CN-550000-CAL76-W0030000.pdf
PDF 66 KB Posted
- Contract number
- CAL76
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), involving AIM Engineering & Surveying, Inc. as the consultant. The contract is identified with Contract No. CAL76 and Payment FM No. 447084-1-32-01, with key FDOT personnel including Project Manager Sam Jumber and Construction Manager Dana Stewart.
The task order authorizes AIM Engineering to provide design services for State Road 15 from E 4th Avenue to Palmetto Avenue, with a total contract value of $310,907.08. The compensation is broken down into several elements, including Design Services for AIM (Prime) at $238,037.65 (limit), Supplemental Survey at $25,248.80 (estimate), Design Services for Utilities at $11,342.43 (limit), Cultural Resources at $9,923.43 (limit), and Public Engagement services at $23,168.78 (limit), with additional direct expenses for Public Engagement. The work is to be completed by 3/1/2026, with payments structured as lump sum based on percentage of completion or units worked at loaded billing rates.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
3/1/2026
*Limiting or Estimating/Budgeted Amount.
Distribution:
Task Work Order No.:
Contract No.: Payment FM No.:
CAL76 447084-1-32-01
$3,185.99
Limit
Limit
Limit
Estimate
$11,342.43
$9,923.43
$23,168.78
$1,433,626.86
(name) (title) Signature
Ed Kestory, PE DCPME
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
(LS2) Lump sum paid based on % of completion
(LA4) Units worked at loaded billing rates in Table 6
Page 1 Total
Page 2 thru 6 Subtotal
Total
(LS2) Lump sum paid based on % of completion
(LS2) Lump sum paid based on % of completion
(LS2) Lump sum paid based on % of completion
(LA5) Actual expenses or at billing rates in Table 6
Design Services - Utilities - BPA
Design Services - Cultural Resources -
SEARCH
Design Services - Public Engagement - Valerin
Direct Expenses - Public Engagement - Valerin
Design Services - AIM (Prime)
AIM Engineering & Surveying, Inc.
2161 Fowler Street Suite 100 Orlando, FL 33901
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
$310,907.08
$238,037.65 Limit
Supplemental Survey - AIM (Prime) $25,248.80 Estimate
The consultant will provide design services for SR 15 FROM E 4TH AVE TO PALMETTO AVE, as stated in the attached scope of services.
FDOT PM: Sam Jumber FDOT CM: Dana Stewart
Signature
FDOT / AIM
Vice President
$310,907.08
$0.00
(name) (title)
Shawn Swets
$310,907.08
Total authorizations to date (including this one):
Departmental Approval:
Consultant Acceptance:
File details come from the government source that posted it. Updated .