CTR060470_Contract_Amendment_Summary_Three___3_.pdf
PDF 984 KB Posted
- Attached to
- Master Agreement AZ|CTR060470
- Contract number
- CTR060470
- Issued by
- Arizona
About this file
The document is a contract amendment and supporting documentation for the Arizona Department of Transportation's (ADOT) Multimodal Transportation Planning On-Call Contract (CTR060470), specifically Amendment Number Three. The primary contractor is High Street Consulting Group, with two new subcontractors being added to the contract: WSP USA Inc. and Y2K Engineering, LLC. The amendment involves the Statewide Climbing and Passing Lane Study (MPD0437-24) and includes lobbying certification documents and subcontractor commitment letters from both new subcontractors.
The contract involves multimodal transportation planning services, with the specific task being a statewide study on climbing and passing lanes. The subcontractors will assist in collecting data, conducting site visits, engaging stakeholders across the state, and developing planning-level cost estimates. WSP USA Inc. and Y2K Engineering will provide technical support, including ADOT and local data sources, and engineering capabilities to support the project's successful completion. The subcontractors have provided commitment letters affirming their willingness to comply with the prime contract's terms and conditions, and have submitted required lobbying certifications as part of the procurement process.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007 602.712.7211
Contract Amendment Summary CONTRACTOR: High Street Consulting Group AMENDMENT NO. Three (3) DESCRIPTION: CTR060470 Multimodal Transportation Planning On-Call
Rev. 04/2020
Procurement
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. The following sub-contractors are hereby be added to the contract:
• WSP USA Inc.
• Y2K Engineering, LLC
2. All other terms, conditions and provisions of this contract remain unchanged.
javascript:void('0') javascript:void('0')
AZDOT | MPD0437-24 Statewide Climbing and Passing Lane Study
WSP, USA Inc.
Y2K Engineering, LLC
Appendix B: Subcontractor Commitment Letters WSP, USA Inc.
Y2K Engineering, LLC.
Appendix C: Letter Requesting Subcontractor Addition to Procurement Contract
| Contract Amendment Summary xx |
| 120123sub additions.pdf |
File details come from the government source that posted it. Updated .