This document is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract No. HW551, issued to AECOM Technical Services, Inc. for groundwater monitoring services at the Drycleaning Art Inc. facility located at 3337 Sheridan Street, Hollywood, Broward County, Florida (FDEP Site No. ERIC_4061). The task assignment was executed on January 27, 2021, with Benjamin Grubbs serving as the DEP Contract Manager and Mark Rasberry as the Contractor Representative.
The task authorizes AECOM to conduct groundwater monitoring activities in accordance with the January 19, 2021 Scope of Work and Cost Estimate. The scope includes three subtasks: Project Management (calculated at 12.5 percent of direct labor costs), 2021 Annual Natural Attenuation Monitoring (NAM) involving groundwater sample collection from six monitor wells analyzed for volatile organic compounds via EPA Method 8260, and GIS and ADaPT data deliverables. The total task assignment value is $5,642.92, structured as a fixed price with no cost reimbursement or retainage. The single deliverable—an Annual Groundwater Monitoring Report and ADaPT/GIS update—is due on March 29, 2021, with project completion scheduled for May 27, 2021. Invoicing is permitted upon submittal and FDEP approval of the Annual Groundwater Monitoring Report and ADaPT/GIS update. The cost estimate reflects 37.4 total labor hours allocated across project management, field sampling activities, laboratory analytical costs ($591.00 for VOC analysis and sample shipping), and field expenses including equipment and expendables totaling $299.25.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW551
D000 N/ADC028H
AECOM Technical Services, Inc. (AECOM)
Mark Rasberry
(850) 245-8992Ben Grubbs
ERIC_4061
Drycleaning Art Inc
3337 Sheridan St, Hollywood, Broward
Monitoring
This Task Assignment authorizes AECOM to conduct groundwater monitoring activities in accordance with the January 19, 2021, Scope of Work and Cost Estimate.
Annual Groundwater Monitoring Report and ADaPT/GIS update
03/29/2021
05/27/2021
$ 5,642.92 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.01.27 09:31:49 -05'00'
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.01.27 09:32:01 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.01.27 10:13:56 -05'00'
Digitally signed by Rasberry, Mark DN: cn=Rasberry, Mark, ou=USORL3 Date: 2021.02.09 15:41:27 -05'00'
Rasberry, Mark
$ 5,642.92
Rasberry, Mark Joyal
Rasberry, Mark Typewriter
AVP
Rasberry, Mark Typewriter 2/9/2021
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 2-3: Annual Groundwater Monitoring Report and ADaPT/GIS update 03/29/2021
Subtasks 1-3: Submittal and FDEP approval of Annual Groundwater Monitoring Report and ADaPT/GIS update $ 5,642.92
$ 5,642.92
HW551
DC028H
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
To: HW551 Contract Negotiation File Drycleaning Art Inc Hollywood, Broward County
ERIC_ 4061
From: Ben Grubbs, Project Manager Date: January 27, 2021 Subject: Negotiation Summary
HW551 DC028H
This Task Assignment authorizes AECOM to conduct groundwater monitoring activities in accordance with the January 19, 2021, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: 2021 Annual NAM AECOM will collect groundwater samples from monitoring wells MW001, MW002, MW005, and MW007 – MW009. Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for volatile organic compounds (VOCs).
Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum, while a sample from the drum is being analyzed for VOCs. IDW will be disposed of on site after receiving laboratory confirmation that the IDW is below Groundwater Cleanup Target Levels (GCTLs).
Subtask 3: GIS and ADaPT Deliverables AECOM will submit the ADaPT and GIS deliverables to FDEP.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $5,642.92 with 37.4 labor hours.
AECOM may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.
Date: 19-Jan-21
Task #: HW551 - DC028H SubTask 1 Project Management SubTask 6
Site: Drycleaning Art SubTask 2 2021 Annual NAM SubTask 7
Activity/Phase: NAM SubTask 3 GIS SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$56.30 Project Manager (Rasberry) 3.1 3.1 $0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$56.30 Sr. Geologist (Rasberry) 15.3 14.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $65.51 Sr. Engineer (Joyal) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 Geologist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Engineer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$34.50 CAD Designer (Barron) 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Field Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$26.00 Field Technician (Slater) 14.0 14.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Field Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Supervisor 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Senior Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 O&M Specialist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$23.96 Administration / Clerical (Pichardo) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 37.4 3.1 33.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Direct Labor $1,595.66 $177.30 $1,345.17 $73.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 38.57% $615.44 $68.38 $518.83 $28.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 122.13% $1,948.79 $216.54 $1,642.86 $89.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,159.89 $462.22 $3,506.86 $190.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $79.79 $8.87 $67.26 $3.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 1
FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.
Date: 19-Jan-21
Task #: HW551 - DC028H SubTask 1 Project Management SubTask 6
Site: Drycleaning Art SubTask 2 2021 Annual NAM SubTask 7
Activity/Phase: NAM SubTask 3 GIS SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $528.00 $528.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $591.00 $591.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $299.25 $299.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,226.93 $471.09 $4,561.37 $194.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $415.99 $46.22 $350.69 $19.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $5,642.92 $517.31 $4,912.06 $213.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 2
SITE : Drycleaning Art SUBTASK: 2 2021 Annual NAM DATE: 19-Jan-21
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Engineer 2021 NAM Sampling (Joyal) Sr. Review of NAM Report 1 subtotal 1
Sr. Geologist 2021 NAM Sampling 14 (Rasberry) Order/ receive & inspect sample containers
Coordinate with owner Prepare field request Review field data documentation Review Updated Figures and Tables Coordinate IDW disposal Prepare NAM Report Sign and Seal Report subtotal 14
CAD 2021 NAM Sampling (Barron) Update Figures 3 subtotal 3
Technician 2021 NAM Sampling (Slater) Collect GW samples from 6 monitor wells 14
(,W001, MW002, MW005, MW007, MW008, MW009)
Water table elevation gauging (ALL 9MWs total) Calibrate equipment Collect one duplicate and 1 IDW sample Preparation of Chain-of-Custody Pack the samples Deliver samples for shipping Travel/ Mob/ Demob subtotal 14
Admin. / Clerical Corres., Mail, Fax, etc. 1 (Pichardo) subtotal 1
TOTAL LABOR 33
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Truck sampling $97.00 day 1 $97.00 subtotal $97.00
TOTAL TRAVEL $97.00
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QA/QC TOTALS
Analytical Costs (Fixed Lab) VOH - 8260 (6 samples +1 IDW + 1 duplicate) 66.00$ 7 1 $528.00 subtotal $528.00 Analytical Costs (Fixed Lab) Shipping (small cooler overnight) 63.00$ 1 $63.00 subtotal $63.00
TOTAL LABORATORY $591.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Expendables Expendables $32.50 day 1 $32.50 subtotal $32.50 IDW Realated Drum $58.20 each 1 $58.20 subtotal $58.20 Other Monitor Well Installation Kit $184.30 day 0 $0.00 Shallow GW Sampling kit $208.55 day 1 $208.55 subtotal $208.55
TOTAL FIELD EXPENSES $299.25
C:\Users\Grubbs_B\HW551_AECOM\ERIC_4061_DC_Art\DC028H\TA\ CEFLOE_HW551_DC028H Page 3 of 4
SITE : Drycleaning Art
SUBTASK: 3 GIS
DATE: 19-Jan-21
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Geologist Prepare & Submit GIS Data Tables 1.25 (Rasberry) Task 2: 7 samples @ 8 min = 56 min (6 MWs, 1 Duplicate)
Task 2: (9-6) 3 WLs @ 5 min = 15 min Total: 71 min
Rename & Submit ADaPT Data Report & Error Logs
TOTAL LABOR 1.25
TRAVEL
TYPE RATE UNIT USAGE TOTALS
subtotal $0.00
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (SERVICES) $0.00
C:\Users\Grubbs_B\HW551_AECOM\ERIC_4061_DC_Art\DC028H\TA\ CEFLOE_HW551_DC028H Page 4 of 4
AECOM
150 N. Orange Avenue Suite 200 Orlando, Florida 32801 www.aecom.com
407 843 6552 tel 407 839 1789 fax
January 19, 2021
Mr. Ben Grubbs State of Florida Department of Environmental Protection Bureau of Waste Cleanup, MS 4520 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: 2021 Annual Natural Attenuation Monitoring Proposal Drycleaning Art Inc. (aka Park Sheridan Cleaners) 3337 Sheridan Street, Hollywood, Broward County, Florida 33021 FDEP Site No. 069500320, ERIC_4061 Proposed FDEP Task Assignment #DC028H
Dear Mr. Hessman:
AECOM is pleased to submit this proposal and Level of Effort/Cost Estimate Forms (LOE/CEF) to conduct an Annual Natural Attenuation Monitoring (NAM) groundwater sampling event at the above referenced site. The most recent sampling event, conducted on June 23, 2020, indicated that concentrations of volatile organic halocarbon (VOH) contaminants of concern were greater than their respective Groundwater Cleanup Target Levels (GCTLs) in on-site monitor wells MW002. Other VOHs were detected in monitor wells MW001, MW002, and MW007 at concentrations below their respective GCTLs.
TASK 1 – Project Management
Project management is calculated at 12.5 percent of the direct labor and includes associated fringe, overhead, ODC and completion fees.
TASK 2 –2021 Annual NAM
Based on recommendations in the August 5, 2020 NAM report and the August 6, 2020 approval letter, AECOM proposes to sample six monitor wells in the annual NAM groundwater sampling event. Samples will be analyzed for volatile organic halocarbons (VOHs) via EPA Method 8260 and screened for other NAM parameters in the field according to the following table:
Well ID Screened Interval
VOHs
Field Screening (Temp, pH, SpC, redox, DO, turbidity)
MW001 3-13 X X
MW002 2-12 X X
MW005 3-13 X X
MW007 25-30 X X
Drycleaning Art, 2021 NAM Proposal January 19, 2021 Page 2
Well ID Screened Interval
VOHs
Field Screening (Temp, pH, SpC, redox, DO, turbidity)
MW008 3-13 X X
MW009 3-13 X X
In addition, AECOM will confirm the type of solvent the current business is utilizing. Sampling will be conducted in accordance with DEP-SOP-002/01 FS 2200, and a duplicate sample will be collected for quality control purposes. Water level measurements will be recorded from all nine existing monitor wells for a determination of the shallow groundwater flow direction across the site. The well locations and previous sampling results are provided in Attachment 1, Figure 3 from the 2020 NAM Report. Purge water will be temporarily stored on-site in a 55-gallon drum pending characterization to determine the proper disposal method. Purge water IDW has not exceeded GCTLs during previous sampling events and was later released to an impervious surface, therefore no IDW disposal costs are included in this proposal; however, they can be added by a change order, if required. AECOM will prepare a letter report documenting the analytical results of the annual NAM sampling activities.
TASK 3 – GIS & ADaPT Deliverables
AECOM will update the GIS data tables to include lab analytical data, field screening, and water level gauging data. The laboratory ADaPT electronic files will also be submitted for this subtask.
AECOM proposes the following invoice and deliverable schedule:
Task Proposed Total Proposed Schedule
Task 1: Project Management $517.31 NA Task 2: 2021 Annual NAM & Report $4,912.06 60 days from tasking Task 3: GIS & ADaPT Data $213.55 60 days from tasking Total / Completion Date $5,642.92 120 days from tasking
The LOE/CEF is included as Attachment 2. Should you have any questions, or require additional information, please contact Mark Rasberry directly at (407) 513-8241, or via email at mark.rasberry@aecom.com.
Sincerely, AECOM Technical Services, Inc.
Mark Rasberry, P.G. Jennifer Joyal, P.E.
Project Manager Associate Vice President Enc:
Attachment 1 – Figure 3, 2020 NAM Analytical Results Attachment 2 – LOE / CEF
DRY CLEANING ART
CLEANERS
6-23-2020
1.4
0.2 U
0.2 U
0.2 U
0.2 U
6-23-2020
4.5
0.2 U
0.86 I
0.2 U
0.2 U
6-23-2020
0.2 U
0.2 U
0.35 I
0.2 U
0.2 U
6-23-2020
0.2 U
0.2 U
0.2 U
0.2 U
0.2 U
6-23-2020
0.2 U
0.2 U
0.2 U
0.2 U
0.2 U
6-23-2020
0.2 U
0.2 U
0.2 U
0.2 U
0.2 U
7/29/2020
FIGURE 3
GROUNDWATER CONTAMINATION MAP
JUNE 2020
DRY CLEANING ART (PARK SHERIDAN CLEANERS)
3337 SHERIDAN ST., HOLLYWOOD, BROWARD COUNTY, FL
FDEP FACILITY ID NO.: ERIC_4061
60631244
DATE
TETRACHLOROETHENE
TRICHLOROETHENE
cis-1,2-DICHLOROETHENE trans-1,2-DICHLOROETHENE
7/8/2019
VINYL CHLORIDE
NOTES:
· RESULTS SHOWN IN µg/L
· U = INDICATES THAT THE CHEMICAL OF CONCERN WAS UNDETECTED
· I = INDICATES THE CHEMICAL WAS DETECTED BUT BELOW THE
REPORTING LIMIT; THEREFORE, AN ESTIMATED VALUE
· D = DATA REPORTED FROM A DILUTION
· GCTL = GROUNDWATER CLEANUP TARGET LEVELS AS PROVIDED IN
62-777, F.A.C.
· BOLD INDICATES ANALYTE DETECTED
· BOLD BLUE INDICATES CONCENTRATION GREATER THAN GCTLs
LEGEND
SHALLOW MONITOR WELL
INTERMEDIATE MONITOR WELL
ABANDONED MONITOR WELL
AutoCAD SHX Text
MW005
AutoCAD SHX Text
MW006
AutoCAD SHX Text
MW001
AutoCAD SHX Text
MW002
AutoCAD SHX Text
MW003
AutoCAD SHX Text
MW004
AutoCAD SHX Text
MW008
AutoCAD SHX Text
MW009
AutoCAD SHX Text
MW007
AutoCAD SHX Text PCE TCE cis-1,2-DCE trans-1,2-DCE VC
AutoCAD SHX Text PCE TCE cis-1,2-DCE trans-1,2-DCE VC
AutoCAD SHX Text PCE TCE cis-1,2-DCE trans-1,2-DCE VC
AutoCAD SHX Text PCE TCE cis-1,2-DCE trans-1,2-DCE VC
AutoCAD SHX Text PCE TCE cis-1,2-DCE trans-1,2-DCE VC
AutoCAD SHX Text
TW001
AutoCAD SHX Text
TW002
AutoCAD SHX Text PCE TCE cis-1,2-DCE trans-1,2-DCE VC
AutoCAD SHX Text N
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REVISED BY:
AutoCAD SHX Text p:\dcs\projects\env\fdep\hw551\dc\dc art inc\dc028g 2020 nam 60631244\900-cad- gis\910-cad\cad\f3_gw contam map.dwg
AutoCAD SHX Text
MAR
AutoCAD SHX Text 0'
AutoCAD SHX Text 50'
AutoCAD SHX Text
SCALE
AutoCAD SHX Text 25'
AutoCAD SHX Text 100'
AutoCAD SHX Text PCE TCE cis-1,2-DCE trans-1,2-DCE VC
AutoCAD SHX Text APPROXIMATE EXTENT OF GROUNDWATER CONTAMINATION ABOVE GCTLs. (DASHED WHERE INFERRED)
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .