This is Amendment No. 9 to the DEP Agency Term Contract No. GC871, a rate increase amendment executed between the Florida Department of Environmental Protection (FDEP) and Kimberly Ann Brown and Associates, Inc. The original contract was executed on February 27, 2014, to provide petroleum contamination site response action services in the South Region. The amendment was processed and became effective on June 19, 2020, following departmental data processing and authorization by both parties.
Amendment No. 9 modifies rates for 168 pay items within the contract's comprehensive rate schedule (Attachment D, Version 3.2), which encompasses services spanning site assessments, drilling and boring, well installation and abandonment, sample collection, laboratory analysis, soil source removal, remedial action construction, pilot testing, system operations and maintenance, reports, and professional engineering and geology services. The rate changes apply exclusively to new work assignments offered on or after the Rate Change Date (June 19, 2020) while pre-rate change work assignments continue under the previous rate schedule. Rate adjustments vary by line item, with changes ranging from decreases of up to 28.88 percent to increases of up to 5.00 percent, reflecting the contractor's justified requests that did not exceed the maximum 5.00 percent increase allowed under contract provision 11.B.ii. All other terms and conditions of the original contract remain in effect, and the amended schedule maintains the reimbursable cost structure and percentage surcharge provisions for laboratory turnaround time options.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.1) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC871 (hereinafter "Contract") between the FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and KIMBERLY
ANN BROWN AND ASSOCIATES, INC. (hereinafter "Contractor") executed on February 27, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC871
RATE INCREASE
AMENDMENT NO. 9
Amendment No. 9
DEP Agency Term Contract No. GC871
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
NOW THEREFORE, the parties agree as follows:
Amendment No. 9
DEP Agency Term Contract No. GC871
4.
5.
6.
Attachment D, Rate Schedule (V3.2) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this
Amendment, Attachment D, Rate schedule (V3.2) shall apply.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s
Data Processing Information. Prior to the Rate Change Date, the Department shall provide
Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date and prior to the Rate Change Date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this
Amendment shall control.
Pre-existing
Rate
Agreed
New Rate (1)
750.00$ $ 700.00
987.00$ $ 900.00
348.86$ $ 366.30
397.26$ $ 417.12
850.00$ $ 750.00
1,020.00$ $ 950.00
241.50$ $ 253.57
619.50$ $ 650.47
934.50$ $ 981.22
1,522.50$ $ 1,598.62
690.00$ $ 650.00
1,035.00$ $ 900.00
12,000.00$ $ 12,600.00
500.00$ $ 450.00
675.00$ $ 625.00
500.00$ $ 425.00
700.00$ $ 625.00
108.67$ $ 114.10
120.75$ $ 126.78
1,837.50$ $ 1,929.37
+5.00%
+4.99%
+5.00%
+5.00%
+5.00%
-5.80%
-13.04%
+5.00%
-10.00%
-7.41%
-15.00%
-10.71%
5-1.b.
5-2.
5-3.a.
Pay
Item No.
3-14.a.
3-6.
3-7.a.
3-9.a.
3-10.a.
3-11.
Receptor Survey and Exposure Pathway Identification
(excludes report)
Drum Compactor mobilization - > 100 miles each way
Drum Compactor mobilization - ≤ 100 miles each way
Mini Excavator/Loader (Bobcat
TM
) Mobilization - >
100 miles each way
Mini Excavator/Loader (Bobcat
TM
) Mobilization - ≤
100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way
Work Trailer - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Contractor Oversight for Non-Price Schedule
Activities
Excavator Mobilization - > 100 miles each way
Excavator Mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
Description
3-12.
Table 1. Listed Schedule of Pay Items with Rate Changes
Direct Push Technology (DPT) Rig and Equipment
Hand Auger Boring ≤ 10 foot total depth
Sonic Core Sampling - 5 or 10 foot (during boring)
2-2.
2-4.
3-1.
3-2.
3-3.
3-4.
3-17.
3-18.
3-19.
3-20.
Est %
Rate
Change (2)
-6.67%
-8.81%
+5.00%
+5.00%
-11.76%
-6.86%
+5.00%
+5.00%
2,625.00$ $ 2,500.00
26.56$ $ 27.88
31.39$ $ 32.95
37.03$ $ 38.00
35.01$ $ 36.76
40.24$ $ 42.25
46.28$ $ 48.58
28.98$ $ 30.42
31.39$ $ 32.95
38.64$ $ 40.57
33.81$ $ 35.50
38.64$ $ 40.57
48.30$ $ 50.71
60.37$ $ 62.00
96.60$ $ 90.00
1,600.00$ $ 1,325.00
136.50$ $ 143.32
12.07$ $ 12.67
14.49$ $ 15.21
19.32$ $ 20.28
24.15$ $ 25.35
16.85$ $ 17.69
385.00$ $ 300.00 -22.08%
+4.97%
+4.97%
+4.97%
+4.97%
+4.99%
-17.19%
+5.00%
+4.97%
+4.97%
+4.99%
+5.00%
+4.99%
+4.99%
+2.70%
-6.83%
-4.76%
+4.97%
+4.97%
5-5.a.
5-17.
5-18.
5-19.
5-20.
5-21.
5-23.
5-12.
5-13.
5-14.
5-15.
5-16.
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline
PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328
High Resolution GC/FID)
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Grout and Abandon Well, > 6 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, 1 to 2 inch diameter
Water Level or Free Product Gauging
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to
100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to
100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth
6-12.
6-13.
DPT Membrane Interface Probe (MIP) Equipped with
PID and ECD (add-on cost to DPT base rate)
Well Redevelopment
Installation of Well Vault - 4 x 4 x 2 foot
7-2.
7-3.
7-4.
7-1.
5-9.
5-10.
5-11.
8-7.
9-72.
+2.62%
+5.00%
+5.00%
+4.97%
606.63$ $ 500.00
21.00$ $ 22.05
2.50$ $ 2.62
25.20$ $ 26.46
3.67$ $ 3.85
30.18$ $ 31.68
21.73$ $ 22.81
89.25$ $ 93.71
90.56$ $ 95.08
108.67$ $ 114.10
315.00$ $ 275.00
105.00$ $ 110.25
345.00$ $ 260.00
54.33$ $ 57.04
42.26$ $ 44.37
3,018.75$ $ 3,169.68
96.59$ $ 101.41
7,000.00$ $ 6,500.00
36.22$ $ 38.03
36.22$ $ 38.03
25.30$ $ 26.56
1.15$ $ 1.20
725.00$ $ 761.25
+4.98%
+4.35%
+5.00%
+4.99%
+4.99%
+5.00%
-7.14%
+5.00%
+5.00%
10-16.
11-2.
12-14.
10-11.a.
10-18.
10-19.
12-17.
10-17.
10-11.b.
10-12.a.
10-12.b.
Remove and Dispose Petroleum Storage Tank - >
1,000 to 5,000 gal. capacity
Delivery, Pick Up and Rental of 20 Cubic Yard Roll-
Off Container
Transport and Disposal of Petroleum Contact Water
(bulk)
Transport Petroleum Impacted Soil (bulk) ≤ 100 miles
Transport and Disposal of Clean Concrete
Loading, Transport and Disposal/Recycle Clean
Overburden
#57 Stone
Pea Gravel
Additional Dewatering System Well Points (2)
(includes installation)
Dewatering System, up to 12 well points (includes installation)
Sheet Piling Rental for ≤ 20 feet deep Excavation
LDA Excavation and Loading With Driven Casing >
300 cubic yards
LDA Excavation and Loading With Surface Casing >
300 cubic yards
LDA Excavation and Loading With Driven Casing <
300 cubic yards
LDA Excavation and Loading With Surface Casing ≤
300 cubic yards
LDA Excavation and Loading Without Casing > 300 cubic yards
LDA Excavation and Loading Without Casing ≤ 300 cubic yards
Conventional Soil Excavation and Loading > 300 cubic yards
Conventional Soil Excavation and Loading ≤ 300 cubic yards
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Installation for > 20 feet deep Excavation
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution
GC/MS)
Sheet Piling Installation for ≤ 20 feet deep
Excavation
10-2.b.
10-7.
10-8.
10-9.
10-10.
10-2.a.
9-73.
10-1.a.
10-1.b.
12-3.
12-4.
12-7.
+4.97%
+4.97%
+5.00%
+4.99%
+5.00%
-12.70%
+5.00%
-24.64%
+4.99%
-17.58%
+5.00%
+4.80%
+5.00%
+4.90%
105.00$ $ 110.25
1,890.00$ $ 1,984.50
4,410.00$ $ 4,630.50
90.00$ $ 75.00
100.00$ $ 90.00
110.00$ $ 95.00
104.00$ $ 75.00
28.00$ $ 25.00
12,600.00$ $ 13,230.00
15,750.00$ $ 16,537.50
18,500.00$ $ 19,425.00
6,100.00$ $ 6,000.00
3,250.00$ $ 2,800.00
3,205.91$ $ 3,366.20
460.00$ $ 483.00
2,656.50$ $ 2,789.32
414.00$ $ 434.70
2,656.50$ $ 2,789.32
437.00$ $ 458.85
2,656.50$ $ 2,789.32
437.00$ $ 458.85
+5.00%
+5.00%
-16.67%
+5.00%
15-2.a.
15-4.a.
15-4.b.
15-4.c.
15-4.d.
15-5.
15-1.d.
12-18.
Vapor Extraction/Aquifer Pumping Test - Additional
Time
Vapor Extraction/Aquifer Pumping Test - 8 hours
Vapor Extraction Pilot Test - Additional Time
Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test - Additional
Time
Air Sparging or Biosparging Pilot Test - 8 hours
Groundwater Recovery System Pilot Test - Additional
Time
Groundwater Recovery System Pilot Test - 8 hours
Trenching and Installation of 21 - 30 Lines
Trenching and Installation of 11 - 20 Lines
System Installation/Integration/Startup – Addition of 1
Technology Component
System Installation/Integration/Startup - 1 Technology
Component - 1-10 Additional Recovery/Treatment
Points greater Than 30 (This item is used in conjunction with 15.4.c when needed)
System Installation/Integration/Startup - 1 Technology
Component - 21-30 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology
Component - 11-20 Recovery/Treatment Points
System Installation/Integration/Startup - 1 Technology
Component - 1-10 Recovery/Treatment Points
Installation of Plumbing (and Electrical) Lines Above
Ground: Per Linear Foot of Piping. Electrical lines are not counted in determination of costs.
Trenching and Installation of Additional 1-10 Lines
Greater Than 30 Lines
Trenching and Installation of 1-10 Plumbing (and
Electrical) Lines in Trench
Groundwater Injection System (not by direct push)
Groundwater Injection System (not by direct push)
Additional Rental of 20 Cubic Yard Roll-Off
Container
14-4.
14-5.
15-1.a.
15-1.b.
15-1.c.
16-1.
16-2.
16-3.
16-4.
16-5.
16-6.
16-7.
16-8.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
-10.00%
-13.64%
-27.88%
-10.71%
+5.00%
+5.00%
+5.00%
-1.64%
-13.85%
3,157.61$ $ 3,315.49
419.75$ $ 440.73
3,157.61$ $ 3,315.49
395.00$ $ 414.75
4,095.00$ $ 4,299.75
420.00$ $ 441.00
4,845.00$ $ 3,900.00
11,900.00$ $ 10,000.00
1,207.50$ $ 1,267.50
3,276.57$ $ 3,440.39
2,655.50$ $ 2,788.27
4,467.75$ $ 4,691.13
2,656.50$ $ 2,789.32
5,433.75$ $ 5,705.43
4,095.00$ $ 4,299.75
10,395.00$ $ 10,914.75
2,940.00$ $ 3,087.00
6,090.00$ $ 6,394.50
3,000.00$ $ 2,500.00
3,550.00$ $ 3,000.00
4,000.00$ $ 3,500.00
4,400.00$ $ 3,800.00
1,000.00$ $ 650.00
703.00$ $ 500.00
565.00$ $ 450.00
1,242.00$ $ 1,100.00
1,242.00$ $ 900.00
6,500.00$ $ 6,000.00
4,491.90$ $ 4,200.00
9,910.00$ $ 8,900.00
-28.88%
-20.35%
-11.43%
-27.54%
-7.69%
-6.50%
-10.19%
+4.97%
+5.00%
-19.50%
-15.97%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
-16.67%
-15.49%
-12.50%
-13.64%
-35.00%
Medium Holding Tank - 2,000 to 6,000 gal. capacity -
Short Term ≤ 6 mos.
Supplemental System O&M Package - Add Thermox or Catox Treatment
Groundwater Treatment System - Stand Alone
Medium - Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone Small -
Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Small -
Short Term ≤ 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity -
Long Term > 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity -
Short Term ≤ 6 mos.
Medium Holding Tank - 2,000 to 6,000 gal. capacity -
Long Term > 6 mos.
Multi-Phase Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test - Additional
Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
System O&M Package - Extra Large
System O&M Package - Large
System O&M Package - Medium
System O&M Package - Small
SVE System Package - Medium
SVE System Package - Medium
AS/MPE System Package - Medium
AS/MPE System Package - Medium
MPE System Package - Medium
MPE System Package - Medium
AS/SVE System Package - Medium
AS/SVE System Package - Medium
Air Sparge System Package - Medium
Air Sparge System Package - Medium
Groundwater Treatment System Package - Medium
Groundwater Treatment System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test -
Additional Time
Air Sparging/Multiphase Extraction Pilot Test - 8 hours
Multi-Phase Pilot Test - Additional Time
16-18.
16-17.
16-9.
16-10.
16-11.
16-12.
16-13.
16-14.
16-19.
16-20.
16-21.
16-22.
16-23.
16-24.
16-25.
18-3.
18-4.
18-5.
18-6.
18-7.
18-2.
16-26.
16-27.
16-28.
17-1.
17-2.
17-3.
17-4.
17-5.
18-1.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
15,000.00$ $ 13,000.00
8,704.38$ $ 8,600.00
3,500.00$ $ 3,000.00
5,200.00$ $ 5,000.00
6,238.56$ $ 5,500.00
7,039.53$ $ 6,000.00
8,528.02$ $ 7,000.00
8,247.42$ $ 7,500.00
6,000.00$ $ 4,000.00
4,500.00$ $ 3,500.00
8,900.00$ $ 6,700.00
5,433.75$ $ 4,100.00
6,795.21$ $ 5,100.00
8,658.16$ $ 6,500.00
707.00$ $ 650.00
510.00$ $ 535.50
4,850.00$ $ 4,500.00
7,200.00$ $ 6,500.00
4,200.00$ $ 4,300.00
5,250.00$ $ 5,512.50
5,040.00$ $ 5,292.00
8,400.00$ $ 7,900.00
7,800.00$ $ 6,900.00
12,000.00$ $ 9,500.00
-7.22%
-9.72%
+2.38%
+5.00%
+5.00%
-5.95%
-8.06%
+5.00%
-9.06%
-33.33%
-22.22%
-24.72%
-24.55%
-24.95%
-24.93%
-13.33%
-1.20%
-14.29%
-3.85%
-11.84%
-14.77%
18-40.
18-42.
18-29.
18-30.
18-31.
18-32.
18-33.
18-34.
18-35.
18-27.
Soil Vapor Extraction (SVE) System - Large - Short
Term ≤ 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Large - Short Term ≤ 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Medium - Short Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Large - Long
Term > 6 Months
Carbon Off Gas Treatment - Add On - Small - Short
Term ≤ 6 mos.
Soil Vapor Extraction (SVE) System - Medium -
Short Term ≤ 6 Months
Thermox/Catox Off Gas Treatment - Add On - Large -
Short Term ≤ 6 mos.
Thermox/Catox Off Gas Treatment - Add On -
Medium - Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Large - Long
Term > 6 mos.
Groundwater Treatment - Add On - Large - Long
Term > 6 mos.
Groundwater Treatment - Add On - Medium - Long
Term > 6 mos.
Groundwater Treatment - Add On - Small - Long
Term > 6 mos.
Groundwater Treatment - Add On - Large - Short
Term ≤ 6 mos.
Groundwater Treatment - Add On - Medium - Short
Term ≤ 6 mos.
Groundwater Treatment - Add On - Small - Short
Term ≤ 6 mos.
MPE System - Large - Short Term ≤ 6 mos.
Air Sparge System - Small - Short Term ≤ 6 mos.
AS/SVE System - Large - Short Term ≤ 6 mos.
AS/SVE System - Medium - Short Term ≤ 6 mos.
AS/SVE System - Small - Short Term ≤ 6 mos.
Air Sparge System - Large - Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone Large -
Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Large -
Short Term ≤ 6 mos.
18-9.
18-10.
18-21.
18-11.
18-15.
18-17.
18-19.
18-43.
18-57.
18-56.
18-49.
18-51.
18-52.
18-55.
-17.92%
-11.54%
-20.83%
10,500.00$ $ 8,900.00
13,630.00$ $ 11,000.00
17,250.00$ $ 16,000.00
567.00$ $ 595.35
425.25$ $ 446.51
708.75$ $ 744.18
1,134.00$ $ 1,190.70
2,160.00$ $ 2,268.00
810.00$ $ 850.50
567.00$ $ 595.35
425.25$ $ 446.51
1,417.50$ $ 1,488.37
918.75$ $ 964.68
262.50$ $ 275.62
389.55$ $ 409.02
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
-7.25%
-15.24%
-19.30%
21-5.
21-11.
21-12.
21-13.
21-15.
21-6.a.
21-6.b.
21-6.c.
21-6.d.
21-7.b.
21-9.
21-10.
P.G. or Qualified P.E. Review, Evaluation and
Certification of a General Site Assessment Report
P.G. or P.E. Review, Evaluation and Certification of a
Soil Source Removal Report That Includes a
Recommendation for NFA
P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering
Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a
Conditional NFA
P.E. Design and Certification of Plans and Project
Oversight of Installation for Engineering Controls
(other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
Level 2 Remedial Action Plan
Level 1 Remedial Action Plan
Air Sparge/Multiphase Extraction (AS/MPE) System -
Large - Long Term > 6 Months
P.G. Review and Certification of Sufficiency of
Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill with Monitoring and Maintenance Recommendations
Required for a Conditional NFA
P.E. Review and Certification of Sufficiency of
Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with
Monitoring and Maintenance Recommendations
Required for a Conditional NFA
P.E. Project Oversight for Short Term or Episodic
Remediation System Operation - Weekly Basis
P.E. Project Oversight for Remediation System
Integration and Startup - Extra Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Large System
P.E. Project Oversight for Remediation System
Integration and Startup - Medium System
P.E. Project Oversight for Remediation System
Integration and Startup - Small System
P.E. Project Oversight for Remediation Technology
Pilot Testing
18-58.
19-11.
19-12.
+5.00%
283.50$ $ 297.67
283.50$ $ 297.67
212.62$ $ 223.25
212.62$ $ 223.25
283.50$ $ 297.67
354.90$ $ 372.64
425.25$ $ 446.51
496.65$ $ 521.48
779.10$ $ 818.05
850.00$ $ 892.50
340.00$ $ 357.00
567.00$ $ 595.35
425.25$ $ 446.51
425.25$ $ 446.51
338.00$ $ 354.90
+5.00%
+5.00%
21-30.
21-21.
21-22.
21-23.
21-24.
21-27.
21-28.
21-29.
21-16.
21-18.
21-19.
21-20.
P.G. or Qualified P.E. Review, Evaluation and
Certification of a Supplemental Site Assessment
Report
P.E. Review, Evaluation and Certification of As-Built
Drawings (P.E. sealed red lined modifications)
P.E. Review, Evaluation and Certification of a Level 4
Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level 3
Limited Scope Remedial Action Plan or RAP
Modification Plan
P.E. Review, Evaluation and Certification of a Level 2
Remedial Action Plan
P.E. Review, Evaluation and Certification of an
Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non-
Annual Operation and Maintenance Report That
Includes Significant Proposed Changes to the
Approved RAP
P.E. Review, Evaluation and Certification of a
Remedial Action Startup Report That Includes a
Recommendation for System Modification or
Significant Change in the Course of Action
P.E. Review, Evaluation and Certification of a Non-
Annual Natural Attenuation or Post RA Monitoring
Report That Includes a Recommendation for NFA or a
Recommendation to Modify the Approved Monitoring
Plan
P.E. Review, Evaluation and Certification of a Level 2
Natural Attenuation Monitoring Plan
Notes:
P.E. Review, Evaluation and Certification of a Level 1
Remedial Action Plan
P.E. Review, Evaluation and Certification of a Pilot
Test Report
P.E. Review, Evaluation and Certification of a Pilot
Test Plan
P.G or P.E. Review, Evaluation and Certification of an Annual Natural Attenuation Monitoring Report
P.E. Review, Evaluation, and Certification of Annual
PARM Report
21-31.
21-32.
21-36.
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
+5.00%
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1)
The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2)
The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
Printed Printed Name: Name:
Title: Title:
Date: Date:
IN WITNESS WHEREOF, the parties have caused this Amendment to be duly executed, the day and year last written below.
The Table 1 rate changes have been entered in effective Rate Change Date of:
Corresponding Rate Schedule, Attachment D Version No. V3.2
Department Data Processing Information:
Signature of Authorized Representative Signature of Authorized Representative
Type Letter/Number Description Attachment D (V3.2) Rate Schedule (27 pages)
KIMBERLY ANN BROWN AND
ASSOCIATES, INC.
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
FEID No.: 650891133
List of attachments/exhibits included as part of this Amendment:
Signature of Processor Printed Name of Processor Data Entry Date
06/19/2020
06/19/2020Blake Miller Digitally signed by Blake Miller Date: 2020.06.19 18:32:02 -04'00'
PAY
ITEM
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
1.
1-1. Per Review $ 575.00 $ 603.75 $ 603.75
1-2. Per Site $ 350.00 $ 367.50 $ 367.50
1-2.a. Per Site Not Applicable $ - $ -
1-3. Per Package $ 295.27 $ 295.27 $ 295.27
1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00
1-5. Per Agreement $ 473.00 $ 473.00 $ 473.00
1-5.a. Per Agreement Not Applicable $ - $ -
1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00
1-7. % Surcharge Not Applicable $ 0.06 $ 0.06
2.
2-1. Per Visit $ 750.00 $ 750.00 $ 750.00
2-2. Per Survey $ 750.00 $ 750.00 $ 700.00
2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00
2-4. Per Day $ 940.00 $ 987.00 $ 900.00
3.
3-1. Per Round Trip $ 332.25 $ 348.86 $ 366.30
3-2. Per Round Trip $ 378.35 $ 397.26 $ 417.12
3-3. Per Round Trip $ 850.00 $ 850.00 $ 750.00
3-4. Per Round Trip $ 1,020.00 $ 1,020.00 $ 950.00
3-5. Per Round Trip $ 172.50 $ 181.12 $ 181.12
3-6. Per Round Trip $ 230.00 $ 241.50 $ 253.57
3-7. Per Round Trip $ 510.00 Not Applicable Not Applicable
DESCRIPTION
OFFICE ACTIVITIES
File Review
Site Health & Safety Plan
Site Health & Safety Plan for Continued Work at no cost to FDEP
Notice of Discovery of Contamination Package (Initial or TPOC)
Site Reconnaissance/Field Measurement Visit
Receptor Survey and Exposure Pathway Identification (Excludes report)
Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)
Contractor Oversight for Non-Price Schedule Activities
MOBILIZATION
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items
Off-Site Property Access Agreement
Site Property Access Agreement for Source Property at no cost to FDEP
Project Specific Financial Guarantee Bond (if required by DEP)
6% Handling Fee for Cost Reimbursable Items
FIELD ACTIVITIES - GENERAL
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Work Trailer - ≤ 100 miles each way
Work Trailer - > 100 miles each way
DPT Rig Mobilization - ≤ 100 miles each way
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
3-7.a. Per Round Trip Not Applicable $ 619.50 $ 650.47
3-8. Per Round Trip $ 750.00 Not Applicable Not Applicable
3-8.a. Per Round Trip Not Applicable $ 1,350.00 $ 1,350.00
3-9. Per Round Trip $ 575.00 Not Applicable Not Applicable
3-9.a. Per Round Trip Not Applicable $ 934.50 $ 981.22
3-10. Per Round Trip $ 865.00 Not Applicable Not Applicable
3-10.a. Per Round Trip Not Applicable $ 1,522.50 $ 1,598.62
3-11. Per Round Trip $ 690.00 $ 690.00 $ 650.00
3-12. Per Round Trip $ 1,035.00 $ 1,035.00 $ 900.00
3-13. Per Round Trip $ 18,000.00 Not Applicable Not Applicable
3-13.a. Per Round Trip Not Applicable $ 12,000.00 $ 12,000.00
3-14. Per Round Trip $ 23,000.00 Not Applicable Not Applicable
3-14.a. Per Round Trip Not Applicable $ 12,000.00 $ 12,600.00
3-15. Per Round Trip $ 690.00 $ 690.00 $ 690.00
3-16. Per Round Trip $ 1,035.00 $ 1,035.00 $ 1,035.00
3-17. Per Round Trip $ 500.00 $ 500.00 $ 450.00
3-18. Per Round Trip $ 675.00 $ 675.00 $ 625.00
3-19. Per Round Trip Not Applicable $ 500.00 $ 425.00
3-20. Per Round Trip Not Applicable $ 700.00 $ 625.00
4.
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way
DPT Rig Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way
Drill Rig Mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤
100 miles each way
Drill Rig Mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Loader/Backhoe Mobilization - ≤ 100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
Mini Excavator/Loader (Bobcat
TM
) Mobilization - ≤ 100 miles each way
Mini Excavator/Loader (Bobcat
TM
) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - >
100 miles each way
Excavator Mobilization - ≤ 100 miles each way
Excavator Mobilization - > 100 miles each way
LDA Rig Mobilization - ≤ 100 miles each way
LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way
LDA Rig Mobilization - > 100 miles each way
Drum Compactor mobilization - > 100 miles each way
MEALS AND LODGING
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
4-1.a.
Per Person, Per Day $ 80.00 $ 80.00 $ 80.00
4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00
5.
5-1.a. Per Spoon $ 28.75 Not Applicable Not Applicable
5-1.a.1. Per Spoon Not Applicable $ 38.00 $ 38.00
5-1.a.2. Per Spoon Not Applicable $ 40.00 $ 40.00
5-1.a.3. Per Spoon Not Applicable $ 45.00 $ 45.00
5-1.b. Per Core $ 103.50 $ 108.67 $ 114.10
5-1.c. Per Core $ 23.00 Not Applicable Not Applicable
5-2. Per Boring $ 115.00 $ 120.75 $ 126.78
5-3. Per Foot $ 14.38 Not Applicable Not Applicable
5-3.a. Full Day Not Applicable $ 1,837.50 $ 1,929.37
5-4. Per Foot $ 27.60 Not Applicable Not Applicable
5-5. Per Foot $ 32.20 Not Applicable Not Applicable
5-5.a. Full Day Not Applicable $ 2,625.00 $ 2,500.00
5-6. Per Foot $ 31.63 $ 31.63 $ 31.63
5-7. Per Foot $ 28.89 $ 30.33 $ 30.33
5-8. Per Foot $ 35.22 $ 36.98 $ 36.98
Split Spoon Sampling – 2 foot (during boring) < 50 feet
Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet
Split Spoon Sampling – 2 foot (during boring) > 100 feet
Sonic Core Sampling - 5 or 10 foot (during boring)
DPT Core Sampling - 4 or 5 foot (during boring)
Hand Auger Boring ≤ 10 foot total depth
Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current
State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.
Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with
Section 112.061, F.S.
DRILLING AND BORING
Split Spoon Sampling - 2 foot (during boring)
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth
Direct Push Boring
Direct Push Technology (DPT) Rig and Equipment
Direct Push Boring with Cone Penetrometer Test Probe (CPT)
Direct Push Boring with Membrane Interface Probe (MIP)
DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT
Base Rate)
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
5-9. Per Foot $ 25.30 $ 26.56 $ 27.88
5-10. Per Foot $ 29.90 $ 31.39 $ 32.95
5-11. Per Foot $ 35.27 $ 37.03 $ 38.00
5-12. Per Foot $ 33.35 $ 35.01 $ 36.76
5-13. Per Foot $ 38.33 $ 40.24 $ 42.25
5-14. Per Foot $ 44.08 $ 46.28 $ 48.58
5-15. Per Foot $ 27.60 $ 28.98 $ 30.42
5-16. Per Foot $ 29.90 $ 31.39 $ 32.95
5-17. Per Foot $ 36.80 $ 38.64 $ 40.57
5-18. Per Foot $ 32.20 $ 33.81 $ 35.50
5-19. Per Foot $ 36.80 $ 38.64 $ 40.57
5-20. Per Foot $ 46.00 $ 48.30 $ 50.71
5-21. Per Foot $ 57.50 $ 60.37 $ 62.00
5-22. Per Foot $ 69.00 $ 72.45 $ 72.45
5-23. Per Foot $ 92.00 $ 96.60 $ 90.00
6.
6-1. Per Foot $ 28.60 $ 30.03 $ 30.03
6-2. Per Foot $ 31.20 Not Applicable Not Applicable
6-2.a. Per Foot Not Applicable $ 36.75 $ 36.75
6-2.b. Per Foot Not Applicable $ 134.40 $ 134.40
6-3. Per Foot $ 33.80 Not Applicable Not Applicable
6-3.a. Per Foot Not Applicable $ 47.25 $ 47.25
6-3.b. Per Foot Not Applicable $ 147.00 $ 147.00
6-4. Per Foot $ 52.00 $ 54.60 $ 54.60
6-5. Per Foot $ 34.50 $ 36.22 $ 36.22
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
WELL INSTALLATION
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling)
Well Installation - 6 inch diameter
Surface Casing - 6 inch diameter
Well Installation - 1 inch diameter
Well Installation - 2 inch diameter
Well Installation - 2 inch diameter (Vertical)
Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)
Well Installation - 4 inch diameter
Well Installation - 4 inch diameter (Vertical)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
6-6. Per Foot $ 46.00 $ 48.30 $ 48.30
6-7. Per Foot $ 57.50 $ 60.37 $ 60.37
6-8. Per Foot $ 69.00 $ 72.45 $ 72.45
6-9.a. Per Foot $ 6.90 $ 7.24 $ 7.24
6-9.b. Per Foot $ 9.20 $ 9.66 $ 9.66
6-9.c. Per Foot $ 17.25 $ 18.11 $ 18.11
6-9.d. Per Foot $ 20.70 $ 21.73 $ 21.73
6-10. Per Well $ 375.00 $ 393.75 $ 393.75
6-11. Per Vault $ 692.00 $ 726.60 $ 726.60
6-12. Per Vault $ 1,600.00 $ 1,600.00 $ 1,325.00
6-13. Per Well Not Applicable $ 136.50 $ 143.32
6-14. Per Well Not Applicable $ 346.50 $ 346.50
6-15. Per Well Not Applicable $ 400.00 $ 400.00
Surface Casing - 8 inch diameter
Surface Casing - 10 inch diameter
Surface Casing - 12 inch diameter
Installation of Well Vault - 4 x 4 x 2 foot
Well Redevelopment
Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Additional Well Screen > 20 feet - 1 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 6 inch diameter
Above Grade Well Completion
Installation of Well Vault - 2 x 2 x 2 foot
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
7.
7-1. Per Foot $ 11.50 $ 12.07 $ 12.67
7-2. Per Foot $ 13.80 $ 14.49 $ 15.21
7-3. Per Foot $ 18.40 $ 19.32 $ 20.28
7-4. Per Foot $ 23.00 $ 24.15 $ 25.35
7-5. Per Vault $ 402.50 $ 402.50 $ 402.50
7-6. Per Vault $ 862.50 $ 862.50 $ 862.50
7-7. Per Well Not Applicable $ 160.00 $ 160.00
8.
8-1. Per Well $ 224.00 $ 224.00 $ 224.00
8-2. Per Well $ 293.00 $ 293.00 $ 293.00
8-3. Per Well $ 131.00 $ 131.00 $ 131.00
8-4. Per Sample $ 115.00 $ 115.00 $ 115.00
8-5. Per Sample $ 104.00 $ 104.00 $ 104.00
8-6. Per Sample $ 69.00 $ 72.45 $ 72.45
8-7. Per Well $ 16.05 $ 16.85 $ 17.69
8-8. Per Well $ 139.00 $ 139.00 $ 139.00
8-9. Per Sample $ 69.00 $ 69.00 $ 69.00
8-10. Per Sample $ 112.35 $ 112.35 $ 112.35
8-11. Per Sampling Event Not Applicable $ 175.00 $ 175.00
8-12. Per Well Not Applicable $ 75.00 $ 75.00
8-13. Per Well Not Applicable $ 52.50 $ 52.50
WELL ABANDONMENT
Grout and Abandon Well, 1 to 2 inch diameter
SAMPLE COLLECTION AND FIELD TESTING
Monitoring Well Sampling with Water Level, ≤ 100 foot depth
Monitoring Well Sampling with Water Level, > 100 foot depth
Domestic Water Well Sampling
Other Water Sampling
Free Product Sample Collection
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 6 inch diameter
Removal of Well Vault - 2 x 2 x 2 foot
Removal of Well Vault - 4 x 4 x 2 foot
Removal of Well Pad and Manhole
Survey Latitude/Longitude of Existing Monitor Wells
Survey Latitude/Longitude of New Monitor Wells
Soil/Sediment Sample Collection
Water Level or Free Product Gauging
Free Product Gauging & Bailing
Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, Tedlar
TM
Bag
(or Equivalent)
Vapor/Ambient Air Sample Collection - SUMMA
TM
Canister (or Equivalent)
Electronic Data Deliverables (EDD)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
8-14. Per Sample Not Applicable $ 20.00 $ 20.00
9.
9.A.
9-1. Per Sample $ 533.00 $ 533.00 $ 533.00
9-2. Per Sample $ 53.00 $ 53.00 $ 53.00
9-3. Per Sample $ 62.35 $ 65.46 $ 65.46
9-4. Per Sample $ 88.00 $ 88.00 $ 88.00
9-5. Per Sample $ 92.00 $ 92.00 $ 92.00
9-6. Per Sample $ 97.00 $ 97.00 $ 97.00
9-7. Per Sample $ 292.00 $ 292.00 $ 292.00
9-8. Per Sample $ 77.00 $ 77.00 $ 77.00
9-8.a. Per Sample Not Applicable $ 275.00 $ 275.00
9-9. Per Sample $ 69.00 $ 69.00 $ 69.00
9-10. Per Sample $ 97.00 $ 97.00 $ 97.00
9-11. Per Sample $ 12.00 $ 12.60 $ 12.60
9-12. Per Sample $ 12.00 $ 12.60 $ 12.60
9-13. Per Sample $ 12.00 $ 12.60 $ 12.60
Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing
(discarded).
LABORATORY ANALYSIS
SOIL/SEDIMENT ANALYSIS
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-
Priority Pollutant Organics (Multiple Methods)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)
Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)
Soil, PCBs [or Aroclors] (EPA 8082)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])
Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA
8270 list [e.g., EPA 8081/8082 + EPA 8270])
Soil, Chromium (EPA 6010 or EPA 6020)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
9-14. Per Sample $ 12.00 $ 12.60 $ 12.60
9-15. Per Sample $ 55.00 $ 57.75 $ 57.75
9-16. Per Sample $ 65.00 $ 65.00 $ 65.00
9-17. Per Sample $ 54.00 $ 54.00 $ 54.00
9-18. Per Sample $ 68.84 $ 72.28 $ 72.28
9-19. Per Sample $ 15.00 $ 15.00 $ 15.00
9-20. Per Sample $ 75.28 $ 75.28 $ 75.28
9-21. Per Sample $ 440.00 $ 440.00 $ 440.00
9-22. Per Sample $ 556.60 $ 556.60 $ 556.60
9-23. Per Sample $ 150.00 $ 150.00 $ 150.00
9-24. Per Sample $ 300.00 $ 300.00 $ 300.00
9.B.
9-25. Per Sample $ 295.00 $ 295.00 $ 295.00
9-26. Per Sample $ 489.00 $ 489.00 $ 489.00
9-27. Per Sample $ 46.00 $ 46.00 $ 46.00
9-28. Per Sample $ 60.80 $ 63.84 $ 63.84
Soil, Moisture Content (ASTM D2216-10)
Soil, Texture, (See Gee 7 Bauder [1966])
Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)
Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High
Resolution GC/MS)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, Lead (EPA 6010 or EPA 6020)
Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)
Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312)
Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -
96e1 or ASTM D2937-10)
WATER ANALYSIS
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple
Methods)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-
Priority Pollutant Organics (Multiple Methods)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
9-29. Per Sample $ 85.00 $ 85.00 $ 85.00
9-30. Per Sample $ 94.00 $ 94.00 $ 94.00
9-31. Per Sample $ 44.00 $ 46.20 $ 46.20
9-31.a. Per Sample Not Applicable $ 57.75 $ 57.75
9-32. Per Sample $ 105.00 $ 105.00 $ 105.00
9-33. Per Sample $ 110.00 $ 110.00 $ 110.00
9-34. Per Sample $ 311.00 $ 311.00 $ 311.00
9-35. Per Sample $ 311.00 $ 311.00 $ 311.00
9-36. Per Sample $ 69.00 $ 72.45 $ 72.45
9-37. Per Sample $ 66.00 $ 66.00 $ 66.00
9-38. Per Sample $ 12.00 $ 12.00 $ 12.00
9-39. Per Sample $ 12.00 $ 12.00 $ 12.00
9-40. Per Sample $ 12.00 $ 12.00 $ 12.00
9-41. Per Sample $ 12.00 $ 12.00 $ 12.00
9-41.a. Per Sample Not Applicable $ 35.00 $ 35.00
9-42. Per Sample $ 16.18 $ 16.98 $ 16.98
9-43. Per Sample $ 12.00 $ 12.00 $ 12.00
9-44. Per Sample $ 12.00 $ 12.00 $ 12.00
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)
Water, Priority Pollutant Volatile Organics (EPA 8260)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for
NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)
Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA
8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)
Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO)
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
9-44.a. Per Sample Not Applicable $ 35.00 $ 35.00
9-45. Per Sample $ 12.00 $ 12.00 $ 12.00
9-46. Per Sample $ 12.00 $ 12.00 $ 12.00
9-47. Per Sample $ 12.00 $ 12.00 $ 12.00
9-48. Per Sample $ 12.00 $ 12.00 $ 12.00
9-49. Per Sample $ 13.02 $ 13.67 $ 13.67
9-50. Per Sample $ 16.07 $ 16.87 $ 16.87
9-51. Per Sample $ 14.50 $ 15.22 $ 15.22
9-52. Per Sample $ 14.50 $ 15.22 $ 15.22
9-53. Per Sample $ 14.50 $ 15.22 $ 15.22
9-54. Per Sample $ 16.82 $ 16.82 $ 16.82
9-55. Per Sample $ 14.50 $ 15.22 $ 15.22
9-56. Per Sample $ 24.00 $ 25.20 $ 25.20
9-57. Per Sample $ 16.93 $ 17.77 $ 17.77
9-58. Per Sample $ 12.44 $ 13.06 $ 13.06
9-59. Per Sample $ 13.02 $ 13.02 $ 13.02
9-60. Per Sample $ 14.50 $ 15.22 $ 15.22
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI
C or SM 4500CI E)
Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or
SM 4500-NO3 F)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)
Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA
9056, SM 4500-PE or SM 4500-PF)
Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)
Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA
9038, EPA 9056 or SM 4500-SO4 C)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
9-61. Per Sample $ 49.52 $ 51.99 $ 51.99
9-62. Per Sample $ 1,006.00 $ 1,006.00 $ 1,006.00
9-63. Per Sample $ 1,035.00 $ 1,035.00 $ 1,035.00
9-64. Per Sample $ 440.00 $ 440.00 $ 440.00
9-65. Per Sample $ 395.00 $ 414.75 $ 414.75
9-66. Per Sample $ 115.00 $ 115.00 $ 115.00
9-67. Per Sample $ 320.00 $ 320.00 $ 320.00
9-78. Per Sample Not Applicable $ 68.25 $ 68.25
9-79. Per Sample Not Applicable $ 47.25 $ 47.25
9-80. Per Sample Not Applicable $ 115.00 $ 115.00
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:
Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]
(EPA 2006.0/2007.0)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High
Resolution GC/MS)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, Heterotrophic Plate Count (SM 9215 B)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:
Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA
2000.0/2002.0)
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)
Water, Methane (EPA SOP RSK-175)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
9.C.
9-68. Per Sample $ 104.00 $ 104.00 $ 104.00
9-69. Per Sample $ 245.00 $ 245.00 $ 245.00
9-70. Per Sample $ 245.00 $ 257.25 $ 257.25
9-71. Per Sample $ 275.00 $ 288.75 $ 288.75
9.D.
9-72. Per Sample $ 385.00 $ 385.00 $ 300.00
9-73. Per Sample $ 606.63 $ 606.63 $ 500.00
9.E.
9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable
9-75.
Percent
Surcharge
9-76.
Percent
Surcharge $ 0.50 $ 0.50 $ 0.50
9-77.
Percent
Surcharge $ 1.00 $ 1.00 $ 1.00
10.
10-1. Per Sq. Foot/Day $ 5.75 Not Applicable Not Applicable
10-1.a. Per Sq. Foot Not Applicable $ 21.00 $ 22.05
10-1.b. Per Sq. Foot/Day Not Applicable $ 2.50 $ 2.62
10-1.c. Per Sq. Foot/Week Not Applicable $ 10.00 $ 10.00
Air, Volatile Organic Compounds (EPA Method TO-17)
PRODUCT ANALYSIS
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High
Resolution GC/FID)
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)
OTHER ANALYSIS
Other Analysis, Not Otherwise Specified
AIR ANALYSIS
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Air, Volatile Organic Aromatics (EPA Method TO-15)
Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)
Sheet Piling Rental for ≤ 20 feet deep Excavation
Sheet Piling Rental for ≤ 20 feet deep Excavation
Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.
SOIL SOURCE REMOVAL RELATED
Sheet Piling for ≤ 20 feet deep excavation (per square foot)
Sheet Piling Installation for ≤ 20 feet deep Excavation
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
South
KIMBERLY ANN BROWN AND ASSOCIATES, INC.
GC871
DEP Restated Agency Term Contract No. GC871
Amendment No. 9
Attachment D (V3.2) - Rate Schedule
10-1.d. Per Sq. Foot/Month Not Applicable $ 20.00 $ 20.00
10-2. Per Sq. Foot/Week $ 10.35 Not Applicable Not Applicable
10-2.a. Per Sq. Foot Not Applicable $ 25.20 $ 26.46
10-2.b. Per Sq. Foot/Day Not Applicable $ 3.67 $ 3.85
10-2.c. Per Sq. Foot/Week Not Applicable $ 13.00 $ 13.00
10-2.d. Per Sq. Foot/Month Not Applicable $ 22.00 $ 22.00
10-3. Per Sq. Foot/Month $ 20.70 Not Applicable Not Applicable
10-4. Per Sq. Foot/Day $ 5.75 Not Applicable Not Applicable
10-5. Per Sq. Foot/Week $ 11.50 Not Applicable Not Applicable
10-6. Per Sq. Foot/Month $ 23.00 Not Applicable Not Applicable
10-7. Per Cubic Yard $ 28.75 $ 30.18 $ 31.68
10-8. Per Cubic Yard $ 20.70 $ 21.73 $ 22.81
10-9. Per Cubic Yard $ 85.00 $ 89.25 $ 93.71
10-10. Per Cubic Yard $ 86.25 $ 90.56 $ 95.08
10-11.a. Per Cubic Yard $ 103.50 $ 108.67 $ 114.10
10-11.b. Per Cubic Yard $ 300.00 $ 315.00 $ 275.00
10-12.a. Per Cubic Yard $ 100.00 $ 105.00 $ 110.25
10-12.b. Per Cubic Yard $ 345.00 $ 345.00 $ 260.00
10-13. Per Cubic Yard $ 115.00 $ 115.00 $ 115.00
10-14. Per Cubic Yard $ 34.50 $ 36.22 $ 36.22
10-15. Per Cubic Yard $ 33.35 $ 35.01 $ 35.01
10-15.a. Per Cubic Yard Not Applicable $ 28.00 $ 28.00
10-15.b. Per Cubic Yard Not Applicable $ 26.00 $ 26.00
10-16. Per Ton $ 51.75 $ 54.33 $ 57.04
Sheet Piling Rental for ≤ 20 feet deep Excavation
Sheet Piling for ≤ 20 feet deep excavation (per square foot)
Sheet Piling Installation for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
Conventional Soil Excavation and Loading ≤ 300 cubic yards
Conventional Soil Excavation and Loading > 300 cubic yards
LDA Excavation and Loading Without Casing ≤ 300 cubic yards
LDA Excavation and Loading Without Casing > 300 cubic yards
LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards
LDA Excavation and Loading With Driven Casing < 300 cubic yards
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling for ≤ 20 feet deep excavation (per square foot)
Sheet Piling for > 20 feet deep excavation (per square foot)
Sheet Piling for > 20 feet deep excavation (per sqyuare foot)
Sheet Piling for > 20 feet deep excavation (per square foot)
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
Pea Gravel
LDA Excavation and Loading With Surface Casing > 300 cubic yards
LDA Excavation and Loading With Driven Casing > 300 cubic yards
Flowable Fill Concrete and Installation
Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards
Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.1)
REVISED
CONTRACTED
ITEM PRICE (V3.2)
DESCRIPTION
Region:
Contractor:
Contract #:
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .