This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) for contract HW551 with AECOM Technical Services, Inc. The task assignment, designated DC004P, authorizes work at the Classic French Dry Cleaners facility located at 5539 W Oakland Park Boulevard, Lauderhill, Broward County, Florida. The DEP Contract Manager is Ben Grubbs, and the Contractor Representative is Mark Rasberry. The task falls under the Monitoring phase of the indefinite delivery contract vehicle.
AECOM will conduct 2021 annual Natural Attenuation Monitoring (NAM) activities at the contaminated site, including groundwater sampling from six monitoring wells, depth-to-water measurements at three additional wells, field parameter screening, volatile organic compound analysis by EPA Method 8260, investigation-derived waste management, and GIS/ADaPT database updates. The task comprises three subtasks: Project Management ($507.83), 2021 Annual NAM Sampling ($4,836.19), and GIS & ADaPT deliverables ($213.55), for a total fixed-price task assignment value of $5,557.57 with no retainage. The work encompasses 36.4 labor hours and must be completed by May 25, 2021, with final deliverables—an Annual Groundwater Monitoring Report and ADaPT/GIS update—due by March 26, 2021. Payment is contingent upon submittal and FDEP approval of the completed report and database updates.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW551
D000 N/ADC004P
AECOM Technical Services, Inc. (AECOM)
Mark Rasberry
(850) 245-8992Ben Grubbs
ERIC_4050
Classic French Dry Cleaners
5539 W Oakland Park Blvd, Lauderhill, Broward
Monitoring
This Task Assignment authorizes AECOM to conduct groundwater monitoring activities in accordance with the January 19, 2021, Scope of Work and Cost Estimate.
Annual Groundwater Monitoring Report and ADaPT/GIS update
03/26/2021
05/25/2021
$ 5,557.57 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.01.25 14:58:10 -05'00'
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.01.25 14:58:21 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.01.25 17:58:50 -05'00'
Digitally signed by Rasberry, Mark DN: cn=Rasberry, Mark, ou=USORL3 Date: 2021.01.26 10:29:18 -05'00'
Rasberry, Mark
$ 5,557.57
Rasberry, Mark Joyal
Rasberry, Mark Typewriter 1/26/2021
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 2-3: Annual Groundwater Monitoring Report and ADaPT/GIS update 03/26/2021
Subtasks 1-3: Submittal and FDEP approval of Annual Groundwater Monitoring Report and ADaPT/GIS update $ 5,557.57
$ 5,557.57
HW551
DC004P
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
To: HW551 Contract Negotiation File Classic French Dry Cleaners Lauderhill, Broward County
ERIC_ 4050
From: Ben Grubbs, Project Manager Date: January 25, 2021 Subject: Negotiation Summary
HW551 DC004P
This Task Assignment authorizes AECOM to conduct groundwater monitoring activities in accordance with the January 19, 2021, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: 2021 Annual Natural Attenuation Monitoring AECOM will collect groundwater samples from monitoring wells MW001, MW014RR, MW016, MW031, MW034, and MW040. Prior to sampling, depth-to-water will be measured.
The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for volatile organic compounds (VOCs). Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum, while a sample from the drum is being analyzed for VOCs. IDW will be disposed of on site after receiving laboratory confirmation that the IDW is below Groundwater Cleanup Target Levels (GCTLs).
Subtask 3: GIS and ADaPT AECOM will submit the ADaPT and GIS deliverables to FDEP.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $5,557.57 with 36.4 labor hours.
AECOM may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATEContractor: AECOM Technical Services, Inc.
Date: 19-Jan-21
Task #: HW551 DC004P SubTask 1 Project Management SubTask 6
Site: Classic French SubTask 2 2021 Annual NAM Sampling SubTask 7
Activity/Phase: Annual NAM Sampling SubTask 3 GIS SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$56.30 Project Manager (Rasberry) 3.1 3.1 $0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$56.30 Sr. Geologist (Rasberry) 15.3 14.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $65.51 Sr. Engineer (Joyal) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 Engineer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Geologist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$34.50 CAD Designer (Barron) 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Engineering Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$26.00 Field Technician (Slater) 13.0 13.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Field Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Supervisor 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Senior Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 O&M Specialist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$23.96 Administration / Clerical (Pichardo) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 36.4 3.1 32.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Direct Labor $1,566.41 $174.05 $1,319.17 $73.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 38.57% $604.16 $67.13 $508.80 $28.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 122.13% $1,913.06 $212.57 $1,611.10 $89.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,083.63 $453.75 $3,439.07 $190.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $78.32 $8.70 $65.96 $3.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 1
FDEP COST ESTI MATEContractor: AECOM Technical Services, Inc.
Date: 19-Jan-21
Task #: HW551 DC004P SubTask 1 Project Management SubTask 6
Site: Classic French SubTask 2 2021 Annual NAM Sampling SubTask 7
Activity/Phase: Annual NAM Sampling SubTask 3 GIS SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $528.00 $528.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $591.00 $591.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $299.25 $299.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,149.20 $462.45 $4,492.28 $194.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $408.37 $45.38 $343.91 $19.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $5,557.57 $507.83 $4,836.19 $213.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 2
SITE : Classic French SUBTASK: 2 2021 Annual NAM Sampling DATE: 19-Jan-21
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Engineer Annual NAM Sampling (Joyal) Review Annual GW Sample Report 1 subtotal 1
Sr. Geologist Annual NAM Sampling 14 (Rasberry) Coordinate site access/schedule
Provide office oversite of field work Order/ receive & inspect GW sample containers Prepare NAM field request Review field data documentation Review Updated Figures and Tables Prepare Annual GW Sample Report Coordinate IDW characterization and disposal Sign and Seal Report subtotal 14
CAD NAM Report (Barron) Update Figures 3 subtotal 3
Field Technician Annual NAM Sampling 13 (Slater) Load all equipment, materials and kit.
Calibrate equipment Collect GW samples from 6 monitor wells (MW001, MW014RR, MW016 MW031, MW034, and MW040) Measure DTW in 3 wells (MW005,, MW035, and MW045) Collect one QC sample Collect water IDW sample Stage and secure IDW Preparation of Chain-of-Custody Pack the samples Deliver samples for shipping Travel/ Mob/ Demob Truck for 1 day subtotal 13
Admin. / Clerical Corres., Mail, Fax, etc. 1 (Pichardo) subtotal 1
TOTAL LABOR 32
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Truck NAM sampling $97.00 day 1 $97.00 subtotal $97.00
TOTAL TRAVEL $97.00
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QA/QC TOTALS
Analytical Costs (Fixed Lab) VOH - 8260 (6 water samples +1 IDW +1QA/QC) 66.00$ 7 1 $528.00 subtotal $528.00
Shipping (small cooler overnight) 63.00$ 1 $63.00 subtotal $63.00
TOTAL LABORATORY $591.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Expendables Expendables $32.50 day 1 $32.50 subtotal $32.50
Other Shallow GW Sampling kit $208.55 day 1 $208.55 55-gallon Drum IDW Water $58.20 ea 1 $58.20 subtotal $266.75
TOTAL FIELD EXPENSES $299.25
C:\Users\Grubbs_B\HW551_AECOM\ERIC_4050_Classic_French\DC004P\TA\ CEFLOE_HW551_DC004P Page 3 of 4
SITE : Classic French
SUBTASK: 3 GIS
DATE: 19-Jan-21
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Geologist Prepare & Submit GIS Data Tables 1.25 (Rasberry) 7 water samples @ 8 min = 56 min
3 WLs @ 5 min = 15 min Total: 71 min
Rename & Submit ADaPT Data Report & Error Logs
TOTAL LABOR 1.25
TRAVEL
TYPE RATE UNIT USAGE TOTALS
subtotal $0.00
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (SERVICES) $0.00
C:\Users\Grubbs_B\HW551_AECOM\ERIC_4050_Classic_French\DC004P\TA\ CEFLOE_HW551_DC004P Page 4 of 4
AECOM
150 N. Orange Avenue Suite 200 Orlando, FL 32801 www.aecom.com
407-843-6552 tel 407-839-1789 fax
January 19, 2021
Mr. Ben Grubbs Florida Department of Environmental Protection Bureau of Waste Cleanup, MS 4520 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Classic French Cleaners 2021 Annual Natural Attenuation Monitoring Proposal 5539 W. Oakland Park, Blvd Lauderhill, Broward County, FL Facility ID # ERIC_4050 (069500171) Proposed Task Assignment HW551 DC004P
Dear Mr. Grubbs:
AECOM is pleased to submit this Scope of Services and the attached Level of Effort/Cost Estimate (LOE/CEF) forms to perform annual Natural Attenuation Monitoring (NAM). Active remediation by Soil Vapor Extraction was terminated on May 12, 2016. The most recent groundwater sampling, conducted on May 12, 2020, indicated that concentrations of volatile organic halocarbon (VOH) contaminants of concern were greater than their respective Groundwater Cleanup Target Levels (GCTLs) in on-site monitor wells MW001, MW016, and
MW034.
TASK 1 Project Management
Project management is calculated at 12.5 percent of the direct labor and includes associated fringe, overhead, ODC and completion fees.
TASK 2 2021 Annual Natural Attenuation Monitoring
Based on recommendations in the June 22, 2020 NAM report and the June 23, 2020 deliverable approval, AECOM proposes annual sampling of six monitoring wells. The wells will be analyzed for volatile organic halocarbons (VOHs) by EPA Method 8260 and screened for other NAM parameters in the field according to the following table:
Sample Location VOHs Field Screening (Temp, pH, SpC, redox, DO, turbidity)
MW001 (shallow well) X X MW014RR (shallow well) X X
Classic French Cleaners 2021 Groundwater Annual NAM Sampling Proposal Januaryy 19, 2021 Page 2
Sample Location VOHs Field Screening (Temp, pH, SpC, redox, DO, turbidity)
MW016 (Shallow well) X X MW031 (Deep well) X X MW034 (Intermediate well) X X MW040 (DDeep well) X X
AECOM will gauge depth to water at 3 additional monitor wells (MW005, MW035, and MW045) for groundwater flow determination. Sampling will be conducted in accordance with DEP-SOP- 002/01 FS 2200, and the appropriate quality control samples will be collected in accordance with Ch. 62-160, FAC. Well purge water will be containerized in a 55-gallon drum pending laboratory results. Purge water IDW has not exceeded GCTLs during previous sampling events and was later released to an impervious surface, therefore no IDW disposal costs are included in this proposal; however, they can be added by a change order, if required. AECOM will prepare a letter report documenting the results of the annual NAM sampling activities.
TASK 3 GIS & ADaPT Deliverables
For this task, AECOM will update the GIS data tables to include all annual NAM analytical, field screening and water level gauging data. The laboratory ADaPT electronic files will also be submitted for this subtask.
AECOM proposes the following invoice and deliverable schedule:
Task Cost Estimate Deliverable Date Task 1 - Project Management $507.83 NA Task 2 –Annual NAM $4,836.19 60 days from issuance of TA Task 3 – GIS & ADaPT $213.55 60 days from issuance of TA TOTAL $5,557.57 TA End Date: 120 days from issuance of TA
If you have any questions or require additional information, please contact me directly at (407) 513-8241 or by email at mark.rasberry@aecom.com.
Sincerely, Mark Rasberry, P.G. Jennifer Joyal, P.E.
Project Manager Associate Vice President
Enc:
Attachment 1 – Figure 3, Well Locations & 2020 Analytical Results Attachment 2 - LOE/CEF
PCE
TCE
Cis-D Trans
VC
5/12/20
4.0
0.89 U
1.3
0.73 U
0.71 U
PCE
TCE
Cis-D Trans
VC
5/12/20
0.76 U
0.89 U
1.9
0.73 U
0.71 U
PCE
TCE
Cis-D Trans
VC
5/12/20
8.9
0.89 U
0.53 U
0.73 U
0.71 U
PCE
TCE
Cis-D Trans
VC
5/12/20
0.76 U
0.89 U
0.53 U
0.73 U
0.71 U
PCE
TCE
Cis-D Trans
VC
5/12/20
0.76 U
0.89 U
0.60 I
0.73 U
9.4
6/2/2020
FIGURE 3
GROUNDWATER CONTAMINATION MAP
MAY 2020
CLASSIC FRENCH CLEANERS
5539 W.OAKLAND PK, BLVD., LAUDERHILL,BROWARD
ERIC_4050
60631240
PCE
TCE
Cis-D Trans
VC
5/12/20
AutoCAD SHX Text
MW001
AutoCAD SHX Text
MW016
AutoCAD SHX Text
MW005
AutoCAD SHX Text
MW014RR
AutoCAD SHX Text
MW004R
AutoCAD SHX Text
MW031
AutoCAD SHX Text
MW034
AutoCAD SHX Text
MW035
AutoCAD SHX Text N
AutoCAD SHX Text
DEEP MONITOR WELL
AutoCAD SHX Text
SHALLOW MONITOR WELL
AutoCAD SHX Text %%uLEGEND
AutoCAD SHX Text
ABANDONED/DESTROYED WELLS
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REVISED BY:
AutoCAD SHX Text p:\dcs\projects\env\fdep\hw551\dc\classic french\dc004o 2020 nam 60631240\900-cad- gis\910-cad\cad\f3_groundwater contam map.dwg
AutoCAD SHX Text
MAR
AutoCAD SHX Text
MAR
AutoCAD SHX Text GROUNDWATER CONTAMINATION >NADCs
AutoCAD SHX Text GROUNDWATER CONTAMINATION >GCTLs
AutoCAD SHX Text
TETRACHLOROETHENE
AutoCAD SHX Text
TRICHLOROETHENE
AutoCAD SHX Text Cis 1,2-DICHLOROETHENE
AutoCAD SHX Text Trans 1,2-DICHLOROETHENE
AutoCAD SHX Text
VINYL CHLORIDE
AutoCAD SHX Text 0'
AutoCAD SHX Text 50'
AutoCAD SHX Text
SCALE
AutoCAD SHX Text 25'
AutoCAD SHX Text 100'
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .