BRIDGE INSPECTION REPORT
OLD TN ROUTE 96 BRIDGE
NATCHEZ TRACE PARKWAY OVER OLD TN ROUTE 96 & DOBBINS BRANCH
NATCHEZ TRACE PARKWAY
LN
STRUCTURE NO. 5570-451P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 3/18/13
Report prepared by: WU
MILE POINT: 430.40
Federal Highway Administration KILOMETER POINT: 692.64 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 5570-451P
OLD TN ROUTE 96 BRIDGE INSPECTION DATE: 3/18/13
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... P/S CONCRETE CONTINUOUS
MAIN SPAN TYPE: ............... BOX GIRDER - SINGLE or SPREAD
# OF BEAMS, MAIN SPAN: .. 1
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE
WEARING SURFACE: .......... BITUMINOUS
ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L
ABUTMENT / PIER MAT'L: ... CONCRETE
PROJ./PLAN REF. NO: ......... 1B6 / 80
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 2008-ROADWAY STRIPING REPAINTED.
LOCATION
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
800.0 FT (243.8 M)
200.0 FT (61.0 M)
37.0 FT (11.3 M)
34.0 FT (10.4 M)
N/A 0 °
NO
NATCHEZ TRACE PARKWAY MILE POINT: ..................... 430.40 (KM PT 692.64)
STATE: ................................. TENNESSEE LOCATION: 1.75 MILES TO TN ROUTE 46
FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY
FEATURE INTERSECTED: .. OLD TN ROUTE 96 & DOBBINS BRANCH
STRUCTURE EVALUATION SUMMARY
This prestressed concrete continuous box girder bridge is in good condition overall. Problems include moderate transverse cracking of the approach pavement at the approach slab ends, a moderate debris accumulation in the expansion joints, spalling with exposed rebar on the west rail near the south abutment, and popouts with exposed rebar on the east side of the box girder at the south abutment.
Repairs should be made as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: D.K. JOHNSON, J.S. SMITHDEAL (CLARK NEXSEN)
CONDITION ASSESSMENT:
D. KEITH JOHNSON, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 8/1/13
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-451P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
222.4 SAW CUT AND SEAL TRANSVERSE CRACKS IN APPROACH PAVEMENT AT
APPROACH SLAB ENDS.
68 LF
58.2 REMOVE DEBRIS FROM EXPANSION JOINTS. 1 LS
FIELD INSPECTION REPORT STRUCTURE NO. 5570-451P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 7 ITEM REFERENCE AND REMARKS
G1. DECK SLAB
F2. EXPANSION JOINTS
G3. WEARING SURFACE
G4. RIDEABILITY
G5. CURBS, SIDEWALKS, AND MEDIAN
G6. PARAPETS AND/OR RAILINGS
G7. DRAINS AND DRAINAGE
N8. UTILITIES
G9. DEFLECTION AND/OR VIBRATION
N10. OTHER
59. SUPERSTRUCTURE 7
G
2. GIRDERS OR BEAMS
1. BEARING DEVICES
G
N3. ARCH(ES) OR SLAB(S)
N4. FLOOR BEAMS AND STRINGERS
N5. TRUSSES
G6. DIAPHRAGMS AND BRACING
N7. PAINT
N8. FASCIA(E)
G9. DEFLECTION AND/OR VIBRATION
G10. ALIGNMENT
N11. OTHER
60. SUBSTRUCTURE 7
58.1 MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE
THROUGHOUT DECK UNDERSIDE. SPANS #1 AND #3 HAVE
EVIDENCE OF LEAKAGE WITH EFFLORESCENCE ALONG
CONSTRUCTION JOINT LINES.
58.2 MODERATE ACCUMULATION OF DEBRIS IN BOTH EXPANSION
JOINTS.
58.3 MINOR RANDOM CRACKING OF WEARING SURFACE. ROADWAY
STRIPING BEGINNING TO CRACK AND FADE.
58.5,6 MINOR VERTICAL, TRANSVERSE, AND RANDOM CRACKING WITH
EFFLORESCENCE ON CURBS AND RAILINGS. MINOR (8"L X 4"H X
1-¼"D) SPALL WITH EXPOSED REBAR ON WEST SIDE OF WEST RAIL
NEAR SOUTH ABUTMENT. MINOR SPALL (6" DIA. X ½"D) AROUND
FORM BOARD LEFT IN PLACE ON EAST CURB NEAR MID-SPAN, SPAN
#4. MINOR SPALL/MOWER SCRAPES ON SOUTHEAST AND
NORTHWEST PARAPET ENDS.
58.7 MINOR VEGETATION GROWING ALONG CURBLINES.
ABUTMENTS
BREASTWALLS OR COLUMNS 1. G
PILE BENTS 2. N
CAPS AND/OR BEARING SEATS 3. G
BACKWALLS AND/OR BULKHEADS4. G
FOUNDATIONS 5. N
WINGWALLS 6. G
WEEP HOLES7. N
EXPANSION JOINTS 8. N
EROSION AND/OR SCOUR9. G
SETTLEMENT OR DEFLECTION10. G
SLOPE PROTECTION11. G
OTHER (VEGETATION) 12. G
PIER(S)
WALLS AND/OR COLUMNS 13. G
PILE BENTS 14. N
CAPS AND/OR BEARING SEATS 15. G
FOUNDATIONS 16. N
EROSION AND/OR SCOUR17. G
SETTLEMENT OR DEFLECTION18. G
OTHER19. N
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 8
G G N G N
MED
SUFF
30 FT.
SILT, GRAVEL
222. APPROACHES 7
OTHER9.
ALIGNMENT8.
SIGNS7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS N
N N F G G G G N
223. RETAINING WALL N
OTHER6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 1
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
59.2 EXTERIOR: MINOR LONGITUDINAL CRACKING ALONG SIDES OF BOX
GIRDER, 9" FROM BOTTOM (APPROXIMATELY AT TOP OF BOTTOM
SLAB). MINOR RANDOM CRACKING ON BOTH WEB WALLS AT
SOUTH ABUTMENT; POPOUTS WITH EXPOSED REBAR. DOOR
HINGES BROKEN ON NORTH HATCH.
INTERIOR: MINOR LONGITUDINAL CRACKING (UP TO 0.015"W X 33'L)
OF BOTH WEB WALLS AT SOUTH ABUTMENT; CRACKS MAY BE
REFLECTIVE OF INTERAL TENDONS. HAIRLINE LONGITUDINAL
CRACKING OF BOTH WEB WALLS ABOVE ANCHORAGE BLOCKS IN
SPAN #1. MINOR CRACKING AND SPALLING OF GROUT ON
ANCHORAGE BLOCK #7-WEST IN SPAN #1. HAIRLINE DIAGONAL
CRACKING OF WEST WEB WALL IN SPAN #1 NEAR SOUTH PIER.
HAIRLINE LONGITUDINAL CRACKING OF EAST WEB WALL (34'L) AND
WEST WEB WALL (37'L) IN SPAN #1 NEAR SOUTH PIER. HAIRLINE
LONGITUDINAL CRACKING (6'L) OF WEST WEB WALL IN SPAN #2,
APPROXIMATELY 40' SOUTH OF CENTER PIER. MINOR DIAGONAL
CRACKING (UP TO 0.010"W X 6'L) OF BOTH WEB WALLS IN SPAN #3,
APPROXIMATELY 3' NORTH OF CENTER PIER. MINOR LONGITUDINAL
CRACKING (8'L) OF WEST WEB WALL IN SPAN #3, APPROXIMATELY
44' NORTH OF CENTER PIER. MINOR LONGITUDINAL, VERTICAL AND
DIAGONAL CRACKING (UP TO 0.040"W) OF BLISTER IN SPAN #3,
WEST SIDE. MINOR LONGITUDINAL CRACKING OF EAST CHAMFER
IN SPAN #4.
59.6 MINOR HORIZONTAL CRACKING ALONG CHAMFER ON SOUTH FACE
OF SOUTH PIER DIAPHRAGM.
60.1,4 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON BOTH
ABUTMENT BACKWALLS AND BREASTWALLS; WATER STAINING
ALSO PRESENT.
60.3 MINOR VERTICAL CRACKING ON BEARING SEATS. PREVIOUSLY
NOTED WATER PONDING ON SOUTH ABUTMENT SEAT NOT
OBSERVED DUE TO DRY CONDITIONS.
60.6 MINOR CRACKING WITH STAINING ON WINGWALLS. MINOR
HORIZONTAL CRACKING OF CHEEKWALLS. MINOR SPALLS ON
SOUTH ABUTMENT CHEEKWALLS.
60.11 SLOPE PROTECTION HAS SETTLED UP TO 3" AT SOUTH ABUTMENT
AND UP TO 2" AT NORTH ABUTMENT WITH MINOR TRANSVERSE
CRACKING ON BOTH ABUTMENT SLOPES. MINOR SPALLING OF
CURBS ALONG SIDES OF SLOPE PROTECTION.
60.12 SEVERAL SMALL TREES GROWING AGAINST NORTHWEST
WINGWALL. MINOR VINE GROWTH ON SLOPE PROTECTION AT BOTH
ABUTMENTS.
60.13 MINOR VERTICAL CRACKS AND MINOR MOWER SCRAPES ON EACH
PIER.
60.15 MINOR VERTICAL CRACKING WITH EFFLORESCENCE AT TOP OF
NORTH AND SOUTH PIERS.
ADDITIONAL ITEM REFERENCE AND REMARKS
222.4 MINOR RANDOM CRACKING OF APPROACH PAVEMENT. MODERATE TRANSVERSE CRACKING OF APPROACH
PAVEMENT AT BOTH APPROACH SLAB ENDS.
222.7 TYPE 3 REFLECTIVE OBJECT MARKER TAPE AT CORNERS OF STRUCTURE. TEMPORARY FLASHER ON EAST
RAILING, SOUTH APPROACH AND WEST RAILING, NORTH APPROACH.
STRUCTURE LOAD RATING STRUCTURE NO. 5570-451P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 20 18 33 30
HS 36 33 60 54
TYPE 3 44 40 73 66
TYPE 3S2 48 44 79 72
TYPE 3-3 49 44 82 74
DESIGN LOADING: HS20 (MS18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-451P
STRUCTURE IDENTIFICATION
(201) PARK: NATCHEZ TRACE PARKWAY (1) STATE: ....................................... 474 - TENNESSEE (TN)
(202) STRUCTURE NAME: .......... OLD TN ROUTE 96 BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 187 - WILLIAMSON
(204) STRUCTURE NUMBER: ..... 5570-451P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... OLD TN ROUTE 96 & DOBBIN
(207) ROAD SECTION NO: .......... 451P (7) FACILITY CARRIED: .................. NATCHEZ TRACE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5570451P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 1.75 MILES TO TN ROUTE 46
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 1B6 (11) MILE POINT: ............................. 430.40 (KM PT 692.64)
(212) DRAWING NUMBERS: ....... 80 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
6 - P/S CONCRETE CONTINUOUS
06 - BOX GIRDER - SINGLE or SPREAD
200.0 FT (61.0 M)
800.0 FT (243.8 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 1 - CONCRETE
(44B) APPR. STR. TYPE: ................ 04 - TEE BEAM
(46) NO. OF APPROACH SPANS: .. 2
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 36.0 TONS (33.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 60.0 TONS (54.4 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 3/13 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-451P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 34.0 FT (10.4 M) (16) LATITUDE: ............................. 35°54'23.80"
(17) LONGITUDE: ......................... 87°00'25.60"
(19) DETOUR LENGTH: ............... 2 MI (3 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 6 - HIGHWAY-WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 24.0 FT (7.3 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
37.0 FT (11.3 M)
34.0 FT (10.4 M)
22.0 FT (6.7 M)
6.0 FT (1.8 M)
6.0 FT (1.8 M)
0 - NO MEDIAN
0 °
NO
34.0 FT (10.4 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
1 - FULL HEIGHT (NO PARAPE
1 - CONCRETE
1 - CONTINUOUS RAIL
2.67 FT (0.81 M)
99.99 FT (99.99 M)
22.42 FT (6.83 M)
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
8 - Stable; scour above top of fo
1 - MAINTENANCE
D - MINOR
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2008-ROADWAY STRIPING REPAINTED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5570-451P
PHOTOGRAPHS STRUCTURE NO. 5570-451P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD TUPELO
FLOW
PHOTO #2 - EAST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW
LOOKING NORTH
PHOTO #4 - TYPICAL ACCUMULATION OF
DEBRIS IN BOTH EXPANSION JOINTS;
EXPANSION JOINT OVER SOUTH ABUTMENT
SHOWN
PHOTO #5 - TYPICAL RANDOM CRACKING OF
WEARING SURFACE; SPAN #1 SHOWN
PHOTO #6 - TYPICAL VERTICAL, TRANSVERSE,
AND RANDOM CRACKING WITH
EFFLORESCENCE ON CURBS; WEST CURB,
SPAN #1 SHOWN
PHOTO #7 - TYPICAL VERTICAL, TRANSVERSE, AND RANDOM
CRACKING WITH EFFLORESCENCE ON RAILINGS; EAST RAILING, SPAN
#1 SHOWN
PHOTO #8 - SPALL WITH EXPOSED REBAR ON WEST SIDE OF WEST
RAIL NEAR SOUTH ABUTMENT
PHOTO #9 - SPALL AROUND FORM BOARD LEFT IN PLACE ON EAST
CURB NEAR MID-SPAN, SPAN #4
PHOTO #10 - SPALL/MOWER SCRAPES ON NORTHWEST PARAPET END
PHOTO #11 - TYPICAL TRANSVERSE
CRACKING OF APPROACH PAVEMENT AT BOTH
APPROACH SLAB ENDS; SOUTH APPROACH
SHOWN
PHOTO #12 - TYPICAL RANDOM CRACKING OF
APPROACH PAVEMENT; SOUTH APPROACH
PHOTO #13 - GENERAL UNDERSIDE VIEW LOOKING SOUTH, SPAN #1
PHOTO #14 - TYPICAL POPOUTS WITH EXPOSED REBAR ON EAST AND
WEST GIRDER WEB WALLS AT SOUTH ABUTMENT; EAST WALL SHOWN
PHOTO #15 - GENERAL VIEW OF BOX GIRDER
INTERIOR LOOKING NORTH, SPAN #1
PHOTO #16 - TYPICAL TRANSVERSE
CRACKING WITH EFFLORESCENCE
THROUGHOUT DECK UNDERSIDE; SPAN #2
PHOTO #17 - DIAGONAL CRACKING OF WEST WEB WALL IN SPAN #1
NEAR SOUTH PIER
PHOTO #18 - CRACKING AND SPALLING OF GROUT ON ANCHORAGE
BLOCK #7-WEST IN SPAN #1
PHOTO #19 - LONGITUDINAL, VERTICAL AND DIAGONAL CRACKING OF
BLISTER IN SPAN #3, WEST SIDE
PHOTO #20 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE VINE
GROWTH ON SLOPE PROTECTION
PHOTO #21 - TYPICAL VERTICAL CRACKING
WITH EFFLORESCENCE ON ABUTMENT
BACKWALLS AND BREASTWALLS; SOUTH
ABUTMENT SHOWN; ALSO NOTE SETTLEMENT
OF SLOPE PROTECTION
PHOTO #22 - SETTLEMENT OF SOUTH
ABUTMENT SLOPE PROTECTION
PHOTO #23 - TYPICAL TRANSVERSE
CRACKING ON BOTH ABUTMENT SLOPES;
SOUTH ABUTMENT SLOPE SHOWN
PHOTO #24 - TYPICAL SPALLING OF CURBS
ALONG SIDES OF SLOPE PROTECTION; EAST
SIDE, SOUTH SLOPE PROTECTION SHOWN
PHOTO #25 - TYPICAL CRACKING AND SPALL
ON BOTH CHEEKWALLS AT SOUTH ABUTMENT;
WEST CHEEKWALL SHOWN
PHOTO #26 - GENERAL VIEW OF SOUTH PIER,
NORTH SIDE
PHOTO #27 - UPSTREAM CHANNEL
PHOTO #28 - DOWNSTREAM CHANNEL