CN-550000-CAL76-W0060000.pdf
PDF 61 KB Posted
- Contract number
- CAL76
- Issued by
- Florida
About this file
This document is a Task Work Order for Professional Services issued by the Florida Department of Transportation (FDOT) to AIM Engineering & Surveying, Inc., located in Fort Myers, FL. The document is associated with Contract No. CAL76 and Task Work Order No. 6, with a Payment FM No. of 452639-1-32-01.
The task order authorizes AIM Engineering & Surveying to provide design services for SR15 from Crystal Lake Drive to Mills Avenue, with a total contract value of $405,130.68. The compensation is broken down into multiple elements including Design Services (for AIM, VGI, SEARCH, and BPA), Direct Expenses, and Survey Services (Authorized and LiDAR), with various compensation methods such as lump sum and loaded billing rates. The project is set to be completed by 12/26/2027, with an independent assessment confirming the staff hours and quantities as fair, reasonable, and competitive. The total authorizations to date, including this task order, amount to $3,838,761.46.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
TASK WORK ORDER FOR PROFESSIONAL SERVICES
375-030-25
PROCUREMENT
08/21
Consultant:
Address:
Date:
12/26/2027
*Limiting or Estimating/Budgeted Amount.
Distribution:
Consultant Acceptance:
Estimate
Limit
Signature
FDOT/AIM
Vice President
$14,511.77
$405,130.68
$0.00
(name) (title)
Shawn Swets
$405,130.68
Total authorizations to date (including this one):
Departmental Approval:
$250,461.92 Limit
Design Services - VGI $20,536.18 Limit
Survey Services Supplemental - AIM
The consultant will provide design services for SR15 from Crystal Lake Dr to Mills Ave as stated in the attached scope of services.
FDOT PM: Martina Paradysz FDOT CM: Jessica Palmer
$6,294.21
AIM Engineering & Surveying, Inc.
2161 Fowler Street
Suite 100
Fort Myers, FL 33901
(To be entered upon execution of T.W.O.)
Brief Task Description:
In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).
Compensation elements are as follows:
Element Description Amount Estimate/LimitMethod of Compensation
The total amount or the limiting amount of the compensation will be:
All services required under this Task Work Order will be completed on or before:
(LS2) Lump sum paid based on % of completion
(LS2) Lump sum paid based on % of completion
(LA4) Units worked at loaded billing rates in Table 6
(LS2) Lump sum paid based on % of completion
Page 1 Total
Page 2 thru 6 Subtotal
Total
(LA5) Actual expenses or at billing rates in Table 6
(LS2) Lump sum paid based on % of completion
(LS2) Lump sum paid based on % of completion
(LA4) Units worked at loaded billing rates in Table 6
Direct Expenses - VGI
Design Services - SEARCH
Design Services - BPA
Survey Services Authorized - AIM
Survey Services LiDAR - AIM
Design Services - AIM
$91,107.54
Estimate
Limit
Limit
Estimate
$3,605.20
$3,910.71
$14,703.15
$3,838,761.46
(name) (title) Signature
Catalina Chacon, PE DCPME
Other Notes:
An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.
Task Work Order No.:
Contract No.: Payment FM No.:
CAL76 452639-1-32-01
$405,130.68