CN-370000-HW551-DC014M.pdf
PDF 1 MB Posted
- Contract number
- HW551
- Issued by
- Florida
About this file
This document is a Task Assignment Notification Form issued by the State of Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW551. The task assignment, numbered DC014M, authorizes AECOM Technical Services, Inc. (AECOM) to conduct well abandonment activities at the Ivy French Cleaners facility located at 7885 N Federal Highway, Boca Raton, Palm Beach County, Florida (DEP Site #ERIC_5122). The task was authorized by FDEP Project Manager Ben Grubbs, with Julie Cassetta serving as AECOM's project representative. The work is performed under a fixed-price contract structure with a May 12, 2021 execution date.
The task assignment authorizes AECOM to abandon eleven existing monitoring wells in accordance with the May 11, 2021 Scope of Work, Cost Estimate, and Bid Documentation. The work comprises two subtasks: Subtask 1 (Project Management) estimated at $367.10, and Subtask 2 (Monitoring Well Abandonment) estimated at $8,566.99, for a total task assignment value of $8,934.09 with no retainage. The final deliverable is a Well Abandonment Letter Report due August 10, 2021, with execution of the task assignment through October 10, 2021. Groundwater Protection was selected as the lowest responsive and responsible bidder among three competing contractors (JAEE Environmental Service at $5,738.00 and Earth Tech Drilling at $6,125.00). AECOM's cost estimate includes 31.2 direct labor hours for project management and engineering oversight, subcontractor drilling services ($4,983.00), travel expenses ($97.00), field expenses ($51.90), and other direct costs. Payment is contingent upon submittal and FDEP approval of the Well Abandonment Letter Report.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW551
D000 N/ADC014M
AECOM Technical Services, Inc. (AECOM)
Julie Cassetta
(850) 245-8992Ben Grubbs
ERIC_5122
Ivy French Cleaners
7885 N Federal Hwy, Boca Raton, Palm Beach
Deletion
This Task Assignment authorizes AECOM to conduct well abandonment activities in accordance with the May 11, 2021, Scope of Work, Cost Estimate, and Bid Documentation.
Well Abandonment Letter Report
08/10/2021
10/10/2021
$ 8,934.09 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.05.12 11:18:21 -04'00'
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.05.12 11:18:31 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.05.12 12:25:12 -04'00'
Joyal, Jennifer Digitally signed by Joyal, Jennifer Date: 2021.05.12 13:08:25 -05'00'
$ 8,934.09
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Well Abandonment Letter Report 08/10/2021
Subtasks 1 & 2: Submittal and FDEP approval of Well Abandonment Letter Report $ 8,934.09
$ 8,934.09
HW551
DC014M
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
To: HW551 Contract Negotiation File Ivy French Cleaners Boca Raton, Palm Beach County
ERIC_5122
From: Ben Grubbs, Project Manager Date: May 12, 2021 Subject: Negotiation Summary
HW551 DC014M
This Task Assignment authorizes AECOM to conduct well abandonment activities in accordance with the May 11, 2021, Scope of Work, Cost Estimate, and Bid Documentation.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Monitoring Well Abandonment AECOM will abandon the eleven existing monitoring wells. The steel manholes will be removed, and the ground surface will be restored to near its original condition. AECOM requested bids for well abandonment from JAEE Environmental Service, Groundwater Protection, and Earth Tech. Groundwater Protection was selected as the lowest responsive and responsible bidder. AECOM will submit the Well Abandonment Letter Report to FDEP.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $8,934.09 with 31.2 labor hours.
AECOM may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATE
Contractor: AECOM, Inc.
Date: 11-May-21
Task #: HW551 DC014M SubTask 1 Project Management SubTask 6
Site: Ivy French Cleaners SubTask 2 Well Abandonment SubTask 7
Activity/Phase: Closure SubTask 3 SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$56.30 Project Manager 2.2 2.2
$0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 Principal 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$65.51 Sr. Engineer (Joyal) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$32.97 Project Manager (Cassetta) 11.0 11.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$34.65 Engineer (Tran) 16.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$23.96 Administration / Clerical (Pichardo) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 31.2 2.2 29.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Direct Labor $1,132.36 $125.82 $1,006.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 38.57% $436.75 $48.53 $388.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 122.13% $1,382.95 $153.66 $1,229.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $2,952.06 $328.01 $2,624.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $56.62 $6.29 $50.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 2
FDEP COST ESTIMATEContractor: AECOM, Inc.
Date: 11-May-21
Task #: HW551 DC014M SubTask 1 Project Management SubTask 6
Site: Ivy French Cleaners SubTask 2 Well Abandonment SubTask 7
Activity/Phase: Closure SubTask 3 SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $4,983.00 $4,983.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $4,983.00 $4,983.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $498.30 $498.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $5,481.30 $5,481.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $19.40 $19.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $51.90 $51.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $8,638.88 $334.30 $8,304.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $295.21 $32.80 $262.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $8,934.09 $367.10 $8,566.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 3
SITE : Ivy French Cleaners SUBTASK: 2 Well Abandonment DATE: 11-May-21
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist Fieldwork Coordination 3 (Cassetta) Preparation of MW Abandonment Report 8 subtotal 11 Sr. Engineer (Joyal) MW Abandonment Report Review 1 subtotal 1
Engineer MW Abandonment Oversight 10 (Tran) Mobilization 6 subtotal 16
Admin. / Clerical Corres., Mail, Fax, etc. 1 (Pichardo) Subtotal 1
TOTAL LABOR 29
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Truck $97.00 day 1 $97.00 Lodging $0.00 night 0 $0.00 Per Diem $0.00 day 0 $0.00 subtotal $97.00
TOTAL TRAVEL $97.00
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
subtotal $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Grpundwater Prot. Mobilization $1,000.00 ls 1 $1,000.00
Per diem $200.00 night 1 $200.00 up to 2" Well Abandonme $6.00 per ft. 458 $2,748.00 2' x 2' Well Pad Removal $95.00 ea 8 $760.00 2' x 2' Pad Removal/soil $75.00 ea 2 $150.00 Removal 8-inch cap / fill $50.00 ea 1 $50.00 Bobcat w/ Jackhammer $500.00 ea 0 $0.00 Permits $75.00 ea 1 $75.00 subtotal $4,983.00
TOTAL SUBCONTRACTOR (SERVICES) $4,983.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QA/QC TOTALS
Analytical Costs (Fixed Lab) $0.00
TOTAL LABORATORY $0.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Expendables $32.50 day 1 $32.50 Water level Indicator $19.40 day 1 $19.40 subtotal $51.90
TOTAL FIELD EXPENSES $51.90
AECOM
150 N. Orange Avenue
Suite 200
Orlando, FL 32803 www.aecom.com
407 843 6552 tel
407 839 1789 fax
May 11, 2021
Mr. Ben Grubbs State of Florida Department of Environmental Protection Bureau of Waste Cleanup, MS 4520 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Monitoring Well Abandonment Proposal Ivy French Cleaners
7885 N. Federal Hwy.
Boca Raton, Palm Beach County, FL FDEP Facility ID ERIC_5122 Proposed Task Assignment # HW551-DC014M
Dear Mr: Grubbs
AECOM is pleased to submit this Scope of Services and the attached level of effort/cost estimate forms (LOE/CEF) to abandon the existing monitoring wells associated with site investigation and remedial activities at the above referenced site.
Sub-Task 1 Project Management
Project management is calculated at 12.5 percent of the direct labor and includes associated fringe, overhead, ODC and completion fees.
Sub-Task 2 Monitoring Well Abandonment
Based upon the FDEP’s recent approval of the Site Rehabilitation Completion Report, AECOM will sub-contract a licensed well driller to abandon all active FDEP-installed monitor wells for the assessment/remedial action of this property. SVE wells and vapor monitoring points associated with site remedial activities were either abandondoned prior to or destroyed during site re-developemnt in 2012. Refer to the following list of the wells to be abandoned:
POINT ID
Screen Interval Diameter Well
(feet bls) (inches) Status
MW003R2 15 to 20 1.5 Monitor MW007R 27 to 32 1.5 Monitor
MW007R1 35 to 40 1.0 Monitor
Ivy French Cleaners Well Abandonment Proposal May 11, 2021 Page 2
POINT ID
Screen Interval Diameter Well
(feet bls) (inches) Status
MW007D 45 to 50 2 Monitor MW008R 15 to 20 1.5 Monitor MW010 31 to 36 1 Monitor MW011 40 to 45 2 Monitor
MW011D 55 to 60 1 Monitor MW012 40 to 45 1 Monitor
MW013D 55 to 60 1 Monitor MW014D 45 to 50 1 Monitor
Monitor wells MW001, MW002, MW003, MW003R, MW004, MW005, MW006, MW007, MW008, and MW009 were identified as abandoned or destroyed, so abandonment cost is not included in this proposal. The concrete pads will be removed from all wells (asphalt parking lot, grass, or landscaped area). Wells installed in concrete or paver areas will have the manhole lid removed, the well grouted up, and the manhole filled with concrete flush to the surface.
AECOM proposes the following invoice and deliverable schedule:
Task Cost Estimate Deliverable Date
Sub-Task 1 - Project Management $367.10 NA
Sub-Task 2 – MW Abandonment/ Report $8,566.99 90 days after tasking
Total / Task Assignment Completion Date $8,934.09 120 days after tasking
The LOE/CEF is included as Attachment 1. A site map and quotes from three drilling firms for well abandonment are provided as Attachment 2. Should you have any questions or require additional information please contact Julie Cassetta directly at (407) 513-8214, or by email at julie.cassetta@aecom.com
Sincerely, AECOM Technical Services, Inc.
Julie Cassetta Jennifer Joyal, P.E.
Project Manager Associate Vice President
Attachment 1: LOE/CEFs
Attachment 2: Site Map & Drilling Firm Quotes
Description of Services JAEE GPI Earth Tech Drilling Monitor Well Abandonment $5,738.00 $4,983.00 $6,125.00
Total Cost Per Vendor $5,738.00 $4,983.00 $6,125.00 Low Bidder
Description of Services
Total Cost Per Vendor $0.00 $0.00 $0.00
Description of Services
Total Cost Per Vendor $0.00 $0.00 $0.00
Description of Services
Total Cost Per Vendor $0.00 $0.00 $0.00
Ivy Fench Cleaners
SUBCONTRACTOR BID SUMMARY FORM
Sonic Auger DPT Injection Well Abandonment
DATE: 4/12/2021
ESTIMATE #: GP 421026
ID QTY Unit Rate TOTAL
1 1 ls 1,000.00$ 1,000.00$
2 Per Diem 1 night 200.00$ 200.00$
3 458 foot 6.00$ 2,748.00$
4 8 each 95.00$ 760.00$
5 2 each 75.00$ 150.00$
6 1 each 50.00$ 50.00$
7 Bobcat w/Jackhammer Attachment (If Needed) 0 ls 500.00$ -$
8 Permits (Palm Beach County) 1 each 75.00$ 75.00$
Completion: 1 Day Subtotal 4,983.00$
Todd Hodgson Todd Hodgson TOTAL 4,983.00$ Partner
PROJECT
Ivy French Cleaners 7885 N. Federal Highway
CUSTOMER
Mark Rasberry
AECOM
Orlando, Florida 32801 Boca Raton, Palm Beach County,Florida 150 N. Orange Avenue, Ste. 200
(8) Removal of 8" Flush Manhole w/2' x 2' Pad w/Concrete Patch
(6) 1" AS Well Abandonment (Total of 291')
Well Abandonment(407) 513-8241
Up to 2" Well Abandonment (Total 458')
Removal 2' x 2' Concrete Pad w/8" Flush Manhole w/Soil Cap
DESCRIPTION
Mobilization
Project Description:
(2) 2" Well Abandonment (Total of 95')
(3) 1.5" Well Abandonment (Total of 72')
***Damage to utilities on private property during borehole clearance are the responsibility of the client***
Borehole Clearance to 5’ bgs beyond 30 minutes may require a change order for additional time.
***Utility Locates on Private Property are the responsibility of the client***
Offsite Disposal of Concrete/Completion Debris
(2) Removal of 8" Flush Manhole w/2' x 2' Pad w/Soil Patch
(1) Removal of 8" Flush Manhole Lid Fill with Concrete
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com
THANK YOU FOR YOUR BUSINESS!
"Actual quantities used and days onsite will be invoiced"
Removal 2' x 2' Concrete Pad w/8" Flush Manhole w/Concrete Cap
Removal 8" Ring/Lid Fill w/Concrete Cap
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.9742423
Date: 4/9/2021
FAC ID#:
PROPOSED SCOPE OF WORK:
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary____ Sonic_____ Other_X_ Well Abandonment
Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation) (includes decon)
HAND CLEARING to 5' BLS per foot $0.00 <50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes steamcleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Recovery Well Diameter: ______ per foot Double Cased Wells
4" Surface Casing per foot $0.00 6" Surface Casing per foot $0.00 8" Surface Casing per foot $0.00 per well $0.00
1"- 2" Well Abandonment (includes grouting) per foot $10.00 458 $4,580.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $85.00 10 $850.00
Mobilization roundtrip $375.00 1 $375.00
Per Diem per crew / per night $0.00 DOT Approved 55-gal Drum each $60.00 $0.00 Permits (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $85.00 2 $170.00 Permits (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $0.00 Traffic Safety Cones each $0.00 Debris disposal offsite ls $125.00 1 $125.00 Remove Lid and Fill Manhole with concrete each $25.00 1 $25.00 Additional Decontamination Time per hour $0.00 Standby/Delay/Difficult Access Time per hour $0.00
TOTAL QUOTE PRICE $6,125.00
Project No.: ________________________
Date: 4/9/2021Signature and Title of Person Submitting Quote: Charles Bucher
Well Completion (includes 30 minute development, 8" B-D manhole, concrete pad, locking well cap)
DRILLING
MISCELLANEOUS
Days to Complete Scope of Work: 1 Day
Subcontract Company Name: EARTH TECH DRILLING 954.974.2424
Subcontract Mailing Address: 2703 NW 19th St., Pompano Bch. FL 33069
Debris disposal offsite
Contractor Name: AECOM / Mark Rasberry / 407 513-8241
Site Name: Ivy French Cleaners - 7885 N Federal Hwy Boca Raton, Florida
Grout Abandon (2) 2" Wells = 95' Total
Grout Abandon (3) 1.5" Wells = 72' Total
Grout Abandon (6) 1" Wells = 291' Total
Remove Pads/Manholes & Patch w/ Concrete or Soil to fill void - (1) Well will leave pad/manhole remove lid and fill with concrete
Monitoring Wells Sparge Wells Horizontal and Vertical Vapor Extraction Wells Geotechnical Drilling Direct Push
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .