CTR072301_Amendment_7-_Adds_and_Revises_Key_Personnel.pdf

PDF 940 KB Posted

Attached to
Master Agreement AZ|CTR072301
Contract number
CTR072301
Issued by
Arizona

About this file

This document is a Contract Amendment (Amendment No. 7) for Contract No. CTR072301 between the Arizona Department of Environmental Quality (ADEQ) and Tetra Tech, Inc. The contract is titled "ASRAC Assessment and Remediation of Hazardous Substances" and involves environmental assessment and remediation services in Arizona.

The amendment modifies the contract's key personnel by adding two new professionals: Sarah Hausmann (Professional Level I) and Luke Baretinicich (Professional Level II). Additionally, it revises the professional levels of two existing personnel: Jon Logan is upgraded from Professional Level I to Professional Level II, and Heather Gardener is similarly upgraded. The amendment is a unilateral acknowledgement of the contractor's approved change request, executed on September 9, 2025, in Phoenix, Arizona. The key personnel added have backgrounds in environmental science, hydrogeology, geology, and GIS analysis, with extensive experience in groundwater monitoring, well installation, environmental site assessments, and related technical services.

View the file

Other files

File Type Posted
2024-10-01 Tetra Tech GAWPP.pdf PDF
BAFO - Tetra Tech Response Email 2024-05-15.pdf PDF
BPM006010_Solicitation_Attachment_3_-_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
BPM006010_Solicitation_Attachment_6_-_Key_Personnel.pdf PDF
BPM006010_Solicitation_Attachment_7_-_Letter_of_Insurability.pdf PDF
BPM006010_Solicitation_Attachment_8_-_Organization_Profile.pdf PDF
CTR072301_Amendment_1_-_Adds_Key_Personnel.pdf PDF
2025-10-01 Tetra Tech GAWPP CTR072301.pdf PDF
BAFO - Tetra Tech Attachment 13 - Pricing Sheet.xlsx XLSX spreadsheet
BPM006010 Award Letter - Tetra Tech.pdf PDF
BPM006010_Solicitation_Attachment_10_Experience_and_Capacity_Response.pdf PDF
BPM006010_Solicitation_Attachment_11_-_References.pdf PDF
BPM006010_Solicitation_Attachment_14_-_Offer_Checklist.pdf PDF
BPM006010_Solicitation_Attachment_4_-_Confidential_Information_Designation.pdf PDF
BPM006010_Solicitation_Attachment_9_-_Proposed_Subcontractors.pdf PDF
CTR072301_Amendment_3_-_Adds_Subs.pdf PDF
CTR072301_Amendment_4_-_Adds_Subs.pdf PDF
CTR072301_Amendment_8-_Adds_Sub.pdf PDF
BAFO - Tetra Tech Attachment 1 - Offer and Acceptance.pdf PDF
BPM006010 Solicitation Requirements.pdf PDF
BPM006010_Solicitation_Attachment_12_-_Method_of_Approach.pdf PDF
BPM006010_Solicitation_Attachment_2_-_Boycott_of_Israel_Disclosure.pdf PDF
CTR072301_Amendment_2_-_Adds_Subs.pdf PDF
CTR072301_Amendment_6-_Adds_Sub.pdf PDF
Clarification - Tetra Tech Response.pdf PDF
2024-10-01_Tetra_Tech_GAWPP.pdf PDF
BPM006010 Solicitation Amendment 1.pdf PDF
BPM006010_Solicitation_Attachment_13_-_Pricing_Document.docx DOCX document
BPM006010_Solicitation_Attachment_13_-_Pricing_Sheet.xlsx XLSX spreadsheet
BPM006010_Solicitation_Attachment_1_-_Offer_and_Acceptance.pdf PDF
BPM006010_Solicitation_Attachment_5_-_Conformance_Statements.pdf PDF
CTR072301_Pricing.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT

AMENDMENT

CONTRACT NO.: CTR072301

AMENDMENT NO.: 7

TITLE: ASRAC Assessment and Remediation of Hazardous Substances CONTRACTOR: Tetra Tech, Inc.

ADEQ PROCUREMENT

1110 W. Washington Street Phoenix, AZ 85007 602-771- 4140

THE PURPOSE OF THIS AMENDMENT IS TO:

In accordance with the Special Terms and Conditions, 5.1 Contract Amendments, this contract is hereby amended as follows:

1. Add the following Contractor Key Personnel to this contract:

• Sarah Hausmann, Professional Level I

• Luke Baretinicich, Professional Level II

2. Revise the following key personnel’s professional levels:

• Jon Logan from Professional Level I to Professional Level II

• Heather Gardener from Professional Level I to Professional Level II

2. All other Terms and Conditions remain unchanged.

THE ABOVE REFERENCED AMENDMENT IS A

UNILATERAL ACKNOWLEDGEMENT OF

CONTRACTOR’S APPROVED CHANGED

REQUEST.

ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY

The above referenced Amendment is hereby executed this 9th day of September, 2025 at Phoenix, Arizona.

Ana Machiche Contract Manager

Available online at Arizona Procurement Portal (APP) eProcurement System https://app.az.gov https://app.az.gov/

Sarah Hausmann Environmental Scientist I

EXPERIENCE SUMMARY

Ms. Hausmann is an environmental scientist working in groundwater where her responsibilities cover a range of hydrogeologic tasks. Her areas of expertise include conducting water sampling of public water systems; Oversight of the drilling and installation of environmental monitoring wells; Performing various types of well testing and analysis such as well sampling and pump testing; Working with a team to monitor progress of groundwater plume remediation.

RELEVANT EXPERIENCE

Public Water Systems PFAS Sampling, ADEQ, Multiple Sites, AZ Coordinated with Public Water System Operators and collected groundwater samples for PFAS from dedicated pumps at numerous public water systems across Arizona. Field data was collected through the application Survey123 to track data collected from multiple samplers in different companies.

Silverbell Jail Annex WQARF Site, ADEQ, Phoenix, AZ Measured depth to water in site groundwater monitoring wells. Installed and sampled hydrasleeves at site groundwater monitoring wells for VOCs. Collected groundwater samples for monitoring natural attenuation parameters from select monitoring wells via low flow sampling methods. Sample collection, handling, and transport was completed using techniques and methods approved by ADEQ.

Poland-Walker Tunnel, Surface Water Sampling, ADEQ, Task managed and performed storm water and baseflow sampling to assist the client with characterizing water quality of the water sheds. Surface water sampling consisted of installing storm water sampling equipment, collecting base flow and stormwater samples, collecting stream flow measurements, and collecting water quality parameters. Sampling was performed in accordance with the ADEQ Surface Water Sampling Standard Operating Procedures. Storm water samples were collected via Nalgene First Flush samplers installed by Tetra Tech and autosamplers installed by

ADEQ.

Orphan Well Sites, ADEQ, Multiple Sites Oversaw contractor for the plugging of two abandoned oil and gas wells and provided daily field notes and pictures. Located and attempted to locate other various abandoned oil and gas wells throughout Arizona, providing soil sampling when applicable. Documented sites with pictures, field notes, and GPS waypoints through GPS Tracks.

48th and Indian School Well Installation, ADEQ, Phoenix, AZ

EDUCATION:

B.S., Biological Sciences- Conservation Biology and Ecology, Arizona State University

TRAINING/CERTIFICATIONS:

40-hr OSHA HAZWOPER, First Aid, Adult/Child CPR and AED (American Red Cross)

OFFICE:

Phoenix, Arizona

YEARS OF EXPERIENCE:

Sarah Hausmann Environmental Scientist I

Provided oversight for the drilling, soil sampling via split spoon, and installation of one monitoring well using the hollow-stem auger and air rotary drilling methods. Ms. Hausmann also conducted quarterly low-flow groundwater sampling.

East Central Phoenix WQARF Sites, ADEQ, Phoenix, AZ Measured depth to water in site groundwater monitoring wells. Installed and sampled multiple hydrasleeves at different depths in select monitoring wells for VOCs. Collected groundwater samples for monitoring natural attenuation parameters at the same depths that hydrasleeves were installed from select monitoring wells via low flow sampling methods. Sample collection, handling, and transport was completed using techniques and methods approved by ADEQ.

Luke Baretinicich Staff Hydrogeologist

Mr. Baretinicich is an accomplished hydrogeologist specializing in groundwater projects, with expertise spanning a wide range of hydrogeologic tasks. His experience includes oversight of the drilling, installation, development, rehabilitation, and abandonment of water production wells, environmental monitoring wells, soil vapor extraction wells, air sparge wells, and injection wells. He is skilled in performing well testing and analysis, including groundwater sampling and pump testing, and works closely with clients to characterize groundwater plumes, implement remediation strategies, and monitor remediation progress. Additionally, he provides technical support for sampling plan development and report preparation, ensuring compliance with regulatory and project requirements.

RELEVANT EXPERIENCE

Havasu and Holly, ADEQ, Lake Havasu City, Arizona Injection Wells LHH-INJ-8, LHH-INJ-9, and LHH-INJ-10 – Mr.

Baretinicich provided oversight for casing installation, well drilling, construction, development, and system startup. Well construction oversight consisted of a material check to document subcontractor compliance with the final well design and contractor oversight during casing and annular material installation. Well development consisted of bail, surge and pump development. Mr. Baretinicich also performed routine O&M of two total injection systems consisting of flow monitoring, Dosatron management, and general equipment maintenance.

24th and Grand, WQARF Site, ADEQ, Phoenix, AZ Provided oversight for the drilling, water sampling via bailor, installation and development of two monitoring wells using a sonic drilling method. Well construction oversight consisted of a material check to document subcontractor compliance with the final well design and contractor oversight during casing and annular material installation. Well development consisted of bail, surge and pump development.

32nd and Indian School, WQARF Site, ADEQ, Phoenix, AZ VCMW-27 S&D – Mr. Baretinicich provided field oversight for the drilling and installation of two monitoring wells using a sonic drilling method. Oversight responsibilities included verifying materials to ensure subcontractor compliance with the final well design, monitoring casing placement and annular material installation, and documenting construction activities. Well development was performed using bailing, surging, and air lifting methods, and groundwater samples were collected via bailer during drilling for water quality evaluation.

7th and Missouri, ADEQ, Phoenix, AZ Mr. Baretinicich provided oversight and hands-on support for the installation, development, and re-development of ozone sparge and injection wells as part of an in-situ remediation program. Mr.

Baretinicich installed two monitoring wells using sonic drilling methods, and two Ozone injection wells via hollow stem auger methods. Responsibilities included monitoring drilling and casing operations to ensure compliance with design specifications, logging soil cuttings, monitoring volatile organic

EDUCATION:

B.S., Geology, Colorado State University

TRAINING/CERTIFICATIONS:

40-hr OSHA HAZWOPER, 8-Hour OSHA Annual Refresher Training

First Aid, Adult/Child CPR and AED (American Red Cross)

OFFICE:

Phoenix, Arizona

YEARS OF EXPERIENCE:

compounds via a photoionization detector, verifying materials and installation methods, and coordinating subcontractor activities. Conducted well development and re-development using surging, pumping, and airlifting techniques to optimize injection performance and maintain system efficiency. All work was documented in accordance with project requirements and completed under strict health, safety, and environmental protocols.

Stone and Grant, WQARF Site, ADEQ, Tucson, AZ Provided oversight for the drilling, installation, soil vapor sampling, and groundwater sampling of a monitoring well using a sonic drilling method, along with drilling and installation of two triple nested soil vapor probe borings using a hollow stem auger setup. Responsibilities included evaluating the lithology of the soil cuttings, monitoring volatile organic compounds vis a photoionization detector, conducting material checks to ensure subcontractor compliance with the final well design and overseeing casing and annular material installation. In-situ soil vapor sampling was performed during the monitoring well install using a soil vapor gauge board and lung box, while groundwater samples were collected using hand bailors.

Davis Monthan Air Force Base, Ahtna, Tucson, AZ Mr. Baretinicich conducted groundwater sampling for PFAS at Davis-Monthan Air Force Base, ensuring strict adherence to project-specific Quality Assurance Project Plans (QAPPs) and Air Force environmental protocols. Responsibilities included hydra sleeve sampling using PFAS-free equipment and materials, field parameter stabilization, and proper sample handling to minimize the risk of cross-contamination. Coordinated with subcontractors and project managers to maintain compliance with chain-of-custody procedures and laboratory requirements, while documenting field activities in accordance with regulatory and client standards.

Nammo Defense Systems Inc., Mesa, AZ Installed two monitoring wells—one single-nested and one dual-nested—using air rotary and mud rotary drilling techniques, while providing oversight of well construction and material compliance.

Oversaw well development using bail, surge-pump, and bail-surge-air-lift methods, and performed in-situ groundwater sampling via air lifting to evaluate aquifer conditions and ensure representative sample collection. Responsibilities also included ensuring project scope compliance, coordinating subcontractor activities, and maintaining strict adherence to site safety protocols.

Lake Pleasant Cleaners, Barclay Group, Peoria, AZ Mr. Baretinicich drilled and installed multiple SVE wells and soil vapor probes using track-mounted sonic and direct push methods to support the startup of an SVE treatment system at Lake Pleasant Cleaners. Oversaw well installation and probe placement to ensure compliance with design specifications and project scope, coordinated subcontractor activities, and maintained strict compliance to site safety protocols. Performed soil vapor and indoor air sampling following system startup to assess system performance, verify data quality, and support ongoing remediation efforts.

Ivanhoe Electric Inc., Casa Grande, AZ Performed low-flow groundwater sampling for multiple analytes at Ivanhoe Electric, ensuring representative sample collection while minimizing disturbance to the aquifer. Followed strict QA/QC protocols, maintained field parameter stabilization, and documented all sampling activities in compliance with regulatory and client requirements.

Multiple Sites, ADEQ, Phoenix, AZ Mr. Baretinicich served as field team lead for quarterly, semiannual, and annual groundwater monitoring events across six sites. Measured depth to water in monitoring wells, installed and sampled multiple Hydrasleeves at various depths, and collected groundwater parameters during sampling. Ensured proper sample collection, handling, and transport using ADEQ-approved techniques and methods, maintaining strict adherence to QA/QC and regulatory requirements.

Jon Logan Staff Geologist

Résumé 1

EXPERIENCE SUMMARY

Mr. Logan is a Staff Geologist with over two years of professional experience at Tetra Tech. He has experience in overseeing production well drilling, construction, development, and testing; overseeing monitoring well drilling, construction, and development; and overseeing monitoring well/soil vapor extraction well abandonment. Mr. Logan also has experience in soil sampling, sampling for legionella, groundwater sampling, soil vapor extraction (SVE) operations, and conducting Phase I Environmental Site Assessments. Mr.

Logan also is experienced in conducting piezometer installations. Mr. Logan is also certified in Wilderness First Aid.

RELEVANT EXPERIENCE

PRODUCTION WELL INSTALLATION

Peacock Nuts, LLC, Kingman AZ. Performed oversight of drilling, construction, and development at wells PR-6 and PR-5. Logged cuttings and tracked annular material installation.

MONITORING WELL ABANDONMENT

Fuentes Auto Repair, ADEQ, Douglas, AZ. Performed oversight of monitoring well and soil vapor extraction well abandonment. Documented proceedings, ensured that the abandonment was carried out in accordance with ADEQ regulations, and maintained site health and safety.

TIP AND DRY WELL INSPECTIONS

Clarion Partners, Phoenix, AZ. Conducted inspections of tenant spaces for stored hazardous materials, hazardous wastes, spills/staining, and general equipment usage. Inspected onsite dry wells for the presence or condition of a petrochemical sponge, condition of the screen, and for any staining on or around the inlet.

UNDERGROUND STORAGE TANK REMOVAL

EDUCATION

B.S., Geosciences, University of Arizona, 2019

AREA OF EXPERTISE

Geology

REGISTRATIONS/

AFFILIATIONS

Member - Geological Society of America

Member – Arizona Geological Society

TRAINING/CERTIFICATIONS

HAZWOPER – General Site Worker: 2020 MSHA 48NM Metal/Nonmetal:

Arizona Department of Environmental Quality – ADEQ Certified Surface Water Sampler

OFFICE

Tucson, Arizona

YEARS OF EXPERIENCE

Jay’s Super Service, ADEQ, Holbrook, AZ. Performed oversight of the YEARS WITHIN TETRA TECH removal of five underground fuel storage tanks (USTs) and associated piping and dispensers. Sampled around each UST, each dispenser, and under key 5 sections of piping for VOCs, PAHs, and TEL in accordance with ADEQ requirements. Logged the samples and maintained site health and safety. Also ensured that UST removal activities did not jeopardize the integrity of the nearby canopy above the dispensers.

SOIL VAPOR EXTRACTION (SVE) OPERATIONS & MAINTENANCE (O&M) AND SAMPLING

Casey’s Auto Repair, ADEQ, Prescott, AZ. Conducted routine O&M on an SVE system in Prescott, AZ.

Recorded operational parameters and took air samples to ensure proper burning-off of VOCs.

MONITORING WELL INSTALLATION – HOLLOW STEM AUGER

Casey’s Auto Repair, ADEQ, Prescott, AZ. Performed oversight of drilling, construction, and development of well MW-18. Logged cuttings, sampled cuttings for VOCs and PAHs, tracked annular material installation, and maintained site health and safety.

Résumé Jon Logan

PHASE I ENVIRONMENTAL SITE ASSESSMENT

Marana-Pinal Airpark, United States Environmental Protection Agency, Marana, AZ. Performed inspection for utilities, current and/or historic hazardous materials usage, current and/or historic hazardous waste storage, air emissions, and spills/staining. Also noted areas of drainage/runoff, current and/or historic site improvements, waste management, and land use of nearby/adjacent sites.

TEST BOREHOLE INSTALLATION

LAFB Well #20 TB, United States Army Corps of Engineers, Luke Air Force Base, Glendale, AZ. Performed sampling of discharge for VOCs, PAHs, and PFAS. Preformed slug testing of four zones and analyzed the resulting data using Aqutesolv.

GROUNDWATER MONITORING

‘Lil Mike’s Service Center, ADEQ, Parker, AZ. Collected seven groundwater samples for VOC. Set up bladder pump, compressor, and controller in accordance with ADEQ regulations. Recorded water quality parameters at set intervals to ensure parameters have stabilized according to ADEQ regulations prior to sampling.

TIP INSPECTIONS

Clarion Partners, Phoenix, AZ. Conducted inspections of tenant spaces for stored hazardous materials, hazardous wastes, spills/staining, and general equipment usage. Compiled deliverables and sent them to the project manager for review.

LEIGONELLA SAMPLING

Collins Aerospace, Phoenix, AZ. Conducted sampling of humidifiers, roof-mounted evaporative coolers, and potable water sources (sinks, showers, etc) for legionella.

SOIL SAMPLING

KTA, Coolidge, AZ. Collected 77 soil samples for toxaphene and 4, 4 DDT.

GROUNDWATER MONITORING

Confidential location, Confidential client, NV. Collected thirty low-flow groundwater samples for environmental remediation. Set up bladder pump, compressor, and controller in accordance with state regulations. Recorded water quality parameters at set intervals to ensure parameters have stabilized according to state regulations prior to sampling.

POND LINER REPLACEMENT

Freeport-McMoRan Copper and Gold, Sierrita Operations, Green Valley, AZ. Oversaw the replacement of the HDPE raffinate pond liner. Conducted installation QA/QC by tracking HDPE panel deployment, fusion seaming, defects/repairs/vacuum tests, and other aspects of the installation process. Was also responsible for maintaining onsite health and safety and ensuring compliance with the SWPPP.

MINE CLOSURE

McKinley Mill, ADEQ, Bradshaw Mountains, near Prescott, AZ. Performed oversight of the closure of the McKinley Mill to prevent environmental contamination due to mine waste. Ensured that construction activities were carried out according to specifications laid out by Tetra Tech engineer/project manager and ADEQ requirements.

Maintained site health and safety.

GROUNDWATER MONITORING

Pesticide Monitoring Program, ADEQ, Buckeye, AZ; Safford, AZ; Yuma, AZ. Collected 13 groundwater samples for environmental remediation. Each sample consisted of two coolers containing approximately twenty sample bottles including E. coli (6-hour hold). Mobilizing to each field site consisted of a maximum of six hours of total drive time. Set up bladder pump, compressor, and controller in accordance with state regulations. Recorded water quality parameters at set intervals to ensure parameters have stabilized according to state regulations prior to sampling. Ensure samples were delivered to the lab within hold times.

MINE CLOSURE

Poland Millsite, ADEQ, Bradshaw Mountains, near Prescott, AZ. Performed oversight of the closure of the Poland Millsite to prevent environmental contamination due to mine waste. Ensured that construction activities were carried out according to specifications laid out by Tetra Tech engineer/project manager and ADEQ requirements.

Maintained site health and safety.

GROUNDWATER MONITORING/NEW HIRE TRAINING

Apache County Roads, ADEQ, St. John’s, AZ. Collected groundwater samples for environmental remediation.

Set up bladder pump, compressor, and controller in accordance with state regulations. Recorded water quality parameters at set intervals to ensure parameters have stabilized according to state regulations prior to sampling.

Trained a new hire on groundwater sampling procedures.

PIPELINE INSTALLATION

Confidential location, Confidential client, NV. Provided oversight during the construction of an HDPE pipeline for the treatment of contaminated water. Maintained site health and safety.

PIEZOMETER DATA COLLECTION

Safford Operations, Freeport McMoRan Copper and Gold, Safford, AZ. Collected data from piezometers installed at an active mine site using a Geokon Model GK-404 Vibrating Wire Readout.

PIEZOMETER INSTALLATION

Chino Operations, Freeport McMoRan Copper and Gold, Silver City, NM. Provided oversight of reverse circulation drilling at an active mine site. Logged cuttings, maintained health and safety, and performed borehole testing once total depth was achieved. Installed piezometers to their specified depths both by hand and by using a gasoline powered reel trailer.

STORMWATER SAMPLING

Three R Mine, Exposed Reef Mine, Lead Queen Mine, Arizona Department of Environmental Quality (ADEQ), Patagonia Mountains, Patagonia, AZ. Installed auto samplers and collected stormwater samples from streams near several abandoned mine sites for remediation effectiveness monitoring.

SOIL GAS WELL INSTALLATION, SOIL SAMPLING, SOIL GAS SAMPLING

Roger Rd. Wastewater Reclamation Facility, US EPA, Tucson, AZ. Provided oversight of soil gas well drilling.

Logged cuttings, measured VOC concentrations in cuttings using a photoionization detector (PID), and maintained health and safety. After drilling was complete, Mr. Logan conducted dripline sampling of the soils around the perimeter of site buildings and collected soil gas samples from the newly installed wells.

STORMWATER POLLUTION PREVENTION PLAN (SWPPP) INSPECTION

Wilson Electric Services Corporation, Green Valley, AZ. Conducted regular and post-storm inspections of a jobsite to ensure compliance with the SWPPP. Noted the condition of the site and BMPs. Communicated with the site foreman following the inspection to discuss corrective action as necessary.

BOREHOLE DILUTION TESTING

Confidential location, Confidential client, Nevada. Conducted borehole dilution testing of several wells.

Recorded transducer data using the Win-Situ computer application.

SLUG TESTING

Tucson Mountain Motors, Arizona Department of Environmental Quality (ADEQ), Tucson, AZ. Conducted slug testing of several wells. Recorded transducer data using the Win-Situ computer application.

MONITORING WELL INSTALLATION - SONIC

Tucson Mountain Motors, Arizona Department of Environmental Quality (ADEQ), Tucson, AZ. Performed oversight of drilling, construction, and development of several monitoring wells using the sonic drilling method.

Logged cuttings, sampled cuttings for VOCs, tracked annular material installation, and maintained site health and safety. Worked with property owners to ensure that the proposed borehole locations were clear and free of all vehicles and other obstructions.

HIGH VACUUM MULTI-PHASE EXTRACTION PILOT TEST

Tucson Mountain Motors, Arizona Department of Environmental Quality (ADEQ), Tucson, AZ. Performed oversight of a two-week HVMPE pilot test. Maintained site health and safety, collected regular system readings, and reported daily to project management.

PFAS SAMPLING

Statewide, Arizona Department of Environmental Quality (ADEQ), AZ. Conducted PFAS sampling of municipal wells throughout the state of Arizona. Coordinated with property owners to conduct sampling and ensured that samples were collected in accordance with state guidelines.

Heather Gardner

Biologist/GIS Analyst

Résumé 1

Ms. Gardner is a botanist and GIS specialist with extensive experience as a field team lead completing rare plant surveys, noxious weed mapping, reclamation monitoring, and rangeland health assessments. She has also served as the primary GIS technician supporting data collection efforts, including GIS data file organization and storage, completing GIS analyses of field collected data, managing ArcGIS Online (AGOL) setup and maintenance efforts, and producing web maps for ArcGIS Field Maps. She conducts research for desktop GIS habitat assessments and produces figures for various reporting efforts, including Storm Water Pollution Prevention Plans (SWPPPs), NEPA, and field survey report documents including for rangeland health assessments, reclamation monitoring, forage production surveys, noxious and invasive weed surveys, and rare plant surveys.

RELEVANT EXPERIENCE

Incremental Sampling Methodology (ISM) – Iron King Mine & Humboldt Smelter Mine, Arizona Department of Environmental Quality, Maricopa County, Arizona. Assisted with GIS data management, GIS desktop analysis in abandoned mine lands reclamation, and preparations of figures for reporting.

Condemnation Drilling at the Proposed Skunk Camp Tailings Storage Facility – Resolution Copper, Pinal County, Arizona. Assisted with GIS data management, GIS desktop analysis in land and parcel ownership and mineral exploration permits, and preparations of figures for reporting.

Desktop GIS Assessments and Field Maps Setups - Northwest Pipeline, multiple locations in Utah and Idaho. Completed several desktop GIS data reviews, provided GIS data management, completed setup with Field Maps for field work, and drafted figures for reporting for biological evaluations, environmental assessments and cultural surveys for pipeline and utility repair or installation projects in Utah.

Riverton Lateral Hydrotest and In-Line Inspection Modifications Project

– Kern River Gas Transmission Company, Salt Lake County, Utah.

Assisted with biological resources and environmental field surveys, which included GIS desktop pre-field work, field maps and figures, ArcGIS Online and Field Maps web map setup, reporting and figures. Assisted with SWPPP reporting and figures. Assisted with weed and reclamation plans.

Centennial Lateral Pipeline Replacement Project - Kern River Gas Transmission Company, Clark County, Nevada. Assisted with GIS desktop analysis for biological resources and SWPPP reporting and figures.

Eaglewood Strength Test Project - Kern River Gas Transmission Company, Davis County, Utah. Assisted with biological resources and environmental field surveys which included GIS desktop pre-field work, field maps and figures, ArcGIS Online and Field Maps web map setup, reporting and figures.

EDUCATION

BS, Botany, minor in geospatial analysis (GIS), Weber State University, Ogden, Utah, 2015

AREA OF EXPERTISE

GIS analysis, GIS data collection and organization, map/figure production, reclamation monitoring, rangeland health assessment, noxious weed surveys, rare plant surveys

SPECIALTY SOFTWARE

ArcGIS Pro ArcGIS Online ArcGIS Field Maps Collector Survey123 Trimble GPS ArcMap 10.8 ArcCatalog ArcScene GPS Pathfinder

OFFICE

Salt Lake City, Utah

TRAINING/CERTIFICATIONS

BLM Rangeland Health Assessment Training, 2017

Endangered Species Section 7 Training – BLM, 2018

Rare Plant Surveyor Training - Uinta Basin, 2019

YEARS OF EXPERIENCE

9 +

YEARS WITH FIRM

6 +

CONTACT

Heather.gardner@tetratech.com

Résumé Heather Gardner

Hidden Hollow Pipe Replacement Project - Kern River Gas Transmission Company, BLM Salt Lake Field Office, Utah County, Utah. Assisted with biological resources and environmental field surveys, which included GIS desktop pre-field work, field maps and figures, ArcGIS Online and Field Maps web map setup, reporting and figures.

Assisted with SWPPP reporting and figures.

Utah County Class III Pipeline Replacement Projects – Wildflower, Kern River Gas Transmission Company, Bureau of Land Management (BLM) Salt Lake Field Office, Utah County, Utah. Assisted with conducting BLM Sensitive plant survey and weed survey which included GIS desktop pre-field work, field maps and figures, ArcGIS Online and Field Maps web map setup, data collection and quantitative vegetation sampling, and reporting and figures. Assisted with SWPPP reporting and figures.

Black Canyon Meter Station Project - Kern River Gas Transmission Company, BLM Cedar City Field Office, Beaver County, Utah. Assisted with prairie dog protocol survey, which included GIS desktop pre-field work, field maps and figures, ArcGIS Online and Field Maps web map setup, reporting and figures.

Wyoming AML Reclamation Monitoring, Wyoming. Conducted 2019, 2020, 2021, and 2022 monitoring survey of past AML reclamation areas which included general vegetation and species lists, quantitative monitoring data collection, noxious weeds, subsidence, erosion, and fire. Assisted with GIS data management, Sample Point analysis, and record keeping for 2023 field efforts.

Rocky Mountain Power, Helper to Columbia #2 Power Line Rebuild Project, BLM Price Field Office, Carbon County, Utah. Assisted with conducting BLM Sensitive plant survey and weed survey which included GIS desktop pre-field work, field maps and figures, ArcGIS Online and Field Maps web map setup, data collection and quantitative vegetation sampling, and reporting and figures. Assisted with SWPPP reporting and figures.

Kinder-Morgan Altamont ROW Renewal, Vernal Utah. Assisted with surveys for Ute ladies’-tresses, federally listed Threatened plant species, which included GIS desktop pre-field work, field maps and figures, ArcGIS Online and Field Maps web map setup, data collection, reporting and figures.

Rocky Mountain Power, Snyderville to Silver Creek 138-kV Powerline Wildfire Upgrade Project, Summit County, Utah. Assisted with bi-annual vegetation and weed monitoring, which included GIS desktop pre-field work, field maps and figures, ArcGIS Online and Field Maps web map setup, data collection and quantitative vegetation sampling, and reporting and figures. Assisted with SWPPP reporting and figures.

Slope Stability and Revegetation Monitoring - Riley Pass Uranium Mine Project, South Dakota. Assisted with conducting 2020, 2021 and 2022 quantitative vegetation sampling surveys which included GIS desktop pre-field work, field maps and figures, ArcGIS Online and Field Maps web map setup, data collection and quantitative vegetation sampling, and reporting and figures.

Forage Production Survey, Raven Solar, Wyoming. Assisted with conducting 2020 and 2021 forage production surveys which included GIS desktop pre-field work, field maps and figures, ArcGIS Online and Field Maps web map setup, data collection and production sampling, reporting and figures.

Vegetation Surveys, Tooele Army Depot. Assisted with conducting 2019 vegetation surveys which included vegetation mapping, species lists, and noxious weeds.

GIS Desktop Assessment and Field Preparation, Rio Tinto Kennecott Copper. Conducted GIS desktop assessment for avian surveys, including field maps and report figures, prepared and managed GIS files pre-field and post-field.

Résumé Heather Gardner

Weed Inventory Specialist, Fiore Gold, LLC, Pan Mine - Annual Weed Inventory, Nevada. Conducted 2022, 2020, 2019 and 2018 annual weed inventory in support of mine reclamation and weed control measures. Managed the GIS database, created project maps of survey results (including the 2021 survey), and supported reporting.

Desktop GIS Assessments and Field Maps Setups, Dominion Energy Utah (formerly Questar Gas/ Questar Pipeline), Rocky Mountain Power, Kinder Morgan Incorporated, Northwest Pipeline, Miscellaneous Linear Projects, multiple locations. 2024, 2023, 2022, 2021, 2020, 2019, 2018 - Field technician – Vegetation, supporting wetland delineations, noxious weed mapping and rare plant surveys in multiple locations throughout Utah, in support of citing and permitting of new and upgraded electrical and oil distribution lines. Completed several desktop GIS data reviews, provided GIS data management, completed setup with Field Maps for field work, and drafted figures for reporting for biological evaluations, environmental assessments and cultural surveys for pipeline and utility repair or installation projects in Utah. Assisted with SWPPP reporting and figures.

Rocky Mountain Power, Dominion Energy Utah (formerly Questar Gas/ Questar Pipeline), Kinder Morgan Incorporated, Miscellaneous Linear Projects, multiple locations. 2024, 2023, 2022, 2021, 2020, 2019, 2018 - Field technician – Vegetation, supporting wetland delineations, noxious weed mapping and rare plant surveys in multiple locations throughout Utah, in support of citing and permitting of new and upgraded electrical and oil distribution lines. Completed several desktop GIS data reviews, provided GIS data management, completed setup with Field Maps for field work, and drafted figures for reporting for biological evaluations and environmental assessments. Assisted with SWPPP reporting and figures.

File details come from the government source that posted it. Updated .