contract has a potential five-year period of performance with annual option periods and allows issuing task orders. Questions are due by May 20, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Services Follow-on, newest first.
File Type Posted
Amendment 4.pdf PDF
Set 4 Environmental Questions and Answers 80GSFC20R0005.pdf PDF
Set 2 Environmental Questions and Answers 80GSFC20R0005.pdf PDF
Set 3 Environmental Questions and Answers 80GSFC20R0005.pdf PDF
Set 1 Environmental Questions and Answers 80GSFC20R0005.pdf PDF
SF30 Amendment 3 to 80GSFC20R0005.pdf PDF
Signed SF30 Amend 2 to 80GSFC20R0005.pdf PDF
SF1408-14b (1).pdf PDF
Final Amendment 2 Pg 2 - 29.pdf PDF
Enclosure 8 - SF1408 Cover Page.pdf PDF
Attachment C - IAGP MEMD EquipRpt GB 6-9-20.pdf PDF
Attachment C - Cover Pg Govt Property - 6-9-20.pdf PDF
Enclosure 1 - RFP Clauses - 6-9-20.pdf PDF
Attachment C - Wallops IAGP_list 6-9-20.pdf PDF
Set 2 Envrionmental Questions and Answsers 80GSFC20R0005.pdf PDF
Amendment 1 Pg 2 - 4.pdf PDF
Set 1 Envrionmental Questions and Answsers 80GSFC20R0005.pdf PDF
Enclosure 7 - Work Load Indicators Document - corrected.pdf PDF
Enclosure 1 - RFP Clauses - 5-15-20.pdf PDF
Attachment F - Work Breakdown Struction - replace pge 3 WBS 20200518 corrected.pdf PDF
SF30 - Amendment 1 to 80GSFC20R0005 - CO Signed.pdf PDF
Enclosure 1 - Form -- SF33-14a - Amendment 1.pdf PDF
Attachment A - SOW.pdf PDF
Attachment D - 533 Attach Core and IDIQ--Both Onsite and Offsite.pdf PDF
Attachment C - Cover Pg Govt Property.pdf PDF
Attachment C - Wallops IAGP_list Feb 2020.pdf PDF
Attachment H - Rate Matrix.pdf PDF
Attachment A - SOW.pdf PDF
Attachment J - IT Sec Mgmt Plan.pdf PDF
Enclosure 1 - Form -- SF33-14a.pdf PDF
Attachment C - IAGP MEMD EquipmentRpt.pdf PDF
Attachment B - PIV Attachment.pdf PDF
Attachment K - IT Security Applicable Documents List.pdf PDF
EXHIBITS 1 - 18 Cost Exhibits Cover Pg.pdf PDF
Enclosure 7 - Work Load Indicators Document.pdf PDF
Attachment E - Safety and Health Plan.pdf PDF
Attachment G - Contract Historical Data.pdf PDF
Enclosure 3 - Template OCI Avoidance Plan Outline.pdf PDF
GPM Exhibits 2-18 Hybrid Core-IDIQ by CY OCT 2016.pdf PDF
Enclosure 6 - Cover Pg RTOs.pdf PDF
Enclosure 2 - IT Security Management Plan Template.pdf PDF
Attachment I - OCI Avoidance Plan.pdf PDF
GPM Exhibits 1A-1B Hybrid Core-IDIQ Std by CY MAR 2016.pdf PDF
Enclosure 8 - Contract Historical Data.pdf PDF
signed Cover Letter Final RFP.pdf PDF
Enclosure 4 - QASP.pdf PDF
Enclosure 1 - Cover Pg - SF33 Clauses w Attachments.pdf PDF
Enclosure 5 - GPM-Specified Non-Mgmt DL Categories DL Hours and PDs Enclosure.pdf PDF
Enclosure 3 - OCI Cover Pg.pdf PDF
Enclosure 2 - IT Sec Mgmt Plan Cover Pg.pdf PDF
Show all 50

Environmental Services Follow-on has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RTO1

Representative ID/IQ Task Order

Request for Task Plan

Environmental Service Contract

Release Response and Remediation:

Greenbelt and Wallops

Projected Task Period of Performance:

The period of performance shall be one year from award.

Task Objective:

To provide the resources and actions necessary for the Center to meet regulatory requirements related to emergency support, release response, mitigation, reporting and recordkeeping, including the related requirements of the Spill Prevention Control and

Countermeasures Plan, Oil Discharge Contingency Plan and Hazardous Waste

Contingency Plan as documented in the Greenbelt and Wallops Integrated Contingency

Plans at the Greenbelt and Wallops facilities.

Task Background:

NA

Task Description:

a. Spill/Release Control, Removal and Emergency Consultation (all media)

Requirement: Report to all Hazardous Material/Hazardous Waste/Oil Spills/Releases.

Provide information on environmental regulatory requirements and support evaluation, planning and assessment of emergency situations during emergency operations in accordance with GSFC plans and applicable regulations. Additionally, report to the

Incident Command Post for any emergencies where environmental support or consultation is requested. All work performed during the emergency phases of an incident shall be provided outside of the “HOT” zone (hazardous area). Support shall include support of GSFC personnel in providing assistance on regional or national incidents.

A 24-hour contact number shall be provided to GSFC and GSFC shall be authorized to activate a response by the contractor or subcontractor.

Re-stocking of expended supplies, materials and damaged equipment as a result of releases for the purpose of returning to appropriate levels of preparedness shall be within the scope of this task.

For Greenbelt Only: Provide investigation and control and cleanup for all spills/releases.

Control and cleanup actions shall not be initiated until after imminent threat to people is controlled by others (emergency conditions are controlled). Provide timely notification with necessary data to the Goddard Environmental Team (GET) on-call member, or designee, for GSFC’s official notification, when applicable, to EPA’s National Response

Center (NRC) and MDE within 2 hours of an incident. If the GET on-call member, or designee, is not available within the regulatory reporting window, provide notification of appropriate regulatory parties as required and provide documentation of the notification details and the NRC Call Number that is assigned to the incident when applicable.

For Wallops Only: Provide investigation and waste management support to the Wallops

Fire Department, and provide control and cleanup for spills/releases beyond the capability of the Wallops Fire Department. Control and cleanup actions shall not be initiated until after imminent threat to people is controlled by others (emergency conditions are controlled). Provide timely notification with necessary data to the Wallops

Environmental Team on-call member, or designee, for GSFC’s official notification, when applicable, to EPA’s National Response Center (NRC) and Tidewater Regional Office of the Virginia DEQ during business hours or the Virginia Department of Emergency

Management during non-business hours within 2 hours of an incident. If the Wallops

Environmental Coordinators are not available within the regulatory reporting window, provide notification of appropriate regulatory parties as required and provide documentation of the notification details and the NRC Call Number that is assigned to the incident when applicable.

b. Emergency Support/Spill/Release Investigation and Incident Report (all media)

Requirement: Report on all incidents supported, regardless of the existence of a spill/release. Investigate reported spills/releases. Provide written support/spill/release incident reports and maintain the support/spill/release log/database. Reports shall meet all requirements established by regulations and permits. Reports shall also contain hours expended by labor category and materials consumed and their costs.

Work Load Indicators:

For Greenbelt: Assume two small releases/support actions per month (capable of being handled by onsite resources with level C PPE) [representative parking lot spills]. Four releases per year are estimated to meet state written report requirements.

For Wallops: Assume two releases/support actions per month requiring waste management support to the Wallops Fire Department of one 55-gallon drum of oily waste per action. One releases per year are estimated to meet state written report requirements.

Task Deliverables: by definition, must meet requirements in contract and SOW.

a. Minimum Standards: Trained coordinator to report to the incident commander within 10 minutes of notification by the GSFC dispatch, Civil Servant

Environmental Team member, or designee during normal business hours and within 2 hours of notification during non-business hours.

b. For Greenbelt Only: Defensive action to be capable of deployment within 30 minutes of notification and offensive action capable of deployment within 2 hours during normal business hours. Defensive action to be capable of deployment within 2 hours and 30 minutes of notification and offensive action capable of deployment within 4 hours during non-business hours. Regulatory notifications within required time frame if GET on-call member, or designee, is not available to complete notifications. Short summary report to the Center Environmental

Manger, Oil Program Manager and COR via email within 24 hours of the incident notification.

c. For Wallops Only: Capable of initiating a response by outside providers within

30 minutes of determination of need during normal business hours. Capable of initiating a response by outside providers within 1 hour and 30 minutes of determination of need during non-business hours. Outside providers shall be capable of providing on-sight resources and personnel within 8 hours of notification. Regulatory notifications within required time frame if GET on-call member, or designee, is not available to complete notifications. Short summary report to the Center Environmental Manger, Oil/Tank Program Manager and COR via email within 24 hours of the incident notification.

d. Minimum Standards: Complete and accurate report. Support/Spill log and incident investigation reports up-to-date within 5 calendar days of notification of spill, final incident investigation reports within 5 calendar days of conclusion of all spill and investigative actions.

Task Constraints:

None identified.

File details come from the government source that posted it. Updated .