J-08 Task Order Work-Plan Template A0009.xlsx
XLSX spreadsheet 109 KB Posted
- Attached to
- Security System Design and Integration II (SSDI II) Federal contract opportunity
- Solicitation number
- DTFAWA-17-R-00049
About this file
This Request for Information document seeks industry feedback on a draft statement of work for the Security System Design and Integration II contract to perform technical refreshes of security systems at staffed Federal Aviation Administration facilities. The incumbent contractor is Versar Security Systems, LLC. Interested parties must register in the System for Award Management and sign a Document Security Notice to receive sensitive documents. Responses to the RFI are due by August 3, 2017 and should be submitted to the Contracting Officer via email. The follow-on contract will replace integrated physical access control, surveillance, and perimeter intrusion detection systems as well as intercoms and door hardware at FAA sites. Access control systems must meet HSPD-12 and NIST FIPS requirements and be on the GSA approved products list for network connectivity to the FAA's Physical Security Enterprise Management System for remote alarm monitoring and personal identity verification cardholder access.
J-08 Task Order Work-Plan Template A0009 (xlsx)
View the file
Other files for this federal contract opportunity
Show all 50
Security System Design and Integration II (SSDI II) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-08 Workplan Instructions
| TO Signature & Summary Page | ||
| Enter: | Order & Work Plan Number | |
| Order Title | ||
| Reason for revision if applicable | ||
| Site Location Information | ||
| Order approval information | ||
| For Sample Tasks, identify the Order Title only. |
| Detail of Work and Shutdowns | ||
| Enter: | Detail of work to be performed | |
| Scheduled / Proposed Shutdowns: | ||
| Labor Hours - ALL LABOR CATS. | ||
| Enter: | Labor Hours are entered on "Basis of Estimate" worksheet | |
| For Sample Tasks, enter Labor Categories and hours. Do not enter rates. | ||
| Travel Costs | ||
| Enter: | Travel Information | |
| For Sample Tasks, enter labor categories of travellers instead of names of individuals and enter duration of trip. Do not enter rates, mileage, or costs for Sample Tasks. | ||
| Existing Equipment | ||
| Enter: | Existing Equipment Information | |
| For Sample Tasks, assume no existing equipment is installed at the Sample Task Sites. | ||
| Sub-Contractor Work | ||
| Enter: | Sub-Contractor Information | |
| For Sample Tasks, enter descriptions. Do not enter costs for Sample Tasks. | ||
| Other Direct Costs | ||
| Enter: | Other direct costs | |
| For Sample Tasks, enter descriptions. Do not enter costs for Sample Tasks. |
| Work Schedule-Deliverables-Doc | ||
| Enter: | Schedule / Deliverable information | |
| Basis of Estimate | ||
| Enter: | Enter labor hours for tasks |
DTFAWA-17-R-00049/A0009
TO Approval
| TASK ORDER Number | Mod. # | Order Type |
| (T&M, FFP, CPFF,etc.) |
(Order Title)
| Job Order Number (JON): | |||
| Total Order Ceiling Amount (including travel): | |||
| Travel Costs (CLIN 5000-5003): | |||
| Fixed Fee (CPFF Orders only): | |||
| Task Order Ceiling Amount (not including Travel): | |||
| Original Order Amount: | |||
| Previous Modification Amounts: | |||
| Funds (added to or subtracted with) this Order: |
Task Order Summary (If Order Modification, indicate reason) :
| Site location included in Order: | ||||
| Facility LOC ID | FACILITY / SITE TYPE (ATCT, FSDO, ARTCC, etc.) | Address, CITY, STATE | Order Completion Date | |
| - |
| Order Approvals: | |||||
| FAA / Contractor | Name | Routing Symbol / Position | Telephone Number | Signature | Date |
| FAA SSDI Contracting Officers Representative (COR) |
FAA Contracting Officer (CO)
| Breakdown of funding: | |||||||
| Site Survey | Design / Consultation | Phase II | Program Management | Total Funding Required By This Modification | |||
| Site Preparation | Integration / Installation | Training | |||||
| Labor Costs: | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| Sub-Contract Costs: | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |
| Travel Costs: | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| Approved Security Equipment: | ERROR:#REF! | ERROR:#REF! | |||||
| Non-Contract Security Equipment (pre-approval required before use): | ERROR:#REF! | ERROR:#REF! | |||||
| Other Direct Costs: | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| Documentation / Bonds / Permits: | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| Order Totals: | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| Yes/No | Verified By | ||||||
| Workplan Approved: | |||||||
| Funding Identified: | |||||||
| Funding Added to or on Contract: |
Notes: Site visits will be coordinated through the FAA designated Field COR or designated FAA individual.
&"Arial,Bold"&14TASK ORDER Security Systems Installation FAA Contract No. DTFAWA-17-R-00049
&F &P &6 Form: SSDI-001 (REV -) Attachment J.
Work Plan Approvals & Summary
| $0.00 | 00 | ||||
| Work Plan Number (yyyy-rr-nnn) | Mod. # | Order Type | |||
| (T&M, FFP, CPFF,etc.) | |||||
| $0.00 | |||||
| (Order Title) |
Job Order Number (JON):
| Task Order Summary (and if Order Modification, indicate reason) : |
| $0.00 |
| Site location included in Order: | |||||
| Facility LOC ID | FACILITY / SITE TYPE (ATCT, FSDO, ARTCC, etc.) | Address, CITY, STATE | Order Completion Date | ||
| 0 | 0 | 0 | 12/31/99 | - | 12/31/99 |
| Work Plan Approvals: | |||||
| FAA / Contractor | Name | Routing Symbol / Position | Telephone Number | Signature | Date |
| Contractor |
Headquarters or Service Area Point of Contact (POC)
FAA Field COR Field COR or Service Area Point of Contact (POC)
FAA Service Area POC Headquarters
FAA SSDI Contracting Officers Representative (COR)
Notes:
&"Arial,Bold"&14WORK PLAN
SECURITY SYSTEMS DESIGN AND INTEGRATION CONTRACT
Contract Number DTFAWA-17-R-00049
Page &P of &N &6 Form: SSDI-001 (REV -)
Detail of Work
| ERROR:#VALUE! | 00 |
| Work Plan Number (yyyy-rr-nnn) | Revision |
Detail of work to be performed:
Contract Number DTFAWA-17-R-00049
Page &P of &N &6 Form: FSRM-001I (REV 6A) Attachment J.7.7.
Labor Hours - ALL LABOR CA
| 00 | |||||||||
| Work Plan Number (yyyy-rr-nnn) | Revision | ||||||||
| Labor categories supporting Order: | |||||||||
| Individuals | Hours | ||||||||
| Item | Labor Category | Name | Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Total Labor Hours |
| Program Manager | 0 | 0 | |||||||
| Service Area Point of Contact (POC) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Project Site Manager | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Project Site Supervisor | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| System Administrator | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Program Management Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Administration Support | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Configuration Control Specialist | 0 | 0 | |||||||
| Program Control Specialist | 0 | 0 | |||||||
| Systems Engineer - Senior | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Security Systems Specialist - Senior | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Security Systems Specialist - Junior | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Electronic Security Technician - SR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Electronic Security Technician - JR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Quality Control Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Training Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Draftsman - CAD Operator | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Principle Specialist I | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Principle Specialist II | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Network Engineer | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Information Assurance Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Logistics Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
| Total Labor Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Contract Number DTFAWA-17-R-00049
Page &P of &N &6 Form: SSDI-001I (REV 9)
Subcontractor Work
| $0.00 | 00 | |
| Work Plan Number (yy-rr-nnn) | Revision |
| Detail of Sub-Contractor Duties | |
| Sub-Contractor | Detail of Sub-Contractor Work |
| Sub-Contractor Labor: | |||||||
| Order Phase (Enter "x" in applicable column) | |||||||
| Sub-Contractor | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Summary of Sub-Contractor Work | Hours / Quantity |
| Sub-Contractor Material: | |||||||
| Task Order Phase (Enter "x" in applicable column) | |||||||
| Sub-Contractor | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Description of Sub-Contractor Material Items | Quantity |
Contract Number DTFAWA-17-R-00049
Page &P of &N
&6Form: SSDI-001I (REV 6A)
Travel
| $0.00 | 00 | |
| Work Plan Number (yyyy-rr-nnn) | Revision |
| Travel Costs: | |
| Purpose of travel |
(Enter "x" in applicable column enter only 1 "x" per row) Individual Traveling Program Mgmt. Reviews / Meetings Site Survey Design / Consultation Site Preparation Integration / Installation Training Origination Destination Airfare or Auto (per trip) FTR Rate / Mile. Rate Duration of Trip (days) / Mileage, # of trips Number of trips / Miles per trip
Contract Number DTFAWA-17-R-00049
Page &P of &N &6 Form: SSDI-001I (REV 6A)
Approved Security Equipment
| 0 | 00 |
| Work Plan Number (yyyy-rr-nnn) | Revision |
| Approved Security Equipment: | |||||
| SSDI ID Number | Part Number | Manufacturer | System/Component | Qty. | Standard Mfg. Warranty (Years) |
Total Equipment/Material Costs:
DTFAWA-17-R-00049
Equipment Requiring Approval
Work Plan Number (yyyy-rr-nnn) Revision
| New Equipment not on approved equipment list: | ||||
| Non Standard Equipment Approvals | Part Number | System/Component | Qty. | |
| Approval Request Number | Approved Item Number |
DTFAWA-17-R-00049
Other Direct Costs
| $0.00 | 00 |
| Work Plan Number (yyyy-rr-nnn) | Revision |
| Other Direct Costs: | ||||||||
| Order Phase (Enter "x" in applicable column) | ||||||||
| Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Description | Qty. |
| Documentation / Bonds / Permits / Freight: | ||||||||
| Order Phase (Enter "x" in applicable column) | ||||||||
| Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Description | Qty. |
Contract Number DTFAWA-17-R-00049
Page &P of &N &6 Form: SSDI-001I (REV 6A)
Work Plan-Deliverables-Doc
| 00 | |||||
| Work Plan Number (yyyy-rr-nnn) | Mod. # | ||||
| Submittals / Deliverables: | |||||
| Required Submittals / Order Deliverables | CLIN | CDRL # or SOW Section | Duration (Working Days) | Start Date (Date or Days After TO Award) | |
| (mm/dd/yy) | Completion Date (Date or Days After Item Start Date) |
(mm/dd/yy)
Project Duration - Weeks (assumes 5 day work week) 0.0
Contract Number DTFAWA-17-R-00049
Page &P of &N &6
Basis of Estimate
| 1 | |||||||||||||||||||||||||||||||||||||||||
| Program Management Support | Site Survey Preparation | Site Survey visit | Develop Site Survey Report | Site Survey Coordination meeting | ADDITIONAL SITE SUREVY TASKS (Identify Task) | ADDITIONAL SITE SUREVY TASKS (Identify Task) | ADDITIONAL SITE SUREVY TASKS (Identify Task) | Prepare Design | ADDITIONAL DESIGN TASKS (Identify Task) | ADDITIONAL DESIGN TASKS (Identify Task) | ADDITIONAL DESIGN TASKS (Identify Task) | Issue Non-Standard Equipment Request | Prepare Draft Phase 2 Order | Prepare Implementation Schedule | Incorporate FAA comments in Order | Issue Subcontracts | Order Equipment | Issue installation drawings and SSR for site installation | Coordinated project activities | Monitor Quality Assurance | Maintain Correspondence | Attend Project Meetings | Prepare meeting minutes | Site | |||||||||||||||||
| Pre-construction meeting | Obtain Permits | Obtain outage permit | Configure, program and bench test head end equipment | Install security fencing | Install General Construction | Install Access Control | Install security power taps/circuits | Install CCTV | Install Security Lighting | Install Locks | Install Perimeter Intrusion system | Install Burglar alarm system | Install Intercom | Inspection & punch list | Commission Access Control system | Commission CCTV | Commission Intercom | Commission Burglar Alarm | Commission Security Lighting | Commission Locks | Commission Perimeter Intrusion Detection | Commission Other | ADDITIONAL INTEGRATION / INSTALLATION TASKS | ||||||||||||||||||
| (Identify Task) | ADDITIONAL INTEGRATION / INSTALLATION TASKS | ||||||||||||||||||||||||||||||||||||||||
| (Identify Task) | ADDITIONAL INTEGRATION / INSTALLATION TASKS | ||||||||||||||||||||||||||||||||||||||||
| (Identify Task) | Pre CAI/JAI Testing | FAA Training | Perform CAI/JAI | Complete As-built drawings | Drawing Re-Work | Construction close out | Prepare O & M Manuals | Prepare / Issue Closeout Order | Hours by Labor Category (not including "PM % of Labor in Order" column) | ||||||||||||||||||||||||||||||||
| Program Manager | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Program Control Specialist | Program Management | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Configuration Control Specialist | Program Management | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Program Management Specialist | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Administrative Support | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||
| Training | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Service Area Point of Contact (POC) | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Project Site Manager | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Project Site Supervisor | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Security Systems Specialist - Senior | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Security Systems Specialist - Junior | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Systems Engineer - Senior | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Electronic Security Technician - Senior | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Electronic Security Technician - Junior | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Quality Control Specialist | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training Specialist | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Draftsman / CAD Operator | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| System Administrator | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Principle Specialist I | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||
| Training | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Principle Specialist II | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Network Engineer | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Information Assurance Specialist | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Logistics Specialist | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| 0 | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 |
Total Labor Hours by Function (FYI Only) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
&P &"Arial,Bold"&14WORK PLAN
SECURITY SYSTEMS DESIGN AND INTEGRATION CONTRACT
Contract Number DTFAWA-08-D-00010
Page &Pof &N &6
Detail Milestone Schedule
WORK PLAN
Contract Number DTFAWA-17-R-00049
File details come from the government source that posted it. Updated .