This document is a Task Assignment Notification Form for DEP Contract No. HW552, a consolidated services contract with the Florida Department of Environmental Protection (FDEP). The parties involved include the State of Florida through FDEP's Waste Site Cleanup Section, the contractor Professional Service Industries, Inc. (PSI), an Intertek company, and various subcontractors including Petrotech Southeast for investigative derived waste (IDW) disposal. The task assignment covers groundwater monitoring activities at the Plant City Laundry site located at 401 East Reynolds Street in Plant City, Hillsborough County, Florida (ERIC_4722).

The task assignment authorizes PSI to conduct annual groundwater monitoring activities consisting of two primary subtasks: Project Management and Groundwater Sampling/Report. The scope includes collecting groundwater elevation measurements and samples from thirty-three existing monitoring wells, submitting samples to a NELAC-approved laboratory for analysis via EPA Method 8260B for volatile organic compounds, managing investigative derived waste, preparing an ADaPT/GIS database update, and delivering a comprehensive Groundwater Monitoring Report. The total task assignment value is $16,082.99 on a fixed-price basis with zero retainage. The work encompasses 124 total labor hours, with costs allocated across direct labor ($9,744.70), overhead ($6,148.34), travel ($776.00), laboratory analysis ($2,376.00), field equipment and expendables ($1,779.00), and IDW disposal services ($253.00) including a handling fee. The final deliverables—the Groundwater Monitoring Report, ADaPT/GIS Update, and Waste Manifest—are due June 25, 2021, with the period of performance extending through October 1, 2021. Payment is contingent upon FDEP receipt and approval of the deliverables.

View the file

Other files

File Type Posted
CN-370000-HW552-A1.pdf PDF
CN-370000-HW552-A3.pdf PDF
CN-370000-HW552-CD05J.pdf PDF
CN-370000-HW552-DC002O.pdf PDF
CN-370000-HW552-DC005I.pdf PDF
CN-370000-HW552-DC006M.pdf PDF
CN-370000-HW552-DC014F.pdf PDF
CN-370000-HW552-DC016G.pdf PDF
CN-370000-HW552-DC017M.pdf PDF
CN-370000-HW552-DC017P.pdf PDF
CN-370000-HW552-DC017T.pdf PDF
CN-370000-HW552-DC018Q.pdf PDF
CN-370000-HW552-DC01ACO1.pdf PDF
CN-370000-HW552-DC01ACO3.pdf PDF
CN-370000-HW552-DC01ACO4.pdf PDF
CN-370000-HW552-DC01K.pdf PDF
CN-370000-HW552-DC023H.pdf PDF
CN-370000-HW552-DC024E.pdf PDF
CN-370000-HW552-DC024J.pdf PDF
CN-370000-HW552-DC026D.pdf PDF
CN-370000-HW552-DC026H.pdf PDF
CN-370000-HW552-DC028C.pdf PDF
CN-370000-HW552-DC02CCO1.pdf PDF
CN-370000-HW552-DC02HCO1.pdf PDF
CN-370000-HW552-DC02I.pdf PDF
CN-370000-HW552-DC02KCO1.pdf PDF
CN-370000-HW552-DC02N.pdf PDF
CN-370000-HW552-DC02PC01.pdf PDF
CN-370000-HW552-DC02S.pdf PDF
CN-370000-HW552-DC034A.pdf PDF
CN-370000-HW552-DC036B.pdf PDF
CN-370000-HW552-DC03C.pdf PDF
CN-370000-HW552-DC03DCO5.pdf PDF
CN-370000-HW552-DC03HCO1.pdf PDF
CN-370000-HW552-DC04G.pdf PDF
CN-370000-HW552-DC04GCO1.pdf PDF
CN-370000-HW552-DC04ICO1.pdf PDF
CN-370000-HW552-DC05ACO2.pdf PDF
CN-370000-HW552-DC05DCO1.pdf PDF
CN-370000-HW552-DC05G.pdf PDF
CN-370000-HW552-DC05ICO3.pdf PDF
CN-370000-HW552-DC06FCO1.pdf PDF
CN-370000-HW552-DC06K.pdf PDF
CN-370000-HW552-DC06MCO1.pdf PDF
CN-370000-HW552-DC07G.pdf PDF
CN-370000-HW552-DC07J.pdf PDF
CN-370000-HW552-DC07PCO1.pdf PDF
CN-370000-HW552-DC07SCO1.pdf PDF
CN-370000-HW552-DC07TCO1.pdf PDF
CN-370000-HW552-DC07X.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW552

D000 N/ADC031D

Professional Service Industries, Inc. (PSI)

Nana Westmark

850-245-8928Killian Talley

ERIC_4722

Plant City Laundry

401 East Reynolds Street, Plant City, Hillsborough County

Monitoring

This Task Assignment authorizes PSI to conduct annual groundwater monitoring activities in accordance with the attached scope of work, cost estimate, and bid documentation.

Groundwater Monitoring Report, ADaPT/GIS Update, and Waste Manifest

06/25/2021

10/01/2021

$ 16,082.99 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Killian Talley Digitally signed by Killian Talley Date: 2021.04.14 04:34:39 -04'00'

Killian Talley Digitally signed by Killian Talley Date: 2021.04.14 04:34:45 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.04.19 12:54:26 -04'00'

Nana G Westmark Digitally signed by Nana G Westmark Date: 2021.04.19 15:35:04 -04'00'

$ 16,082.99

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1-2: Submittal of Groundwater Monitoring Report, ADaPT/GIS Update, and Waste Manifest 06/25/2021

Subtasks 1-2: FDEP receipt and approval of Groundwater Monitoring Report, ADaPT/GIS Update, and Waste Manifest $ 16,082.99

$ 16,082.99

HW552

DC031D

Florida Department of Memorandum Environmental Protection

Printed on recycled paper.

To: HW552 Contract Negotiation File Plant City Laundry Plant City, Hillsborough County

ERIC_4722

From: Killian Talley, Project Manager Date: April 14, 2021 Subject: Negotiation Summary

HW552 DC031D

Task Assignment authorizes PSI to conduct annual groundwater monitoring at the Plant City Laundry site.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Groundwater Sampling/Report Subtask includes costs and labor for PSI to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, thirty-three (33) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B, and management of investigative derived waste. Upon receipt of the groundwater analytical data, PSI will generate a Groundwater Monitoring Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations. IDW will be transported and disposed by Petrotech Southeast as the lowest responsive and responsible bidder.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $16,082.99 with 124 labor hours.

PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTI MATEContractor: Professional Service Industries, Inc.

Date: 4/7/2021

Task #: SubTask 1 Project Management SubTask 6

Site: Plant City Laundry SubTask 2 Groundwater Sampling/ Report SubTask 7

Activity/Phase: Groundwater Sampling SubTask 3 SubTask 8

Project Manager: Nana Westmark SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$48.08 Project Manager 8 8.3 $62.50 Principal Consultant 0 0.0 0 0 0 0 0 0 0 0 $52.89 Senior Engineer, MR 0 0.0 0 0 0 0 0 0 0 0 $48.08 Senior Geologist, NW 8 8.0 0 0 0 0 0 0 0 0 $45.20 Senior Scientist 0 0.0 0 0 0 0 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0.0 0 0 0 0 0 0 0 0 $50.00 Certified Hazardous Materials Manager 0 0.0 0 0 0 0 0 0 0 0 $50.00 Florida Licensed Asbestos Consultant 0 0.0 0 0 0 0 0 0 0 0 $39.42 Project Manager 0 0.0 0 0 0 0 0 0 0 0 $31.75 Project Engineer, MM 0 0.0 0 0 0 0 0 0 0 0 $32.94 Project Geologist, CC 22 22.0 0 0 0 0 0 0 0 0 $31.01 Project Scientist 0 0.0 0 0 0 0 0 0 0 0 $29.81 QA Officer 0 0.0 0 0 0 0 0 0 0 0 $32.21 Remediation Coordinator 0 0.0 0 0 0 0 0 0 0 0

$0.00 Professional Land Surveyor 0 0.0 0 0 0 0 0 0 0 0 $0.00 Chemist 0 0.0 0 0 0 0 0 0 0 0

$24.50 GIS Specialist 7 7.0 0 0 0 0 0 0 0 0 $25.00 Staff Engineer 0 0.0 0 0 0 0 0 0 0 0 $21.88 Staff Geologist, RM 0 0.0 0 0 0 0 0 0 0 0 $24.76 Staff Scientist, RH 38 38.0 0 0 0 0 0 0 0 0 $24.04 Staff Scientist, RF 39 39.0 0 0 0 0 0 0 0 0 $20.57 Staff Scientist, AH 0 0.0 0 0 0 0 0 0 0 0 $18.30 Environmental Technician 0 0.0 0 0 0 0 0 0 0 0 $18.75 Administrative Assistant, BM 2 2.0 0 0 0 0 0 0 0 0 $15.50 Secretary 0 0.0 0 0 0 0 0 0 0 0 $15.00 Senior Laborer 0 0.0 0 0 0 0 0 0 0 0 $12.00 Laborer 0 0.0 0 0 0 0 0 0 0 0

Total Hours 124.3 8.3 116.0 0 0 0 0 0 0 0 0

Professional Service Industries, Inc.

Direct Labor $3,596.36 $399.60 $3,196.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 170.96% $6,148.34 $683.16 $5,465.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $9,744.70 $1,082.76 $8,661.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $9,744.70 $1,082.76 $8,661.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $179.82 $19.98 $159.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Plant City 0552-340078 CEF_PSI.XLS Page 1

FDEP COST ESTI MATEContractor: Professional Service Industries, Inc.

Date: 4/7/2021

Task #: SubTask 1 Project Management SubTask 6

Site: Plant City Laundry SubTask 2 Groundwater Sampling/ Report SubTask 7

Activity/Phase: Groundwater Sampling SubTask 3 SubTask 8

Project Manager: Nana Westmark SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $776.00 $776.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $776.00 $776.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $230.00 $230.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $230.00 $230.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $23.00 $23.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $253.00 $253.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $2,376.00 $2,376.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,376.00 $2,376.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $130.00 $130.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $116.40 $116.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,532.60 $1,532.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,779.00 $1,779.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $15,108.52 $1,102.74 $14,005.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $974.47 $108.28 $866.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $16,082.99 $1,211.02 $14,871.97 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Plant City 0552-340078 CEF_PSI.XLS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Plant City Laundry SubTask 2 Groundwater Sampling

DATE: 4/7/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities Senior Geologist, N Westmark Develop Level of Effort and Cost Estimate 3

Staff Scientist, R Fetter Project Prep 1 Travel (4 days @ 2 hours roundtrip) 8 Collect groundwater elevations (33 wells) (10 minutes per well) 5.5 Collect groundwater samples (13 wells total) 7 shallow wells @ 1 hour per well 7 5 intermediate wells @ 1.5 hour per well 7.5 4 deep wells @ 2 hrs per well 8 Documentation of groundwater sampling & measurements 2

Staff Scientist, R Hanson Load, unload 2

Travel (4 days @ 2 hours roundtrip) 8 Collect groundwater samples (18 wells total) 7 shallow wells @ 1 hour per well 6 6 intermediate wells @ 1.5 hour per well 9 5 deep wells @ 2 hrs per well 10 Stage IDW 1 Pick-up, drop off samples 2

Report Project Geologist, C Cummins Prepare tables and draft maps 5

Prepare GIS package (9 minute per point) 5 Data reduction / evaluation, prepare report 12

22.0 GIS / CAD Specialist, D Grove Create maps, figures 7

Senior Geologist, N Westmark Report Review, sign and seal 5 8.0

Administrative Assistance, B Meynardie Compile document for submittal 2

TOTAL LABOR 116

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow Groundwater Sampling Kit $208.55 day 4 $834.20 $834.20 week 0 $0.00

Deep Groundwater Sampling Kit $349.20 day 2 $698.40 $1,532.60

Expendables $32.50 day 4 $130.00

55--gallon drum $58.20 each 2 $116.40

TOTAL EQUIPMENT $1,779.00

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck, R Fetter $97.00 day 4 $388.00 Equipment Van / Truck, R Hanson $97.00 day 4 $388.00

$420.00 week 0 $0.00

TOTAL VEHICLE $776.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC #IDW

EPA Method 8260 $66.00 33 2 1 $2,376.00

$0.00

TOTAL LAB $2,376.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

Petrotech Southeast IDW drum pickup 2 $115.00 $230.00

TOTAL $230.00

Page 7 Plant City 0552-340078

PSI Proposal Number: 0552- 340078 April 7, 2021

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634

Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building

Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Attention: Mr. Killian Talley, Environmental Specialist III

Contract Manager Telephone: (850) 245-8705 Email: Killian.Talley@FloridaDEP.gov

Re: Proposal for Groundwater Sampling

Plant City Laundry 401 East Reynolds Street

Plant City, Hillsborough County, Florida 33563 FDEP Facility ID# 29 9501205/ ERIC_4722 PSI Project No. 0552-2476

Dear Mr. Talley:

Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to conduct groundwater sampling and analysis for the former Plant City Laundry at 401 East Reynolds, Plant City, Hillsborough County, Florida. Included with this proposal is a brief discussion of project background, proposed scope of work, cost estimate and a proposed schedule for completion.

PROJECT BACKGROUND

The former Plant City Laundry operated from 1953 to 2000 and existed as a standalone structure until it was demolished sometime around 2005. The site is currently an open field with no building structures.

The site is located approximately 1.4 miles south of Interstate-4 (I-4) and approximately 1.3 miles east of the intersection of Reynolds Street and State Road 39.

Plant City Laundry operated as a uniform rental and drycleaner facility and maintained a PCE drycleaning machine as well as a conventional laundry machine. The facility was connected to the public sanitary sewer. The site reportedly used well water according to a 1993 HCEPC Hazardous Waste Facility Inspection Report and a 1996 FDEP RCRA compliance inspection report.

PSI prepared a Site Assessment Work Plan on November 20, 2017, which detailed recommendations for assessment activities and was approved by the Department December 3, 2017. PSI has been conducting mailto:Killian.Talley@FloridaDEP.gov

FDEP – Plant City Laundry, ERIC_4722 the site assessment since February 2018 and has conducted over 7 different sampling episodes to delineate the soil and groundwater impact from the former drycleaner.

The soil impact, based on data obtained to date, is at least 100 feet by at least 60 feet, to a depth of approximately 6 feet.

Thirty-three monitoring wells have been installed at the site to characterize shallow groundwater quality.

Most of the wells have been installed in a clustered configuration with wells screened from 2-12 ft., 14- 19 ft. and 22-27 ft. The highest levels VOH in groundwater were detected in MW002S, a well located at the southeast corner of the formerly existing dry cleaning facility footprint. A groundwater sample collected from MW002S in 2018 contained 51,000 ug/L of PCE; and 27,000 ug/L of TCE. Eighteen different locations within the study area have shallow groundwater concentrations exceeding NADC criteria. It is our understanding that Waste Site Cleanup desires updated information on groundwater quality. PSI recommends collecting groundwater samples from the network of monitoring wells present at the site followed by laboratory analysis of the samples for volatile organic halogens (VOH).

PROPOSED SCOPE OF WORK

The proposed scope of work consists of the following subtasks:

1. Project Management

This scope is provided for in the template worksheets.

2. Groundwater Sampling and Analysis, with Report

Groundwater samples will be collected from existing wells to evaluate current groundwater quality in the project area. Field sampling and decontamination procedures will be conducted by PSI in general accordance with FDEP Standard Operating Procedures (DEP SOP 001/01). The following activities will be conducted:

a. Mobilization to the site.

b. Collect groundwater elevation measurements from all wells.

c. Collect groundwater samples from the thirty-three existing wells.

d. Submit samples to a National Environmental Laboratory Accredited Conference (NELAC) approved laboratory for Total Volatile Halogens by EPA Method 8260.

e. Containerize the investigation derived waste (IDW) purge water in a 55-gallon drum and arrange for IDW to be transported and disposed of at an approved facility. A waste manifest will be submitted subsequent to receipt.

f. Develop an ADaPT package for submittal

g. Develop a brief Groundwater Sampling and Analysis Report to include tables, data and maps with a description of site activities.

FDEP – Plant City Laundry, ERIC_4722

COST ESTIMATE AND SCHEDULE

The estimated cost to conduct the groundwater sampling and analysis is shown on the attached Cost Estimate and Level of Effort. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW552, Bureau of Waste Cleanup Consolidated Services, dated December 10, 2010. We anticipate approximately 7 to 10 weeks from approval of this proposal to complete the groundwater sampling event and report.

All PSI services will be conducted in accordance with the terms and conditions contained within the DEP Contract No. HW552, Bureau of Waste Cleanup Consolidated Services, dated December 10, 2010.

PSI appreciates the opportunity to be of service to the FDEP. We look forward to working with you on this important project. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Christopher L. Cummins, PG Nana Westmark, PG, CHMM Senior Geologist Principal Consultant / Contract Manager

Enclosure: Cost Estimate Level of Effort

Z:\552-Env\FDEP BWC\05522476 Plant City Laundry\Proposal\Groundwater Sampling 2021\Plant City 0552-340078.docx

PSI - Intertek Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort Myers, Naples) Panhandle water $90.00 $90.00 $100.00 $100.00 $110.00 soil $110.00 $110.00 $120.00 $120.00 $130.00 low volume fee if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$200 Pick-up fee NA NA NA NA NA Total Per One Drum Water $140.00 $140.00 $150.00 $150.00 310.00$ Total Per One Drum Soil $160.00 $160.00 $170.00 $170.00 330.00$

Plus $150 per day / per diem water $115.00 $115.00 Non service area Non service area Non service area soil $150.00 $150.00 Non service area Non service area Non service area water $92.00 $92.00 $92.00 $92.00 $92.00 soil $67.00 $67.00 $67.00 $67.00 $67.00 low volume fee if 3 drums or less add $35 if 3 drums or less add $45 if 3 drums or less add $55 if 3 drums or less add $55 if 10 drums or less add $450

Pick-up Fee 30 40 50 50 95.00$ Total Per One Drum Water $157.00 $177.00 $197.00 $197.00 637.00$ Total Per One Drum Soil $132.00 $152.00 $172.00 $172.00 612.00$

Plus $150 per day / per diem

* = DOT shippable drums on hard concrete or asphalt surface easily accessible with tractor trailer with no dirt, grass or curbs to get drums to tailgate of truck ** = Need TCLPs for VOHS for soils, Totals only for VOHSs for water 100% liquids.

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

Petrotech Southeast, Inc.

Clark Environmental, Inc. * and **

NRC / US Ecology(formerly SWS)

Page 1 of 1 PSI IDW Bids 1-31-2020

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Panhandle water soil low volume fee Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

$115.00 $150.00

$115.00 $150.00

Petrotech Southeast, Inc.

Phone: 407 - 656-8114 Fax: 407 - 358-5030 Natacha Mitchell-Jackson

Quote # TP02077

US Ecology Waste (IDW) IDW Pick-up, Transport & Disposal Services

Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida

Description of Service

State of Florida

Description

Tampa Area

Orlando - Central

Florida

Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples)

Panhandle 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

water soil low volume fee Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. Drums must be in DOT Shippable containers before being transported.

2. Pricing does not include over-packing Non-DOT shippable containers (drums).

3. Disposal pricing offered is based on the non-hazardous waste being containerized in 55/Gal drums. 15/Gal, 30/Gal, 85/Gal & 95/Gal containers are not included.

4. All waste must be profiled and acknowledged by Intertek PSI as well as providing signed waste manifests for each site.

5. Pricing for waste is upon disposal facility acceptance. Off-spec charges and/or surcharges will be priced accordingly.

6. All waste pickups will be scheduled during normal business hours, Monday - Friday. Nights, weekends and holidays are not included

7. The Panhandle pricing will apply to drum pickups in the Florida Keys.

Intertek PSI Representative

$92.00 $67.00 $67.00

$92.00 $67.00 $92.00 $92.00

$67.00 $67.00 $92.00

$95.00 $450 / 10 Drums or Less35 / 3 Drums or Less

$30.00 $40.00 $45 / 3 Drums or Less

$50.00 $55/ 3 Drums or Less

$50.00 $55/ 3 Drums or Less

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .