About this file

This document is a Task Work Order Amendment Form for Professional Services issued by the Florida Department of Transportation (FDOT), involving Gortemoller Engineering, Inc., a consultant located in Panama City Beach, FL. The amendment is associated with Contract No. CAO55 and Task Work Order No. 5, with Amendment No. 1 executed on August 24, 2023.

The amendment pertains to a minor design project for safety improvements on State Road 20 West from SW CR 275 to SW Matthew Wood Road in Calhoun County. The document redistributes compensation elements between Basic Services and Survey Services, reducing Basic Services by $21,431.56 and increasing Survey Services by the same amount. The total authorization to date remains $565,651.00, with no net change in the overall task work order amount. The amendment is specifically for CS Traffic Operations and involves units worked at loaded billing rates, with compensation methods including a lump sum paid based on percentage of completion.

View the file

Other files

File Type Posted
CN-550000-CAM50-W0090000.pdf PDF
CN-550000-CAO55-00020000.pdf PDF
CN-550000-CAO55-W0090000.pdf PDF
CN-550000-CAO55-W0100000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-CAO55-W0070100.pdf PDF
CN-550000-CAO55-W0080000.pdf PDF
CN-550000-CAO55-W0110000.pdf PDF
CN-550000-CAO55-W0120000.pdf PDF
CN-550000-CAO55.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER AMENDMENT FORM

FOR PROFESSIONAL SERVICES

375-030-26

PROCUREMENT

08/21 recovered is $ .

Subtotal Estimate/L imit

$93,486.44 Limit

$21,431.56 Limit

$0.00

$0.00

$0.00

$0.00

$114,918.00

$0.00

$114,918.00

Attachments:

Distribution:

$0.00

$0.00

$0.00

Encumber by Task

Departmental Approval:

Total authorizations to date (including this one):

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

Page 1 subtotal

Page 2 thru 6 Subtotal

Total authorized against this task work order beyond the date of execution of this amendment. The following amount is the remaining work order balance to be recovered

The time for completion of services for the subject task work order is extended thru

The total amount for services performed under this task work order is increased by $

The total amount for services performed under this task work order is decreased by $

The decrease in funds will be allocated to the following compensation elements described below.

elements are described below.

from this task work order $ . Note: for Prof. Serv. Task Work Order Amendments, the encumbrance line should never be closed

The subject task work order is hereby closed. Final payment for the task work order has been set to PAID status in CITS. No additional services or charges are

(Status 50) by Financial Services staff based on this selection. Additional Note: Please be sure you want to close out before marking. Premature close outs that must

The subject task work order is hereby canceled (no work has been performed and no payment is due). The total amount of the task work order which is

The additional funds will be allocated to the following compensation elements described below.

There is no increase/decrease in the task work order amount, funds are only redistributed between compensation elements. Revised compensation be corrected in CITS may require programmer time and costs borne by the program office.

(LA4) Units worked at loaded billing rates in

Table 6

Compensation Element

Description

This Amendment

Amount

Basic Services (LS2) ($21,431.56)

Survey Services (LA 4) $21,431.56

Previous

Amount

$114,918.00

$0.00

Method of Compensation

(LS2) Lump sum paid based on % of completion

(Title)

Dexter M. Gortemoller, P.E.

Signature

President

(Name)

$565,651.00

(Name) (Title) Signature

Jason Peters, P.E. Director of Transportation Operations

Michael Lewis, Jimmy Smith, Consultant, FS, PSU A. Goines

Consultant Acceptance:

Payment FM No. (must be the same as original Task Work Order):

44566513201

Check all applicable Terms:

Correction of Compensation Elements- CS Traffic Operations Minor Design for safety improvements at SR 20 W from SW CR 275 to SW Matthew Wood Road in Calhoun

County. (F.A.P. No. D323 069 B) The effective date of this TWO AMD is the Execution date of TWO05, August 16, 2023.

708 Thomas Drive, Panama City Beach, FL 32408

Gortemoller Engineering, Inc.

Address:

Consultant:

Date (To be entered upon execution of Task Work Order Amendment):Contract No.:

CAO55

Purpose of Amendment:

Amendment No.

to Task Work Order No.

DocuSign Envelope ID: D52813E6-91E2-4B45-B50E-93DBC87887D1

8/24/2023

File details come from the government source that posted it. Updated .