This document is a Task Assignment Notification Form (TA #DC029A) issued under Florida Department of Environmental Protection (DEP) Contract No. HW551 with AECOM Technical Services, Inc. The task assignment was executed between DEP and AECOM, with Suzanne Schomer as the contractor representative and Sharonda A. Perkins-Davis serving as the DEP Contract Manager. The work is assigned to the Sun Fresh Laundry site (069701255) located at 1010 E. Sample Road, Pompano Beach, Broward County, Florida, and represents an environmental assessment initiative under the state's indefinite delivery vehicle contract structure.
The task assignment calls for AECOM to develop a Site Assessment Work Plan and cost estimate for the Sun Fresh Laundry drycleaning facility, with a fixed-price contract value of $4,200.00. The deliverable—a Site Assessment Workplan—is due July 31, 2015, with the task execution period extending through October 14, 2015. The scope includes site data review, a drycleaning site visit, and comprehensive deliverables encompassing a site summary report, sampling plan, health and safety plan, property owner identification, resource-loaded schedule, and cost estimate worksheets. The single invoice milestone requires submittal and FDEP approval of the Site Assessment Workplan, upon which the full $4,200.00 contract amount becomes due. No retainage was specified, and the compensation structure is entirely fixed-price with no fee schedule or cost reimbursement components.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Assessment Work Plan Development Task List
Site Data Review:
- Application
- Site Screening Report
- Department of Health well survey and sampling data
- Rapid Risk Screening Form
- County Comprehensive Plan for identification future land use
- Additional information as available (e.g. Oculus, Google maps, aerial photographs, soil surveys, topographical maps, building/planning department records, land use maps, insurance maps, other regulatory agency records, etc.)
Drycleaning Site Visit:
- Complete Drycleaning Site Visit Checklist
- Verify Site Screening Report information and Rapid Risk Screening Information
- Confirm location/contamination data for ranking drinking water well for program eligibility
- Identify above/below ground utilities and potential impediments to assessment activities
- Identify land use of adjacent properties
- Identify nearby properties that may require site access
- Verify accuracy of site map, revise as necessary
- Identify area lithology / hydrogeologic characteristics
- Discuss work plan elements with property owner and get direction regarding approach to tenants, and schedule.
Deliverables:
- Completed Drycleaning Site Visit Checklist
- Site Summary Report - brief summary of site with attached figure(s) Figures should identify major features i.e., facility, ranking well, waste storage areas, utilities, etc.
- City/County Plat Map identifying all parcel identification numbers, zoning classifications, and current property use for properties within 1,000 feet of the site.
- Summary of historical data - results of the historical data review, and site inspection.
- Overall project approach summary (<1 pg) i.e. proposed order in which work should proceed on the assigned sites following evaluation of the preliminary site assessments and other logistical considerations.)
- Sampling Plan - Including recommendations for soil, soil gas, MAGs, groundwater, sediment and surface water sampling (as appropriate). Including QA/QC measures, screening levels, and sampling procedures (SOP)
- including site map indicating proposed/alternative sampling locations
- Identify property owners (name and address) for all properties adjacent to the site and for those properties on which sampling is proposed and site access will be required
- Health and Safety Plan in compliance with 29 CFR 1910.120
- Proposed resource-loaded schedule for Site Assessment with projected schedule for
Site Remediation
- Cost Estimate/Level of Effort (LOE) Worksheets, including subcontractor quotes, as appropriate. The Cost Estimate/Level of Effort should be submitted under separate cover to the DEP Project Manager.
| SDWM-BMC-PR15060215460 |
| SiteAssessmentWorkPlanTaskList |