This document is a Task Work Order for Professional Services issued by the State of Florida Department of Transportation (FDOT), involving AIM Engineering & Surveying, Inc. as the consultant. The contract is numbered CAL76 with a Payment FM No. of 447084-1-32-01, and is associated with Task Work Order No. 3.

The task order covers design services for SR 15 from E 4th Ave to Palmetto Ave, with a total contract value of $310,907.08. The compensation is broken down into multiple elements including Design Services for AIM (Prime), Supplemental Survey, Utilities, Cultural Resources, and Public Engagement, with different compensation methods such as lump sum based on percentage of completion and units worked at loaded billing rates. The contract has a completion date of 3/1/2026, and the services include various design and survey work. The document shows departmental approval by Ed Kestory, PE and consultant acceptance by Shawn Swets, Vice President of AIM Engineering & Surveying, Inc.

View the file

Other files

File Type Posted
CN-550000-CAL76-00020000.pdf PDF
CN-550000-CAL76-W0040000.pdf PDF
CN-550000-CAL76-W0060000.pdf PDF
CN-550000-CAL76-W0070000.pdf PDF
CN-550000-CAM50-W0080000.pdf PDF
CN-550000-CAL76-W0020000.pdf PDF
CN-550000-CAL76-W0050000.pdf PDF
CN-550000-CAM50-W0070000.pdf PDF
CN-550000-CAL76-W0010000.pdf PDF
CN-550000-CAL76-W0030000.pdf PDF
CN-550000-CAL76.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

TASK WORK ORDER FOR PROFESSIONAL SERVICES

375-030-25

PROCUREMENT

08/21

Consultant:

Address:

Date:

3/1/2026

*Limiting or Estimating/Budgeted Amount.

Distribution:

Task Work Order No.:

Contract No.: Payment FM No.:

CAL76 447084-1-32-01

$3,185.99

Limit

Limit

Limit

Estimate

$11,342.43

$9,923.43

$23,168.78

$1,433,626.86

(name) (title) Signature

Ed Kestory, PE DCPME

Other Notes:

An independent assessment of the staff hours and quantities for the proposed services has been performed, and found to be fair, reasonable, and competitive.

(LS2) Lump sum paid based on % of completion

(LA4) Units worked at loaded billing rates in Table 6

Page 1 Total

Page 2 thru 6 Subtotal

Total

(LS2) Lump sum paid based on % of completion

(LS2) Lump sum paid based on % of completion

(LS2) Lump sum paid based on % of completion

(LA5) Actual expenses or at billing rates in Table 6

Design Services - Utilities - BPA

Design Services - Cultural Resources -

SEARCH

Design Services - Public Engagement - Valerin

Direct Expenses - Public Engagement - Valerin

Design Services - AIM (Prime)

AIM Engineering & Surveying, Inc.

2161 Fowler Street Suite 100 Orlando, FL 33901

(To be entered upon execution of T.W.O.)

Brief Task Description:

In accordance with the above referenced contract, you are authorized to perform the tasks detailed in attached Exhibit A (Scope of Services).

Compensation elements are as follows:

Element Description Amount Estimate/LimitMethod of Compensation

The total amount or the limiting amount of the compensation will be:

All services required under this Task Work Order will be completed on or before:

$310,907.08

$238,037.65 Limit

Supplemental Survey - AIM (Prime) $25,248.80 Estimate

The consultant will provide design services for SR 15 FROM E 4TH AVE TO PALMETTO AVE, as stated in the attached scope of services.

FDOT PM: Sam Jumber FDOT CM: Dana Stewart

Signature

FDOT / AIM

Vice President

$310,907.08

$0.00

(name) (title)

Shawn Swets

$310,907.08

Total authorizations to date (including this one):

Departmental Approval:

Consultant Acceptance:

File details come from the government source that posted it. Updated .