10021_-_Dry_Docking_REV_1.doc
DOC document 37 KB Posted
- Attached to
- Emergency Dry Dock for Z-Drive Repairs Federal contract opportunity
- Solicitation number
- EA-133M-18-RQ-01428
About this file
10021 - Dry Docking REV 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_04.pdf | ||
| Amendment_03.pdf | ||
| 12351_-_Z-drive_Flush,_Seal_replacement_REV1.doc | DOC document | |
| Amendment_02.pdf | ||
| Amendment_01.pdf | ||
| AMC-997-1A.pdf | ||
| NF-241-05__Z_Drive_Tech_Man.pdf | ||
| NF-505-6501097_Standard_Piping_Details.pdf | ||
| MOC-300-3.pdf | ||
| 12351_-_Z-drive_Flush,_Seal_replacement.doc | DOC document | |
| RFQ_EA-133M-18-RQ-01428.pdf | ||
| 10021_-_Emergency_Dry_Docking_Basic_Spec_.doc | DOC document | |
| AMC-000-1F_.pdf | ||
| AMC-000-2C.doc | DOC document | |
| MOC-631-2D.pdf | ||
| 10011_-_General_Requirements.doc | DOC document | |
| NF085002_F,_Docking_Plan.pdf | ||
| NF085001.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOAA SHIP NANCY FOSTER
(R-352)
2MAY2018
ITEM NO. 10021
BASIC ITEM
MED/KRZ
Dry Docking
REV1
l.0 ABSTRACT
1.1 This item describes the requirements for drydocking the ship.
2.0 REFERENCES:
2.1 Drawing NF-085-002, Docking Plan
2.2 NOAA Standard Specification AMC-997-1A, “Drydocking and Routine Drydock Work (As modified)”
2.3 NOAA Standard Specification AMC-000-2C, “Temporary Services at Contractor Facilities (As modified)”
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Overall length
186'- 0"
Beam, Molded
40'- 0"
Draft, Design
11'- 0"
Draft, Navigational
12'- 0"
Displacement (FL)
1271 LT
Propulsion Z-Drives
Propulsion shafts -
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES
4.1 Government Furnished Eqipment: None.
4.2 Government Furnished Services:
4.2.1 The Government will provide the services of an ABS Surveyor.
5.0 NOTES
5.1 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract, including but not limited to 10011 to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in references included in work item 10011.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK REQUIRED
7.1 SEQ CHAPTER \h \r 1Accomplish the requirements of Reference 2.2 (as modified below) to drydock the ship in accordance with Reference 2.1.
7.1.1 Since this is an emergency dry docking, the following paragraphs in Reference 2.2 are not required to be accomplished:
· 3.5.2
· 3.5.4
· 3.5.5
· 3.5.6
· 3.6
· 3.7
· 3.8
· 3.9
· 3.10
· 3.11
7.2 The crew will be living aboard during the dry docking period. As a clarification to Ref. 2.3, services required while in drydock include:
7.2.1 Cooling water for the A/C plant.
7.2.2 Cooling water for the reefer plant.
7.2.3 Water connection for hotel flushing.
7.2.4 Sewage connection to ship’s deck riser.
7.2.5 Three each phone lines to ship’s phone junction box on weather deck.
7.2.6 Potable water connection.
7.2.7 High Speed Internet Service.
7.2.8 Trash bins.
7.2.9 Crane service as required to remove trash or load stores.
7.2.10 Electrical power, one each cable, 440V.
7.2.11 Fire Main connection.
7.2.10 Provide 10 each parking spaces.
7.3 SEQ CHAPTER \h \r 1Security Service. Provide security guard service 1600H-0800H and 24 hrs day on weekends for the duration that the ship is at the contractor’s facility.
7.3.1 A guard shall inspect all unlocked compartments at least once every two hours, or part thereof, while work is not being performed. The guard shall be equipped with a Detex watch clock during the compartment inspections and shall record their inspections on the clock at key stations.
8.0 GENERAL REQUIREMENTS: None Additional.
002-1