CON 436-23-123 Building 170 Warehouse Upgrades_DWG_01.pdf

PDF 822 KB Posted

Attached to
Z2DA--Building 170 Warehouse Upgrades - 436-23-123
Solicitation number
36C25924R0016
Issued by

About this file

This package includes construction documents for upgrades to Building 170 Warehouse at the Fort Harrison VA Medical Center in Montana. The project involves mechanical system replacements and upgrades in the warehouse including a new air handling unit with direct expansion cooling and condensing unit. Drawings show demolition of existing equipment, proposed mechanical equipment locations and connections, and schedules with equipment specifications. The related federal contract opportunity is solicitation number 36C25924R0016 for the Building 170 Warehouse Upgrades project numbered 436-23-123, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19. The documents provide requirements for mechanical construction work at the site.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 View Name 1/8" = 1'-0"

SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE

ELEVATION CALLOUT EXAMPLE

DETAIL CALLOUT EXAMPLE

SECTION CALLOUT EXAMPLE

SECTION, DETAIL, OR ELEVATION

SYMBOL IDENTIFIERS

DETAIL NAME

LETTER OR NUMBER DESIGNATOR

DRAWING SEQUENCE NUMBER

INDICATES WHERE TITLE IS

LOCATED

ONE OR TWO CHARACTER

DISCIPLINE DESIGNATOR

(MAY NOT BE PRESENT IF

CALLOUT AND TITLE ARE ON

DRAWINGS WITHIN THE SAME

DISCIPLINE)

A A101

AE101

AE101

MATCH LINE

DETAIL NUMBER

ON SHEET

SHEET NUMBER

DETAIL NUMBER

ON SHEET

SHEET NUMBER

02 \ A-1.04

FORT HARRISON VA MEDICAL SYSTEM

VAMC PROJECT # 436-23-123

BUILDING 170 WAREHOUSE UPGRADES

SHEET LIST

G-0.00 COVER SHEET

MD-1.01

GENERAL NOTES

ABBREVIATIONSA

& AND

@ AT

AB ANCHOR BOLT

ACFL ACCESS FLOOR

ACOUS ACOUSTICAL

AD AREA DRAIN

ADJ ADJUSTABLE

ADJ ADJACENT

ADMIN ADMINISTRATION

AFF ABOVE FINISH FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

AP ACCESS PANEL

APROX APPROXIMATE

ARCH ARCHITECTURAL

AT ACOUSTICAL CEILING TILE

AUTO AUTOMATIC

AWT ACOUSTICAL WALL TREATMENT

B

BD BOARD

BFE BOTTOM FOOTING ELEVATION

BG BUMPER GUARD

BKT BRACKET

BLDG BUILDING

BM BEAM

BOT BOTTOM

BP BRICK PAVING

BR BRICK

BRG BEARING

BSMT BASEMENT

C

C CHANNEL

CAB CABINET

CANTL CANTILEVER

CAP CAPACITY

CAT CATEGORY

CCTV CLOSED CIRCUIT TELEVISION

CD COILING DOOR

CG COILING GRILLE

CG COILING GUARD

CH COAT HOOK

CJT CONTROL JOINT

CL CENTER LINE

CL CLASS

CLG CEILING

CLR CLEAR

CM CONSTRUCTION MANAGER

CMU CONCRETE MASONRY UNIT

CO CASED OPENING

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONN CONNECT/-ED/-ION

CONST CONSTRUCTION

CONT CONTINUE/CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CP CARPET

CPT CARPET MODULE TILE

CR-1 CHAIR RAIL

CR-2 CRASH RAIL

CT CERAMIC TILE

CTR CENTER

CW CURTAIN WALL

CW COLD WATER

CYL CYLINDER

D

D DEPTH OR DEEP

DEMO DEMOLITION

DEPR DEPRESSIONDBL DOUBLE

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIFF DIFFUSER

DIM DIMENSION

DISP DISPENSER

DIST DISTRIBUTION

DIV DIVISION

DN DOWN

DP DATA PROCESSING

DR DOOR

DS DOWNSPOUT

DWG DRAWING

E

EC ELECTRICAL CABINET

EC EPOXY COATING

EF EXHAUST FAN

EFTR EXISTING FINISH TO REMAIN

EJT EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

EMERG EMERGENCY

EO ELECTRICAL OUTLET

EPDM ETHYLENE PROPYLENE

DIENE MONOMER

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXH EXHAUST HOOD

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

EXT-P EXTERIOR PAINT

EXT-ST EXTERIOR STAIN

F

FA FIRE ALARM

FAP FIRE ALARM PANEL

FB FIRE BLANKET

FD FLOOR DRAIN

FDN FOUNDATION

FDV FIRE DEPARTMENT VALVE

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FGS FOAM GASKET SEAL

FH FIRE HOSE

FHV FIRE HOSE VALVE

FIN FINISH

FIXT FIXTURE

FL FLOOR

FL FLOW LINE

FP FIRE PROOFING

H

H HIGH

HB HOSE BIB

HD HAND DRYER

HDCP HANDICAP

HDR HEADER

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HPT HIGH POINT

HR HANDRAIL

HT HEIGHT

HTR HEATER

HVAC HEATING, VENTILATING,

AIR CONDITIONING

HW HOT WATER

HWD HARDWOOD

I

IC INTERCOM

ID INSIDE DIAMETER

IN INCH

INSUL INSULATION

INT INTERIOR

ISO ISOLATION

J

JAN JANITOR

JB JUNCTION BOX

JST JOIST

JT JOINT

K

KO KNOCK OUT

L

L LAVATORY

LB POUND

LCD LINEAR CEILING DIFFUSER

LF LINE FIGURED

LIN LINEAR

LKR LOCKER

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMC LINEAR METAL CEILING

LOC LOCATION OR LOCATE

LPT LOW POINT

LS LAWN SPRINKLING

LT LIGHT

LTG LIGHTING

LVR LOUVER

LWC LINEAR WOOD CEILINGM

MAT MATERIAL

MAX MAXIMUM

MBD MARKER BOARD

MC MEDICINE CABINET

MCU MODULAR COOLING UNIT

MECH MECHANICAL

MEMB MEMBRANE

MET METAL

MRF MANUFACTURER

MH MANHOLE

MIL MILLIMETER

MN MINIMUM

MR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MONO MONOLITHIC

MPU MULTI- PURPOSE UNIT

MTD MOUNTED

MTL METAL

MTR MOTOR

MULL MULLION

P

PNL PANEL

PR PAIR

PRELIM PRELIMINARY

PRES PLASTIC RESIN

PRESS PRESSURE

PRIM PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PTC PAPER TOWEL CABINET

PTR PRINTER

PVC POLYVINYL CHLORIDE

R

R RADIUS

R RISER

RA RETURN AIR

RB RESILIENT BASE/RUBBER BASE

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REFR REFRIGERATOR

REG REGISTER

REIN REINFORCE/-ED/-ING

REM REMOVE

REQD REQUIRED

RET RETAINING

REV REVERSE

REV REVISE

RF RESILIENT FLOOR

RFI REQUEST FOR INFORMATION

RH ROOF HATCH

RM ROOM

RO ROUGH OPENING

RS ROUGH SLAB

RSF RESILIENT SHEET FLOOR

RWC RAIN WATER CONDUCTOR

S

S SINK

S STAIN

SCHED SCHEDULE

SD SHOWER DRAIN

SD SMOKE DAMPER

SDISP SOAP DISPENSER

SF STORE FRONT

SF SQUARE FOOT

SH SHOWER

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SM SURFACE MOUNTED

SNC SANITARY NAPKIN CABINET

SND SANITARY NAPKIN DISPOSER

SP STANDPIPE

SPEC SPECIFICATIONS

SPR SINGLE PLY ROOF

SQ SQUARE

SQ YD SQUARE YARD

SR SERVICE RECEPTOR

SS SERVICE SINK

SST STAINLESS STEEL

ST STREET

ST STONE TILE

STC SOUND TRANSMISSION

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

T

T TOP

TAN TANGENT

TCAB TOWEL CABINET

TDR TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPERATURE

TER TERRAZZO

TG TONGUE & GROVE

THRES THRESHOLD

TPH TOILET PAPER HOLDER

TR TREAD

TRANSF TRANSFORMER

TS TUBE SECTION

TV TELEVISION

TYP TYPICAL

U

U URINAL

UC UNDERCUT

UC UNDERCOUNTER

UFD UNDER FLOOR DUCT

UG UNDERGROUND

UH UNIT HEATER

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

US UTILITY SHELF

UTIL UTILITY

V

VC VALVE CABINET

VCT VINYL COMPOSITION TILE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

W

W WALL COVERING

W WIDTH/WIDE

W WIDE FLANGE

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDW WINDOW

WG WALL GUARD

WH WALL HYDRANT

WHCH WHEELCHAIR

WHTR WATER HEATER

WP WALL PANEL

WP WATERPROOF

WR WASTE RECEPTACLE

WS WEATHERSTRIP

WSCT WAINSCOT

WSF WELDED SEAM-RESILIENT

SHEET FLOORING

WT WINDOW TREATMENT

WT WEIGHT

N

NA NOT APPLICABLE

NC NURSE CALL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NRC NOISE REDUCTION COEFFICIENT

NT NOTE

NTS NOT TO SCALE

O

OC ON CENTER

OD OUTSIDE DIAMETER

OFF OFFICE

OH OVERHEAD

OP OPERABLE PARTITION

OPER OPERATOR

OPNG OPENING

OPP OPPOSITE

OFD OVERFLOW ROOF DRAIN

P

P PAINT

PART PARTITION

PB PUSH BUTTON

F

FRMG FRAMING

FSTOP FIRE STOPPING

FT FOOT/FEET

FTG FOOTING

FURR FURRING

G

GA GAUGE

GAL GALLONS

GALV GALVANIZED

GB GRAB BAR

GB GRADE BEAM

GC GENERAL CONTRACTOR

GEN GENERAL

GEN GENERATOR

GL GLASS

GR GRADE

GRT GROUT

GWB GYPSUM WALLBOARD

GYP GYPSUM

PC PRECAST CONCRETE

PCD PAPER CUP DISPENSER

PED PEDESTAL

PL PLATE

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLS PLASTER

1. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY. VERIFY ALL

DIMENSIONS PRIOR TO START OF WORK. IN THE EVENT OF

DISCREPANCY, NOTIFY THE ARCHITECT AND OBTAIN RESOLUTION

BEFORE PROCEEDING.

2. PROVIDE ALL BLOCKING AND ANCHORAGE AS NECESSARY FOR PROPER

INSTALLATION OF WALL HUNG OR WALL MOUNTED EQUIPMENT

FIXTURES.

3. ADDITIONAL PLAN INFORMATION IS SHOWN ON LARGER SCALE PLANS

WHERE INDICATED BY KEYED REFERENCE. LARGE SCALE DRAWINGS

TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.

4. THE LIST OF ABBREVIATIONS IS SHOWN AS A GUIDE ONLY AND DOES

NOT NECESSARILY INCLUDE ALL ABBREVIATIONS USED. OTHER

ABBREVIATIONS MAY BE FOUND AMONG THE DRAWINGS.

5. ALL CONSTRUCTION SHALL MEET OR EXCEED LOCAL INDUSTRY

STANDARDS. DETAILS ARE PROVIDED TO INDICATE MINIMUM QUALITY

AND TO GIVE STANDARDS OF CONSTRUCTION. IF A CONDITION IS NOT

SPECIFICALLY DETAILED, SUBMIT A SIMILAR DETAIL FOR GUIDE AND

APPROVAL. UFC 3-600-01, NFPA 101 AND 5000.

WAREHOUSE - MECHANICAL DEMOLITION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08-6231

A

ROCKY MOUNTAIN NETWORK 19

MONTANA VA HEALTH CARE

SYSTEM (436)

3687 VETERANS DRIVE FORT

HARRISON, MT 59636-1500

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project COR

Revisions: Date:

NAME:

Sheet of

FULLY SPRINKLED

TITLE:

PHONE:

EMAIL:

BUILDING 170 WAREHOUSE

UPGRADES

436-23-123COVER SHEET

G 0.00

01 03

ITJJ

FORT HARRISON, MT

06/30/2023

JOSEPH BILODEAU

DEPUTY CHIEF ENGINEER

N/A N/A

M-1.01 WAREHOUSE - MECHANICAL PLAN

AutoCAD SHX Text

SYMBOL LEGEND

1. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY

DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.

2. CONTRACTOR TO PROVIDE HEPA FILTRATION "NEGATIVE AIR" MACHINES AND OTHER ACTIVE MEANS

(TOOL VACUUM SYSTEMS) WHEN DEEMED NECESSARY TO PREVENT AIR-BORNE DUST FROM

DISPERSING INTO THE ATMOSPHERE WITHIN THE WORKSITE.

3. CONTRACTOR IS TO ISOLATE ALL AIR VENTS WITHIN THE AREA OF WORK. ISOLATION OF AIR VENTS

AS REQUIRED TO PREVENT AIRBORNE DUST FROM ENTERING THE VENT/DUCT. CONTRACTOR TO

REMOVE VENT/DUCT ISOLATION BARRIERS AT THE END OF THE WORK PERIOD AND 30 MINUTES

BEFORE REGULAR HOSPITAL HOURS ARE TO COMMENCE.

4. TEMPORARY BARRIERS WILL BE ERECTED SO AS TO NOT IMPEDE ACCESS TO REMAINING AREAS OF

THE FACILITY FOR PATIENTS, VISITORS, AND HOSPITAL STAFF.

5. ALL DEBRIS MUST BE REMOVED BY CART/CONTAINER WITH A TIGHTLY COVERED LID, NO

EXCEPTIONS WILL BE ALLOWED.

6. CONTRACTOR TO MAINTAIN A CLEAR AND ORDERLY, DUST, DEBRIS, TRIP HAZARD FREE WORK AREA

ON A DAILY BASIS DURING REGULAR HOSPITAL HOURS. CONTRACTOR TO WIPE WORK SURFACES

WITH DISINFECTANT, WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING

THE WORK AREA AT THE END OF EACH WORK DAY OR THIRTY MINUTES BEFORE REGULAR

HOSPITAL HOURS ARE TO COMMENCE.

7. IN THE EVENT THAT AN AEXISTING FIRE EXTINGUISHER IS NOT READILY ACCESSIBLE DUE TO THE

ERECTION OF TEMPORARY BARRIERS, THE CONTRACTOR WILL PROVIDE A FIRE EXTINGUISHER

OUTSIDE THE AREA OF WORK.

8. CONTRACTOR TO FIELD VERIFY ALL SITE CONDITIONS PRIOR TO COMMENCING WITH THE WORK.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF ANY

DISCREPANCIES NOT SHOWN ON THE PLAN(S) PRIOR TO COMMENCING WITH THE WORK.

9. SEE INFECTION CONTROL PLAN FOR ADDITIONAL INFORMATION FOR PROPOSED INFECTION

CONTROL BARRIERS AND PHASING FOR EACH AREA OF WORK REQUIRED. CONTRACTOR WILL BE

RESPONSIBLE FOR COORDINATING THE WORK REQUIRED. CONTRACTOR WILL BE RESPONSIBLE

FOR COORDINATING THE WORK AND THE APPROPRIATE INFECTION CONTROL BARRIER AS NEEDED

TO ACCOMPLISH THE WORK. COORDINATE ALL PROPOSED BARRIERS WITH THE COR THAT MAY

NEED TO BE CREATED TO ACCOMMODATE VARIOUS TRADES AS NEEDED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08-6231

A

ROCKY MOUNTAIN NETWORK 19

MONTANA VA HEALTH CARE

SYSTEM (436)

3687 VETERANS DRIVE FORT

HARRISON, MT 59636-1500

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project COR

Revisions: Date:

NAME:

Sheet of

FULLY SPRINKLED

TITLE:

PHONE:

EMAIL:

BUILDING 170 WAREHOUSE

UPGRADES

436-23-123WAREHOUSE - MECHANICAL

DEMOLITION PLAN

MD 1.01

02 03

ITJJ

FORT HARRISON, MT

06/30/2023

JOSEPH BILODEAU

DEPUTY CHIEF ENGINEER

N/A N/A

REMOVE EXISTING AHU SUPPLY FAN BOX.

AutoCAD SHX Text 26"~

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text 20/20

AutoCAD SHX Text 20/28

AutoCAD SHX Text 36/36

AutoCAD SHX Text

30/30 CONN.

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text 28/20

AutoCAD SHX Text

ACCESS LADDER

AutoCAD SHX Text

AutoCAD SHX Text

MD101

AutoCAD SHX Text

DEMOLITION PLAN GENERAL NOTES:

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

MEZZANINE - MECHANICAL DEMOLITION PLAN

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN SHEET NOTES:

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

MEZZANINE - MECHANICAL DEMOLITION PLAN

AutoCAD SHX Text

AutoCAD SHX Text

NORTH

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08-6231

A

ROCKY MOUNTAIN NETWORK 19

MONTANA VA HEALTH CARE

SYSTEM (436)

3687 VETERANS DRIVE FORT

HARRISON, MT 59636-1500

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project COR

Revisions: Date:

NAME:

Sheet of

FULLY SPRINKLED

TITLE:

PHONE:

EMAIL:

BUILDING 170 WAREHOUSE

UPGRADES

436-23-123WAREHOUSE - MECHANICAL PLAN

M 1.01

03 03

ITJJ

FORT HARRISON, MT

06/30/2023

JOSE RIVERA-HERNANDEZ

DEPUTY CHIEF ENGINEER

N/A N/A

INSTALL NEW SUPPLY FAN BOX AND DIRECT EXPANSION COIL. AHU IS TO BE EXPECTED TO EXTEND

BY 8". INSTALL PLUMBING CONNECTIONS TO CU-4.

INSTALL CU-4 ON 4" CONCRETE PAD. FINAL LOCATION TO BE COORDINATED WITH THE COR. RUN

COPPER PIPES EXPOSED ALONG THE EXTERIOR WALL.

PENETRATE COPPER PIPES THROUGH EXTERIOR WALLS AND IS TO BE FIRE CAULK AND FULLY

INSULATED FROM THE COILS TO THE CONDENSOR UNIT.

AutoCAD SHX Text 26"~

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text 20/20

AutoCAD SHX Text 20/28

AutoCAD SHX Text 36/36

AutoCAD SHX Text

30/30 CONN.

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

NEW LIQUID DISTRIBUTION & SUCTION REFRIGERANT COPPER PIPE

AutoCAD SHX Text

CU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text 28/20

AutoCAD SHX Text

ACCESS LADDER

AutoCAD SHX Text

AutoCAD SHX Text M101

AutoCAD SHX Text

NEW LIQUID DISTRIBUTION & SUCTION REFRIGERANT COPPER PIPE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

RECEIVING

AutoCAD SHX Text T

AutoCAD SHX Text

FS

AutoCAD SHX Text

CU

AutoCAD SHX Text

AutoCAD SHX Text

NEW LIQUID DISTRIBUTION & SUCTION REFRIGERANT COPPER PIPE

AutoCAD SHX Text

MECHANICAL PLAN GENERAL NOTES:

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

MEZZANINE - MECHANICAL PLAN

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL PLAN SHEET NOTES:

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

MEZZANINE - MECHANICAL PLAN

AutoCAD SHX Text

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

PLAN

AutoCAD SHX Text H.P.

AutoCAD SHX Text R.P.M.

AutoCAD SHX Text

DRIVE

AutoCAD SHX Text

TYPE

AutoCAD SHX Text C.F.M.

AutoCAD SHX Text

REMARKS

AutoCAD SHX Text

HZ

AutoCAD SHX Text

PHASE

AutoCAD SHX Text

VOLT

AutoCAD SHX Text

ESP (IN H2O)

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

AIR HANDLING UNIT SCHEDULE

AutoCAD SHX Text

TSP (IN H2O)

AutoCAD SHX Text

SUPPLY FAN

AutoCAD SHX Text

CIRCUIT TYPE

AutoCAD SHX Text

FACE VELOCITY (FPM)

AutoCAD SHX Text

DIRECT EXPANSION COIL

AutoCAD SHX Text

LIQUID/SUCTION (%%DF)

AutoCAD SHX Text

TOTAL CAP (MBH)

AutoCAD SHX Text

SENSIBLE CAP (MBH)

AutoCAD SHX Text

LDB/LWB (%%DF)

AutoCAD SHX Text

APD (IN WG)

AutoCAD SHX Text

EDB/EWB (%%DF)

AutoCAD SHX Text

FINS PER FOOT

AutoCAD SHX Text

ROWS

AutoCAD SHX Text

ALL COILS SHALL HAVE SAME END CONNECTIONS

AutoCAD SHX Text

AHU-2

AutoCAD SHX Text

WAREHOUSE

AutoCAD SHX Text

VENTILATION

AutoCAD SHX Text

AutoCAD SHX Text 1.500

AutoCAD SHX Text 2.785

AutoCAD SHX Text 3.925

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

15" FC

AutoCAD SHX Text

AutoCAD SHX Text

DIRECT DRIVE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BELT

AutoCAD SHX Text

MAKE

AutoCAD SHX Text

MODEL

AutoCAD SHX Text

TRANE

AutoCAD SHX Text

CSAA010UA

AutoCAD SHX Text

1. FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL OPERATIONS NECESSARY FOR FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL OPERATIONS NECESSARY FOR THE INSTALLATION OF COMPLETE AND OPERATING MECHANICAL SYSTEMS SUBJECT TO THE CONDITIONS OF THE CONTRACT. THIS WORK ALSO INCLUDES THE COMPLETION OF SUCH MECHANICAL AND ELECTRICAL DETAILS NOT MENTIONED OR SHOWN WHICH ARE NECESSARY FOR THE SUCCESSFUL OPERATION OF ALL SYSTEMS. 2. VISIT THE PREMISES BEFORE BID AS NO EXTRAS WILL BE ALLOWED FOR LACK OF VISIT THE PREMISES BEFORE BID AS NO EXTRAS WILL BE ALLOWED FOR LACK OF KNOWLEDGE OF EXISTING CONDITIONS. 3. THE PLANS INDICATE THE LOCATION, TYPE AND SIZES OF VARIOUS UTILITIES WITHIN THE THE PLANS INDICATE THE LOCATION, TYPE AND SIZES OF VARIOUS UTILITIES WITHIN THE SITE WHERE KNOWN. THESE UTILITIES ARE INDICATED AS ACCURATELY AS POSSIBLE. IF UTILITIES ARE ENCOUNTERED DURING CONSTRUCTION WHICH ARE NOT SHOWN ON THE DRAWINGS, AS FOR INSTRUCTIONS FROM THE ARCHITECT. ANY RELOCATION OR REMODELING REQUIRED WILL THEN BE DIRECTED BY CHANGE ORDER. ASSUME ALL RESPONSIBILITY FOR PROTECTION OF ALL UTILITIES, SHOWN OR NOT, AND REPAIR ANY DAMAGE CAUSED BY THIS CONSTRUCTION AT NO EXTRA CHARGE TO THE OWNER. 4. COORDINATE AND ORDER THE PROGRESS OF THE MECHANICAL WORK TO CONFORM TO COORDINATE AND ORDER THE PROGRESS OF THE MECHANICAL WORK TO CONFORM TO THE OWNER'S SCHEDULE AND THE PROGRESS OF THE WORK OF THE OTHER TRADES. COMPLETE THE ENTIRE INSTALLATION AS SOON AS THE CONDITION OF THE BUILDING WILL PERMIT. 5. COORDINATE MECHANICAL UTILITY INTERRUPTIONS WITH THE OWNER AND THE UTILITY COORDINATE MECHANICAL UTILITY INTERRUPTIONS WITH THE OWNER AND THE UTILITY COMPANY. PLAN WORK SO THAT THE DURATION OF THE INTERRUPTION IS KEPT TO A MINIMUM. 6. MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND BECAUSE OF THE SMALL SCALE, IT IS MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND BECAUSE OF THE SMALL SCALE, IT IS NOT POSSIBLE TO INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM THE ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK. VERIFY ALL SPACE REQUIREMENTS, COORDINATING WITH OTHER TRADES, AND INSTALL THE SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE OWNER. 7. DRAWINGS ARE PRODUCED IN VARIOUS DIMENSIONAL SCALES AND DO NOT ALWAYS DRAWINGS ARE PRODUCED IN VARIOUS DIMENSIONAL SCALES AND DO NOT ALWAYS MATCH THE DRAWING SCALES SHOWN ON THE ARCHITECTURAL DRAWINGS. CAREFULLY VERIFY THE SCALE OF EACH MECHANICAL DRAWING. 8. ALL DEMOLISHED EQUIPMENT IS THE PROPERTY OF THE OWNER. MEET WITH THE ALL DEMOLISHED EQUIPMENT IS THE PROPERTY OF THE OWNER. MEET WITH THE OWNER AND DETERMINE WHICH PIECES OF EQUIPMENT THE OWNER WOULD LIKE TO SALVAGE AND DELIVER THIS EQUIPMENT TO LOCATION DESIGNATED BY THE OWNER. BE RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL EQUIPMENT ETC. THAT THE OWNER DOES NOT WANT TO SALVAGE. 9. DUCT SIZES SHOWN ON THE DRAWINGS ARE OUTSIDE (SHEET METAL) DUCT DIMENSIONS. DUCT SIZES SHOWN ON THE DRAWINGS ARE OUTSIDE (SHEET METAL) DUCT DIMENSIONS. IF INTERNALLY LINED DUCTWORK IS SPECIFIED, THE DIMENSIONS SHOWN ARE FOR THE SHEET METAL AND THE LINER HAS BEEN ACCOUNTED FOR. IF OUTSIDE DUCT WRAP IS SPECIFIED, THE DIMENSIONS SHOWN ARE FOR THE SHEET METAL AND THE INSULATION IS EXTERNAL TO THE SIZE SHOWN. IF DUCT LINER OR OUTSIDE DUCT WRAP IS A CONTRACTOR OPTION, THE DUCTWORK SHOWN ON THE DRAWINGS WILL ASSUME THAT THE DUCTWORK IS INTERNALLY LINED. IF A GLASS FIBER DUCT SYSTEM IS SPECIFIED, THE DIMENSIONS SHOWN WILL BE THE OUTSIDE DIMENSION OF THE DUCT ASSEMBLY. 10. DUCTWORK INSULATION SHALL BE AS IS SPECIFIED IN THE DRAWING OR BOOKLET DUCTWORK INSULATION SHALL BE AS IS SPECIFIED IN THE DRAWING OR BOOKLET SPECIFICATIONS. DUCTWORK INSULATION WILL ONLY BE IDENTIFIED ON THE PLANS WHEN A SINGLE DUCT SYSTEM SWITCHES FROM INTERNAL TO EXTERNAL INSULATION OR ONLY A PORTION OF THE DUCT SYSTEM IS INSULATED.

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

CONDENSING UNIT SCHEDULE

AutoCAD SHX Text

CU-4

AutoCAD SHX Text

WAREHOUSE

AutoCAD SHX Text

MODEL

AutoCAD SHX Text

MAKE

AutoCAD SHX Text

TRANE

AutoCAD SHX Text

TTA15043DAA

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

FIRST FLOOR - MECHANICAL PLAN

AutoCAD SHX Text

EXISTING CU-3

Sheets and Views
436-23-123 Building 170 Warehouse Upgrades -G0.00
436-23-123 Building 170 Warehouse Upgrades -MD1.01
436-23-123 Building 170 Warehouse Upgrades -M1.01

File details come from the government source that posted it. Updated .