CON 436-23-123 Building 170 Warehouse Upgrades_DWG_01.pdf
PDF 822 KB Posted
- Solicitation number
- 36C25924R0016
About this file
This package includes construction documents for upgrades to Building 170 Warehouse at the Fort Harrison VA Medical Center in Montana. The project involves mechanical system replacements and upgrades in the warehouse including a new air handling unit with direct expansion cooling and condensing unit. Drawings show demolition of existing equipment, proposed mechanical equipment locations and connections, and schedules with equipment specifications. The related federal contract opportunity is solicitation number 36C25924R0016 for the Building 170 Warehouse Upgrades project numbered 436-23-123, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19. The documents provide requirements for mechanical construction work at the site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924R0016 0004.docx | DOCX document | |
| 36C25924R0016 0003.docx | DOCX document | |
| Rolling Door Cut Sheet.pdf | ||
| 36C25924R0016 0002.docx | DOCX document | |
| S04-Site Visit Doc 36C25924R0016.pdf | ||
| CON 436-23-123 Building 170 Warehouse Upgrades Sitewalk Sheet.pdf | ||
| 36C25924R0016 0001.docx | DOCX document | |
| CON 436-23-123 Building 170 Warehouse Upgrades_SOW_Final_REV1.pdf | ||
| CON 436-23-123 Building 170 Warehouse Upgrades_SPEC_REV1.pdf | ||
| CON 436-23-123 Building 170 Warehouse Upgrades_DWG_master.pdf | ||
| CON 436-23-123 Building 170 Warehouse Upgrades_HVAC.docx | DOCX document | |
| CON 436-23-123 Building 170 Warehouse Upgrades_ICRA.docx | DOCX document | |
| 36C25924R0016.docx | DOCX document | |
| CON 436-23-123 Building 170 Warehouse Rollup Door_Specifications Combined.pdf | ||
| CON 436-23-123 Building 170 Warehouse Upgrades_PCRA.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 View Name 1/8" = 1'-0"
SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE
ELEVATION CALLOUT EXAMPLE
DETAIL CALLOUT EXAMPLE
SECTION CALLOUT EXAMPLE
SECTION, DETAIL, OR ELEVATION
SYMBOL IDENTIFIERS
DETAIL NAME
LETTER OR NUMBER DESIGNATOR
DRAWING SEQUENCE NUMBER
INDICATES WHERE TITLE IS
LOCATED
ONE OR TWO CHARACTER
DISCIPLINE DESIGNATOR
(MAY NOT BE PRESENT IF
CALLOUT AND TITLE ARE ON
DRAWINGS WITHIN THE SAME
DISCIPLINE)
A A101
AE101
AE101
MATCH LINE
DETAIL NUMBER
ON SHEET
SHEET NUMBER
DETAIL NUMBER
ON SHEET
SHEET NUMBER
02 \ A-1.04
FORT HARRISON VA MEDICAL SYSTEM
VAMC PROJECT # 436-23-123
BUILDING 170 WAREHOUSE UPGRADES
SHEET LIST
G-0.00 COVER SHEET
MD-1.01
GENERAL NOTES
ABBREVIATIONSA
& AND
@ AT
AB ANCHOR BOLT
ACFL ACCESS FLOOR
ACOUS ACOUSTICAL
AD AREA DRAIN
ADJ ADJUSTABLE
ADJ ADJACENT
ADMIN ADMINISTRATION
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AP ACCESS PANEL
APROX APPROXIMATE
ARCH ARCHITECTURAL
AT ACOUSTICAL CEILING TILE
AUTO AUTOMATIC
AWT ACOUSTICAL WALL TREATMENT
B
BD BOARD
BFE BOTTOM FOOTING ELEVATION
BG BUMPER GUARD
BKT BRACKET
BLDG BUILDING
BM BEAM
BOT BOTTOM
BP BRICK PAVING
BR BRICK
BRG BEARING
BSMT BASEMENT
C
C CHANNEL
CAB CABINET
CANTL CANTILEVER
CAP CAPACITY
CAT CATEGORY
CCTV CLOSED CIRCUIT TELEVISION
CD COILING DOOR
CG COILING GRILLE
CG COILING GUARD
CH COAT HOOK
CJT CONTROL JOINT
CL CENTER LINE
CL CLASS
CLG CEILING
CLR CLEAR
CM CONSTRUCTION MANAGER
CMU CONCRETE MASONRY UNIT
CO CASED OPENING
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONN CONNECT/-ED/-ION
CONST CONSTRUCTION
CONT CONTINUE/CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CP CARPET
CPT CARPET MODULE TILE
CR-1 CHAIR RAIL
CR-2 CRASH RAIL
CT CERAMIC TILE
CTR CENTER
CW CURTAIN WALL
CW COLD WATER
CYL CYLINDER
D
D DEPTH OR DEEP
DEMO DEMOLITION
DEPR DEPRESSIONDBL DOUBLE
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DISP DISPENSER
DIST DISTRIBUTION
DIV DIVISION
DN DOWN
DP DATA PROCESSING
DR DOOR
DS DOWNSPOUT
DWG DRAWING
E
EC ELECTRICAL CABINET
EC EPOXY COATING
EF EXHAUST FAN
EFTR EXISTING FINISH TO REMAIN
EJT EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
EMERG EMERGENCY
EO ELECTRICAL OUTLET
EPDM ETHYLENE PROPYLENE
DIENE MONOMER
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST HOOD
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
EXT-P EXTERIOR PAINT
EXT-ST EXTERIOR STAIN
F
FA FIRE ALARM
FAP FIRE ALARM PANEL
FB FIRE BLANKET
FD FLOOR DRAIN
FDN FOUNDATION
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FGS FOAM GASKET SEAL
FH FIRE HOSE
FHV FIRE HOSE VALVE
FIN FINISH
FIXT FIXTURE
FL FLOOR
FL FLOW LINE
FP FIRE PROOFING
H
H HIGH
HB HOSE BIB
HD HAND DRYER
HDCP HANDICAP
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HPT HIGH POINT
HR HANDRAIL
HT HEIGHT
HTR HEATER
HVAC HEATING, VENTILATING,
AIR CONDITIONING
HW HOT WATER
HWD HARDWOOD
I
IC INTERCOM
ID INSIDE DIAMETER
IN INCH
INSUL INSULATION
INT INTERIOR
ISO ISOLATION
J
JAN JANITOR
JB JUNCTION BOX
JST JOIST
JT JOINT
K
KO KNOCK OUT
L
L LAVATORY
LB POUND
LCD LINEAR CEILING DIFFUSER
LF LINE FIGURED
LIN LINEAR
LKR LOCKER
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMC LINEAR METAL CEILING
LOC LOCATION OR LOCATE
LPT LOW POINT
LS LAWN SPRINKLING
LT LIGHT
LTG LIGHTING
LVR LOUVER
LWC LINEAR WOOD CEILINGM
MAT MATERIAL
MAX MAXIMUM
MBD MARKER BOARD
MC MEDICINE CABINET
MCU MODULAR COOLING UNIT
MECH MECHANICAL
MEMB MEMBRANE
MET METAL
MRF MANUFACTURER
MH MANHOLE
MIL MILLIMETER
MN MINIMUM
MR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MONO MONOLITHIC
MPU MULTI- PURPOSE UNIT
MTD MOUNTED
MTL METAL
MTR MOTOR
MULL MULLION
P
PNL PANEL
PR PAIR
PRELIM PRELIMINARY
PRES PLASTIC RESIN
PRESS PRESSURE
PRIM PRIMARY
PROJ PROJECTION
PRV POWER ROOF VENTILATOR
PTC PAPER TOWEL CABINET
PTR PRINTER
PVC POLYVINYL CHLORIDE
R
R RADIUS
R RISER
RA RETURN AIR
RB RESILIENT BASE/RUBBER BASE
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REIN REINFORCE/-ED/-ING
REM REMOVE
REQD REQUIRED
RET RETAINING
REV REVERSE
REV REVISE
RF RESILIENT FLOOR
RFI REQUEST FOR INFORMATION
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
RS ROUGH SLAB
RSF RESILIENT SHEET FLOOR
RWC RAIN WATER CONDUCTOR
S
S SINK
S STAIN
SCHED SCHEDULE
SD SHOWER DRAIN
SD SMOKE DAMPER
SDISP SOAP DISPENSER
SF STORE FRONT
SF SQUARE FOOT
SH SHOWER
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SM SURFACE MOUNTED
SNC SANITARY NAPKIN CABINET
SND SANITARY NAPKIN DISPOSER
SP STANDPIPE
SPEC SPECIFICATIONS
SPR SINGLE PLY ROOF
SQ SQUARE
SQ YD SQUARE YARD
SR SERVICE RECEPTOR
SS SERVICE SINK
SST STAINLESS STEEL
ST STREET
ST STONE TILE
STC SOUND TRANSMISSION
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
T
T TOP
TAN TANGENT
TCAB TOWEL CABINET
TDR TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TG TONGUE & GROVE
THRES THRESHOLD
TPH TOILET PAPER HOLDER
TR TREAD
TRANSF TRANSFORMER
TS TUBE SECTION
TV TELEVISION
TYP TYPICAL
U
U URINAL
UC UNDERCUT
UC UNDERCOUNTER
UFD UNDER FLOOR DUCT
UG UNDERGROUND
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
US UTILITY SHELF
UTIL UTILITY
V
VC VALVE CABINET
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
W
W WALL COVERING
W WIDTH/WIDE
W WIDE FLANGE
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WALL GUARD
WH WALL HYDRANT
WHCH WHEELCHAIR
WHTR WATER HEATER
WP WALL PANEL
WP WATERPROOF
WR WASTE RECEPTACLE
WS WEATHERSTRIP
WSCT WAINSCOT
WSF WELDED SEAM-RESILIENT
SHEET FLOORING
WT WINDOW TREATMENT
WT WEIGHT
N
NA NOT APPLICABLE
NC NURSE CALL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NT NOTE
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD
OP OPERABLE PARTITION
OPER OPERATOR
OPNG OPENING
OPP OPPOSITE
OFD OVERFLOW ROOF DRAIN
P
P PAINT
PART PARTITION
PB PUSH BUTTON
F
FRMG FRAMING
FSTOP FIRE STOPPING
FT FOOT/FEET
FTG FOOTING
FURR FURRING
G
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GB GRAB BAR
GB GRADE BEAM
GC GENERAL CONTRACTOR
GEN GENERAL
GEN GENERATOR
GL GLASS
GR GRADE
GRT GROUT
GWB GYPSUM WALLBOARD
GYP GYPSUM
PC PRECAST CONCRETE
PCD PAPER CUP DISPENSER
PED PEDESTAL
PL PLATE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLS PLASTER
1. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY. VERIFY ALL
DIMENSIONS PRIOR TO START OF WORK. IN THE EVENT OF
DISCREPANCY, NOTIFY THE ARCHITECT AND OBTAIN RESOLUTION
BEFORE PROCEEDING.
2. PROVIDE ALL BLOCKING AND ANCHORAGE AS NECESSARY FOR PROPER
INSTALLATION OF WALL HUNG OR WALL MOUNTED EQUIPMENT
FIXTURES.
3. ADDITIONAL PLAN INFORMATION IS SHOWN ON LARGER SCALE PLANS
WHERE INDICATED BY KEYED REFERENCE. LARGE SCALE DRAWINGS
TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
4. THE LIST OF ABBREVIATIONS IS SHOWN AS A GUIDE ONLY AND DOES
NOT NECESSARILY INCLUDE ALL ABBREVIATIONS USED. OTHER
ABBREVIATIONS MAY BE FOUND AMONG THE DRAWINGS.
5. ALL CONSTRUCTION SHALL MEET OR EXCEED LOCAL INDUSTRY
STANDARDS. DETAILS ARE PROVIDED TO INDICATE MINIMUM QUALITY
AND TO GIVE STANDARDS OF CONSTRUCTION. IF A CONDITION IS NOT
SPECIFICALLY DETAILED, SUBMIT A SIMILAR DETAIL FOR GUIDE AND
APPROVAL. UFC 3-600-01, NFPA 101 AND 5000.
WAREHOUSE - MECHANICAL DEMOLITION PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08-6231
A
ROCKY MOUNTAIN NETWORK 19
MONTANA VA HEALTH CARE
SYSTEM (436)
3687 VETERANS DRIVE FORT
HARRISON, MT 59636-1500
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project COR
Revisions: Date:
NAME:
Sheet of
FULLY SPRINKLED
TITLE:
PHONE:
EMAIL:
BUILDING 170 WAREHOUSE
UPGRADES
436-23-123COVER SHEET
G 0.00
01 03
ITJJ
FORT HARRISON, MT
06/30/2023
JOSEPH BILODEAU
DEPUTY CHIEF ENGINEER
N/A N/A
M-1.01 WAREHOUSE - MECHANICAL PLAN
AutoCAD SHX Text
SYMBOL LEGEND
1. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY
DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.
2. CONTRACTOR TO PROVIDE HEPA FILTRATION "NEGATIVE AIR" MACHINES AND OTHER ACTIVE MEANS
(TOOL VACUUM SYSTEMS) WHEN DEEMED NECESSARY TO PREVENT AIR-BORNE DUST FROM
DISPERSING INTO THE ATMOSPHERE WITHIN THE WORKSITE.
3. CONTRACTOR IS TO ISOLATE ALL AIR VENTS WITHIN THE AREA OF WORK. ISOLATION OF AIR VENTS
AS REQUIRED TO PREVENT AIRBORNE DUST FROM ENTERING THE VENT/DUCT. CONTRACTOR TO
REMOVE VENT/DUCT ISOLATION BARRIERS AT THE END OF THE WORK PERIOD AND 30 MINUTES
BEFORE REGULAR HOSPITAL HOURS ARE TO COMMENCE.
4. TEMPORARY BARRIERS WILL BE ERECTED SO AS TO NOT IMPEDE ACCESS TO REMAINING AREAS OF
THE FACILITY FOR PATIENTS, VISITORS, AND HOSPITAL STAFF.
5. ALL DEBRIS MUST BE REMOVED BY CART/CONTAINER WITH A TIGHTLY COVERED LID, NO
EXCEPTIONS WILL BE ALLOWED.
6. CONTRACTOR TO MAINTAIN A CLEAR AND ORDERLY, DUST, DEBRIS, TRIP HAZARD FREE WORK AREA
ON A DAILY BASIS DURING REGULAR HOSPITAL HOURS. CONTRACTOR TO WIPE WORK SURFACES
WITH DISINFECTANT, WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING
THE WORK AREA AT THE END OF EACH WORK DAY OR THIRTY MINUTES BEFORE REGULAR
HOSPITAL HOURS ARE TO COMMENCE.
7. IN THE EVENT THAT AN AEXISTING FIRE EXTINGUISHER IS NOT READILY ACCESSIBLE DUE TO THE
ERECTION OF TEMPORARY BARRIERS, THE CONTRACTOR WILL PROVIDE A FIRE EXTINGUISHER
OUTSIDE THE AREA OF WORK.
8. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY
DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.
9. SEE INFECTION CONTROL PLAN FOR ADDITIONAL INFORMATION FOR PROPOSED INFECTION
CONTROL BARRIERS AND PHASING FOR EACH AREA OF WORK REQUIRED. CONTRACTOR WILL BE
RESPONSIBLE FOR COORDINATING THE WORK REQUIRED. CONTRACTOR WILL BE RESPONSIBLE
FOR COORDINATING THE WORK AND THE APPROPRIATE INFECTION CONTROL BARRIER AS NEEDED
TO ACCOMPLISH THE WORK. COORDINATE ALL PROPOSED BARRIERS WITH THE COR THAT MAY
NEED TO BE CREATED TO ACCOMMODATE VARIOUS TRADES AS NEEDED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08-6231
A
ROCKY MOUNTAIN NETWORK 19
MONTANA VA HEALTH CARE
SYSTEM (436)
3687 VETERANS DRIVE FORT
HARRISON, MT 59636-1500
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project COR
Revisions: Date:
NAME:
Sheet of
FULLY SPRINKLED
TITLE:
PHONE:
EMAIL:
BUILDING 170 WAREHOUSE
UPGRADES
436-23-123WAREHOUSE - MECHANICAL
DEMOLITION PLAN
MD 1.01
02 03
ITJJ
FORT HARRISON, MT
06/30/2023
JOSEPH BILODEAU
DEPUTY CHIEF ENGINEER
N/A N/A
REMOVE EXISTING AHU SUPPLY FAN BOX.
AutoCAD SHX Text 26"~
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text 20/20
AutoCAD SHX Text 20/28
AutoCAD SHX Text 36/36
AutoCAD SHX Text
30/30 CONN.
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text 28/20
AutoCAD SHX Text
ACCESS LADDER
AutoCAD SHX Text
AutoCAD SHX Text
MD101
AutoCAD SHX Text
DEMOLITION PLAN GENERAL NOTES:
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
MEZZANINE - MECHANICAL DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
DEMOLITION PLAN SHEET NOTES:
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
MEZZANINE - MECHANICAL DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08-6231
A
ROCKY MOUNTAIN NETWORK 19
MONTANA VA HEALTH CARE
SYSTEM (436)
3687 VETERANS DRIVE FORT
HARRISON, MT 59636-1500
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project COR
Revisions: Date:
NAME:
Sheet of
FULLY SPRINKLED
TITLE:
PHONE:
EMAIL:
BUILDING 170 WAREHOUSE
UPGRADES
436-23-123WAREHOUSE - MECHANICAL PLAN
M 1.01
03 03
ITJJ
FORT HARRISON, MT
06/30/2023
JOSE RIVERA-HERNANDEZ
DEPUTY CHIEF ENGINEER
N/A N/A
INSTALL NEW SUPPLY FAN BOX AND DIRECT EXPANSION COIL. AHU IS TO BE EXPECTED TO EXTEND
BY 8". INSTALL PLUMBING CONNECTIONS TO CU-4.
INSTALL CU-4 ON 4" CONCRETE PAD. FINAL LOCATION TO BE COORDINATED WITH THE COR. RUN
COPPER PIPES EXPOSED ALONG THE EXTERIOR WALL.
PENETRATE COPPER PIPES THROUGH EXTERIOR WALLS AND IS TO BE FIRE CAULK AND FULLY
INSULATED FROM THE COILS TO THE CONDENSOR UNIT.
AutoCAD SHX Text 26"~
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text 20/20
AutoCAD SHX Text 20/28
AutoCAD SHX Text 36/36
AutoCAD SHX Text
30/30 CONN.
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
NEW LIQUID DISTRIBUTION & SUCTION REFRIGERANT COPPER PIPE
AutoCAD SHX Text
CU
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text 28/20
AutoCAD SHX Text
ACCESS LADDER
AutoCAD SHX Text
AutoCAD SHX Text M101
AutoCAD SHX Text
NEW LIQUID DISTRIBUTION & SUCTION REFRIGERANT COPPER PIPE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
RECEIVING
AutoCAD SHX Text T
AutoCAD SHX Text
FS
AutoCAD SHX Text
CU
AutoCAD SHX Text
AutoCAD SHX Text
NEW LIQUID DISTRIBUTION & SUCTION REFRIGERANT COPPER PIPE
AutoCAD SHX Text
MECHANICAL PLAN GENERAL NOTES:
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
MEZZANINE - MECHANICAL PLAN
AutoCAD SHX Text
AutoCAD SHX Text
MECHANICAL PLAN SHEET NOTES:
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
MEZZANINE - MECHANICAL PLAN
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
AutoCAD SHX Text H.P.
AutoCAD SHX Text R.P.M.
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
TYPE
AutoCAD SHX Text C.F.M.
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
HZ
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
VOLT
AutoCAD SHX Text
ESP (IN H2O)
AutoCAD SHX Text
SERVICE
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
AIR HANDLING UNIT SCHEDULE
AutoCAD SHX Text
TSP (IN H2O)
AutoCAD SHX Text
SUPPLY FAN
AutoCAD SHX Text
CIRCUIT TYPE
AutoCAD SHX Text
FACE VELOCITY (FPM)
AutoCAD SHX Text
DIRECT EXPANSION COIL
AutoCAD SHX Text
LIQUID/SUCTION (%%DF)
AutoCAD SHX Text
TOTAL CAP (MBH)
AutoCAD SHX Text
SENSIBLE CAP (MBH)
AutoCAD SHX Text
LDB/LWB (%%DF)
AutoCAD SHX Text
APD (IN WG)
AutoCAD SHX Text
EDB/EWB (%%DF)
AutoCAD SHX Text
FINS PER FOOT
AutoCAD SHX Text
ROWS
AutoCAD SHX Text
ALL COILS SHALL HAVE SAME END CONNECTIONS
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text
VENTILATION
AutoCAD SHX Text
AutoCAD SHX Text 1.500
AutoCAD SHX Text 2.785
AutoCAD SHX Text 3.925
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
15" FC
AutoCAD SHX Text
AutoCAD SHX Text
DIRECT DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BELT
AutoCAD SHX Text
MAKE
AutoCAD SHX Text
MODEL
AutoCAD SHX Text
TRANE
AutoCAD SHX Text
CSAA010UA
AutoCAD SHX Text
1. FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL OPERATIONS NECESSARY FOR FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL OPERATIONS NECESSARY FOR THE INSTALLATION OF COMPLETE AND OPERATING MECHANICAL SYSTEMS SUBJECT TO THE CONDITIONS OF THE CONTRACT. THIS WORK ALSO INCLUDES THE COMPLETION OF SUCH MECHANICAL AND ELECTRICAL DETAILS NOT MENTIONED OR SHOWN WHICH ARE NECESSARY FOR THE SUCCESSFUL OPERATION OF ALL SYSTEMS. 2. VISIT THE PREMISES BEFORE BID AS NO EXTRAS WILL BE ALLOWED FOR LACK OF VISIT THE PREMISES BEFORE BID AS NO EXTRAS WILL BE ALLOWED FOR LACK OF KNOWLEDGE OF EXISTING CONDITIONS. 3. THE PLANS INDICATE THE LOCATION, TYPE AND SIZES OF VARIOUS UTILITIES WITHIN THE THE PLANS INDICATE THE LOCATION, TYPE AND SIZES OF VARIOUS UTILITIES WITHIN THE SITE WHERE KNOWN. THESE UTILITIES ARE INDICATED AS ACCURATELY AS POSSIBLE. IF UTILITIES ARE ENCOUNTERED DURING CONSTRUCTION WHICH ARE NOT SHOWN ON THE DRAWINGS, AS FOR INSTRUCTIONS FROM THE ARCHITECT. ANY RELOCATION OR REMODELING REQUIRED WILL THEN BE DIRECTED BY CHANGE ORDER. ASSUME ALL RESPONSIBILITY FOR PROTECTION OF ALL UTILITIES, SHOWN OR NOT, AND REPAIR ANY DAMAGE CAUSED BY THIS CONSTRUCTION AT NO EXTRA CHARGE TO THE OWNER. 4. COORDINATE AND ORDER THE PROGRESS OF THE MECHANICAL WORK TO CONFORM TO COORDINATE AND ORDER THE PROGRESS OF THE MECHANICAL WORK TO CONFORM TO THE OWNER'S SCHEDULE AND THE PROGRESS OF THE WORK OF THE OTHER TRADES. COMPLETE THE ENTIRE INSTALLATION AS SOON AS THE CONDITION OF THE BUILDING WILL PERMIT. 5. COORDINATE MECHANICAL UTILITY INTERRUPTIONS WITH THE OWNER AND THE UTILITY COORDINATE MECHANICAL UTILITY INTERRUPTIONS WITH THE OWNER AND THE UTILITY COMPANY. PLAN WORK SO THAT THE DURATION OF THE INTERRUPTION IS KEPT TO A MINIMUM. 6. MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND BECAUSE OF THE SMALL SCALE, IT IS MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND BECAUSE OF THE SMALL SCALE, IT IS NOT POSSIBLE TO INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM THE ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK. VERIFY ALL SPACE REQUIREMENTS, COORDINATING WITH OTHER TRADES, AND INSTALL THE SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE OWNER. 7. DRAWINGS ARE PRODUCED IN VARIOUS DIMENSIONAL SCALES AND DO NOT ALWAYS DRAWINGS ARE PRODUCED IN VARIOUS DIMENSIONAL SCALES AND DO NOT ALWAYS MATCH THE DRAWING SCALES SHOWN ON THE ARCHITECTURAL DRAWINGS. CAREFULLY VERIFY THE SCALE OF EACH MECHANICAL DRAWING. 8. ALL DEMOLISHED EQUIPMENT IS THE PROPERTY OF THE OWNER. MEET WITH THE ALL DEMOLISHED EQUIPMENT IS THE PROPERTY OF THE OWNER. MEET WITH THE OWNER AND DETERMINE WHICH PIECES OF EQUIPMENT THE OWNER WOULD LIKE TO SALVAGE AND DELIVER THIS EQUIPMENT TO LOCATION DESIGNATED BY THE OWNER. BE RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL EQUIPMENT ETC. THAT THE OWNER DOES NOT WANT TO SALVAGE. 9. DUCT SIZES SHOWN ON THE DRAWINGS ARE OUTSIDE (SHEET METAL) DUCT DIMENSIONS. DUCT SIZES SHOWN ON THE DRAWINGS ARE OUTSIDE (SHEET METAL) DUCT DIMENSIONS. IF INTERNALLY LINED DUCTWORK IS SPECIFIED, THE DIMENSIONS SHOWN ARE FOR THE SHEET METAL AND THE LINER HAS BEEN ACCOUNTED FOR. IF OUTSIDE DUCT WRAP IS SPECIFIED, THE DIMENSIONS SHOWN ARE FOR THE SHEET METAL AND THE INSULATION IS EXTERNAL TO THE SIZE SHOWN. IF DUCT LINER OR OUTSIDE DUCT WRAP IS A CONTRACTOR OPTION, THE DUCTWORK SHOWN ON THE DRAWINGS WILL ASSUME THAT THE DUCTWORK IS INTERNALLY LINED. IF A GLASS FIBER DUCT SYSTEM IS SPECIFIED, THE DIMENSIONS SHOWN WILL BE THE OUTSIDE DIMENSION OF THE DUCT ASSEMBLY. 10. DUCTWORK INSULATION SHALL BE AS IS SPECIFIED IN THE DRAWING OR BOOKLET DUCTWORK INSULATION SHALL BE AS IS SPECIFIED IN THE DRAWING OR BOOKLET SPECIFICATIONS. DUCTWORK INSULATION WILL ONLY BE IDENTIFIED ON THE PLANS WHEN A SINGLE DUCT SYSTEM SWITCHES FROM INTERNAL TO EXTERNAL INSULATION OR ONLY A PORTION OF THE DUCT SYSTEM IS INSULATED.
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
CONDENSING UNIT SCHEDULE
AutoCAD SHX Text
CU-4
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text
MODEL
AutoCAD SHX Text
MAKE
AutoCAD SHX Text
TRANE
AutoCAD SHX Text
TTA15043DAA
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
FIRST FLOOR - MECHANICAL PLAN
AutoCAD SHX Text
EXISTING CU-3
| Sheets and Views |
| 436-23-123 Building 170 Warehouse Upgrades -G0.00 |
| 436-23-123 Building 170 Warehouse Upgrades -MD1.01 |
| 436-23-123 Building 170 Warehouse Upgrades -M1.01 |
File details come from the government source that posted it. Updated .