CN-370000-HW551-DC028G.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW551|33edafae2c3893eb7d47fe26a35025da
Contract number
HW551
Issued by
Florida

About this file

This document is a Task Assignment Notification Form for contract HW551 under the Florida Department of Environmental Protection (FDEP). The task assignment (DC028G) is awarded to AECOM Technical Services, Inc., with Mark Rasberry serving as the contractor representative and Billy Hessman as the FDEP Contract Manager. The work is being performed at the Drycleaning Art Inc. site located at 3337 Sheridan Street, Hollywood, Broward County, Florida (DEP Site #ERIC_4061). The task assignment is part of the monitoring phase of environmental remediation activities at this contaminated site.

The task assignment requires AECOM to conduct groundwater sampling and prepare a Groundwater Monitoring Report in accordance with an April 2020 scope of work and cost proposal. The work is structured in three subtasks: Project Management (calculated at 12.5 percent of direct labor), Groundwater Sampling (sampling at six monitoring wells for volatile organic halocarbon analysis via EPA Method 8260), and GIS Update (generating and submitting updated GIS/ADaPT data files). The total fixed-price task assignment value is $5,557.57, with the final deliverable due by August 7, 2020, and overall task completion by October 30, 2020. Invoice payment is contingent upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report. No retainage is applied to this task assignment.

View the file

Other files

File Type Posted
CN-370000-HW551-A4.pdf PDF
CN-370000-HW551-DC004O.pdf PDF
CN-370000-HW551-DC005G.pdf PDF
CN-370000-HW551-DC010K.pdf PDF
CN-370000-HW551-DC010L.pdf PDF
CN-370000-HW551-DC014H.pdf PDF
CN-370000-HW551-DC014M.pdf PDF
CN-370000-HW551-DC017F.pdf PDF
CN-370000-HW551-DC01ACO7.pdf PDF
CN-370000-HW551-DC02ECO3.pdf PDF
CN-370000-HW551-DC02ECO4.pdf PDF
CN-370000-HW551-DC02F.pdf PDF
CN-370000-HW551-DC02G.pdf PDF
CN-370000-HW551-DC02H.pdf PDF
CN-370000-HW551-DC02HCO1.pdf PDF
CN-370000-HW551-DC02KCO1.pdf PDF
CN-370000-HW551-DC030B.pdf PDF
CN-370000-HW551-DC033B.pdf PDF
CN-370000-HW551-DC03DCO1.pdf PDF
CN-370000-HW551-DC04ECO2.pdf PDF
CN-370000-HW551-DC04GCO2.pdf PDF
CN-370000-HW551-DC04HCO6.pdf PDF
CN-370000-HW551-DC04LCO1.pdf PDF
CN-370000-HW551-DC04P.pdf PDF
CN-370000-HW551-DC05C.pdf PDF
CN-370000-HW551-DC05DCO1.pdf PDF
CN-370000-HW551-DC05ECO3.pdf PDF
CN-370000-HW551-DC05ECO4.pdf.crdownload CRDOWNLOAD file
CN-370000-HW551-DC05Eco2.pdf PDF
CN-370000-HW551-DC06ECO1.pdf PDF
CN-370000-HW551-DC06FCO1.pdf PDF
CN-370000-HW551-DC07F.pdf PDF
CN-370000-HW551-DC07HCO1.pdf PDF
CN-370000-HW551-DC08CCO1.pdf PDF
CN-370000-HW551-DC08D.pdf PDF
CN-370000-HW551-DC08ECO1.pdf PDF
CN-370000-HW551-DC08H.pdf PDF
CN-370000-HW551-DC10CCO1.pdf PDF
CN-370000-HW551-DC10CCO3.pdf PDF
CN-370000-HW551-DC10DCO4.pdf PDF
CN-370000-HW551-DC10E.pdf PDF
CN-370000-HW551-DC10F.pdf PDF
CN-370000-HW551-DC10HCO1.pdf PDF
CN-370000-HW551-DC10HCO3.pdf PDF
CN-370000-HW551-DC10MCO1.pdf PDF
CN-370000-HW551-DC11CCO1.pdf PDF
CN-370000-HW551-DC11GCO2.pdf PDF
CN-370000-HW551-DC11HCO1.pdf PDF
CN-370000-HW551-DC12C.pdf PDF
CN-370000-HW551-DC12CCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW551

D000 NADC028G

AECOM Technical Services, Inc. (AECOM)

Mark Rasberry

850-245-8972Billy Hessman

ERIC_4061

Drycleaning Art Inc

3337 Sheridan St, Hollywood, Broward Co

Monitoring

AECOM will conduct groundwater sampling in accordance with the April 2020 scope of work and cost proposal.

Groundwater Monitoring Report will be generated.

Groundwater Monitoring Report

08/07/2020

10/30/2020

$ 5,557.57 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Billy Hessman Digitally signed by Billy Hessman Date: 2020.04.01 11:26:04 -04'00'

Billy Hessman Digitally signed by Billy Hessman Date: 2020.04.01 11:26:10 -04'00'

Digitally signed by Jennifer Farrell Date: 2020.04.01 15:57:43 -04'00'

Digitally signed by Rasberry, Mark DN: cn=Rasberry, Mark, ou=USORL3 Date: 2020.04.02 12:20:42 -04'00'

Rasberry, Mark

$ 5,557.57

Rasberry, Mark Joyal

Rasberry, Mark Joyal

Rasberry, Mark Typewriter 4/2/2020

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report 08/07/2020

Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report $ 5,557.57

$ 5,557.57

HW551

DC028G

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

TO: HW551 Contract File Drycleaning Art Inc

ERIC_4061

FROM: Billy Hessman, Contract Manager

DATE: April 1, 2020

SUBJECT: Task Assignment Summary

HW551 DC028G

Groundwater Monitoring

This Task Assignment is for AECOM to conduct groundwater sampling. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: Groundwater Sampling Groundwater sampling will be conducted at 6 monitoring wells. All samples will be analyzed for the presence of VOHs by EPA Method 8260. Following receipt of analytical data, a Groundwater Monitoring Report will be prepared and submitted to FDEP. Report will include field notes, sampling logs, lab report, and recommendations.

Subtask 3: GIS Update Subtask 3 includes labor hours for AECOM to generate and submit updated GIS/ADaPT data files.

This work will be conducted in line with the scope of work included in the GHD proposal, received April 1, 2020.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is August 7, 2020, and the completion date for the task assignment is October 30, 2020.

The final cost total for Task Assignment DC028G is $5,557.57.

FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.

Date: 1-Apr-20

Task #: HW551 - DC028G SubTask 1 Project Management SubTask 6

Site: Drycleaning Art SubTask 2 2020 Annual NAM SubTask 7

Activity/Phase: NAM SubTask 3 GIS SubTask 8

Project Manager: Mark Rasberry SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$56.30 Project Manager (Rasberry) 3.1 3.1 $0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$56.30 Sr. Geologist (Rasberry) 15.3 14.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $65.51 Sr. Engineer (Joyal) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Geologist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Engineer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$34.50 CAD Designer (Barron) 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Field Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$26.00 Field Technician (Slater) 13.0 13.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Field Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Supervisor 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Senior Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 O&M Specialist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

$23.96 Administration / Clerical (Pichardo) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Total Hours 36.4 3.1 32.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Direct Labor $1,566.41 $174.05 $1,319.17 $73.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 38.57% $604.16 $67.13 $508.80 $28.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 122.13% $1,913.06 $212.57 $1,611.10 $89.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,083.63 $453.75 $3,439.07 $190.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $78.32 $8.70 $65.96 $3.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 04/10 CEF AECOM Page 1

FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.

Date: 1-Apr-20

Task #: HW551 - DC028G SubTask 1 Project Management SubTask 6

Site: Drycleaning Art SubTask 2 2020 Annual NAM SubTask 7

Activity/Phase: NAM SubTask 3 GIS SubTask 8

Project Manager: Mark Rasberry SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $528.00 $528.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $591.00 $591.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $299.25 $299.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $5,149.20 $462.45 $4,492.28 $194.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $408.37 $45.38 $343.91 $19.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $5,557.57 $507.83 $4,836.19 $213.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 04/10 CEF AECOM Page 2

SITE : Drycleaning Art SUBTASK: 2 2020 Annual NAM DATE: 1-Apr-20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Geologist 2020 NAM Sampling 14 (Rasberry) Order/ receive & inspect sample containers

Coordinate with owner Prepare field request Review field data documentation Review Updated Figures and Tables Coordinate IDW disposal Prepare NAM Report Sign and Seal Report subtotal 14

Sr. Engineer 2020 NAM Sampling (Joyal) Sr. Review of NAM Report 1 subtotal 1

CAD NAM Report (Barron) Update Figures 3 subtotal 3

Technician 2020 NAM Sampling (Slater) Collect GW samples from 6 monitor wells 13

Water table elevation gauging (9MWs total) Calibrate equipment Collect one duplicate and 1 IDW sample Preparation of Chain-of-Custody Pack the samples Deliver samples for shipping Travel/ Mob/ Demob subtotal 13

Admin. / Clerical Corres., Mail, Fax, etc. 1 (Pichardo) subtotal 1

TOTAL LABOR 32

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental Truck sampling $97.00 day 1 $97.00 subtotal $97.00

Per Diem + Hotel Per Diem $36.00 0 days $0.00 Hotel 0 days $0.00 subtotal $0.00

TOTAL TRAVEL $97.00

P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\DC Art Inc\DC028G 2020 NAM_project number\000-Pre-Contract\040 Proposal\ DC Art 2020 NAM LOECEF.xlsx Page 1 of 3

SUBTASK: 2 2020 Annual NAM DATE: 1-Apr-20

SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

subtotal $0.00

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional) IDW Disposal TBD Drum Disposal $0.00 drum 0 $0.00

(Add by TACO) subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QA/QC TOTALS

Analytical Costs (Fixed Lab) VOH - 8260 (6 samples +1 IDW + 1 duplicate) 66.00$ 7 1 $528.00 subtotal $528.00 Analytical Costs (Fixed Lab) Shipping (small cooler overnight) 63.00$ 1 $63.00 subtotal $63.00

TOTAL LABORATORY $591.00

FIELD EXPENSES

ITEM RATE UNIT USAGE TOTALS

Expendables Expendables $32.50 day 1 $32.50 subtotal $32.50 IDW Realated Drum $58.20 each 1 $58.20 subtotal $58.20 Other Monitor Well Installation Kit $184.30 day 0 $0.00 Shallow GW Sampling kit $208.55 day 1 $208.55 subtotal $208.55

TOTAL FIELD EXPENSES $299.25

P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\DC Art Inc\DC028G 2020 NAM_project number\000-Pre-Contract\040 Proposal\ DC Art 2020 NAM LOECEF.xlsx Page 2 of 3

SUBTASK: 3 GIS

DATE: 1-Apr-20

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Geologist Prepare & Submit GIS Data Tables 1.25 (Rasberry) Task 2: 7 samples @ 8 min = 56 min (6 MWs, 1 Duplicate)

Task 2: (9-6) 3 WLs @ 5 min = 15 min Total: 69 min

Rename & Submit ADaPT Data Report & Error Logs

TOTAL LABOR 1.25

TRAVEL

TYPE RATE UNIT USAGE TOTALS

Vehicle Rental subtotal $0.00

Mileage Costs subtotal $0.00

Air Fare subtotal $0.00

Per Diem + Hotel subtotal $0.00 subtotal $0.00

SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00

SUBCONTRACTOR (SERVICES PROCUREMENT)

NAME PURPOSE RATE UNIT USAGE TOTALS

Drilling (Conventional) subtotal $0.00 Drilling (Non-Conventional) subtotal $0.00 Mobile Laboratory subtotal $0.00 Surveying subtotal $0.00

IDW

subtotal $0.00 Other subtotal $0.00

TOTAL SUBCONTRACTOR (SERVICES) $0.00

P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\DC Art Inc\DC028G 2020 NAM_project number\000-Pre-Contract\040 Proposal\ DC Art 2020 NAM LOECEF.xlsx Page 3 of 3

AECOM

150 N. Orange Avenue Suite 200 Orlando, Florida 32801 www.aecom.com

407 843 6552 tel 407 839 1789 fax

April 1, 2020

Mr. Billy Hessman State of Florida Department of Environmental Protection Bureau of Waste Cleanup, MS 4520 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: 2020 Annual Natural Attenuation Monitoring Proposal Drycleaning Art Inc. (aka Park Sheridan Cleaners) 3337 Sheridan Street, Hollywood, Broward County, Florida 33021 FDEP Site No. 069500320, ERIC_4061 Proposed FDEP Task Assignment #DC028G

Dear Mr. Hessman:

AECOM is pleased to submit this proposal and Level of Effort/Cost Estimate Forms (LOE/CEF) to conduct an Annual Natural Attenuation Monitoring (NAM) groundwater sampling event at the above referenced site. The most recent sampling event was conducted on August 12, 2019.

TASK 1 – Project Management

Project management is calculated at 12.5 percent of the direct labor and includes associated fringe, overhead, ODC and completion fees.

TASK 2 –2020 Annual NAM

Based on recommendations in the August 26, 2019 NAM report and the October 25, 2019 approval letter, AECOM proposes to sample six monitor wells in the annual NAM groundwater sampling event. Samples will be analyzed for volatile organic halocarbons (VOHs) via EPA Method 8260 and screened for other NAM parameters in the field according to the following table:

Well ID Screened Interval

VOHs

Field Screening (Temp, pH, SpC, redox, DO, turbidity)

MW001 3-13 X X

MW002 2-12 X X

MW005 3-13 X X

MW007 25-30 X X

MW008 3-13 X X

MW009 3-13 X X

Drycleaning Art, 2020 NAM Proposal April 1, 2020 Page 2

Sampling will be conducted in accordance with DEP-SOP-002/01 FS 2200, and a duplicate sample will be collected for quality control purposes. Water level measurements will be recorded from all nine existing monitor wells for a determination of the shallow groundwater flow direction across the site. The well locations and previous sampling results are provided in Attachment 1, Figure 3 from the 2019 NAM Report. Purge water will be temporarily stored on-site in a 55-gallon drum pending characterization to determine the proper disposal method. No IDW disposal costs are included in this proposal; however, they can be added via change order, if required. AECOM will prepare a letter report documenting the analytical results and present recommendations for additional work.

TASK 3 – GIS & ADaPT Deliverables

AECOM will update the GIS data tables to include lab analytical data, field screening, and water level gauging data. The laboratory ADaPT electronic files will also be submitted for this subtask.

AECOM proposes the following invoice and deliverable schedule:

Task Proposed Total Proposed Schedule

Task 1: Project Management $507.83 NA Task 2: 2020 Annual NAM & Report $4,836.19 90 days from tasking Task 3: GIS & ADaPT Data $213.55 90 days from tasking Total / Completion Date $5,557.57 120 days from tasking

The LOE/CEF is included as Attachment 2. Should you have any questions, or require additional information, please contact Mark Rasberry directly at (407) 513-8241, or via email at mark.rasberry@aecom.com.

Sincerely, AECOM Technical Services, Inc.

Mark Rasberry, P.G. Jennifer Joyal, P.E.

Project Manager Associate Vice President

Enc:

Attachment 1 – Figure 3, 2019 NAM Analytical Results Attachment 2 – LOE / CEF

DRY CLEANING ART

CLEANERS

8/12/2019

2.7

0.2 U

0.32 I

0.2 U

0.2 U

8/12/2019

0.56 I

0.2 U

2.9

8/12/2019

0.2 U

0.2 U

0.64 I

0.2 U

0.2 U

8/12/2019

0.2 U

0.2 U

0.2 U

0.2 U

0.2 U

8/12/2019

0.2 U

0.2 U

0.2 U

0.2 U

0.2 U

8/21/2019

FIGURE 3

GROUNDWATER CONTAMINATION MAP

AUGUST 2019

DRY CLEANING ART (PARK SHERIDAN CLEANERS)

3337 SHERIDAN ST., HOLLYWOOD, BROWARD COUNTY, FL

FDEP FACILITY ID NO.: ERIC_4061

60608655

DATE

TETRACHLOROETHENE

TRICHLOROETHENE

cis-1,2-DICHLOROETHENE trans-1,2-DICHLOROETHENE

7/8/2019

VINYL CHLORIDE

NOTES:

· RESULTS SHOWN IN µg/L

· U = INDICATES THAT THE CHEMICAL OF CONCERN WAS UNDETECTED

· I = INDICATES THE CHEMICAL WAS DETECTED BUT BELOW THE

REPORTING LIMIT; THEREFORE, AN ESTIMATED VALUE

· D = DATA REPORTED FROM A DILUTION

· GCTL = GROUNDWATER CLEANUP TARGET LEVELS AS PROVIDED IN

62-777, F.A.C.

· BOLD INDICATES ANALYTE DETECTED

· BOLD BLUE INDICATES CONCENTRATION GREATER THAN GCTLs

LEGEND

SHALLOW MONITOR WELL

INTERMEDIATE MONITOR WELL

ABANDONED MONITOR WELL

ERIC_4061 Drycleaning Art 2020 NAM Proposal.pdf
Sheets and Views
F3_GW CONTAM MAP-Layout1

File details come from the government source that posted it. Updated .