This document contains an amendment to a solicitation for the Building 170 Warehouse Upgrades project. The amendment extends the solicitation closing date to November 30, 2023 at 14:00 MT and provides responses to contractor questions. Key project details include upgrades to doors, installation of HVAC controls integrated with the Schneider Electric BAS, replacement of legacy JCI controls, and addition of concrete housekeeping pads and bollards. The Department of Veterans Affairs is the contracting agency. Products and services required include installation of access control on a man door, replacement of HVAC components with Schneider Electric controls to integrate with infrastructure from an ongoing EHRM project, and replacement of all remaining JCI controls as part of the project scope. Bid guarantees and payment/performance bonds are also required in accordance with FAR 52.228-15 for any award over $150,000.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 436-23-123 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25924R0016 09-27-2023
X x x November 30, 2023 at 14:00 MT x The purpose of this amendment is to extend solicitation close date and provide answers to rfi's. Solicitation close date is now November 30, 2023 at 14:00 MT. All other terms and conditions remain unchanged.
· Would you consider extending the questions due date. There was a significant number of documents released today and this project does not have detailed drawings.
· Solicitation extended to close on November 30, 2023 at 14:00 MT.
· Please specify if access control will be required on the single door. If so, we may need more details on the door hardware and type of access control.
· Yes, a PAC reader will be required on the man door. It should be run back to room 103.
· Please specify door hardware, panic bar, core locks, handle, Etc?
· Please clarify additional electrical that will be required for new HVAC. Will additional circuits be required and are sizes know?
· New HVAC is expected to require a circuit, similar to existing, circuits may require to be updated due to increased capacity of the system.
· Please clarify if you would like a half lite for the single exterior door. Would that be large enough or too large?
· Yes, a metal security half lite door is required, in order for the warehouse technicians to have visuals on the dock levers during operation with requiring the door to be open. Exact size of half light to be determined by COR during the submittal process.
· Can you provide a cut sheet of the roll up door that will be provided and exactly what parts will be provided by the government. We could not find that model. Also, does the government know what power head is compatible, it might be worth specifying so we get the one that works with the provided door.
· Please see the posted amendment in the solicitation labeled “Rolling Door Cut Sheet”. From the parts breakdown (page 4) the VA was able to confirm they have parts A and F1. All other parts are to be provided by the contractor. The contractor shall be responsible for providing a proper power head to operate the VA provided door.
· Please clarify if existing framing is wood or metal.
· Metal
· Please clarify if the surface mount bollards, with a 4.5’’ diameter with 11-gauge steel painted yellow would be acceptable? If that is not acceptable, please clarify the diameter and gauge of steel that is acceptable. We cannot find bollards specifically rated for “forklift/pallet truck impacts” but want to provide a product the government is looking for.
· Surface mounted 4.5’’ diameter with 11-gauge steel painted yellow is acceptable. Concrete fill will be required for extra strength.
· Please clarify if a pre-fabricated housekeeping pad would be acceptable or new concrete will need to be placed.
· New concrete pad will be required.
· Please clarify if we will be given an admin NTP, separate from the 60 days POP required to complete the project. Some items may be long lead.
· Admin NTP to be determined by contraction based on materials and lead times after award.
· The Project Scope states Install/update control unit on building louvers to optimize conditions inside Building 170. Can the end user furnish any Plans, Manufactures Information, Model#, ETC? given it is not shown on the mechanical plan attachments.
· In the project documents the plans (warehouse mechanical plans) provided do not correlate with the SOW as written in the solicitation for the upgrading of exterior doors.
· Please see both sets of drawings. One set of drawings is for the mechanical aspects of this solicitation. The other is for the door upgrades.
· Are there plans that show the existing and new doors, room 105, and the required solar energy system needed.
· One set of drawings show the existing doors and room 105. There are no requirements for a solar energy system. Specifications were revised and submitted as an amendment.
· On the site walk we observed the AHU in Building 170 was tied to a legacy JCI NCE controller, is it the intent of this project for this controller to be replaced by a new Schneider Electric controller and tied back to the main facility control system? There will be Schneider Electric controls installed in the building as a part of the current Y1DZ EHRM Infrastructure Upgrades project so infrastructure/network for the SE system will be installed as apart of that project.
· Yes, controller to be replaced with new Schneider controller.
· In addition to the AHU, there are several small terminal units on the JCI system in the Warehouse (5 IR Gas Heaters, 2 Electric Radiant Heaters, and 1 Evaporator Coil) some of which are going to be removed as a part of the current Y1DZ EHRM Infrastructure Upgrades project. Is it the intent for these systems to also be replaced with SE controls as well?
· Yes, the 5 IR Gas Heaters, 2 Electric Radiant Heaters shall be upgraded to SC controls as part of this project. The Evaporator Coil will be handled as part of the EHRM project as it is related to the telecom space.
· If any part of the JCI control system is going to remain in Building 170, will VA facilities personnel be responsible for deleting/rebinding the remaining JCI controls to their existing platform?
· The intention is to replace all JCI control systems as part of this project and the aforementioned EHRM project.
· Would any new SE controls for this project be able to operate stand-alone until the infrastructure/network for the current Y1DZ EHRM Infrastructure Upgrades project is installed?
· It is the VA’s intention to insure a fully integrated BAS system as the end result. Understanding EHRM project is ongoing this building will need to stand alone until that infrastructure is built out, at which point it can be integrated.
· Are bonds required?
· Bid Guarantee & Payment/Performance Bonds: IAW FAR 52.228-15, offerors are reminded that any award amount exceeding $150,000 shall require both Payment and Performance Bonds. Performance and Payment bonds are due no later than 10 calendar days after award. Original bid guarantee due at time of solicitation closing. If the bid guarantee is not received at the time of solicitation closing, the proposal is late and will not be considered.
Building 170 Warehouse Upgrades Amendment 3
Attachments See attached document: Rolling Door Cut Sheet.
image1.png image2.jpeg image3.png
File details come from the government source that posted it. Updated .