This document is a Task Assignment Notification Form for contract HW551 under the Florida Department of Environmental Protection (FDEP). The task assignment (DC028G) is awarded to AECOM Technical Services, Inc., with Mark Rasberry serving as the contractor representative and Billy Hessman as the FDEP Contract Manager. The work is being performed at the Drycleaning Art Inc. site located at 3337 Sheridan Street, Hollywood, Broward County, Florida (DEP Site #ERIC_4061). The task assignment is part of the monitoring phase of environmental remediation activities at this contaminated site.
The task assignment requires AECOM to conduct groundwater sampling and prepare a Groundwater Monitoring Report in accordance with an April 2020 scope of work and cost proposal. The work is structured in three subtasks: Project Management (calculated at 12.5 percent of direct labor), Groundwater Sampling (sampling at six monitoring wells for volatile organic halocarbon analysis via EPA Method 8260), and GIS Update (generating and submitting updated GIS/ADaPT data files). The total fixed-price task assignment value is $5,557.57, with the final deliverable due by August 7, 2020, and overall task completion by October 30, 2020. Invoice payment is contingent upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report. No retainage is applied to this task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW551
D000 NADC028G
AECOM Technical Services, Inc. (AECOM)
Mark Rasberry
850-245-8972Billy Hessman
ERIC_4061
Drycleaning Art Inc
3337 Sheridan St, Hollywood, Broward Co
Monitoring
AECOM will conduct groundwater sampling in accordance with the April 2020 scope of work and cost proposal.
Groundwater Monitoring Report will be generated.
Groundwater Monitoring Report
08/07/2020
10/30/2020
$ 5,557.57 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Billy Hessman Digitally signed by Billy Hessman Date: 2020.04.01 11:26:04 -04'00'
Billy Hessman Digitally signed by Billy Hessman Date: 2020.04.01 11:26:10 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.04.01 15:57:43 -04'00'
Digitally signed by Rasberry, Mark DN: cn=Rasberry, Mark, ou=USORL3 Date: 2020.04.02 12:20:42 -04'00'
Rasberry, Mark
$ 5,557.57
Rasberry, Mark Joyal
Rasberry, Mark Joyal
Rasberry, Mark Typewriter 4/2/2020
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 08/07/2020
Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report $ 5,557.57
$ 5,557.57
HW551
DC028G
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
TO: HW551 Contract File Drycleaning Art Inc
ERIC_4061
FROM: Billy Hessman, Contract Manager
DATE: April 1, 2020
SUBJECT: Task Assignment Summary
HW551 DC028G
Groundwater Monitoring
This Task Assignment is for AECOM to conduct groundwater sampling. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.
Subtask 2: Groundwater Sampling Groundwater sampling will be conducted at 6 monitoring wells. All samples will be analyzed for the presence of VOHs by EPA Method 8260. Following receipt of analytical data, a Groundwater Monitoring Report will be prepared and submitted to FDEP. Report will include field notes, sampling logs, lab report, and recommendations.
Subtask 3: GIS Update Subtask 3 includes labor hours for AECOM to generate and submit updated GIS/ADaPT data files.
This work will be conducted in line with the scope of work included in the GHD proposal, received April 1, 2020.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is August 7, 2020, and the completion date for the task assignment is October 30, 2020.
The final cost total for Task Assignment DC028G is $5,557.57.
FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.
Date: 1-Apr-20
Task #: HW551 - DC028G SubTask 1 Project Management SubTask 6
Site: Drycleaning Art SubTask 2 2020 Annual NAM SubTask 7
Activity/Phase: NAM SubTask 3 GIS SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$56.30 Project Manager (Rasberry) 3.1 3.1 $0.00 Officer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$56.30 Sr. Geologist (Rasberry) 15.3 14.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $65.51 Sr. Engineer (Joyal) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Geologist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Engineer 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Scientist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$34.50 CAD Designer (Barron) 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Field Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$26.00 Field Technician (Slater) 13.0 13.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Field Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Manager 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Supervisor 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Senior Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 Construction Technician 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 O&M Specialist 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
$23.96 Administration / Clerical (Pichardo) 1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Hours 36.4 3.1 32.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Direct Labor $1,566.41 $174.05 $1,319.17 $73.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 38.57% $604.16 $67.13 $508.80 $28.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 122.13% $1,913.06 $212.57 $1,611.10 $89.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $4,083.63 $453.75 $3,439.07 $190.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $78.32 $8.70 $65.96 $3.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 1
FDEP COST ESTIMATEContractor: AECOM Technical Services, Inc.
Date: 1-Apr-20
Task #: HW551 - DC028G SubTask 1 Project Management SubTask 6
Site: Drycleaning Art SubTask 2 2020 Annual NAM SubTask 7
Activity/Phase: NAM SubTask 3 GIS SubTask 8
Project Manager: Mark Rasberry SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $528.00 $528.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $591.00 $591.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $299.25 $299.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,149.20 $462.45 $4,492.28 $194.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $408.37 $45.38 $343.91 $19.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $5,557.57 $507.83 $4,836.19 $213.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 04/10 CEF AECOM Page 2
SITE : Drycleaning Art SUBTASK: 2 2020 Annual NAM DATE: 1-Apr-20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Geologist 2020 NAM Sampling 14 (Rasberry) Order/ receive & inspect sample containers
Coordinate with owner Prepare field request Review field data documentation Review Updated Figures and Tables Coordinate IDW disposal Prepare NAM Report Sign and Seal Report subtotal 14
Sr. Engineer 2020 NAM Sampling (Joyal) Sr. Review of NAM Report 1 subtotal 1
CAD NAM Report (Barron) Update Figures 3 subtotal 3
Technician 2020 NAM Sampling (Slater) Collect GW samples from 6 monitor wells 13
Water table elevation gauging (9MWs total) Calibrate equipment Collect one duplicate and 1 IDW sample Preparation of Chain-of-Custody Pack the samples Deliver samples for shipping Travel/ Mob/ Demob subtotal 13
Admin. / Clerical Corres., Mail, Fax, etc. 1 (Pichardo) subtotal 1
TOTAL LABOR 32
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental Truck sampling $97.00 day 1 $97.00 subtotal $97.00
Per Diem + Hotel Per Diem $36.00 0 days $0.00 Hotel 0 days $0.00 subtotal $0.00
TOTAL TRAVEL $97.00
P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\DC Art Inc\DC028G 2020 NAM_project number\000-Pre-Contract\040 Proposal\ DC Art 2020 NAM LOECEF.xlsx Page 1 of 3
SUBTASK: 2 2020 Annual NAM DATE: 1-Apr-20
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
subtotal $0.00
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional) IDW Disposal TBD Drum Disposal $0.00 drum 0 $0.00
(Add by TACO) subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QA/QC TOTALS
Analytical Costs (Fixed Lab) VOH - 8260 (6 samples +1 IDW + 1 duplicate) 66.00$ 7 1 $528.00 subtotal $528.00 Analytical Costs (Fixed Lab) Shipping (small cooler overnight) 63.00$ 1 $63.00 subtotal $63.00
TOTAL LABORATORY $591.00
FIELD EXPENSES
ITEM RATE UNIT USAGE TOTALS
Expendables Expendables $32.50 day 1 $32.50 subtotal $32.50 IDW Realated Drum $58.20 each 1 $58.20 subtotal $58.20 Other Monitor Well Installation Kit $184.30 day 0 $0.00 Shallow GW Sampling kit $208.55 day 1 $208.55 subtotal $208.55
TOTAL FIELD EXPENSES $299.25
P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\DC Art Inc\DC028G 2020 NAM_project number\000-Pre-Contract\040 Proposal\ DC Art 2020 NAM LOECEF.xlsx Page 2 of 3
SUBTASK: 3 GIS
DATE: 1-Apr-20
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Geologist Prepare & Submit GIS Data Tables 1.25 (Rasberry) Task 2: 7 samples @ 8 min = 56 min (6 MWs, 1 Duplicate)
Task 2: (9-6) 3 WLs @ 5 min = 15 min Total: 69 min
Rename & Submit ADaPT Data Report & Error Logs
TOTAL LABOR 1.25
TRAVEL
TYPE RATE UNIT USAGE TOTALS
Vehicle Rental subtotal $0.00
Mileage Costs subtotal $0.00
Air Fare subtotal $0.00
Per Diem + Hotel subtotal $0.00 subtotal $0.00
SUBCONTRACTOR (EQUIP & MATERIAL PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
TOTAL SUBCONTRACTOR (EQUIPMENT) $0.00
SUBCONTRACTOR (SERVICES PROCUREMENT)
NAME PURPOSE RATE UNIT USAGE TOTALS
Drilling (Conventional) subtotal $0.00 Drilling (Non-Conventional) subtotal $0.00 Mobile Laboratory subtotal $0.00 Surveying subtotal $0.00
IDW
subtotal $0.00 Other subtotal $0.00
TOTAL SUBCONTRACTOR (SERVICES) $0.00
P:\DCS\Projects\ENV\FDEP\PRP\HW551\DC\DC Art Inc\DC028G 2020 NAM_project number\000-Pre-Contract\040 Proposal\ DC Art 2020 NAM LOECEF.xlsx Page 3 of 3
AECOM
150 N. Orange Avenue Suite 200 Orlando, Florida 32801 www.aecom.com
407 843 6552 tel 407 839 1789 fax
April 1, 2020
Mr. Billy Hessman State of Florida Department of Environmental Protection Bureau of Waste Cleanup, MS 4520 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: 2020 Annual Natural Attenuation Monitoring Proposal Drycleaning Art Inc. (aka Park Sheridan Cleaners) 3337 Sheridan Street, Hollywood, Broward County, Florida 33021 FDEP Site No. 069500320, ERIC_4061 Proposed FDEP Task Assignment #DC028G
Dear Mr. Hessman:
AECOM is pleased to submit this proposal and Level of Effort/Cost Estimate Forms (LOE/CEF) to conduct an Annual Natural Attenuation Monitoring (NAM) groundwater sampling event at the above referenced site. The most recent sampling event was conducted on August 12, 2019.
TASK 1 – Project Management
Project management is calculated at 12.5 percent of the direct labor and includes associated fringe, overhead, ODC and completion fees.
TASK 2 –2020 Annual NAM
Based on recommendations in the August 26, 2019 NAM report and the October 25, 2019 approval letter, AECOM proposes to sample six monitor wells in the annual NAM groundwater sampling event. Samples will be analyzed for volatile organic halocarbons (VOHs) via EPA Method 8260 and screened for other NAM parameters in the field according to the following table:
Well ID Screened Interval
VOHs
Field Screening (Temp, pH, SpC, redox, DO, turbidity)
MW001 3-13 X X
MW002 2-12 X X
MW005 3-13 X X
MW007 25-30 X X
MW008 3-13 X X
MW009 3-13 X X
Drycleaning Art, 2020 NAM Proposal April 1, 2020 Page 2
Sampling will be conducted in accordance with DEP-SOP-002/01 FS 2200, and a duplicate sample will be collected for quality control purposes. Water level measurements will be recorded from all nine existing monitor wells for a determination of the shallow groundwater flow direction across the site. The well locations and previous sampling results are provided in Attachment 1, Figure 3 from the 2019 NAM Report. Purge water will be temporarily stored on-site in a 55-gallon drum pending characterization to determine the proper disposal method. No IDW disposal costs are included in this proposal; however, they can be added via change order, if required. AECOM will prepare a letter report documenting the analytical results and present recommendations for additional work.
TASK 3 – GIS & ADaPT Deliverables
AECOM will update the GIS data tables to include lab analytical data, field screening, and water level gauging data. The laboratory ADaPT electronic files will also be submitted for this subtask.
AECOM proposes the following invoice and deliverable schedule:
Task Proposed Total Proposed Schedule
Task 1: Project Management $507.83 NA Task 2: 2020 Annual NAM & Report $4,836.19 90 days from tasking Task 3: GIS & ADaPT Data $213.55 90 days from tasking Total / Completion Date $5,557.57 120 days from tasking
The LOE/CEF is included as Attachment 2. Should you have any questions, or require additional information, please contact Mark Rasberry directly at (407) 513-8241, or via email at mark.rasberry@aecom.com.
Sincerely, AECOM Technical Services, Inc.
Mark Rasberry, P.G. Jennifer Joyal, P.E.
Project Manager Associate Vice President
Enc:
Attachment 1 – Figure 3, 2019 NAM Analytical Results Attachment 2 – LOE / CEF
DRY CLEANING ART
CLEANERS
8/12/2019
2.7
0.2 U
0.32 I
0.2 U
0.2 U
8/12/2019
0.56 I
0.2 U
2.9
8/12/2019
0.2 U
0.2 U
0.64 I
0.2 U
0.2 U
8/12/2019
0.2 U
0.2 U
0.2 U
0.2 U
0.2 U
8/12/2019
0.2 U
0.2 U
0.2 U
0.2 U
0.2 U
8/21/2019
FIGURE 3
GROUNDWATER CONTAMINATION MAP
AUGUST 2019
DRY CLEANING ART (PARK SHERIDAN CLEANERS)
3337 SHERIDAN ST., HOLLYWOOD, BROWARD COUNTY, FL
FDEP FACILITY ID NO.: ERIC_4061
60608655
DATE
TETRACHLOROETHENE
TRICHLOROETHENE
cis-1,2-DICHLOROETHENE trans-1,2-DICHLOROETHENE
7/8/2019
VINYL CHLORIDE
NOTES:
· RESULTS SHOWN IN µg/L
· U = INDICATES THAT THE CHEMICAL OF CONCERN WAS UNDETECTED
· I = INDICATES THE CHEMICAL WAS DETECTED BUT BELOW THE
REPORTING LIMIT; THEREFORE, AN ESTIMATED VALUE
· D = DATA REPORTED FROM A DILUTION
· GCTL = GROUNDWATER CLEANUP TARGET LEVELS AS PROVIDED IN
62-777, F.A.C.
· BOLD INDICATES ANALYTE DETECTED
· BOLD BLUE INDICATES CONCENTRATION GREATER THAN GCTLs
LEGEND
SHALLOW MONITOR WELL
INTERMEDIATE MONITOR WELL
ABANDONED MONITOR WELL
| ERIC_4061 Drycleaning Art 2020 NAM Proposal.pdf |
| Sheets and Views |
| F3_GW CONTAM MAP-Layout1 |
File details come from the government source that posted it. Updated .