This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Consultant Contract Number CN221 with Registe, Sliger Engineering, Inc., a civil, structural, and water resources engineering firm based in Tallahassee, Florida. The task involves structural and geotechnical engineering services for a 3-bay pole barn at the Guana Tolomato Matanzas National Estuarine Research Reserve (GTM Preserve). FDEP's Bureau of Design and Construction provides architectural design coordination, while a geotechnical subconsultant, EGS, Inc., performs subsurface investigation and soil analysis.
The contract consists of three subtasks with a total fixed price cost of $7,036.09 and no reimbursable expenses. Subtask 1 ($3,735.23) includes coordination services and geotechnical investigation comprising two 20-foot deep Standard Penetration Test borings, soil analysis, and recommendations for timber pile-supported foundations. Subtask 2 ($2,843.58) delivers 90% structural plans including wind loading analysis, and Subtask 3 ($457.28) provides final signed and sealed structural plans with revisions based on FDEP review comments. Work is scheduled to commence upon Notice to Proceed (anticipated May 26, 2017) with completion by August 11, 2017. Payment is contingent upon FDEP approval of deliverables for each subtask, with the FDEP Contract Manager identified as Mae Roth and the project manager as Gretchen Miller.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN221-CMC3.pdf | ||
| CN-370000-CN221-T5.pdf | ||
| CN-370000-WQ154-T6.pdf | ||
| CN-370000-CN221-CMC2.pdf | ||
| CN-370000-CN221-CMC4.pdf | ||
| CN-370000-CN221-T12CO1.pdf | ||
| CN-370000-CN221-T2.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN221-T7CO1.pdf | ||
| CN-370000-CN221-T8.pdf | ||
| CN-370000-CN221-T9.pdf | ||
| CN-370000-CN221-A1.pdf | ||
| CN-370000-CN221-CMC1.pdf | ||
| CN-370000-CN221-CMC5.pdf | ||
| CN-370000-CN221-T11.pdf | ||
| CN-370000-CN221-T2.pdf | ||
| CN-370000-CN221-T1.pdf | ||
| CN-370000-CN221-T12.pdf | ||
| CN-370000-CN221-T1CO1.pdf | ||
| CN-370000-CN221-T4.pdf | ||
| CN-370000-CN221-T7.pdf | ||
| CN-370000-CN221-TA12 CO2.pdf | ||
| CN-370000-CN221.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN221 03 CAMA CN1702
GTM Preserve GTM Preserve- pole barn
Registe, Sliger Engineering
John Sliger 850-894-4521 sligerj@reng.biz
Mae Roth 850-245-2781 Mae.roth@dep.state.fl.us
Provide structural engineering design for 3-bay pole barn per the attached proposal dated May 17, 2017.
Gretchen Miller
Upon execution $ 7,036.09 10/1/2017 $ 0.00
$ 7,036.09
Lisa Yarborough
Gretchen Miller
Mae Roth
John Sliger
Kevin Claridge
CN1702 37538060000 083643/17 423001 U3210 242000 QK $ 7,036.09
$ 7,036.09
May 17, 2017
Gretchen Z. Miller, AIA, LEED AP Senior Architect Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399
RE: Consultant Contract Number CN221
Guana Tolomato Matanzas National Estuarine Research Reserve ‐ 3 Bay Pole Barn
Dear Gretchen;
For your review, Registe, Sliger Engineering, Inc., has provided a proposal summary and man‐ hour documentation for the services identified below:
Structural and geotechnical engineering services.
Please review the attached Proposal Summary and deliverables.
Sincerely, John Sliger, P.E.
Vice President/Project Manager
3 Bay Pole Barn Structural and Geotechnical Engineering
Guana Tolomato Matanzas National Estuarine Research Reserve
CN221, Task Assignment 3
Subtask 1: Preliminary
Description: Structural design team will provide coordination with subconsultant and BDC and provide geotechnical services. This proposal excludes site visits, permitting and site design.
RSE will coordinate with Geotechnical Engineering Subconsultant and BDC. BDC will provide the
Architectural Design for this project.
Geotechnical Report – EGS will perform the geotechnical design services at the subject property.
Install 2‐20 feet deep SPT borings at the location of the Pole Barn as given by FDEP, provide subsurface materials encountered, measured groundwater and estimated "normal" seasonal high groundwater (if encountered), provide geotechnical recommendations and geotechnical design parameters for the timber pile supported foundations, including evaluation for uplift. Bid assumes that EGS can perform the work between the normal business hours of Monday through
Friday, 7:00 am to 5:00 pm.
Deliverable: Design team will provide BDC with a geotechnical report in PDF format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Coordination ‐ RSE
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Registe, Sliger Engineering Senior Project Engineer $164.67 3 $494.01
Reimbursable expense $0
Total $494.01
Geotechnical Report ‐ EGS
Firm Name Position Classification Hourly Rate
Hours or Cost/Unit
Total Fixed Price Cost
EGS, Inc. Sr Engineer $194.76 1 $194.76
EGS, Inc. Geotechnical Engineer $115.50 2 $231.00
EGS, Inc. Engineering Intern $77.25 8 $618.00
EGS, Inc. Sr. Engineering Technician $78.99 2 $157.98
EGS, Inc. Engineering Technician $32.49 2 $64.98
EGS, Inc. Secretary $51.00 1 $51.00
EGS, Inc. Truck Rig Mobilization $417.64 1 $417.64
EGS, Inc. SPT – Truck 0‐50 Ft $15.94 40 $637.60
EGS, Inc. Grout Boreholes – Truck 0‐50 Ft
$6.07 40 $242.80
EGS, Inc. Extra SPT $31.88 8 $255.04
EGS, Inc. Full Grad Grain Analysis $48.58 6 $291.48
EGS, Inc. Organic Content $39.47 2 $78.94
Total $3,241.22
Total for Subtask 1: $3,735.23
Subtask 2: Pole Barn Structural 90% Plans
Description: RSE will provide 90% Structural Plans (11 in x 17 in) including wind loading for a three bay open pole barn structure based on the Architectural Design provided by FDEP BDC. No other engineering services will be provided. This proposal excludes site visits, permitting and site design.
Deliverable: RSE will provide 90% Structural Plans in PDF format for review by BDC.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 2: Pole Barn Structural 90% Plans‐ RSE
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Registe, Sliger Engineering Chief Engineer $215.42 3 $646.26
Registe, Sliger Engineering Senior Project Engineer $164.67 6 $988.02
Registe, Sliger Engineering Engineer Intern $80.62 15 $1,209.30
Subtask 2 Total $2,843.58
Total for Subtask 2: $2,843.58
Subtask 3: Pole Barn Structural Final Plans
Description: RSE will revise plans based on BDC comments. RSE will provide 5 – 11 in x 17 in signed and sealed structural plans for a three bay pole barn after all comments from BDC have been addressed. This proposal excludes site visits, permitting and site design.
Deliverable: RSE will provide 5 – 11 in x 17 in signed and sealed structural plans, AutoCAD drawings and
PDF to BDC for a 3 bay pole barn.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 3: Pole Barn Structural Final Plans ‐ RSE
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
Registe, Sliger Engineering Chief Engineer $215.42 1 $215.42
Registe, Sliger Engineering Engineer Intern $80.62 3 $241.86
Subtask 3 Total $457.28
Total for Subtask 3: $376.66
Project Schedule: Based upon receiving NTP by May 26, 2017 and 2 week review period for FDEP between 90% and Final Plans
Activity Duration (Calendar Days)
Dates
Subtask 1: Coordination 32 5/26/17 – 6/27/17
Subtask 1: Geotechnical 32 5/26/17 – 6/27/17
Subtask 2: 90% Structural Plans 27 6/28/17 – 7/24/17
Subtask 3: Final Structural Plans 11 8/7/17– 8/11/17
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1: Coordination $494.01 $0.00
Subtask 1: Geotechnical $3,241.22 $0.00
Subtask 2: 90% Structural Plans $2,843.58 $0.00
Subtask 3: Final Structural Plans $457.28 $0.00
Total Fixed Price Cost: $7,036.09
Total Reimbursable Cost: $0.00
Overall Total Cost: $7,036.09
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.