10021 - Emergency Dry Docking Basic Spec

View the file

Other files

File Type Posted
Amendment_04.pdf PDF
10021_-_Dry_Docking_REV_1.doc DOC document
Amendment_03.pdf PDF
Amendment_02.pdf PDF
12351_-_Z-drive_Flush,_Seal_replacement_REV1.doc DOC document
Amendment_01.pdf PDF
AMC-997-1A.pdf PDF
NF-241-05__Z_Drive_Tech_Man.pdf PDF
NF-505-6501097_Standard_Piping_Details.pdf PDF
MOC-300-3.pdf PDF
12351_-_Z-drive_Flush,_Seal_replacement.doc DOC document
RFQ_EA-133M-18-RQ-01428.pdf PDF
10011_-_General_Requirements.doc DOC document
NF085002_F,_Docking_Plan.pdf PDF
NF085001.pdf PDF
AMC-000-1F_.pdf PDF
AMC-000-2C.doc DOC document
MOC-631-2D.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA SHIP NANCY FOSTER

(R-352)

30APR2018

ITEM NO. 10021

BASIC ITEM

MED/KRZ

Dry Docking l.0 ABSTRACT

1.1 This item describes the requirements for drydocking the ship.

2.0 REFERENCES:

2.1 Drawing NF-085-002, Docking Plan

2.2 NOAA Standard Specification AMC-997-1A, “Drydocking and Routine Drydock Work (As modified)”

2.3 NOAA Standard Specification AMC-000-2C, “Temporary Services at Contractor Facilities (As modified)”

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Overall length

186'- 0"

Beam, Molded

40'- 0"

Draft, Design

11'- 0"

Draft, Navigational

12'- 0"

Displacement (FL)

1271 LT

Propulsion Z-Drives

Propulsion shafts -

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES

4.1 Government Furnished Eqipment: None.

4.2 Government Furnished Services:

4.2.1 The Government will provide the services of an ABS Surveyor.

5.0 NOTES

5.1 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract, including but not limited to 10011 to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in references included in work item 10011.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7.0 STATEMENT OF WORK REQUIRED

7.1 SEQ CHAPTER \h \r 1Accomplish the requirements of Reference 2.2 to drydock the ship in accordance with Reference 2.1.

7.2 The crew will be living aboard during the dry docking period. As a clarification to Ref. 2.3, services required while in drydock include:

7.2.1 Cooling water for the A/C plant.

7.2.2 1 and ½” NPT Water connection for hotel flushing, connection is in Auxiliary machinery space on port side.

7.2.3 3” Camlock connection for sewage connection to ship’s deck riser.

7.2.4 Three each phone lines to ship’s phone junction box on main weather deck.

7.2.5 1-1/2“ Potable water connection located on main deck port or stbd side.

7.2.6 High Speed Internet Service.

7.2.7 Trash bins.

7.2.8 Crane service as required to remove trash or load stores.

7.2.9 Electrical power, one each cable, 3 phase, 300 Amp service, 460V.

7.2.10 Fire Main connection.

7.2.10 Provide 10 each parking spaces.

7.3 SEQ CHAPTER \h \r 1Provide for removal of up to 500 gallons oily waste from ship & disposal of oily rags.

8.0 GENERAL REQUIREMENTS: None Additional.

002-2