This document is a Task Assignment Notification Form under Florida Department of Environmental Protection (FDEP) Contract No. HW552, issued to Professional Service Industries, Inc. (PSI), an Intertek company. The task assignment authorizes PSI to conduct annual groundwater monitoring activities at the Priceless Dry Cleaners facility located at 220 North Orlando Avenue, Winter Park, Orange County, Florida. The contract is administered by the FDEP's Hazardous Waste Cleanup Section, with Killian Talley serving as the DEP Contract Manager and Nana Westmark as the Contractor Representative.

The scope of work consists of two subtasks: Project Management and Annual Groundwater Sampling and Analysis and Report. Subtask 2 includes mobilization to the site, collection of groundwater samples and elevation measurements from nine monitoring wells (two shallow, seven intermediate, and one deep well), laboratory analysis of ten groundwater samples for volatile organic compounds using EPA Method 8260B, management of investigative derived waste (IDW) to be handled by PetroTech Southeast, and preparation of a comprehensive Groundwater Monitoring Report. The total fixed-price task assignment value is $6,716.32, with 50 total labor hours allocated. The work is authorized through November 13, 2020, with final deliverables due by August 7, 2020. PSI may invoice upon FDEP receipt and approval of the Groundwater Monitoring Report, ADaPT/GIS Update, and IDW Manifest. There is no retainagfe, no fee schedule component, and no cost reimbursement or cost-plus arrangements; payment is on a fixed-price basis only.

View the file

Other files

File Type Posted
CN-370000-HW552-A1.pdf PDF
CN-370000-HW552-A3.pdf PDF
CN-370000-HW552-CD05J.pdf PDF
CN-370000-HW552-DC002O.pdf PDF
CN-370000-HW552-DC005I.pdf PDF
CN-370000-HW552-DC006M.pdf PDF
CN-370000-HW552-DC014F.pdf PDF
CN-370000-HW552-DC016G.pdf PDF
CN-370000-HW552-DC017M.pdf PDF
CN-370000-HW552-DC017P.pdf PDF
CN-370000-HW552-DC017T.pdf PDF
CN-370000-HW552-DC018Q.pdf PDF
CN-370000-HW552-DC01ACO1.pdf PDF
CN-370000-HW552-DC01ACO3.pdf PDF
CN-370000-HW552-DC01ACO4.pdf PDF
CN-370000-HW552-DC01K.pdf PDF
CN-370000-HW552-DC023H.pdf PDF
CN-370000-HW552-DC024E.pdf PDF
CN-370000-HW552-DC024J.pdf PDF
CN-370000-HW552-DC026D.pdf PDF
CN-370000-HW552-DC026H.pdf PDF
CN-370000-HW552-DC028C.pdf PDF
CN-370000-HW552-DC02CCO1.pdf PDF
CN-370000-HW552-DC02HCO1.pdf PDF
CN-370000-HW552-DC02I.pdf PDF
CN-370000-HW552-DC02KCO1.pdf PDF
CN-370000-HW552-DC02N.pdf PDF
CN-370000-HW552-DC02PC01.pdf PDF
CN-370000-HW552-DC02S.pdf PDF
CN-370000-HW552-DC031D.pdf PDF
CN-370000-HW552-DC034A.pdf PDF
CN-370000-HW552-DC036B.pdf PDF
CN-370000-HW552-DC03C.pdf PDF
CN-370000-HW552-DC03DCO5.pdf PDF
CN-370000-HW552-DC03HCO1.pdf PDF
CN-370000-HW552-DC04G.pdf PDF
CN-370000-HW552-DC04GCO1.pdf PDF
CN-370000-HW552-DC04ICO1.pdf PDF
CN-370000-HW552-DC05ACO2.pdf PDF
CN-370000-HW552-DC05DCO1.pdf PDF
CN-370000-HW552-DC05G.pdf PDF
CN-370000-HW552-DC05ICO3.pdf PDF
CN-370000-HW552-DC06FCO1.pdf PDF
CN-370000-HW552-DC06K.pdf PDF
CN-370000-HW552-DC06MCO1.pdf PDF
CN-370000-HW552-DC07G.pdf PDF
CN-370000-HW552-DC07J.pdf PDF
CN-370000-HW552-DC07PCO1.pdf PDF
CN-370000-HW552-DC07SCO1.pdf PDF
CN-370000-HW552-DC07TCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Memorandum Environmental Protection

Printed on recycled paper.

To: HW552 Contract Negotiation File Priceless Dry Cleaners Winter Park, Orange County

ERIC_5015

From: Killian Talley, Project Manager Date: February 10, 2020 Subject: Negotiation Summary

HW552 DC006L

Task Assignment authorizes PSI to conduct annual groundwater monitoring at the Priceless Dry Cleaners site.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Annual Groundwater Sampling and Analysis and Report Subtask includes costs and labor for PSI to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, ten (10) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B, and management of investigative derived waste. Upon receipt of the groundwater analytical data, PSI will generate a Groundwater Monitoring Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations. IDW will be transported and disposed by PetroTech Southeast as the lowest responsive and responsible bidder.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $6,716.32 with 50 labor hours.

PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATE

Contractor: Professional Service Industries, Inc.

Date: 1/17/2020

Task #: SUBTASK 1: Project Management SUBTASK 6:

Site: Priceless Cleaners SUBTASK 2: Groundwater Monitoring SUBTASK 7:

Activity/Phase: Annual GW Monitorimg SUBTASK 3: SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: SUBTASK 9:

SUBTASK 5: SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$48.08 Project Manager 4 3.5 $62.50 Principal Consultant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $52.89 Senior Engineer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $48.08 Senior Geologist, NW 5 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $45.20 Senior Scientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $34.62 Certified Industrial Hygientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $50.00 Certified Hazardous Materials Manager 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $50.00 Florida Licensed Asbestos Consultant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $39.42 Project Manager 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $31.73 Project Engineer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $32.94 Project Geologist, CC 11 11.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $29.81 Project Scientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $29.81 QA Officer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $32.21 Remediation Coordinator 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$0.00 Professional Land Surveyor 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $0.00 Chemist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$24.50 GIS Specialist, DG 3 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $25.00 Staff Engineer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $24.04 Staff Scientist, RF 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $24.76 Staff Scientist, RH 27 27.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $20.57 Staff Scientist, AH 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $24.04 Environmental Scientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $18.30 Environmental Technician 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $18.75 Administrative Assistant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $15.50 Secretary 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $15.00 Senior Laborer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $12.00 Laborer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

Total Hours 50 4 46.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

Professional Service Industries, Inc.

Direct Labor $1,512.86 $168.10 $1,344.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 170.96% $2,586.38 $287.38 $2,299.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $4,099.24 $455.48 $3,643.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $4,099.24 $455.48 $3,643.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Page 1 HW552_DC006L_CEFLOE.xlsx

FDEP COST ESTIMATE

Contractor: Professional Service Industries, Inc.

Date: 1/17/2020

Task #: SUBTASK 1: Project Management SUBTASK 6:

Site: Priceless Cleaners SUBTASK 2: Groundwater Monitoring SUBTASK 7:

Activity/Phase: Annual GW Monitorimg SUBTASK 3: SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: SUBTASK 9:

SUBTASK 5: SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10

Other Direct Costs $75.65 $8.41 $67.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $291.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $291.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling, Conventional $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling, Non-Conventional $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $115.00 $115.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drum $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $115.00 $115.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.50 $11.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $126.50 $126.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $792.00 $792.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $792.00 $792.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $97.50 $97.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $766.30 $766.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $922.00 $922.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,306.39 $463.89 $5,842.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $409.93 $45.55 $364.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $6,716.32 $509.44 $6,206.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Page 2 HW552_DC006L_CEFLOE.xlsx

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Priceless Cleaners SUBTASK 2: Groundwater Monitoring

DATE: 1/17/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Senior Geologist Develop cost estimate and level of effort 2

Staff Scientist (R Hanson) Load / unload 1

Travel (2 round trips for sampling) 8

Collect groundwater elevations (9 wells) (10 minutes per well) 1.5

Collect groundwater samples

2 shallow wells @ 1 hour per well 2

7 intermediate wells @ 1.5 hour per well 10.5

1 deep well 2

Pick up / drop off sample kits 2

27.00

Report

Project Geologist (C Cummins) Prepare tables and draft maps 2

Prepare GIS package (8 minute per point) 2

Project Geologist (C Cummins) 7

GIS / CADD Specialist (D Grove) Create maps, figures 3

Senior Geologist, N Westmark Report Review, sign and seal 5 3

TOTAL LABOR 46

EQUIPMENT ITEM RATE COSTING UNIUSEAGE TOTALS

55-gallon drum $58.20 each 1 $58.20

Shallow groundwater sampling kit $208.55 day 2 $417.10

Deep groundwater sampling kit $349.20 day 1 $349.20

$766.30

Expendables $32.50 day 3 $97.50

TOTAL EQUIPMENT $922.00

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (GW Sampling) $97.00 day 3 $291.00

TOTAL VEHICLE $291.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

EPA Method 8260 $66.00 10 1 1 $792.00

TOTAL LAB $792.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

PetroTech Southeast IDW drum & pickup 1 $115.00 $115.00

TOTAL $115.00

Page 3 HW552_DC006L_CEFLOE.xlsx

PSI Proposal Number: 0552-300253 January 17, 2020

MMMM DD,

www.intertek.com/building

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634

Phone: (813) 886-1075 Fax: (813) 249-4916

Florida Department of Environmental Protection Hazardous Waste Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Attention: Mr. Killian Talley, Environmental Specialist III Telephone: (850) 245-8705 Email: Killian.Talley@FloridaDEP.gov

Re: Proposal for Annual Groundwater Monitoring

Priceless Dry Cleaners 220 North Orlando Avenue Winter Park, Orange County, Florida

FDEP Facility ID# 48 9502059 / ERIC_5015 PSI Project No. 0552-599

Dear Mr. Talley:

Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to provide Annual Groundwater Monitoring services for the Priceless Dry Cleaners at 220 North Orlando Avenue, Winter Park, Florida. Included with this proposal is a discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion.

PROJECT BACKGROUND

The Priceless Dry Cleaners opened in October 1991 and utilized perchloroethene (PCE) as their drycleaning solvent. Based on documented impacts from drycleaning fluids, the facility was accepted into the Florida Drycleaning Solvent Cleanup Program in June 1997, and assessment activities commenced in August 2001.

A Bioremediation Pilot Study was conducted in April 2006 with two injection areas, one in the source area and one downgradient.

In September 2007, a Remedial Action Plan was developed and implemented which consisted of 5 vapor extraction wells, powered by a 5 HP AMETEK Rotron blower, and off gas treatment via Granular Activated Carbon (GAC). PSI was tasked with providing remediation system start-up on January 31, 2011 and the system ran until April 2012 when the motor seized and was not repaired. The system was subsequently transferred to the Department’s Lakeland warehouse for storage.

mailto:Killian.Talley@FloridaDEP.gov mailto:Killian.Talley@FloridaDEP.gov

FDEP – Priceless Cleaners

Groundwater monitoring has occurred generally on an annual basis which continues to reveal a groundwater plume migrating to the southwest and off-site. In 2014, groundwater monitoring was deferred until the adjacent property was re-developed. The southwest adjacent property was redeveloped as a shopping center in 2014 with the grocery store, Trader Joes, as the anchor tenant.

Subsequent to the adjacent property reconfiguration, PSI provided oversight for the installation of a 46-foot deep monitor well (MW019) on the Trader Joes property in July 2015. The monitor well was installed as a replacement for MW006, MW011 and MW016, which were destroyed during site redevelopment.

PSI conducted annual groundwater sampling and analysis in 2015, 2016 and 2017. Results of the annual groundwater monitoring program reveals a narrow contaminant plume migrating towards Lake Killarney.

Results from 2017 also indicated vertical migration of PCE near MW015, located on-site at the former Priceless Cleaner.

In July and August 2019, Supplemental Assessment was conducted which consisted of soil confirmation samples and a MAGS study. The tenant apparently moved in 2019 and it was considered an opportune time to collect additional data inside the former drycleaner. Results revealed remaining impacts to the soil.

PSI has developed the proposal contained herein to continue the groundwater monitoring program. The recommended network is based on previous results and in accordance with our most recent groundwater report.

PROPOSED SCOPE OF WORK

The proposal contained herein consists of conducting groundwater sampling and analysis, along with a report deliverable. The results will be used to evaluate current groundwater quality conditions.

Specifically, the proposed scope of work consists of the following subtasks:

1. Project Management

This scope is provided for in the template worksheets.

2. Annual Groundwater Sampling and Analysis and Report

a. Mobilization to the site.

b. Collect groundwater samples and groundwater elevation measurements from the following wells:

i. Shallow wells: MW014 and MW017,

ii. Intermediate wells: MW004, MW007, MW008, MW009, MW015, MW018 and

MW019,

iii. Deep wells: MW005.

c. Collected groundwater samples will be laboratory analyzed for Volatile Organic

Halocarbons (VOH) by EPA Method 8260. The analysis will be performed using a National Environmental Laboratory Accreditation Conference (NELAC) approved laboratory.

FDEP – Priceless Cleaners

d. The investigative derived waste (IDW) will be containerized in a 55-gallon drum. Once characterization of the IDW has been performed, the drum will be transported off the site to an approved facility. A copy of the manifest will be provided to the Department upon receipt.

e. An Annual Groundwater Monitoring Report will be developed which will include current and historical data, with a comparison to state standards and consist of current groundwater elevation and quality date, development of ADaPT package, and recommendations. Conclusions and recommendations will be made, which will include any modifications to the proposed annual groundwater sampling event. The report will incorporate specific recommendations and provide opinions based on professional experience to achieve the most efficient endpoints and closure.

COST ESTIMATE AND SCHEDULE

The estimated cost to perform the above described services is shown on the attached Cost Estimate and Level of Effort sheets, which includes groundwater sampling and analysis and the report deliverable. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW552, Bureau of Waste Cleanup Services, dated December 10, 2010. The Annual Groundwater Monitoring will be scheduled for April / May 2020 with a report submittal in July 2020. The manifest will be transmitted to the Department upon receipt.

PSI appreciates the opportunity to be of service to the FDEP. We look forward to working with you on this important project. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Erin Lennox Nana Westmark, PG, CHMM Project Scientist Principal Consultant / Contract Manager

Enclosure: Cost Estimate Level of Effort

\\Tampa-fs1\projects\552-Env\FDEP BWC\0552599 Priceless Dry Cleaners\PSI Proposal\2020 - Jan Groundwater Monitoring\Priceless ERIC_5015 0552-300253.docx

PSI - Intertek Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort Myers, Naples) Panhandle water $90.00 $90.00 $100.00 $100.00 $110.00 soil $110.00 $110.00 $120.00 $120.00 $130.00 low volume fee if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$200 Pick-up fee NA NA NA NA NA Total Per One Drum Water $140.00 $140.00 $150.00 $150.00 310.00$ Total Per One Drum Water $160.00 $160.00 $170.00 $170.00 330.00$

Plus $150 per day / per diem water $115.00 $115.00 Non service area Non service area Non service area soil $150.00 $150.00 Non service area Non service area Non service area water $92.00 $92.00 $92.00 $92.00 $92.00 soil $67.00 $67.00 $67.00 $67.00 $67.00 low volume fee if 3 drums or less add $35 if 3 drums or less add $45 if 3 drums or less add $55 if 3 drums or less add $55 if 10 drums or less add $450

Pick-up Fee 30 40 50 50 95.00$ Total Per One Drum Water $157.00 $177.00 $197.00 $197.00 637.00$ Total Per One Drum Water $132.00 $152.00 $172.00 $172.00 612.00$

Plus $150 per day / per diem

* = DOT shippable drums on hard concrete or asphalt surface easily accessible with tractor trailer with no dirt, grass or curbs to get drums to tailgate of truck ** = Need TCLPs for VOHS for soils, Totals only for VOHSs for water 100% liquids.

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

Petrotech Southeast, Inc.

Clark Environmental, Inc. * and **

NRC / US Ecology(formerly SWS)

Page 1 of 1 PSI IDW Bids 1-31-2020.xlsx

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Panhandle water soil low volume fee Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

$115.00 $150.00

$115.00 $150.00

Petrotech Southeast, Inc.

Phone: 407 - 656-8114 Fax: 407 - 358-5030 Natacha Mitchell-Jackson

Quote # TP02077

US Ecology Waste (IDW) IDW Pick-up, Transport & Disposal Services

Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida

Description of Service

State of Florida

Description

Tampa Area

Orlando - Central

Florida

Jacksonville Area, North Florida

South Florida

(Miami, Fort

Myers, Naples)

Panhandle

55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

water soil low volume fee

Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. Drums must be in DOT Shippable containers before being transported.

2. Pricing does not include over-packing Non-DOT shippable containers (drums).

3. Disposal pricing offered is based on the non-hazardous waste being containerized in 55/Gal drums. 15/Gal, 30/Gal, 85/Gal & 95/Gal containers are not included.

4. All waste must be profiled and acknowledged by Intertek PSI as well as providing signed waste manifests for each site.

5. Pricing for waste is upon disposal facility acceptance. Off-spec charges and/or surcharges will be priced accordingly.

6. All waste pickups will be scheduled during normal business hours, Monday - Friday. Nights, weekends and holidays are not included

7. The Panhandle pricing will apply to drum pickups in the Florida Keys.

Intertek PSI Representative

$92.00

$67.00 $67.00

$92.00

$67.00

$92.00 $92.00

$67.00 $67.00

$92.00

$95.00

$450 / 10 Drums or Less35 / 3 Drums or Less

$30.00 $40.00

$45 / 3 Drums or Less

$50.00

$55/ 3 Drums or Less

$50.00

$55/ 3 Drums or Less

Cost Estimate