This is a Task Assignment Change Order for Florida Department of Environmental Protection (FDEP) Contract No. HW551, Task Assignment DC007H, issued on July 1, 2020. The contract involves AECOM Technical Services, Inc. (AECOM) as the contractor, with Mark Rasberry serving as the contractor representative and Billy Hessman as the DEP Contract Manager. The work is being performed at the No Spot Cleaners Inc. site (ERIC_4066) located at 716 N Federal Hwy, Hallandale, Broward, Florida.

This Change Order adjusts costs associated with not sampling monitor well MW015 due to the interior well being inaccessible following the closure of the business occupying the building. The original task amount was $7,292.63 with no change in labor costs; however, laboratory fees decreased by $66.00 due to the elimination of one well sampling. The net decrease in task amount is ($66.00), resulting in a revised total task amount of $7,226.63. The final deliverable is a Groundwater Monitoring Report, with the original completion date of October 30, 2020 remaining unchanged. The task is structured as a fixed-price contract, with invoice payment due upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report.

View the file

Other files

File Type Posted
CN-370000-HW551 (1).pdf PDF
CN-370000-HW551-A2.pdf PDF
CN-370000-HW551-A8.pdf PDF
CN-370000-HW551-CO3.pdf PDF
CN-370000-HW551-CO4.pdf PDF
CN-370000-HW551-DC001G.pdf PDF
CN-370000-HW551-DC003E.pdf PDF
CN-370000-HW551-DC004L.pdf PDF
CN-370000-HW551-DC008F.pdf PDF
CN-370000-HW551-DC010J.pdf PDF
CN-370000-HW551-DC018L.pdf PDF
CN-370000-HW551-DC018M.pdf PDF
CN-370000-HW551-DC01ACO5.pdf PDF
CN-370000-HW551-DC01ACO9.pdf PDF
CN-370000-HW551-DC01C.pdf PDF
CN-370000-HW551-DC01E.pdf PDF
CN-370000-HW551-DC024B.pdf PDF
CN-370000-HW551-DC024E.pdf PDF
CN-370000-HW551-DC02G-1.pdf PDF
CN-370000-HW551-DC02JCO2.pdf PDF
CN-370000-HW551-DC031B.pdf PDF
CN-370000-HW551-DC032B.pdf PDF
CN-370000-HW551-DC03C.pdf PDF
CN-370000-HW551-DC03CCO1.pdf PDF
CN-370000-HW551-DC03CCO2.pdf PDF
CN-370000-HW551-DC03ECO1.pdf PDF
CN-370000-HW551-DC03F.pdf PDF
CN-370000-HW551-DC04D.pdf PDF
CN-370000-HW551-DC04E.pdf PDF
CN-370000-HW551-DC04ECO1.pdf PDF
CN-370000-HW551-DC04G.pdf PDF
CN-370000-HW551-DC04H.pdf PDF
CN-370000-HW551-DC04HCO4.pdf PDF
CN-370000-HW551-DC04JCO1.pdf PDF
CN-370000-HW551-DC04MCO1.pdf PDF
CN-370000-HW551-DC04MCO2.pdf PDF
CN-370000-HW551-DC05BCO1.pdf PDF
CN-370000-HW551-DC05ECO4.pdf PDF
CN-370000-HW551-DC05ECO5.pdf PDF
CN-370000-HW551-DC05ECO6.pdf PDF
CN-370000-HW551-DC05F.pdf PDF
CN-370000-HW551-DC06CCO1.pdf PDF
CN-370000-HW551-DC06DCO1.pdf PDF
CN-370000-HW551-DC07C.pdf PDF
CN-370000-HW551-DC07E.pdf PDF
CN-370000-HW551-DC07ECO7.pdf PDF
CN-370000-HW551-DC07GCO1.pdf PDF
CN-370000-HW551-DC07GCO2.pdf PDF
CN-370000-HW551-DC07H.pdf PDF
CN-370000-HW551-DC07iCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Change Order No.:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

Site Name:

Site ID / Facility ID::

Description of Change [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverable:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

Cost Reimbursement Fixed Fee

Original Task Amount

Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00

Original Task Completion Date:

Completion Date Prior to this Change:

Net Increase/Decrease in Task Period:

Completion Date with all Change Orders:

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

FIXED PRICE

TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM

ITEM

$0.00

$0.00

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

Final Deliverable Due Date:

$0.00

$0.00

CHANGE IN TASK TIME

FEE SCHEDULE

COST PLUS FIXED FEE

TOTAL

WCP TAFORM 01_18

Received

HW551

1DC007H

AECOM Technical Services, Inc. (AECOM)

Mark Rasberry

850-245-8972Billy Hessman

No Spot Cleaners Inc.

ERIC_4066

This Task Assignment Change Order adjusts costs associated with not sampling monitor well MW015.

Groundwater Monitoring Report

$ 7,292.63 $ 0.00 $ 0.00 $ 0.00

$ 7,292.63 $ 0.00 $ 0.00 $ 0.00 $ 7,292.63

($ 66.00) $ 0.00 $ 0.00 $ 0.00 ($ 66.00)

$ 7,226.63

10/30/2020

10/30/2020

N/A

10/30/2020

Billy Hessman Digitally signed by Billy Hessman Date: 2020.07.01 13:17:21 -04'00'

Billy Hessman Digitally signed by Billy Hessman Date: 2020.07.01 13:17:31 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2020.07.01 15:10:21 -04'00'

Digitally signed by Rasberry, Mark DN: cn=Rasberry, Mark, ou=USORL3 Date: 2020.07.02 13:29:03 -04'00'

Rasberry, Mark

$ 7,226.63 $ 0.00 $ 0.00 $ 0.00

$ 7,292.63

Rasberry, Mark Joyal

Rasberry, Mark Joyal

Rasberry, Mark Typewriter 7/2/2020

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Received

HW551

DC007H

$ 7,226.63

Groundwater Monitoring Report

Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report $ 7,226.63

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

TO: HW551 Contract File No Spot Cleaners Inc.

ERIC_4066

FROM: Billy Hessman, Contract Manager

DATE: July 1, 2020

SUBJECT: Task Assignment Summary

HW551 DC007H

Change Order #1 Monitoring

Task Assignment Change Order DC007H-1 adjusts costs associated with not sampling monitor well MW015. The interior well was inaccessible due to closure of the business that occupies the building. Access to this well will be coordinated for subsequent sampling events. An overall reduction in sampling labor did not occur as a result of not sampling MW015. Specific changes are detailed below:

Subtask 2: Groundwater Sampling Costs under subtask 2 decreased $66.00 for a reduction in laboratory fees associated with not sampling MW015.

Task Assignment Change Order DC007H-1 results in a total cost decrease of $66.00.

The final cost total for Task Assignment DC007H-1 is $7,226.63.

FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.

Date: 1-Jul-20

Task #: HW551 DC007H TACO-1 New Total SubTask 1 Project Management SubTask 6

Site: No Spot Cleaners SubTask 2 2020 Annual NAM SubTask 7

Activity/Phase: Annual NAM SubTask 3 GIS SubTask 8

Project Manager: Mark Rasberry SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.30 Project Manager (Rasberry) 3.8 3.8 $0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$56.30 Sr. Geologist (Rasberry) 17.0 15.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $65.51 Sr. Engineer (Joyal) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$0.00 Geologist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$34.50 CAD Designer (Barron) 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $26.00 Field Technician (Slater) 12.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $19.96 Field Technician (Parsotan) 12.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$0.00 Field Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Supervisor 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Senior Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 O&M Specialist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$23.96 Administration / Clerical (Pichardo) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Total Hours 49.8 3.8 44.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Direct Labor $1,914.29 $212.70 $1,588.99 $112.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 38.57% $738.34 $82.04 $612.87 $43.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 122.13% $2,337.92 $259.77 $1,940.63 $137.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,990.55 $554.51 $4,142.49 $293.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $95.72 $10.64 $79.45 $5.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 04/10 CEF AECOM Page 1

Task #: HW551 DC007H TACO-1 New Total SubTask 1 Project Management SubTask 6

Site: No Spot Cleaners SubTask 2 2020 Annual NAM SubTask 7

Activity/Phase: Annual NAM SubTask 3 GIS SubTask 8

Project Manager: Mark Rasberry SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $844.00 $844.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $907.00 $907.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $417.10 $417.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $540.30 $540.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,727.57 $565.15 $5,863.24 $299.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $499.06 $55.45 $414.25 $29.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $7,226.63 $620.60 $6,277.49 $328.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 04/10 CEF AECOM Page 2

HW551

SITE : No Spot SUBTASK: 2 2020 Annual NAM

DATE: 7/1/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Geologist 2020 Annual Sampling 15 (Rasberry) Order/ receive & inspect sample containers

Prepare field request Coordinate with owners Review field data documentation Update Tables Prepare NAM Report Cordinate IDW disposal Sign and Seal Report

Sr. Engineer 2020 Annual Sampling 1 (Joyal) Review NAM Report

Field Technician 2020 Annual Sampling 12 (Slater) Collect Water Level Measurements (12 MWs)

Calibrate equipment Collect GW samples from 11 MWs Collect one duplicate QC sample Collect one IDW sample for characterization Preparation of Chain-of-Custody Stage IDW Pack the samples Travel/ Mob/ Demob

Field Technician 2020 Annual Sampling 12 (Parsotan) Collect Water Level Measurements (12 MWs)

Calibrate equipment Collect GW samples from 11 MWs Collect one IDW sample for characterization Preparation of Chain-of-Custody Deliver samples for shipping Travel/ Mob/ Demob

CAD Designer 2020 Annual Sampling 3 (Barron) Update Figures

Admin. / Clerical Corres., Mail, Fax, etc. 1 (Pichardo)

TOTAL LABOR 44

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck 1 day x 2 $97.00 day 2 $194.00 subtotal $194.00

TOTAL TRAVEL $194.00

SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

subtotal $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

C:\Users\hessman_b\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\OK8T6OM9\ No Spot DC007H TACO-1 New Total.xlsx Page 3 of 5

SUBTASK: 2 2020 Annual NAM

DATE: 7/1/2020

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

IDW

TBD IDW Disposal $0.00 drum 0 $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QA/QC TOTALS

Analytical Costs (Fixed Lab) VOH - 8260 (10 wells + 1 IDW + 1 duplicate) 66.00$ 11 1 $792.00 TOC (2 samples) 26.00$ 2 0 $52.00 subtotal $844.00 Analytical Costs (Fixed Lab) Shipping (small cooler overnight) 63.00$ 1 $63.00 subtotal $63.00

TOTAL LABORATORY $907.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Expendables Expendables 1 day x 2 $32.50 day 2 $65.00 subtotal $65.00 IDW Related Drum $58.20 each 1 $58.20 subtotal $58.20 Other Shallow GW Sampling kit 1 day x 2 $208.55 day 2 $417.10 subtotal $417.10

TOTAL FIELD EXPENSES $540.30

No Spot DC007H TACO-1 New Total.xlsx Page 4 of 5

SUBTASK: 3 GIS

DATE: 7/1/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Geologist Prepare & Submit GIS Data Tables 2 (Rasberry) 12 samples @ 8 min = 96 min (11 MW, 1 Duplicate)

1 WLs @ 5 min = 5 min Total: 101 min

Rename & Submit ADaPT Data Report & Error Logs

TOTAL LABOR 2

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental subtotal $0.00

Mileage Costs subtotal $0.00

Air Fare subtotal $0.00

Per Diem + Hotel subtotal $0.00 subtotal $0.00

SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional) subtotal $0.00 Drilling (Non-Conventional) subtotal $0.00 Mobile Laboratory subtotal $0.00 Surveying subtotal $0.00

IDW

subtotal $0.00 Other subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

No Spot DC007H TACO-1 New Total.xlsx Page 5 of 5

Task #: HW551 DC007H TACO-1 Delta SubTask 1 Project Management SubTask 6

Site: No Spot Cleaners SubTask 2 2020 Annual NAM SubTask 7

Activity/Phase: Annual NAM SubTask 3 GIS SubTask 8

Project Manager: Mark Rasberry SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.30 Project Manager (Rasberry) 0.0 0.0 $0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$56.30 Sr. Geologist (Rasberry) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $65.51 Sr. Engineer (Joyal) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$0.00 Geologist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$34.50 CAD Designer (Barron) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $26.00 Field Technician (Slater) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $19.96 Field Technician (Parsotan) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$0.00 Field Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Supervisor 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Senior Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 O&M Specialist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$23.96 Administration / Clerical (Pichardo) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Total Hours 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 38.57% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 122.13% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Task #: HW551 DC007H TACO-1 Delta SubTask 1 Project Management SubTask 6

Site: No Spot Cleaners SubTask 2 2020 Annual NAM SubTask 7

Activity/Phase: Annual NAM SubTask 3 GIS SubTask 8

Project Manager: Mark Rasberry SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs ($66.00) ($66.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory ($66.00) ($66.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($66.00) $0.00 ($66.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($66.00) $0.00 ($66.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

SUBTASK: 2 2020 Annual NAM

DATE: 7/1/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Geologist 2020 Annual Sampling (Rasberry) Order/ receive & inspect sample containers

Prepare field request Coordinate with owners Review field data documentation Update Tables Prepare NAM Report Cordinate IDW disposal Sign and Seal Report

Sr. Engineer 2020 Annual Sampling (Joyal) Review NAM Report

Field Technician 2020 Annual Sampling (Slater) Collect Water Level Measurements (12 MWs)

Calibrate equipment Collect GW samples from 11 MWs Collect one duplicate QC sample Collect one IDW sample for characterization Preparation of Chain-of-Custody Stage IDW Pack the samples Travel/ Mob/ Demob

Field Technician 2020 Annual Sampling (Parsotan) Collect Water Level Measurements (12 MWs)

Calibrate equipment Collect GW samples from 11 MWs Collect one IDW sample for characterization Preparation of Chain-of-Custody Deliver samples for shipping Travel/ Mob/ Demob

CAD Designer 2020 Annual Sampling (Barron) Update Figures

Admin. / Clerical Corres., Mail, Fax, etc.

(Pichardo)

TOTAL LABOR 0

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck 1 day x 2 $97.00 day $0.00 subtotal $0.00

TOTAL TRAVEL $0.00

SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

subtotal $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

No Spot DC007H TACO_1 Delta.xlsx Page 3 of 4

SUBTASK: 2 2020 Annual NAM

DATE: 7/1/2020

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

IDW

TBD IDW Disposal $0.00 drum 0 $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QA/QC TOTALS

Analytical Costs (Fixed Lab) VOH - 8260 (11 wells + 1 IDW + 1 duplicate) 66.00$ -1 0 ($66.00) TOC (2 samples) 26.00$ 0 0 $0.00 subtotal ($66.00) Analytical Costs (Fixed Lab) Shipping (small cooler overnight) 63.00$ 0 $0.00 subtotal $0.00

TOTAL LABORATORY ($66.00)

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Expendables Expendables 1 day x 2 $32.50 day 0 $0.00 subtotal $0.00 IDW Related Drum $58.20 each 0 $0.00 subtotal $0.00 Other Shallow GW Sampling kit 1 day x 2 $208.55 day 0 $0.00 subtotal $0.00

TOTAL FIELD EXPENSES $0.00

No Spot DC007H TACO_1 Delta.xlsx Page 4 of 4

FDEP COST ESTI MATEContractor: AECOM Technical Services, Inc.

Task #: HW551 DC007H TACO-1 Original SubTask 1 Project Management SubTask 6

Site: No Spot Cleaners SubTask 2 2020 Annual NAM SubTask 7

Activity/Phase: Annual NAM SubTask 3 GIS SubTask 8

Project Manager: Mark Rasberry SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.30 Project Manager (Rasberry) 3.8 3.8 $0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$56.30 Sr. Geologist (Rasberry) 17.0 15.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $65.51 Sr. Engineer (Joyal) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$0.00 Geologist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$34.50 CAD Designer (Barron) 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $26.00 Field Technician (Slater) 12.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $19.96 Field Technician (Parsotan) 12.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$0.00 Field Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Supervisor 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Senior Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 O&M Specialist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$23.96 Administration / Clerical (Pichardo) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Total Hours 49.8 3.8 44.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Direct Labor $1,914.29 $212.70 $1,588.99 $112.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 38.57% $738.34 $82.04 $612.87 $43.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 122.13% $2,337.92 $259.77 $1,940.63 $137.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,990.55 $554.51 $4,142.49 $293.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $95.72 $10.64 $79.45 $5.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTI MATEContractor: AECOM Technical Services, Inc.

Task #: HW551 DC007H TACO-1 Original SubTask 1 Project Management SubTask 6

Site: No Spot Cleaners SubTask 2 2020 Annual NAM SubTask 7

Activity/Phase: Annual NAM SubTask 3 GIS SubTask 8

Project Manager: Mark Rasberry SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $910.00 $910.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $973.00 $973.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $417.10 $417.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $540.30 $540.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,793.57 $565.15 $5,929.24 $299.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $499.06 $55.45 $414.25 $29.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $7,292.63 $620.60 $6,343.49 $328.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Task Assignment CHANGE ORDER
BWC Task Assignment Change Order Form (Rev 02-17).pdf
Task Assignment CHANGE ORDER
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
No Spot DC007H TACO-1 New Total.pdf
Cost Estimate
ST2 - NAM
ST3 - GIS
No Spot DC007H TACO_1 Delta.pdf
Cost Estimate
ST2 - NAM
No Spot DC007H TACO-1 Original.pdf
Cost Estimate

File details come from the government source that posted it. Updated .