This document is a Task Assignment Notification Form under DEP Contract No. HW552, issued by the Florida Department of Environmental Protection (FDEP) to Professional Service Industries, Inc. (PSI), an Intertek company. The task assignment authorizes PSI to conduct annual groundwater monitoring activities at the Viking Plaza site located at 32 NW Wright Parkway, Fort Walton Beach, Okaloosa County, Florida (FDEP Site #ERIC_4947). The work is being performed under the FDEP's Hazardous Waste Cleanup Section's Drycleaning Solvent Cleanup Program, with Killian Talley serving as the DEP Contract Manager and Nana Westmark as the Contractor Representative.

The task assignment consists of two subtasks: Project Management (Subtask 1) and Post Injection Groundwater Sampling and Analysis and Report (Subtask 2). Subtask 2 includes mobilization to the site, collection of groundwater elevation measurements from 20 monitoring wells, collection and analysis of 37 groundwater samples from multiple monitoring wells across three zones, analysis via EPA Method 8260B for volatile organic compounds, UIC parameters, natural attenuation parameters, management of investigative derived waste, and development of a comprehensive Post Injection Groundwater Monitoring Report with GIS/ADaPT deliverables. The total task assignment value is $14,671.64 on a fixed-price basis, comprised of direct labor costs of $2,819.24, overhead of $4,819.78, laboratory analytical costs of $3,038.00, travel expenses of $1,219.00, subcontractor costs of $682.00 for investigative derived waste disposal through Clark Environmental, field expenses of $1,188.75, and a completion fee of $763.91. The work is scheduled for execution from April 8, 2020, through March 12, 2021, with a final deliverable due date of November 27, 2020. Invoicing is contingent upon FDEP receipt and approval of the Post Injection Groundwater Monitoring Report and GIS/ADaPT deliverables.

View the file

Other files

File Type Posted
CN-370000-HW552-A1.pdf PDF
CN-370000-HW552-A3.pdf PDF
CN-370000-HW552-CD05J.pdf PDF
CN-370000-HW552-DC002O.pdf PDF
CN-370000-HW552-DC005I.pdf PDF
CN-370000-HW552-DC006M.pdf PDF
CN-370000-HW552-DC014F.pdf PDF
CN-370000-HW552-DC016G.pdf PDF
CN-370000-HW552-DC017M.pdf PDF
CN-370000-HW552-DC017P.pdf PDF
CN-370000-HW552-DC017T.pdf PDF
CN-370000-HW552-DC018Q.pdf PDF
CN-370000-HW552-DC01ACO1.pdf PDF
CN-370000-HW552-DC01ACO3.pdf PDF
CN-370000-HW552-DC01ACO4.pdf PDF
CN-370000-HW552-DC01K.pdf PDF
CN-370000-HW552-DC023H.pdf PDF
CN-370000-HW552-DC024E.pdf PDF
CN-370000-HW552-DC024J.pdf PDF
CN-370000-HW552-DC026D.pdf PDF
CN-370000-HW552-DC026H.pdf PDF
CN-370000-HW552-DC028C.pdf PDF
CN-370000-HW552-DC02CCO1.pdf PDF
CN-370000-HW552-DC02HCO1.pdf PDF
CN-370000-HW552-DC02I.pdf PDF
CN-370000-HW552-DC02KCO1.pdf PDF
CN-370000-HW552-DC02N.pdf PDF
CN-370000-HW552-DC02PC01.pdf PDF
CN-370000-HW552-DC02S.pdf PDF
CN-370000-HW552-DC031D.pdf PDF
CN-370000-HW552-DC034A.pdf PDF
CN-370000-HW552-DC036B.pdf PDF
CN-370000-HW552-DC03C.pdf PDF
CN-370000-HW552-DC03DCO5.pdf PDF
CN-370000-HW552-DC03HCO1.pdf PDF
CN-370000-HW552-DC04G.pdf PDF
CN-370000-HW552-DC04GCO1.pdf PDF
CN-370000-HW552-DC04ICO1.pdf PDF
CN-370000-HW552-DC05ACO2.pdf PDF
CN-370000-HW552-DC05DCO1.pdf PDF
CN-370000-HW552-DC05G.pdf PDF
CN-370000-HW552-DC05ICO3.pdf PDF
CN-370000-HW552-DC06FCO1.pdf PDF
CN-370000-HW552-DC06K.pdf PDF
CN-370000-HW552-DC06MCO1.pdf PDF
CN-370000-HW552-DC07G.pdf PDF
CN-370000-HW552-DC07J.pdf PDF
CN-370000-HW552-DC07PCO1.pdf PDF
CN-370000-HW552-DC07SCO1.pdf PDF
CN-370000-HW552-DC07TCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93)

Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW552

D000 N/ADC017S

Professional Service Industries (PSI)

Nana Westmark

850-245-8928Killian Talley

ERIC_4947

Viking Plaza

32 NW Wright Pkwy, Ft. Walton Beach, Okaloosa County

Monitoring

This Task Assignment authorizes PSI to conduct annual groundwater monitoring activities in accordance with the March 30, 2020 scope of work, cost estimate, and bid documentation.

Post Injection Groundwater Monitoring Report; GIS/ADaPT

11/27/2020

03/12/2021

$ 14,671.64 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Killian Talley Digitally signed by Killian Talley Date: 2020.04.08 12:15:01 -04'00'

Killian Talley Digitally signed by Killian Talley Date: 2020.04.08 12:15:11 -04'00'

Digitally signed by Jennifer Farrell Date: 2020.04.08 13:10:13 -04'00'

Nana G Westmark Digitally signed by Nana G Westmark Date: 2020.04.08 15:05:51 -04'00'

$ 14,671.64

Task Assignment Notification/Change Order

Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1-2: Submittal of Post Injection Groundwater Monitoring Report;

GIS/ADaPT 11/27/2020

Subtasks 1-2: FDEP receipt and approval of Post Injection Groundwater Monitoring Report; GIS/ADaPT $ 14,671.64

$ 14,671.64

HW552

DC017S

Florida Department of Memorandum Environmental Protection

To:

From:

Date:

HW552 Contract Negotiation File Viking Plaza Fort Walton Beach, Okaloosa County ERIC_4947 Killian Talley, Project Manager April 8, 2020

Subject: Negotiation Summary

HW552 DC017S

Task Assignment authorizes PSI to conduct annual groundwater monitoring at the Viking Plaza site.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Annual Groundwater Sampling and Analysis and Report Subtask includes costs and labor for PSI to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, twenty-one (21) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B, six (6) groundwater samples for UIC parameters, ten (10) groundwater samples for natural attenuation parameters, and management of investigative derived waste. Sampling for UIC and natural attenuation parameters will be conducted to help evaluate the possible effect of a site in the petroleum restoration program in-situ chemical oxidation remediation on the Viking Plaza site. Upon receipt of the groundwater analytical data, PSI will generate a Groundwater Monitoring Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations. IDW will be transported and disposed by Clark Environmental as the lowest responsive and responsible bidder.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $14,671.64 with 102 labor hours.

PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

Printed on recycled paper.

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc.

Date: 3/30/2020

Task #: SUBTASK 1: Project Management SUBTASK 6:

Site: Viking Plaza SUBTASK 2: Post Injection Groundwater Monitoring SUBTASK 7:

Activity/Phase: SUBTASK 3: SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: SUBTASK 9:

SUBTASK 5: SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$48.08 Project Manager 7 6.5 $65.63 Principal Consultant 0 0 0 0 0 0 0 0 0 0 $52.89 Senior Engineer, MR 0 0.0 0.0 0 0 0 0 0 0 0 $48.08 Senior Geologist, NW 10 10.0 0.0 0 0 0 0 0 0 0 $39.67 Senior Engineer, BM 0 0.0 0.0 0 0 0 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0.0 0.0 0 0 0 0 0 0 0 $56.50 Certified Hazardous Materials Manager 0 0.0 0.0 0 0 0 0 0 0 0 $50.00 Florida Licensed Asbestos Consultant 0 0.0 0.0 0 0 0 0 0 0 0 $48.08 Project Manager 0 0.0 0.0 0 0 0 0 0 0 0 $31.73 Project Engineer, MM 0 0.0 0.0 0 0 0 0 0 0 0 $32.94 Project Geologist, CC 7 7.0 0.0 0 0 0 0 0 0 0 $26.93 Project Scientist 0 0.0 0.0 0 0 0 0 0 0 0 $29.81 QA Officer 0 0.0 0.0 0 0 0 0 0 0 0 $32.21 Remediation Coordinator 0 0.0 0.0 0 0 0 0 0 0 0

$0.00 Professional Land Surveyor 0 0.0 0.0 0 0 0 0 0 0 0 $0.00 Chemist 0 0.0 0.0 0 0 0 0 0 0 0

$24.50 GIS Specialist, DG 6 6.0 0.0 0 0 0 0 0 0 0 $25.00 Staff Engineer 0 0.0 0.0 0 0 0 0 0 0 0 $20.57 Staff Scientist, AH 30 30.3 0.0 0 0 0 0 0 0 0 $24.04 Staff Scientist, RF 5 5.0 0.0 0 0 0 0 0 0 0 $24.76 Staff Scientist, RH 35 35.0 0.0 0 0 0 0 0 0 0 $24.04 Environmental Scientist 0 0.0 0.0 0 0 0 0 0 0 0 $18.30 Environmental Technician 0 0.0 0.0 0 0 0 0 0 0 0 $18.75 Administrative Assistant, BM 2 2.0 0.0 0 0 0 0 0 0 0 $15.50 Secretary 0 0.0 0.0 0 0 0 0 0 0 0 $15.00 Senior Laborer 0 0.0 0.0 0 0 0 0 0 0 0 $12.00 Laborer 0 0.0 0.0 0 0 0 0 0 0 0

Total Hours 102 7 95.3 0.0 0 0 0 0 0 0 0

Professional Service Industries, Inc.

Direct Labor $2,819.24 $313.24 2506.0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 170.96% $4,819.78 $535.52 $4,284.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $7,639.02 $848.76 $6,790.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $140.96 $15.66 $125.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Post Injection Monitoring

Page 1 Viking ERIC_4947 GW 0552-307021

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc.

Date: 3/30/2020

Task #: SUBTASK 1: Project Management SUBTASK 6:

Site: Viking Plaza SUBTASK 2: Post Injection Groundwater Monitoring SUBTASK 7:

Activity/Phase: SUBTASK 3: SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: SUBTASK 9:

SUBTASK 5: SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10

Post Injection Monitoring

Travel Vehicle Rental $679.00 $679.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $540.00 $540.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,219.00 $1,219.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $620.00 $620.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $620.00 $620.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $62.00 $62.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $682.00 $682.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $3,038.00 $3,038.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,038.00 $3,038.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $97.50 $97.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $116.40 $116.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $974.85 $974.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,188.75 $1,188.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $13,907.73 $864.42 $13,043.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $763.91 $84.88 $679.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $14,671.64 $949.30 $13,722.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Page 2 Viking ERIC_4947 GW 0552-307021

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Viking Plaza SUBTASK 2: Post Injection Groundwater Monitoring

DATE: 3/30/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities Senior Geologist, N Westmark Develop LOE and cost estimate 3

Technical oversight 1 Notification to irrigation well owners 1

Staff Scientist, R Hanson Load / Unload 1

Travel 12 Collect groundwater samples (21 wells)

7 shallow wells (1 hour per well) 7 7 intermediate wells (1.5 hour per well) 10.5 1 irrigation wells (2.5 hrs per well) 2.5

Pickup / drop off samples 2

Staff Scientist Load / Unload 1 Project Preparation 2 Travel 8 Collect groundwater elevations (20 wells) (10 minutes per well ) 3.3 Collect groundwater samples

3 shallow wells 3 2 deep wells (2 hours per well) 4 1 irrigation wells (2.5 hours per well) 2.5

Additional parameters sampling for 11 wells 4.5 Documentation of groundwater sampling & measurements 2

30.3

Report Staff Scientist, R Fetter Prepare tables and draft maps 5 Project Geologist, C Cummins Data reduction / evaluation, prepare report 7 GIS / CADD Specialist, D Grove Create maps, figures 6 Senior Geologist, N Westmark Report Review, sign and seal 5 Administrative Assistant, B Meynardie Compile report 2

TOTAL LABOR 95.3

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow groundwater sampling kit $208.55 day 3 $625.65 Deep groundwater sampling kit $349.20 day 1 $349.20

$974.850

55-gallon drum $58.20 each 2 $116.40

Expendables $32.50 day 3 $97.50

TOTAL EQUIPMENT $1,188.75

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (GW Sampling) $97.00 day 4 $388.00 Equipment Van / Truck (GW Sampling) $97.00 day 3 $291.00

TOTAL VEHICLE $679.00

PER DIEM STAFF RATE UNIT USEAGE

Staff Scientist, R Hanson Lodging Groundwater Sampling $99.00 4 $396.00 Meals Groundwater Sampling $36.00 4 $144.00

TOTAL PER DIEM $540.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

VOHs by EPA Method 8260 $66.00 19 2 $1,386.00 VOCs by EPA Method 8260 $135.00 2 0 $270.00 UIC Parameters

TRPH $84.00 6 $504.00

Sodium $11.50 6 $69.00 Total Dissolved Solids $11.50 6 $69.00

Natural Attenuation Parameters Total Organic Carbon $26.00 10 $260.00

Methane, ethane, ethene $160.00 3 $480.00 $3,038.00

TOTAL LAB $3,038.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

Clark Environmental IDW transport and disposal 2 $310.00 $620.00

TOTAL $620.00

Page 7 Viking ERIC_4947 GW 0552-307021

PSI Proposal Number: 0552-307021 March 30, 2020 www.intertek.com/building

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634 Phone: (813) 886-1075

Fax: (813) 249-4916

Florida Department of Environmental Protection Hazardous Waste Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Attention: Mr. Killian Talley, Environmental Specialist III Telephone: (850) 245-8705 Email: Killian.Talley@FloridaDEP.gov

Re: Proposal for Post Injection Groundwater Monitoring

Viking Plaza 32 NW Wright Parkway Fort Walton Beach, Okaloosa County, FL FDEP Facility ID No. 46 9700533 / ERIC_4947 PSI Project No. 0552-622

Dear Mr. Talley:

Professional Service Industries, Inc. (PSI), an Intertek company, is pleased to provide the proposal contained herein to conduct Post Injection Groundwater Monitoring services for the Viking Plaza Drycleaner at 32 NW Wright Parkway, Fort Walton Beach, Florida. Included with this proposal is a discussion of project history to date, proposed scope of work, cost estimate and a proposed work schedule

PROJECT BACKGROUND

The Viking Plaza is located at 32 NW Wright Parkway, Fort Walton Beach, Okaloosa County, Florida. Viking Plaza began operating as a coin laundry in 1970 and utilized dry cleaning equipment until 1985 when the equipment was removed. In 1997 the facility was found eligible for state funded cleanup under the Drycleaning Solvent Cleanup Program. The drycleaner business is no longer in operation and currently operates as a laundromat. The Viking Plaza strip center consists of five tenants including a convenience mart which historically sold gasoline and is a documented petroleum Leaking Underground Storage Tank site (Viking Food Mart, aka Sunshine Junior No. 83, FDEP Facility No. 46 8512309).

Various assessment and remediation activities have been conducted for the petroleum impact, including a source removal of approximately 112 tons of petroleum impacted soil. During the petroleum contamination assessment, chlorinated solvent groundwater impacts were reported above Groundwater Cleanup Target Levels (GCTLs) and Natural Attenuation Default Concentrations (NADCs).

mailto:Killian.Talley@FloridaDEP.gov

Viking Plaza, Post Injection Monitoring

In 2005, site assessment activities were conducted to investigate impact at the site from the drycleaner.

The soil contamination was primarily beneath the building which was addressed during a limited source removal in 2010. During the removal, HRC-X and EOS® groundwater amendments were applied to augment remediation. An SVE system from a state funded site was installed at the Viking Plaza site by PSI. SVE system operation commenced in June 2012 and continued through October 2014.

A video survey of the wastewater line was conducted in January 2013 which identified two breaks in front of the building.

Annual groundwater sampling has occurred since August 2011 which reveal continuing impacts of the chemicals of concern. In 2014, impacts were discovered again in the off-site irrigation wells east of the Viking Plaza. It is our understanding that a Notification of Discovery of Contamination was previously filed.

Groundwater injection activities were conducted by PSI in March of 2015. The injections involved the injection of a vegetable oil substrate and bacteria culture into the six newly installed injection point clusters and one existing injection point located inside the building.

Site restoration activities occurred on the adjacent residential property (owned by Mr. and Mrs. Freeman) in November 2015 and March 2018. The SVE wells were cut and capped, along with gravel removal and revegetation. The SVE remediation system was scrapped in November 2019.

The Viking Plaza strip center also houses a convenience mart which historically sold gasoline and is in the petroleum cleanup program (Viking Food Mart, aka Sunshine Junior No. 83, FDEP Facility No. 46 8512309).

The petroleum contamination is being addressed through in-situ chemical oxidation using EN Rx Sustained Singlet Oxygen™ (SSO) and EN Rx Synergist™, a proprietary form of sodium peroxide and a catalyst. The end products are carbon dioxide and water.

Based on the annual site review of the Viking Plaza Drycleaners between FDEP Hazardous Waste Cleanup Section and PSI, post injection monitoring was recommended. The first two post injection groundwater sampling activities were conducted in June and September 2015. A third post injection groundwater sampling event was conducted in August / September 2016. The fourth post injection groundwater sampling event was conducted in February / March 2018 and the fifth event was in November 2018.

Based on our understanding, the Department requests an additional monitoring event.

PROPOSED SCOPE OF WORK

The proposal contained herein consists of Post Injection Groundwater Monitoring which will be used to monitor groundwater quality and to evaluate if additional injection activities are warranted.

Specifically, the proposed scope of work consists of the following subtasks:

Subtask 1. Project Management

This scope is provided for in the template worksheets.

Subtask 2. Groundwater Sampling and Analysis

Groundwater sampling and analysis will be performed according to specifications within the most recent FDEP review memorandum of the post injection groundwater monitoring event. The groundwater sampling and analysis will consist of the following:

a. Mobilization to the site.

b. Collect groundwater elevation measurements of select monitor wells.

c. Collect samples from the following along with the parameters listed in the table as follows:

Monitor Well Description Annual Post Injection

AMW001 plume definition A

AMW002 plume definition A

AMW004R Zone A - Upgradient A, C, D AMW014R Zone A - Source/Downgradient A, C, D AMW022 Zone A - Source A, B, C, D MW010 Zone A - Downgradient (off-site) A, B, C

AMW013 Zone A - Sidegradient (off-site) A AMW017 Zone A - Downgradient (off-site) A AMW015 Zone A - Sidegradient A AMW024 Zone A - Point of Compliance A

IW004/IW006 Irrigation Well - Downgradient (off-site) E IW005/IW007 Irrigation Well - Downgradient (off-site) E

BMW005 TPOC A

BMW011 Zone B - Sidegradient A, C BMW012 Zone B - Sidegradient A, C BMW019 Zone B - Sidegradient (off-site) A BMW023 Zone B - Source A, B, C BMW026 Zone B - Upgradient (Source) A, C BMW027 Zone B - Downgradient A, B, C

CMW007

CMW020

Zone C - Source Zone C - Downgradient

A, B, C A, B

Notes:

A = VOHs by EPA Method 8260

B = UIC parameters for SRS® (TRPH, sodium, TDS) C = Natural Attenuation Parameter (TOC, dissolved oxygen, pH, ORP) D = Methane, ethane, and ethene, E = VOCs

d. Submit groundwater samples to a NELAC approved laboratory for analysis described above.

e. The Investigation Derived Waste (purge water, decontamination water) will be containerized in 55-gallon drums and transported to an approved facility for treatment / disposal.

f. Development of GIS tables and deliverable.

g. Development of ADaPT package deliverable.

h. Development of a Post Injection Groundwater Monitoring which will include current groundwater elevation maps and current groundwater quality data. Conclusions and recommendations will be made, which will include any modifications to the groundwater sampling network. The report will incorporate specific recommendations and provide opinions based on professional experience to achieve the most efficient endpoints.

COST ESTIMATE AND SCHEDULE

The estimated cost to perform the post injection monitoring is shown on the attached Cost Estimate and Level of Effort sheets. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW552, Bureau of Waste Cleanup Services, dated December 10, 2010.

The Post Injection Groundwater Monitoring will be conducted in August – September 2020 with a report deliverable at the end of November 2020.

PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Christopher L. Cummins Nana G. Westmark, PG, CHMM Senior Geologist Principal Consultant /Contract Manager

Enclosure: Cost Estimate Level of Effort

Tampa PROJECTS\0552 ENV\FDEP BWC\Viking Plaza\Proposals/2020/Viking GW 0552-307021.docx

TABLE 5: GROUNDWATER MONITORING PARAMETERS AND SCHEDULE (REVISED 8-19-16)

Facility Name: Viking Plaza Facility ID Number: 469700533

Monitor Well Description Annual Post

Injection

AMW001 plume definition A

AMW002 plume definition A

AMW004R Zone A - Upgradient A, C, D AMW014R Zone A - Source/Downgradient A, C, D AMW022 Zone A - Source A, B, C, D MW010 Zone A - Downgradient (off-site) A, B, C

AMW013 Zone A - Sidegradient (off-site) A AMW017 Zone A - Downgradient (off-site) A AMW015 Zone A - Sidegradient A AMW024 Zone A - Point of Compliance A

IW004/IW006 Irrigation Well - Downgradient (off-site) E IW005/IW007 Irrigation Well - Downgradient (off-site) E

BMW005 TPOC A

BMW011 Zone B - Sidegradient A, C BMW012 Zone B - Sidegradient A, C BMW019 Zone B - Sidegradient (off-site) A BMW023 Zone B - Source A, B, C BMW026 Zone B - Upgradient (Source) A, C BMW027 Zone B - Downgradient A, B, C CMW007 Zone C - Source A, B, C CMW020 Zone C - Downgradient A, B

Notes:

Sampling schedule and parameters subject to changed based on injection performance A = VOHs by EPA Method 8260

B = UIC parameters for SRS® (TRPH, sodium, TDS)

C = Natural Attenuation Parameter (TOC, disolved oxygen, pH, ORP)

D = Methane, ethane, and ethene

E = VOCs by EPA Method 8260

DEP Comments March 10, 2016 for 1 and 2nd Post Injection Groundwater Monitoring Events requested sampling AMW001 and AMW002, CMW020.

2018 Report recommends deleting UIC parameters from monitoring.

PSI - Intertek Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort Myers, Naples) Panhandle water $90.00 $90.00 $100.00 $100.00 $110.00 soil $110.00 $110.00 $120.00 $120.00 $130.00 low volume fee if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$200 Pick-up fee NA NA NA NA NA Total Per One Drum Water $140.00 $140.00 $150.00 $150.00 310.00$ Total Per One Drum Water $160.00 $160.00 $170.00 $170.00 330.00$

Plus $150 per day / per diem water $115.00 $115.00 Non service area Non service area Non service area soil $150.00 $150.00 Non service area Non service area Non service area water $92.00 $92.00 $92.00 $92.00 $92.00 soil $67.00 $67.00 $67.00 $67.00 $67.00 low volume fee if 3 drums or less add $35 if 3 drums or less add $45 if 3 drums or less add $55 if 3 drums or less add $55 if 10 drums or less add $450

Pick-up Fee 30 40 50 50 95.00$ Total Per One Drum Water $157.00 $177.00 $197.00 $197.00 637.00$ Total Per One Drum Water $132.00 $152.00 $172.00 $172.00 612.00$

Plus $150 per day / per diem

* = DOT shippable drums on hard concrete or asphalt surface easily accessible with tractor trailer with no dirt, grass or curbs to get drums to tailgate of truck ** = Need TCLPs for VOHS for soils, Totals only for VOHSs for water 100% liquids.

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

Petrotech Southeast, Inc.

Clark Environmental, Inc. * and **

NRC / US Ecology(formerly SWS)

Page 1 of 1 PSI IDW Bids 1-31-2020.xlsx

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Panhandle water soil low volume fee Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

$115.00 $150.00

$115.00 $150.00

Petrotech Southeast, Inc.

Phone: 407 - 656-8114 Fax: 407 - 358-5030 Natacha Mitchell-Jackson

Quote # TP02077

US Ecology Waste (IDW) IDW Pick-up, Transport & Disposal Services

Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida

Description of Service

State of Florida

Description

Tampa Area

Orlando - Central

Florida

Jacksonville Area, North Florida

South Florida

(Miami, Fort

Myers, Naples)

Panhandle

55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

water soil low volume fee

Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. Drums must be in DOT Shippable containers before being transported.

2. Pricing does not include over-packing Non-DOT shippable containers (drums).

3. Disposal pricing offered is based on the non-hazardous waste being containerized in 55/Gal drums. 15/Gal, 30/Gal, 85/Gal & 95/Gal containers are not included.

4. All waste must be profiled and acknowledged by Intertek PSI as well as providing signed waste manifests for each site.

5. Pricing for waste is upon disposal facility acceptance. Off-spec charges and/or surcharges will be priced accordingly.

6. All waste pickups will be scheduled during normal business hours, Monday - Friday. Nights, weekends and holidays are not included

7. The Panhandle pricing will apply to drum pickups in the Florida Keys.

Intertek PSI Representative

$92.00

$67.00 $67.00

$92.00

$67.00

$92.00 $92.00

$67.00 $67.00

$92.00

$95.00

$450 / 10 Drums or Less35 / 3 Drums or Less

$30.00 $40.00

$45 / 3 Drums or Less

$50.00

$55/ 3 Drums or Less

$50.00

$55/ 3 Drums or Less

COST ESTIMATE AND SCHEDULE
COST ESTIMATE AND SCHEDULE

File details come from the government source that posted it. Updated .