CN-550000-CAL76-W0070000.pdf

PDF 63 KB Posted

Attached to
Master Agreement FL|CAL76|be626232bd5ce2006152c2ac64b517ea
Contract number
CAL76
Issued by
Florida

About this file

This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), involving AIM Engineering & Surveying, Inc. as the consultant. The contract is numbered CAL76 and is associated with Payment FM No. 451310-1-62-02, with key personnel including FDOT Project Manager Anthony Miller and Construction Manager Brenda Aufdenkamp.

The task order authorizes post-design services for SR 519 (Fiske Boulevard) from Barbara Jenkins to SR 520 (King St.), with a total compensation amount of $32,799.73. The compensation is broken down into three service elements: Post Design Services - AIM ($11,251.76), Post Design Services - FDA ($15,602.73), and Post Design Services - FBT ($5,945.24). The services will be compensated using loaded billing rates in Table 6, with all work to be completed by 12/26/2027. The document notes that an independent assessment has confirmed the staff hours and quantities as fair, reasonable, and competitive, and the total authorizations to date, including this order, are $3,871,561.19.

View the file

Other files

File Type Posted
CN-550000-CAL76-W0020000.pdf PDF
CN-550000-CAL76-W0050000.pdf PDF
CN-550000-CAM50-W0070000.pdf PDF
CN-550000-CAL76-00020000.pdf PDF
CN-550000-CAL76-W0040000.pdf PDF
CN-550000-CAL76-W0060000.pdf PDF
CN-550000-CAM50-W0080000.pdf PDF
CN-550000-CAL76-W0010000.pdf PDF
CN-550000-CAL76-W0030000.pdf PDF
CN-550000-CAL76-W0030100.pdf PDF
CN-550000-CAL76.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

12/26/2027

*Limiting or Estimating/Budgeted Amount.

Distribution:

Task Work Order No.:

Contract No.: Payment FM No.:

CAL76 451310-1-62-02

Estimate$5,945.24

$3,871,561.19

(name) (title) Signature

Catalina Chacon, P.E. DCPME

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

(LA4) Units worked at loaded billing rates in Table 6

(LA4) Units worked at loaded billing rates in Table 6

Page 1 Total

Page 2 thru 6 Subtotal

Total

(LA4) Units worked at loaded billing rates in Table 6Post Design Services - FBT

Post Design Services - AIM

AIM Engineering & Surveying, Inc.

2161 Fowler Street Suite 100 Fort Myers, FL 33901

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$32,799.73

$11,251.76 Estimate

Post Design Services - FDA $15,602.73 Estimate

The consultant will provide post design services for SR 519 (Fiske Boulevard) From Barbara Jenkins to SR 520 (King St.) as stated in the attached scope of services.

FDOT PM: Anthony Miller

FDOT CM: Brenda Aufdenkamp

Signature

FDOT / AIM

Vice President

$32,799.73

$0.00

(name) (title)

Shawn Swets

$32,799.73

Total authorizations to date (including this one):

Departmental Approval:

Consultant Acceptance:

File details come from the government source that posted it. Updated .